You are on page 1of 32

CN: 8140010184, 8140010185, 8140010186, 8140010187, 8140010188

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 6 to 10

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 6 to 10 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of FOUR HUNDRED FIFTY-EIGHT THOUSAND SEVEN HUNDRED NINETY PESOS
AND 95 /100 CENTAVOS (458,790.95), shall be the cost for PCE - BLOCK 17 lot 6 to 10. The
DEVELOPER does hereby agree to the amount and the scope of work and hereby awarded to the
CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140010184, 8140010185, 8140010186, 8140010187, 8140010188
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 6 to 10, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140010189

CONTRACT AGREEMENT
FOR PCE-BLOCK 17 LOT 12

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE-BLOCK 17
LOT 12 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of NINETY-ONE THOUSAND SEVEN HUNDRED FIFTY-EIGHT PESOS AND 19 /100
CENTAVOS (91,758.19), shall be the cost for PCE-BLOCK 17 LOT 12. The DEVELOPER does
hereby agree to the amount and the scope of work and hereby awarded to the CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140010189
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 12, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140010084, 8140010190, 8140010191, 8140010192

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 16 to 19

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 16 to 19 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of THREE HUNDRED SIXTY-SEVEN THOUSAND THIRTY-TWO PESOS AND 76


/100 CENTAVOS (367,032.76), shall be the cost for PCE - BLOCK 17 lot 16 to 19. The
DEVELOPER does hereby agree to the amount and the scope of work and hereby awarded to the
CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140010084, 8140010190, 8140010191, 8140010192
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 16 to 19, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140009995, 8140010193, 8140010194, 8140010195, 8140010196

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 21 to 25

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 21 to 25 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of FOUR HUNDRED SEVENTY-ONE THOUSAND FIFTY-ONE PESOS AND 58 /100
CENTAVOS (471,051.58), shall be the cost for PCE - BLOCK 17 lot 21 to 25. The DEVELOPER
does hereby agree to the amount and the scope of work and hereby awarded to the
CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140009995, 8140010193, 8140010194, 8140010195, 8140010196
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique EU CIP SCW at PCE-BLOCK 17 LOT 21, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 22 to 25, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:
___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140010197, 8140010198, 8140010199, 8140010200, 8140010201, 8140010202,
8140010203

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 27 to 33

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 27 to 33 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of SIX HUNDRED FORTY-TWO THOUSAND THREE HUNDRED SEVEN PESOS
AND 33 /100 CENTAVOS (642,307.33), shall be the cost for PCE - BLOCK 17 lot 27 to 33. The
DEVELOPER does hereby agree to the amount and the scope of work and hereby awarded to the
CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140010197, 8140010198, 8140010199, 8140010200, 8140010201, 8140010202,
8140010203
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 27 to 33, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140009996, 8140009997, 8140010204, 8140010205, 8140010206, 8140010207,
8140010208, 8140010209, 8140010210, 8140010211

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 36 to 45

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 36 to 45 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of NINE HUNDRED FORTY-TWO THOUSAND ONE HUNDRED THREE PESOS
AND 16 /100 CENTAVOS (942,103.16), shall be the cost for PCE - BLOCK 17 lot 36 to 45. The
DEVELOPER does hereby agree to the amount and the scope of work and hereby awarded to the
CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140009996, 8140009997, 8140010204, 8140010205, 8140010206, 8140010207,
8140010208, 8140010209, 8140010210, 8140010211
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique EU CIP SCW at PCE-BLOCK 17 LOT 36, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique EU CIP SCW at PCE-BLOCK 17 LOT 37, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:
___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 38 to 45, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:
___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140009998, 8140009999, 8140010212, 8140010213, 8140010214, 8140010215,
8140010216

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 47 to 53

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 47 to 53 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of SIX HUNDRED SIXTY-SIX THOUSAND EIGHT HUNDRED TWENTY-EIGHT


PESOS AND 59 /100 CENTAVOS (666,828.59), shall be the cost for PCE - BLOCK 17 lot 47 to 53.
The DEVELOPER does hereby agree to the amount and the scope of work and hereby awarded to
the CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140009998, 8140009999, 8140010212, 8140010213, 8140010214, 8140010215,
8140010216
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 47 to 51, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique EU CIP SCW at PCE-BLOCK 17 LOT 52, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:
___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique EU CIP SCW at PCE-BLOCK 17 LOT 53, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:
___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140010217, 8140010218

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 55 to 56

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 55 to 56 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of ONE HUNDRED EIGHTY-THREE THOUSAND FIVE HUNDRED SIXTEEN PESOS
AND 38 /100 CENTAVOS (183,516.38), shall be the cost for PCE - BLOCK 17 lot 55 to 56. The
DEVELOPER does hereby agree to the amount and the scope of work and hereby awarded to the
CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140010217, 8140010218
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 55 to 56, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor
CN: 8140010219, 8140010220, 8140010221, 8140010222, 8140010223, 8140010224,
8140010225, 8140010226, 8140010227, 8140010228

CONTRACT AGREEMENT
FOR PCE - BLOCK 17 lot 58 to 67

KNOW ALL MEN BY THESE PRESENTS:


This Contract ("CONTRACT") executed and entered into this at BRGY. LAGUNDI, PLARIDEL,
BULACAN by and between:

COMMUNITIES BULACAN, INC. , a corporation duly-organized and existing under the laws of the
Philippines, with address at UGF Mezzanine Area, Starmall Edsa cor Shaw Blvd Mandaluyong City , duly
represented herein by its , hereinafter called as DEVELOPER;

-and-

METROWIDE HOMEBUILDERS INC., a corporation duly-organized and existing under the laws of the
Philippines, duly represented herein by its Mhi Area Head, Joel V. Borromeo, hereinafter called as
CONTRACTOR.

W I T N E S S E T H:

WHEREAS, COMMUNITIES BULACAN, INC., is the owner-developer of Bria Homes Plaridel located at Brgy.
Lagundi, Plaridel, Bulacan; engaged the services and resources of the CONTRACTOR to do the PCE - BLOCK 17
lot 58 to 67 and the CONTRACTOR has agreed to undertake the same.

NOW THEREFORE, for and in consideration of the foregoing premises, and the mutual covenants, stipulations and
agreements herein contained, the DEVELOPER and the CONTRACTOR have agreed, as they do hereby contract
as follows:

1. The amount of NINE HUNDRED SEVENTEEN THOUSAND FIVE HUNDRED EIGHTY-ONE


PESOS AND 90 /100 CENTAVOS (917,581.90), shall be the cost for PCE - BLOCK 17 lot 58 to 67.
The DEVELOPER does hereby agree to the amount and the scope of work and hereby awarded to
the CONTRACTOR.
2. An amount of equivalent to THIRTY percent (30%) of the total contract price shall be given to the
CONTRACTOR upon the execution hereof and by way of mobilization fund. The remaining
SEVENTY percent (70%) of the total contract price shall be paid by the DEVELOPER to the
CONTRACTOR in pro-rated progress billing, plus ZERO percent(0%) retention of the total contract
price. The manner and conditions for payment is listed hereunder:
3. The CONTRACTOR should complete the agreed scope of work within ELEVEN(11) CALENDAR
DAYS upon written notice from the DEVELOPER’S authorized representative indicating the exact
reference point of work to start with.
4. Terms of payment shall be fifteen (15) days upon receipt of billing, considering all the necessary
documents for processing is complete and valid.
5. It is hereby expressly agreed and understood that the employee of the CONTRACTOR are not
employee of the DEVELOPER, and hence, the DEVELOPER shall not in any way be liable and/or
responsible for any personal injury including disability or death, or damage to property sustained by
or caused by any of the employees of the CONTRACTOR and/or his sub-contractors, agents,
whether or not occurring the performance of their duties. The CONTRACTOR shall indemnity the
DEVELOPER for any and all injuries or damages the latter may suffer or incur due to the ac,
omission, or fault, negligence or conduct of the CONTRACTOR and/or it’s employees,
sub-contractor, agents arising out of in connection with or on the occasion of the performance of
this CONTRACT. The CONTRACTOR shall at all times, stand solely liable and/or responsible for
the enforcement and compliance with all existing laws, rules and regulations and binds itself to save
and hold the DEVELOPER free and harmless from any and all liability in respect thereof and/or
there from and/or by reason of this CONTRACT and/or its implementation.
CN: 8140010219, 8140010220, 8140010221, 8140010222, 8140010223, 8140010224,
8140010225, 8140010226, 8140010227, 8140010228
OTHER CONDITIONS:
1. Time is the essence of this CONTRACT. Should the CONTRACTOR refuse or fail to complete the
work within the CONTRACT time, plus time extension granted by the DEVELOPER, as liquidated
damages, and not by way of penalty, an amount of equivalent to one-tenth of one percent of the
total contract price for each calendar day of delay, Sunday and Holidaysincluded, until the work is
completed and accepted by the DEVELOPER. Likewise, the DEVELOPER has the prerogative to
anytime to cancel this CONTRACT if performance and quality of work does not meet by the
CONTRACTOR.

IN WITNESS WHEREOF, the parties have hereunto signed this CONTRACT on the date and place
herein above written.

DEVELOPER CONTRACTOR
COMMUNITIES BULACAN, INC. METROWIDE HOMEBUILDERS INC.
By: By:

Joel V. Borromeo

________________________________ ________________________________
Mhi Area Head

SIGNED IN THE PRESENCE OF:

_____________________________ _________________________
NOTICE TO PROCEED
(NTP)

"Metrowide Homebuilders Inc." - referred to as the "Contractor" for the


CONSTRUCTION OF Angelique IU CIP SCW at PCE-BLOCK 17 LOT 58 to 67, Bria
Homes Plaridel. In this regard a confirmation to proceed is being issued to them by
COMMUNITIES BULACAN, INC..
The CONTRACTOR is given the Notice to Proceed on June 1, 2023 with
the completion of the unit by July 30, 2023.

Approved By:

___________________________
Chief Accountant

Conforme:
Metrowide Homebuilders Inc
Contractor

You might also like