scour protection
N C D E F G H J Notes:
0013 0013 0013 0013 0014 0014 0014
1. Unless shown otherwise or indicated in the Specification,
whichever is the more onerous, dimensional tolerance is
Sluice control to be in accordance with Tables 1 and 2 of BS 5606.
Void between slab and sheet pile, filled
with stone at every 10th pile (approx) Mass concrete 'plugs' to 2. All dimensions are in millimetres (mm) unless noted
300 wide x 200 deep full Access ladder, retain stone infill, see drg
for water seepage, see to drg 0015 Access ladder, otherwise. DO NOT SCALE FROM THIS DRAWING, USE
height rebate for camera see drg 0019 55-19007-DR-0015
Rock armour to existing see drg 0020 FIGURED DIMENSIONS ONLY.
Access ladder,
see drg 0020 bank adajacent & below
Movement Joint, Access ladder, Weir Movement Joint, 3. This drawing is to be read in conjunction with the
14.420m weir Dn50, 80-134 kg rock
see drg 0015 see drg 0019 see drg 0015 Specification and any Specialist drawings.

B 4. Refer also to:

1190
0012 14.420m 14.00m 13.580m Weir 13.160m Weir 12.740m
Drawing numbers: 55-19007-DR-0010, 0011, 0013 &
0014.

300
1:2 slope 5. All exposed concrete edges (not including stop log
A rebates) to have 25mm chamfer.
Mass concrete to

5000
0012 14.420m 14.420m 14.00m 13.580m 13.160m 12.740m 12.950m 12.740m
retain stone infill 6. Client to confirm that design meets hydraulic design
requirements for fish pass.

300
Access ladder, Access ladder, Access ladder, Access ladder,
see drg 0019 see drg 0019 see drg 0020 see drg 0020 7. UNLESS THE REVISION OF THIS DRAWING IS
DENOTED BY THE PREFIX C THEN THIS DRAWING IS
NOT FOR CONSTRUCTION.

1190
14.420m 14.420m 14.00m 13.580m 13.160m Weir 12.740m
8. Crucial material characteristics are as follows:

9. Unless noted otherwise, all steelwork is to be execution


Weir Movement Joint, class EXC2.
300 wide x 200 deep full Concrete infill to form see drg 0015
Sluice control
height rebate for camera rebate for weir IF IN DOUBT ASK

For details of Fish Pass Water For details of Junction Pool &
Intlet, see Enlarged Plan on Water Outlet, see Enlarged Plan
drawing 55-19007-DR-0017 Plan on drawing 55-19007-DR-0016
Scale 1:125
Penstocks 300 wide x 200 deep full height Top of sheet piled wall
rebate to top of stone for camera
19.0
17.70m 17.70m 17.70m
17.46m

0
18.0 17.25m 17.04m 17.04m
16.83m 16.62m 16.69m
16.41m 16.34m
17.0 Reinforced
concrete plinth to
16.20m 15.99m 15.99m FOR APPROVAL

3700
16.0 1:2 slope retain stone infill

4960
920
14.42m 14.42m

1068
15.0

920
14.00m 14.22m

920
13.58m

920
14.0 13.16m
12.74m 12.95m
13.0 Additional notes added. Inlet
2500
Movement P04 20.12.19 area updated. Walkways MB GRM MG

500
12.0 Joint 1850 indicated.
Sheet Piles 75mm concrete Movement P03 29.11.19 Updated to suit comments MB GRM MG

776

710
Joint 2150 Sheet Piles
11.0 blinding Movement P02 22.10.19 Slab arrangement updated MB MG MG
Mass concrete 'plugs' to Joint P01 03.10.19 Preliminary issue MB MG MG
10.0
retain stone infill, see drg Issue Date Description Drawn Des. Chkd.
9.0 55-19007-DR-0015 Issue codes:-
F : Feasibility T : Tender P: Preliminary C : Construction AB : As built
DATUM 8.000
Drawing

13.580 18.512

13.580 18.581

13.160 18.584

12.740 18.623
14.420 18.348

14.000 18.353

14.000 18.469

13.580 18.476

18.504

18.568

18.597

13.160 18.600

18.525

13.160 18.623

18.620

12.740 18.589

18.477

18.245

17.599

16.597
12.740 18.445

12.740 18.062

12.926 18.021

12.740 16.894

12.740 16.203
14.420 18.242

14.420 18.222

14.420 18.204
14.420 18.198

14.420 18.270

14.420 18.295

14.420 18.286

14.420 18.275
14.420 18.271

14.420 18.218

14.420 18.078

14.420 18.105

14.420 18.256

EXISTING
GROUND LEVEL
status
NOT FOR CONSTRUCTION

12.950
PROPOSED
SLAB LEVEL
15.050
15.050

15.050

15.050

15.050

14.840

14.630

14.619

14.420

14.409

14.210

14.000

13.989

13.790

13.580

13.569

13.370

13.160

12.950

12.915

12.740

12.740
14.420

14.420

14.420
14.420

14.420
14.420

14.420

PROPOSED
BED LEVEL

40.000
35.000

70.000
40.925

41.196

46.225
25.025

25.296

45.000
30.325

30.596

35.625

50.000

51.525

51.796

55.000

56.825

60.000

62.125

65.000

67.425

67.996

72.996

75.000

77.527
10.000

14.425

14.697

19.725
4.425

4.850
2.500
2.925
0.000

6.350

7.620
8.120
1.310

CHAINAGE PARTNERS

Section A-A
Scale 1:125
Penstocks Penstock Top of sheet piled wall

19.0
17.70m 17.70m
18.0 SPONSORS
17.04m
16.69m
17.0
1100

15.52m Weir level


16.0
100 on Original - A1

14.84m Weir level


14.42m 14.42m 14.41m Weir level
15.0
14.00m 14.00m UNLOCKING THE SEVERN FOR LIFE
13.58m LIFE 15 NAT UK 000219/H6-15-04573
14.0 13.16m ACTION A.1 PREPARE CIVIL ENGINEERING DRAWINGS FOR FISH PASSAGE

12.74m 12.95m IMPROVEMENTS.

13.0
Movement
12.0
Sheet Piles
Joint 75mm concrete
Movement
KIER PROFESSIONAL SERVICES FS 653123
blinding
11.0 Joint Sheet Piles
Movement
Joint Kier Professional Services Limited
10.0 Kier Duplex, Ayton Rd, Wymondham, Norfolk NR18 0QH
Tel : 01953 609 899
9.0 www.kier.co.uk professional.services@kier.co.uk
DATUM 8.000
Client
16.801

17.632
17.792

17.891
17.920

17.800
17.642

17.541

17.695

17.897

17.871

18.079

18.318

18.388

18.405

18.482

18.481

18.471

18.523

18.535

18.466

18.167

18.281

18.516

18.303

17.889

17.889

17.334

16.698

16.451
EXISTING
GROUND LEVEL CANAL & RIVER TRUST
14.420

14.420
14.420

14.420
14.420

14.420
14.420

14.420

14.420

14.420
15.520
15.520
14.420

15.520
14.420

14.420

23.926 14.420

25.296 14.420
14.000

29.226 14.000

30.597 14.000
13.580

35.000 13.580

39.825 13.580

41.196 13.580
13.160

45..000 13.160

50.426 13.160

51.797 13.160
12.740

55.000 12.740

60.000 12.740

65.000 12.740

67.425 12.740
12.950

70.000 12.847

72.472 12.740

73.571 12.740

77.420 12.740
PROPOSED
SLAB LEVEL Contract
20.000
10.000

12.413

13.263

14.900
2.500
2.925

4.425
4.850

6.350
6.775

9.275
0.000

CHAINAGE
LINCOMB FISH PASS
Safety, Health and Environment Information. Dismantling/Demolition (future)
Section B-B Notes below are additional to hazard/risks normally Di. No unusual risks not previously identified.
Scale 1:125 associated with this type of work:
Title
Construction These notes are based on the use of experienced and
Ci. No unusual risks not previously identified. competent contractors carrying out the work using an
Operations approved safe method of working.
Oi. No unusual risks not previously identified. The Temporary Works Coordinator (or other suitably
Maintenance competent person) is responsible for the implementation of PLAN & SECTIONS
Mi. Maintenance access to screens to attraction flow these works on site and notifying the designer of any
channels and weirs in abeyance. changes.
Mii. Maintenance access to fish pass inlet screens and pools
in abeyance.
Miii. Maintenance access to operate and maintain penstocks Scale (A1)
to attraction flow channels and fish pass channel in
As shown
abeyance. Drawing No. Issue
Miv. Emergency access and means of escape to attraction
flow channels and fish pass in abeyance. 55-19007-DR-0012 P 04
100 on Original - A1 Plotted by: brooks, mark 20/12/2019 11:57:34 File reference: 55-19007-DR-0012 P04 - Plan & Sections.dwg