Addition

items.No L(M)= Dia(MM) Space(M)

1 3.0 20 0.30
2 3.0 20 0.15
3 3.0 25 0.15
4 4.0 25 0.15
5 4.0 20 0.15
6
7
8
9
10
11
12
90

BASEMENT -01- G.FLOOR RAMP STE

LENGTH DISTANCE

(N-4)-(N-7) LONG SPAN TOP 29.448 3.66

BOTT 26.958 3.66

SHORT SPAN TOP 4.41 25.76

BOTT 4.41 25.76

(A*-4)-(A*7) LONG SPAN TOP 29.448 3.66

BOTT 26.958 3.66

SHORT SPAN TOP 4.41 25.26

BOTT 4.41 25.26

TOTAL(KG)

STRUCTURAL - STAIRS
NO length Width height

Stair case -01


Riser Hight 0.1685

Step Width 0.28

stair slab thick 0.18

Stair width 1.31

No.of Steps 20

0.35

Landing 0.18

TAKE OFF SHEET COLUMN


DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH
MM
C1 1.6 4.05 5.65 32
C2 1.6 4.05 5.65 32
C3 1.6 4.05 5.65 32
C4 1.6 4.05 5.65 32
C4* 0 4.05 4.05
C5 0 4.05 4.05
C6 0 4.05 4.05
C7 0 4.05 4.05
C8 0 4.05 4.05
C9 0 4.05 4.05
C10 0 4.05 4.05
C10* 0 4.05 4.05
C11 0 4.05 4.05
C12 0 4.05 4.05
C13 0 4.05 4.05
C14 0 4.05 4.05
C15 0 4.05 4.05
C16 0 4.05 4.05
C23 0 4.05 4.05
C24* 0 4.05 4.05
PC. C3* 0 4.05 4.05
post 0 4.05 4.05
Total

TAKE OFF SHEET COLUMN


DIA
COLUMN Bar .L DIS-LENGTH Space
MM
C1 16.55 4.05 0.15 8
C2 12.15 4.05 0.15 8
C3 4.05
C4 4.05
C4* 4.05
C5 4.05
C6 4.05
C7 4.05
C8 4.05
C9 4.05
C10 4.05
C10* 4.05
C11 4.05
C12 4.05
C13 4.05
C14 4.05
C15 4.05
C16 4.05
C23 4.05
C24* 4.05
PC. C3* 4.05
post 0 4.05
Total

dowel bar
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH
COLUMN 50*Dia(M) LENGTH T.LENGTH
MM
C1 1.6 1.2 4.4 32
C2 1.6 1.2 4.4 32
C3 1.6 1.2 4.4 32
C4 1 1.2 3.2 20
C4* 1 1.2 3.2 20
C5 1 1.2 3.2 20
C6 1 1.2 3.2 20
C7 1 1.2 3.2 20
C8 1 1.2 3.2 20
C9 1 1.2 3.2 20
C10 1 1.2 3.2 20
C10* 1 1.2 3.2 20
C11 1 1.2 3.2 20
C12 1 1.2 3.2 20
C13 0.8 1.2 2.8 16
C14 1 1.2 3.2 20
C15 0.8 1.2 2.8 16
C16 1 1.2 3.2 20
C23 1 1.2 3.2 20
C24* 1 1.2 3.2 20
PC. C3* 1 1.2 3.2 20
post 0.8 1.2 2.8 16
Total

dowel bar retaining w


DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH
MM
1 1.2 3.2 20
0.8 1.2 2.8 16

Total
basement 2main bar
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH
MM
C1 1.6 4.05 5.65 32
C2 1.6 4.05 5.65 32
C3 1.6 4.05 5.65 32
C4 1 4.05 5.05 20
C4* 1 4.05 5.05 20
C5 1 4.05 5.05 20
C6 1 4.05 5.05 20
C7 1 4.05 5.05 20
C8 1 4.05 5.05 20
C9 1 4.05 5.05 20
C10 1 4.05 5.05 20
C10* 1 4.05 5.05 20
C11 1 4.05 5.05 20
C12 1 4.05 5.05 20
C13 0.8 4.05 4.85 16
C14 1 4.05 5.05 20
C15 0.8 4.05 4.85 16
C16 1 4.05 5.05 20
C23 1 4.05 5.05 20
C24* 1 4.05 5.05 20
PC. C3* 1 4.05 5.05 20
post 0.8 4.05 4.85 16
Total

TAKE OFF SHEET COLUMNS


DIA
COLUMN Bar .L DIS-LENGTH Space
MM
C1 16.25 4.05 0.15 8
C2 12.15 4.05 0.15 8
C3 4.05
C4 4.05
C4* 4.05
C5 4.05
C6 4.05
C7 4.05
C8 4.05
C9 4.05
C10 4.05
C10* 4.05
C11 4.05
C12 4.05
C13 4.05
C14 4.05
C15 4.05
C16 4.05
C23 4.05
C24* 4.05
PC. C3* 4.05
post 0 4.05
Total
basement 1 main bar
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH
MM
S.S.L 0.00
C17 0.5 3.65 4.15 10
C18 1.6 3.65 5.25 32
C20 1 3.65 4.65 20
C21 1 3.65 4.65 20
S.S.L + 0.65
C19 1 4.3 5.3 20
S.S.L + 0.15
C18 1 3.8 4.8 20
C21 1 3.8 4.8 20
S.S.L + 1.25
C1 1 4.9 5.9 20
C2 1 4.9 5.9 20
C3 1 4.9 5.9 20
C5 0.8 4.9 5.7 16
C6 1 4.9 5.9 20
C7 0.8 4.9 5.7 16
C8 0 4.9 4.9
C9 0 4.9 4.9
C10 0 4.9 4.9
C11 0 4.9 4.9
C12 0 4.9 4.9
C13 0 4.9 4.9
C14 0 4.9 4.9
C16 1 4.9 5.9 20
Total

TAKE OFF SHEET COLUMNS


DIA
COLUMN Bar .L DIS-LENGTH Space
MM
S.S.L 0.00
C17 12.15 3.65 0.2 10
C18 4.05
C20 4.05
C21 4.05
S.S.L + 0.65
C19 4.05
S.S.L + 0.15
C18 4.05
C21 4.05
S.S.L + 1.25
C1 4.05
C2 4.05
C3 4.05
C5 4.05
C6 4.05
C7 4.05
C8 4.05
C9 4.05
C10 4.05
C11 4.05
C12 4.05
C13 4.05
C14 4.05
C16 4.05
4.05
Total

col concrete bs1


description unit length width height
S.S.L 0.00
C17 m3 0.8 0.2 3.25
C18 m3 0.6 0.2 3.25
C20 m3 0.5 0.3 3.25
C21 m3 0.8 0.5 3.25
S.S.L + 0.65
C19 m3 0.95 0.2 4.15
S.S.L + 0.15
C18 m3 0.6 0.2 3.65
C21 m3 0.8 0.5 3.65
S.S.L + 1.25
C1 m3 2.1 0.6 4.55
C2 m3 1 1 4.55
C3 1.5 0.7 4.55
C5 1.8 0.5 4.55
C6 1.6 0.5 4.55
C7 1.4 0.5 4.55
C8 1.2 0.5 4.55
C9 1.2 0.5 4.55
C10 0.8 0.8 4.55
C11 0.8 0.6 4.55
C12 1 0.5 4.55
C13 0.8 0.4 4.55
C14 1.4 0.3 4.55
C16 1.2 0.5 4.55
m3 4.55
total

bs 2 retaining wa
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH
MM
vertical bar 1 4.05 5.05 20
vertical bar 0.8 4.05 4.85 16
horizontal bar 0.6 298.7 313.7 12
horizontal bar 0.6 298.7 313.7 12

Total

bs 1 retaining wa
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH
MM
vertical bar +0.00 0.3 3.65 3.95 20
vertical bar +0.00 0.3 3.65 3.95 16
vertical bar +0.65 0.3 4.3 4.6 20
vertical bar +0.65 0.3 4.3 4.6 16
vertical bar +0.85 0.3 4.5 4.8 20
vertical bar +0.85 0.3 4.5 4.8 16

horizontal bar +0.00 0.6 248.7 261.3 12


horizontal bar +0.00 0.6 248.7 261.3 12
horizontal bar +0.65 0.6 22 22.6 12
horizontal bar +0.65 0.6 22 22.6 12
horizontal bar +0.85 0.6 28 29.2 12
horizontal bar +0.85 0.6 28 29.2 12

Total
Additional Steel

Distance QTY W/M W(KG) Notes

3 11 2.4691 81.48
3 21 2.4691 155.56
3 21 3.8580 243.06
3 21 3.8580 324.07
3 21 2.4691 207.41
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
#DIV/0! 0.0000 #DIV/0!
ToTal Additional Steel(KG)= #DIV/0!
#DIV/0!

FLOOR RAMP STEEL QUANTITIES

SPACE QTY DIA(MM) WEIGTH T.WEIGHTKG)

0.2 19 10 0.617 350.670

0.2 19 10 0.617 321.019

0.15 173 12 0.88848 676.803

0.15 173 12 0.88848 676.803

0.2 19 10 0.617 350.670

0.2 19 10 0.617 321.019

0.15 169 12 0.88848 663.743

0.15 169 12 0.88848 663.743

4024.468

area Total-Qty Unit


staircase concrete 2.16 m3

4.55 floor 1.59 m3

3.75 landing concrete 0.68 m3

4.43

HEET COLUMNS (MAIN BAR)


NO OF BAR QTY WT/M WT(KG)

40 2 6.318 2855.772
40 5 6.318 7139.430
28 6.318 0.000
30 6.318 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
9,995.203

SHEET COLUMNS (stirupps)


NO OF BAR QTY WT/M WT(KG)

28 2 0.395 365.975
28 5 0.395 671.691
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0!

l bar
NO OF BAR QTY WT/M WT(KG)
NO OF BAR QTY WT/M WT(KG)

40 2 6.318 2223.964
40 2 6.318 2223.964
28 2 6.318 1556.775
16 1 2.468 126.362
16 1 2.468 126.362
16 3 2.468 379.085
16 2 2.468 252.723
14 6 2.468 663.398
16 4 2.468 505.446
16 7 2.468 884.531
16 1 2.468 126.362
16 1 2.468 126.362
16 2 2.468 252.723
14 7 2.468 773.965
12 9 1.580 477.647
12 2 2.468 189.542
12 1.580
16 4 2.468 505.446
10 1 2.468 78.976
20 1 2.468 157.952
12 4 2.468 379.085
4 2 1.580 35.381
12,046.051

bar retaining wall


distribution WT(KG)
NO OF BAR Space WT/M
length
2391 298.7 0.125 2.468 18,880.00
2391 298.7 0.125 1.580 10,572.80
0.000

29,452.80
2main bar
NO OF BAR QTY WT/M WT(KG)

40 2 6.318 2855.772
40 2 6.318 2855.772
28 2 6.318 1999.041
16 1 2.468 199.414
16 1 2.468 199.414
16 3 2.468 598.243
16 2 2.468 398.829
14 6 2.468 1046.926
16 4 2.468 797.658
16 7 2.468 1395.901
16 1 2.468 199.414
16 1 2.468 199.414
16 2 2.468 398.829
14 7 2.468 1221.413
12 9 1.580 827.353
12 2 2.468 299.122
12 1.580
16 4 2.468 797.658
10 1 2.468 124.634
20 1 2.468 249.268
12 4 2.468 598.243
4 2 1.580 61.285
17,323.603

EET COLUMNS (stirupps) BS-2


NO OF BAR QTY WT/M WT(KG)

28 2 0.395 359.341
28 2 0.395 268.676
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 3 0.000 #DIV/0!
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 6 0.000 #DIV/0!
#DIV/0! 4 0.000 #DIV/0!
#DIV/0! 7 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 7 0.000 #DIV/0!
#DIV/0! 9 0.000 #DIV/0!
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 4 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 4 0.000 #DIV/0!
#DIV/0! 2 0.000 #DIV/0!
#DIV/0!
1 main bar
NO OF BAR QTY WT/M WT(KG)

16 2 0.617 81.938
28 2 6.318 1857.516
16 1 2.468 183.619
16 1 2.468 183.619

16 2 2.468 418.573

16 4 2.468 758.170
16 7 2.468 1326.797

16 1 2.468 232.979
16 2 2.468 465.958
14 7 2.468 1426.998
12 9 1.580 972.353
12 2 2.468 349.469
12 1.580 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
16 4 2.468 931.917
9,189.904

EET COLUMNS (stirupps) BS-2


NO OF BAR QTY WT/M WT(KG)

19 2 0.617 288.617
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!

#DIV/0! 2 0.000 #DIV/0!


#DIV/0! 4 0.000 #DIV/0!
#DIV/0! 7 0.000 #DIV/0!

#DIV/0! 1 0.000 #DIV/0!


#DIV/0! 3 0.000 #DIV/0!
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 6 0.000 #DIV/0!
#DIV/0! 4 0.000 #DIV/0!
#DIV/0! 7 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 7 0.000 #DIV/0!
#DIV/0! 9 0.000 #DIV/0!
#DIV/0! 2 0.000 #DIV/0!
#DIV/0! 0.000 #DIV/0!
#DIV/0! 4 0.000 #DIV/0!
#DIV/0! 1 0.000 #DIV/0!
#DIV/0!

no.of item qty Formwork m2

4 2.08 26
5 1.95 26
4 1.95 20.8
12 15.6 101.4
0 0
1 0.7885 9.545
0 0
8 3.504 46.72
2 2.92 18.98
0 0
2 11.466 49.14
2 9.1 36.4
2 9.555 40.04
3 12.285 62.79
2 7.28 38.22
5 15.925 86.45
4 10.92 61.88
7 19.11 108.29
2 5.824 29.12
2 4.368 25.48
8 18.2 109.2
6 8.736 65.52
2 3.822 30.94
4 10.92 61.88
0 0
176.3035 1054.795

2 retaining wall
distribution WT(KG)
NO OF BAR length Space WT/M

2391 298.7 0.125 2.468 29,795.00


2391 298.7 0.125 1.580 18,313.60
21 4.05 0.2 0.888 5,922.72
21 4.05 0.2 0.888 5,922.72

59,954.04

1 retaining wall
distribution WT(KG)
NO OF BAR length Space WT/M

1991 248.7 0.125 2.468 19,405.56


1991 248.7 0.125 1.580 12,419.56
177 22 0.125 2.468 2,009.45
177 22 0.125 1.580 1,286.05
225 28 0.125 2.468 2,665.44
225 28 0.125 1.580 1,705.88

19 3.65 0.2 0.888 4,469.08


19 3.65 0.2 0.888 4,469.08
23 4.3 0.2 0.888 451.79
23 4.3 0.2 0.888 451.79
24 4.5 0.2 0.888 609.67
24 4.5 0.2 0.888 609.67

50,553.02
189.5

118.5

288.35

442.4

442.4

442.4

442.4

1.55

2.11
0.16 442.4
0.169 206.19

2.76
56,176,300.00
56,176,300.00
Basement -01- Retaining wall steel

LEVELS No. Length of


DIS(M) over lap one BAR(M) 50*DIA F.Length(M)

vertical bar 0.00 213.89 3.83 7.66

1.1 25.63 4.93 9.86

horizontal bar 297.9 24 297.9 0.6 312.20

25.63 1 25.99 0.6 26.67

Total(kg)

STAIR CASE -12- STEEL QUANTITIES


DISCRIPTION BAR SHAPE LENGTH STAIR CASE SPACE QTY
MARK WIGTH

Level (-7.4 to -5.924)

3.263 1.2 0.2 7

2.908 1.2 0.165 8

2.147 1.2 0.165 8

1.8 1.2 0.2 7

0.929 1.2 0.2 35

Landing area 1.15 0.2 12

flight area 1.15 0.2 22


Steps 1.15 5

Level (-5.924 to -5.756)

2.866 1.3 0.2 8

1.936 1.3 0.2 8

1.799 1.3 0.2 8

1.679 1.3 0.2 8

2.147 1.3 0.2 8

Landing-1 area 1.5 0.2 8

1.5 0.2 8

flight area 1.5 0.2 2

Landing-2 area 1.5 0.2 8

1.5 0.2 8

Total

Top Mesh(KG)=
Dim(M)
Direction Lbar(M)= No.OverLap 50XDia Final Lbar(M)=
L(M)= B(M)=
21.55 2.90 21.90 2 0.48 22.78
17.45 2.95 17.80 1 0.48 18.51
8.90 3.75 9.25 0.48 9.25
7.20 2.30 7.55 0.48 7.55

5.85 8.50 6.20 0.48 6.20


11.90 7.20 12.25 1 0.48 12.74
9.60 1.75 9.95 0.48 9.95
2.90 4.10 3.25 0 0.48 3.38

3.80 2.40 3.89 0 0.40 4.02


2.40 3.80 2.49 0 0.40 2.57
6.65 6.00 6.86 0.48 6.86
6.00 6.65 6.21 0.48 6.21
6.90 2.90 7.11 0.48 7.11
2.90 6.90 3.11 0 0.48 3.23

Machine room shear wall- BAR-A


BAR LENGTH OF BAR TOTAL.
SHEAR WALL 45*DIA BAR NO-OF BAR
NAME SHEAR WALL LENGTH LENGTH
W2 A 3.85 3.85 3.85 20
W2 A 1.75 3.85 3.85 9
W2 A 1.55 3.85 3.85 8
W2 A 1.1 3.85 3.85 6
W5 2.4 3.85 3.85 13

TOTAL

bath room wall area - 1st flo


Room Perameter Height Thk(MM) Window
Room Name Numbe
r (M) (M) L(M)= h(M)=
1.8 2.1

16.35 3.85 400


16.35 3.85 400

Total=
0.5 0.8
office-1 0.7 1

bath-2 143.8 3.85 200

Total=
1.8 2.1

44.25 3.65 400

Total=
office-2
1.8 2.1

bath-2 6.4 3 200

Total=
0.5 0.8

bath-1 7.6 3 200

Total=
office-3
0.5 0.8

bath-2 7.6 3

Total=
0.5 0.8

bath-1 7.6 3

office-4
bath-1 7.6 3

Total=
office-4 0.5 0.8

bath-2 7.6 3

Total=
0.5 0.8

bath-1 7.6 3

Total=
office-5
0.5 0.8

bath-2 7.6 3

Total=
0.5 0.8

bath-1 7.6 3

Total=
office-6
0.5 0.8

bath-2 7.6 3

Total=
0.5 0.8

bath-1 6.4 3

Total=
office-7
0.5 0.8

bath-2 6.4 3
office-7

bath-2 6.4 3

Total=
0.5 0.8

bath-1 7.65 3

Total=
office-8 0.5 0.8

bath-2 7.65 3

Total=
TOTAL

Top Mesh(KG)= raft


Dim(M)
Direction Lbar(M)= No.OverLap 50XDia Final Lbar(M)=
L(M)= DIS.L(M)=
X direction 30.00 20.00 32.40 2 1.00 34.40
y direction 20.00 30.00 22.40 1 1.00 23.40

X direction 30.00 20.00 32.40 2 1.00 34.40


y direction 20.00 30.00 22.40 1 1.00 23.40

8.479167

Top Mesh(KG)= raft


Dim(M)
Direction Lbar(M)= No.OverLap 50XDia Final Lbar(M)=
L(M)= DIS.L(M)=
X direction 107.04 19.00 109.44 9 1.00 118.44
X direction 99.35 27.65 101.75 8 1.00 109.75

y direction 47.25 93.35 49.65 4 1.00 53.65


y direction 33.13 16.64 35.53 2 1.00 37.53
y direction 9.50 3.37 11.90 1.00 11.90

X direction 107.04 19.00 109.44 9 1.00 118.44


X direction 99.35 27.65 101.75 8 1.00 109.75

y direction 47.25 93.35 49.65 4 1.00 53.65


y direction 33.13 16.64 35.53 2 1.00 37.53
y direction 9.50 3.37 11.90 1.00 11.90

elevator pit 11.30 13.50


4.80 19.98
g wall steel

QTY SPACE (M) DIA(MM) Weight T.Weight (kg)

1713 0.125 16 1.5795 20,725.80

207 0.125 16 1.5795 3,223.83

18 0.2 12 0.888 9,985.64

7 0.2 12 0.888 331.76

34,267.03

TIES
DIA(MM) W/M T.WEIGHT

10 0.6170 14.093

16 1.5795 36.746

16 1.5795 27.130

10 0.6170 7.774

10 0.6170 20.062

12 0.8885 12.261

10 0.6170 15.610
10 0.6170 3.548

12 0.8885 20.371

12 0.8885 13.761

12 0.8885 12.787

12 0.8885 11.934

12 0.8885 15.261

10 0.6170 7.404

16 1.5795 18.954

10 0.6170 1.851

10 0.6170 7.404

16 1.5795 18.954

265.904

Space
No.Qty Dia(MM) W/M W(KG)
(M)
16 12 0.20 0.888 313.66
16 12 0.20 0.888 259.05
20 12 0.20 0.888 162.31
13 12 0.20 0.888 83.85
0.00
44 12 0.20 0.888 239.62
37 12 0.20 0.888 418.81
10 12 0.20 0.888 86.19
22 12 0.20 0.888 64.57
0.00
13 10 0.20 0.617 32.24
20 10 0.20 0.617 31.75
41 12 0.15 0.888 249.89
45 12 0.15 0.888 250.12
20 12 0.15 0.888 128.45
47 12 0.15 0.888 135.06

Top Mesh(KG)= 2,455.59

wall- BAR-A
T.WEIGHT(kg
QTY SPACE(M) DIA(MM) WEIGHT
)

2 0.20 16 1.5795 241.42


4 0.20 16 1.5795 227.44
2 0.20 16 1.5795 101.56
2 0.20 16 1.5795 74.19
4 0.20 14 1.2093 234.66

879.26

all area - 1st floor


Window Door Area
Qty Area(M2) W(M)= h(M)= Qty Area(M2) (M2)
3 11.34 0
0 0

51.61
0 0
51.61
0 0
0 0
Total= 11.34 Total= 0
4 1.6 1.7 2.2 6 22.44
3 2.1 0
0 0
0 0
0 0 527.49
0 0
0 0
0 0
Total= 3.7 Total= 22.44
6 22.68 0
0 0
0 0 138.83
0 0
Total= 22.68 Total= 0
6 22.68 0
0 0
0 0 -3.48
0 0
Total= 22.68 Total= 0
1 0.4 0.8 2.2 1 1.76
0 0
0 0 20.64
0 0
Total= 0.4 Total= 1.76
1 0.4 0
0 0.8 2.2 1 1.76
0 0 20.64
0 0
Total= 0.4 Total= 1.76
1 0.4 0
0 0.8 2.2 1 1.76
0 0 20.64
20.64
0 0
Total= 0.4 Total= 1.76
1 0.4 0.8 2.2 1 1.76
0 0
0 0 20.64
0 0
otal= 0.4 Total= 1.76
1 0.4 0.8 2.2 1 1.76
0 0
0 0 20.64
0 0
Total= 0.4 Total= 1.76
1 0.4 0.8 2.2 1 1.76
0 0
0 0 20.64
0 0
Total= 0.4 Total= 1.76
1 0.4 0.8 2.2 1 1.76
0 0
0 0 20.64
0 0
Total= 0.4 Total= 1.76
1 0.4 0.8 2.2 1 1.76
0 0
0 0 20.64
0 0
Total= 0.4 Total= 1.76
1 0.4 0.8 2.2 1 1.76
0 0
0 0 17.04
0 0
Total= 0.4 Total= 1.76
1 0.4 0
0 0.8 2.2 1 1.76
0 0 17.04
17.04
0 0
Total= 0.4 Total= 1.76
1 0.4 0
0 0.8 2.2 1 1.76
0 0 20.79
0 0
Total= 0.4 Total= 1.76
1 0.4 0.8 2.2 1 1.76
0 0
0 0 20.79
0 0
otal= 0.4 Total= 1.76
955.23

Space
No.Qty Dia(MM) W/M W(KG)
(M)
134 20 0.15 2.468 11,404.79
1 mesh
201 20 0.15 2.468 11,607.99

134 20 0.15 2.468 11,404.79


1 mesh
201 20 0.15 2.468 11,607.99

Top Mesh(KG)= 46,025.57


Space
No.Qty Dia(MM) W/M W(KG)
(M)
128 20 0.15 2.468 37,318.23
185 20 0.15 2.468 50,199.94

1 mesh
623 20 0.15 2.468 82,534.44
112 20 0.15 2.468 10,366.34
23 20 0.15 2.468 689.20

128 20 0.15 2.468 37,318.23


185 20 0.15 2.468 50,199.94

623 20 0.15 2.468 82,534.44


112 20 0.15 2.468 10,366.34
23 20 0.15 2.468 689.20

76 20 0.15 2.468 2,543.27


33 20 0.15 2.468 1,627.25

Top Mesh(KG)= 366,386.83


Construction of Residential - Commecial Building (2B+G+M+7) - P#53 C
Quantities- the Summary

REIN FORCED CONCRETE QTY UNIT(M3)

SubStructure
Foundation
Raft+Elevator+Sumpit+Firepit 5959.37 (M3)

TOTAL 5,959.37 (M3)

REIN FORCED CONCRETE QTY UNIT(M3)

Basement -2
Retaining Wall 303.90 (M3)

Column 162.05 (M3)

Shear Wall 133.31 (M3)

(Slab+Ramp+landing) Beams 37.85 (M3)

Slab 1,553.24 (M3)

Ramp(1 & 2) 38.16 (M3)

Stair case 33.43 (M3)

TOTAL 2,261.94 (M3)

Construction of Residential - Commecial Building (2B+G+M+7) - P53


Quantities- the Summary

REIN FORCED CONCRETE QTY UNIT

SubStructure
Basement -1
Retaining Wall 327.53 (M3)

Column 209.36 (M3)


Shear Wall 150.00 (M3)

Beam 67.61 (M3)

Slab 1,238.76 (M3)

Ramp(1 & 2) 39.13 (M3)

Ramp(3 & 4) 51.93 (M3)

Stair case 38.08 (M3)

TOTAL 2,122.40 (M3)

Super Structure
Ground Floor
Column 130.17 (M3)

Shear Wall 120.47 (M3)

Beam 42.94 (M3)

Stair case 33.71 (M3)

Ceiling Slab 583.85 (M3)

TOTAL 911.14 (M3)

Mezz Floor
Column 129.37 (M3)

Shear Wall 123.71 (M3)

Beam 51.49 (M3)

Stair case 19.86 (M3)

Ceiling Slab 667.60 (M3)

TOTAL 992.03 (M3)

First Floor
Column 113.95 (M3)

Shear Wall 117.69 (M3)

Beam 49.14 (M3)

Stair case 19.87 (M3)


Ceiling Slab 662.98 (M3)

TOTAL 963.63 (M3)

2nd Floor
Column 113.95 (M3)

Shear Wall 117.69 (M3)

Beam 46.63 (M3)

Stair case 19.87 (M3)

Ceiling Slab 672.93 (M3)

TOTAL 971.07 (M3)

3rd Floor
Column 97.65 (M3)

Shear Wall 117.69 (M3)

Beam 49.26 (M3)

Stair case 19.87 (M3)

Ceiling Slab 662.98 (M3)

TOTAL 947.45 (M3)

4th Floor
Column 97.65 (M3)

Shear Wall 117.69 (M3)

Beam 46.94 (M3)

Stair case 19.87 (M3)

Ceiling Slab 672.93 (M3)

TOTAL 955.08 (M3)

5th Floor
Column 81.55 (M3)

Shear Wall 117.69 (M3)

Beam 49.45 (M3)


Stair case 19.87 (M3)

Ceiling Slab 662.98 (M3)

TOTAL 931.54 (M3)

6th Floor
Column 81.55 (M3)

Shear Wall 117.69 (M3)

Beam 49.45 (M3)

Stair case 19.87 (M3)

Ceiling Slab 662.98 (M3)

TOTAL 931.54 (M3)

7th Floor
Column 69.22 (M3)

Shear Wall 117.69 (M3)

Beam 49.45 (M3)

Stair case 15.29 (M3)

Ceiling Slab 679.47 (M3)

TOTAL 931.12 (M3)

Total Super Structure 8,534.60 (M3)

Total 10,657.00 (M3)


+7) - P#53 Concrete

TOTAL

5959.37

5,959.37

TOTAL

303.90

162.05

133.31

37.85

1,553.24

38.16

33.43 0.617 12
2,261.94

461

7.4

31 .

- P53 Concrete

TOTAL(M3)

327.53

209.36
150.00

67.61

1,238.76

39.13

51.93

38.08

2,122.40

130.17

120.47

42.94

33.71

583.85

911.14

129.37

123.71

51.49

19.86

667.60

992.03

113.95

117.69

49.14

19.87
662.98

963.63

113.95

117.69

46.63

19.87

672.93

971.07

97.65

117.69

49.26

19.87

662.98

947.45

97.65

117.69

46.94

19.87

672.93

955.08

81.55

117.69

49.45
19.87

662.98

931.54

81.55

117.69

49.45

19.87

662.98

931.54

69.22

117.69

95.63

15.29

648.75

946.58

8,550.06

10,672.46
QUANTITY
ITEM BOQ-REF# DESCRIPTION UNIT
OMISSION
1 Changing Kitchen door from 80cm to 90cm
1.1 New fire rated 90cm door no.
1.2 Breaking block and replacing * no.
1.3 BQ/02/14-F original fire rated door 80 cm no. 60
1.4 BQ/02/27-G internal plaster m2 13.2
1.5 BQ/02/27-H internal paint m2 13.2
BQ/02/12-C Block Deduction m2 13.2
1.6 BQ/02/27-E Wall Ceramic m3 13.2
2 Changing Main door from 100 to 110
2.1 New fire rated 110 cm door no.
2.2 Breaking block and replacing * no.
2.3 BQ/02/14-B original fire rated door 100 cm no. 60
2.4 BQ/02/27-G internal plaster m2 26.4
BQ/02/12-C Block Deduction m2 13.2
2.5 BQ/02/27-H internal paint m2 26.4
3 Closing Extra Kitchen door
3.1 breaking block for connection ** no.
3.2 BQ/02/12-C extra block m2
3.3 BQ/02/27-G extra plaster m2
3.4 BQ/02/27-H extra paint m2
3.5 BQ/02/27-E extra ceramic m2
3.6 BQ/02/14-F fire rated wood door 80 cm no. 49
4 Door of maid toilet 80 cm
4.1 breaking block for connection ** no.
4.2 BQ/02/19-L additional lintel 200x300 m
4.3 BQ/02/12-C extra block ( Jab & above ) m2
4.4 BQ/02/27-G extra plaster m2
4.5 BQ/02/27-H extra paint m2
4.6 BQ/02/14-C wood door 80 cm no.
5 Maid toilet finish
5.1 BQ/02/27-E ceramic for walls m2
5.2 Water proofing m2
5.3 BQ/04/1-C Water Closet WC1 no.
5.4 BQ/04/1-E Hand spray hose HS no.
5.5 BQ/04/1-B Wash Basin LAV1 no.
5.6 Shower Mixer no.
5.8 BQ/02/27-G internal plaster m2 1442
5.9 BQ/02/27-H internal paint m2 1442
Bill of Omission
Bill of Addition
Total Value of Variation
QUANTITY RATE OMISSION ADDITION
ADDITION QR QR QR
- -
60 5,490 - 329,400
19 885 - 16,815
4,300 258,000 -
48 634 -
24 317 -
120 1,584 -
130 1,716 -
- -
60 6,180 - 370,800
19 885 - 16,815
4,850 291,000 -
48 1,267 -
120 1,584 -
24 634 -
- -
21 345 - 7,245
90 120 - 10,800
90 48 - 4,320
90 24 - 2,160
90 130 - 11,700
4,300 210,700 -
- -
25 345 - 8,625
70 45 - 3,150
125 120 - 15,000
125 48 - 6,000
125 24 - 3,000
58 1,320 - 76,560
- -
1240 130 - 161,200
242 85 - 20,570
58 1,200 - 69,600
58 270 - 15,660
58 1,000 - 58,000
58 825 - 47,850
48 69,216 -
24 34,608 -
871,259
1,255,270
384,011
area 5079,99990590
perimeter 305828.09

5080 M2
305.82 M
EXCAVATION AND EARTH WORK

Sr.no description unit length

1 site clearance m2

2 top soil removal 150 mm thk. m2

3 excavation m3

4 disposal m3

ex+top soil (45,212+762)

5 Anti-termite (ver.area +hor.area) m2 305.82

6 backfilling m3

EXCAVATION AND EARTH WORK

Sr.no description unit length

1 site clearance m2

2 top soil removal 150 mm thk. m2

3 excavation m3

disposal of excavated materials


4 m3
(excavation qty+ top soil qty)

5 Anti-termite

(vertical.area qty 78.26

horizontal.area qty

6 backfilling m3

7 filling sand above natural ground level m3


width height no.of item area qty final qty

5080 5080

5080 5080

8.9 5080 45,212

45,974 762
9.05 5080 7,847.67

9.05 292 2642.6

width height area qty final qty

361.93 361.93
361,938,146.48
361.93 361.93

1.35 361.93 489

543

479.32

1.5 117.39

361.93

0
dowel bar r
rt.wall.length space 50*Dia(M) LENGTH

298 0.125 1 1.2


298 0.125 0.8 1.2

Total

dowel bar shea


length OF WALL space 50*Dia(M) LENGTH

A 8.9 0.12 1 1.2


W1
C 1.25 1.2
A 8.9 0.12 1 1.2
W1
C 1.25 1.2

CORE 1 16.12 0.15 0.8 1.2


C 1 1.2
Total

RAFT
MAIN MESH
ADDI
DOWEL
RETAINING WALL
COLUMN
SHEAR WALL/CORE WALL
CHAIRS

shear wall,core
D.LENGTH length OF WALL space 50*Dia(M) LENGTH

A 8.9 0.12 1 4.05


B 4.05 0.2 19.8
W1
C 1.25 4.05
STRU
A 8.9 0.12 1 4.05
B 4.05 0.2 19.8
W1
C 1.25 4.05
STRU
CORE 1 A 14.52 0.15 0.8 4.05
B 4.05 0.2 35.64

C 1 4.05
Total
dowel bar retaining wall
DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
3.2 20 2385 1 2.468 18,835.78
2.3 16 2385 1 1.580 8,664.46

27,500.233

dowel bar shear wall,core wall


DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
3.2 20 75 2 2.468 1,187.27
3.7 25 5 2 3.856 142.68
3.2 20 75 2 2.468 1,187.27
3.7 25 5 2 3.856 142.68

2.8 16 108 2 1.580 959.42


3.2 20 5 4 2.468 157.95
3,777.281

shear wall,core wall BASEMENT 2


DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
5.05 20 76.0 2 2.468 1,894.44
19.8 12 22.0 1 0.888 387.02
5.3 25 5 2 3.856 204.38
1.3 8 836 1 0.395 429.16
5.05 20 76.0 2 2.468 1,894.44
19.8 12 22.0 1 0.888 387.02
5.3 25 5 2 3.856 204.38
1.8 8 836 1 0.395 594.22
4.85 16 98.0 2 1.580 1,501.49
35.64 12 22.0 1 0.888 696.64

5.05 20 5 4 2.468 249.27


8,442.450
Sr.no description unit length width height no.of item
concrete work
plain concrete
100 mm blinding m2
50 mm screed m2
reinforced concrete

raft foundation m3 1.2


add
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4
sum.pit-3 1.4
dedt
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4
sum.pit-3 1.4

col concrete bs2 m3


c1 2.1 0.6 3.7 2
c2 1 1 3.7 6
c3 3.7 7
c4 3.7 4
c5 3.7 9
c6 3.7 4
c7 3.7 2
c8 3.7 1
c9 3.7 1
c10 3.7 3
c11 3.7 5

retaining wall con m3 298 0.3 3.7

column concrete m3
c1 2.1 0.6 3.7 10
c2 1 1 3.7 2
c3 1.5 0.7 3.7 4
c4 3.7 7
c5 3.7
c6 3.7
c7 3.7
c8 3.7
c9 3.7
c10 3.7

wall
w1 m3 8.9 0.5 3.7 2

w2 9.8 0.3 3.7 1


dedt 1.2 0.3 2.2 1

add fw

slab con m3
350mm 0.35
150 mm 0.15

134,836,000.00

ceramic skirting type 3


1st floor
detd
room name perimeter qty (M)
L(M) NOS
0.9 4
master bedroom 72 66.8
0.8 2
Formwork
area qty final qty m2

4808 4808
4778 4778

4778 5733.6

72.5 87
30.5 42.7 60,100,000.00
36.18 50.652
30.5 42.7
5956.652
17 20.4
2.25 3.15
4.2 5.88
2.25 3.15 block shuttering
32.58
5924.072 357.6 m2
9.324 39.96
22.2 88.8
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
31.524 31.524 128.76
330.78 330.78 2205.2

46.62 199.8
7.4 29.6
15.54 65.12
0 0
0 0
0 0
0 0
0 0
0 0
0 0
69.56 69.56 294.52

32.93 139.12

10.878 74.74
0.792 5.28
10.086 69.46
1.68
71.14
43.016 210.26

4426.62 1549.317 4514.02


87.4 13.11 104.3
1562.427 39.522
4,657.84

5,079,999,905.90
perimeter 305828.09
Sr.no description unit length width height

site cleance m2
150mm top soil removal m2
excavation m3 9.05
disposal m3
anti-termite m2
backfill m3
excavation area- building area
dewatering
Formwork
no.of item area qty final qty
m2

5080 5080
5080 5080 5080
5080 45,974 0.15
46,736 762
7848 305.8
2,767.49
3,495

4778
9.05
43240.9

4,807,963,002.64

5,079,999,905.90
perimeter 305828.09

###
meter 305828.09
col concrete bs2
description unit length width height no.of item qty
c1 m3 2.1 0.6 3.7 2 9.324
c2 m3 1 1 3.7 6 22.2
c3 m3 1.5 0.7 3.7 7 27.195
c4 m3 3.7 4 0
c5 m3 3.7 9 0
c6 m3 3.7 4 0
c7 m3 3.7 2 0
c8 m3 3.7 1 0
c9 m3 3.7 1 0
c10 m3 3.7 3 0
c11 m3 3.7 5 0
total 58.719

Retaining wall concrete


basement 2 m3 298 0.3 3.7 330.78
basement 1 m3 248 0.3 3.25 241.8
basement 1 m3 22 0.3 3.95 26.07
basement 1 m3 27.92 0.3 4.15 34.7604
633.4104

col concrete bs1


description unit length width height no.of item qty
c1 m3 2.1 0.6 3.25 2 8.19
c2 m3 1 1 3.25 6 19.5
c3 m3 1.5 0.7 3.25 7 23.8875
c4 m3 4.55 4 0
c5 m3 4.55 9 0
c6 m3 4.55 4 0
c7 m3 4.55 2 0
c8 m3 4.55 1 0
c9 m3 4.55 1 0
c10 m3 4.55 3 0
c11 m3 4.55 5 0
total 51.5775

col concrete gr
description unit length width height no.of item qty
c1 m3 2 0.5 3.85 2 7.7
c2 m3 1 0.9 3.85 6 20.79
c3 m3 1.5 0.6 3.85 7 24.255
c4 m3 3.85 4 0
c5 m3 3.85 9 0
c6 m3 3.85 4 0
c7 m3 3.85 2 0
c8 m3 3.85 1 0
c9 m3 3.85 1 0
c10 m3 3.85 3 0
c11 m3 3.85 5 0
total 52.745

col concrete mezz


description unit length width height no.of item qty
c1 m3 2 0.5 3.85 2 7.7
c2 m3 1 0.9 3.85 6 20.79
c3 m3 1.5 0.6 3.85 7 24.255
c4 m3 3.85 4 0
c5 m3 3.85 9 0
c6 m3 3.85 4 0
c7 m3 3.85 2 0
c8 m3 3.85 1 0
c9 m3 3.85 1 0
c10 m3 3.85 3 0
c11 m3 3.85 5 0
total 52.745
Formwork m2
39.96
88.8
113.96
0
0
0
0
0
0
0
0
242.72 1093.35 1102.6

2205.2
1612
173.8
231.736

Formwork m2
35.1
78
100.1
0
0
0
0
0
0
0
0
213.2

Formwork m2
38.5
87.78
113.19
0
0
0
0
0
0
0
0
239.47

Formwork m2
38.5
87.78
113.19
0
0
0
0
0
0
0
0
239.47
shear wall core wall concrete bs2
wall type unit length width height no.of item qty
w1 m3 8.9 0.5 3.7 2 32.93
w2 m3 7.45 0.3 3.7 2 16.539
w2 m3 7.5 0.3 3.7 1 8.325
w2 m3 9.8 0.3 3.7 1 10.878
w4 m3 6 0.2 3.7 2 8.88
w5 m3 3.7 0
core1 m3 6 0.2 3.7 2 8.88
m3 1.66 0.2 3.7 1 1.2284
dedt-openings m3 1 0.2 2.3 1 0.46
add-opening

total 87.2004

shear wall core wall concrete bs1


wall type unit length width height no.of item qty
w1 m3 8.9 0.5 4.55 2 40.495
w2 m3 7.45 0.3 4.55 2 20.3385
w2 m3 7.5 0.3 4.55 1 10.2375
w2 m3 9.8 0.3 4.55 1 13.377
w4 m3 6 0.2 4.55 2 10.92
w5 m3 4.55 0
core1 m3 6 0.2 4.55 2 10.92
m3 1.66 0.2 4.55 1 1.5106
dedt-openings m3 1 0.2 2.3 3 1.38
add-opening

total 106.4186

description unit length width height no.of item area


concrete work
plain concrete
100 mm blinding m2 4808
dedt area
ele.pit - plan area 94.5
sumpit-1 - plan area 44.9
sumpit-2 - plan area 44.9

sub-total 4,623.70
add
ele.pit - plan area 54.24
slope area 36.6 1.67 61.122
sumpit-1 - plan area 18.5
slope area 22.65 1.98 44.847
sumpit-2 - plan area 18.5
slope area 22.65 1.98 44.847

242.06
final total 4,865.76

screed concrete
50mm screed m2 4778.13
dedt area
ele.pit - plan area 94.5
sumpit-1 - plan area 44.9
sumpit-2 - plan area 44.9
sumpit-3 - plan area 52.56
sub-total 4,541.27
add
ele.pit - plan area 54.24
slope area 36.6 1.67 61.122
sumpit-1 - plan area 18.5
slope area 22.65 1.98 44.847
sumpit-2 - plan area 18.5
slope area 22.65 1.98 44.847
sumpit-3 - plan area 23.52
slope area 24.2 1.98 47.916
313.49
final total 4,854.76
description unit length width height no.of item area
raft foundation m3 1.2 4778.13

add

elev.pit 1.2 74.35

sum.pit-1 1.4 31.69

sum.pit-2 1.4 36.18

sum.pit-3 1.4 31.69

dedt

elev.pit 1.2 17

sum.pit-1 1.4 2.25

sum.pit-2 1.4 4.2

sum.pit-3 1.4 2.25

col concrete bs2 m3

col concrete bs2


description unit length width height no.of item qty
c2 m3 1 1 3.7 2 7.4
c3 m3 1.5 0.7 3.7 2 7.77
c5 m3 1.8 0.5 3.7 4 13.32
c6 m3 1.6 0.5 3.7 0
c7 m3 1.4 0.5 3.7 5 12.95
c8 m3 1.2 0.5 3.7 4 8.88
c9 m3 1.2 0.5 3.7 4 8.88
c10 m3 0.8 0.8 3.7 0
c12 m3 1 0.5 3.7 8 14.8
c13 m3 0.8 0.4 3.7 5 5.92
m3 3.7 0
total 79.92
col concrete bs1
description unit length width height no.of item qty
S.S.L 0.00
C17 m3 0.8 0.2 3.25 4 2.08
C18 m3 0.6 0.2 3.25 5 1.95
C20 m3 0.5 0.3 3.25 4 1.95
C21 m3 0.8 0.5 3.25 12 15.6
S.S.L + 0.65 0
C19 m3 0.95 0.2 4.15 1 0.7885
S.S.L + 0.15 0
C18 m3 0.6 0.2 3.65 8 3.504
C21 m3 0.8 0.5 3.65 2 2.92
S.S.L + 1.25 0
C1 m3 2.1 0.6 4.55 2 11.466
C2 m3 1 1 4.55 2 9.1
C3 1.5 0.7 4.55 2 9.555
C5 1.8 0.5 4.55 3 12.285
C6 1.6 0.5 4.55 2 7.28
C7 1.4 0.5 4.55 5 15.925
C8 1.2 0.5 4.55 4 10.92
C9 1.2 0.5 4.55 7 19.11
C10 0.8 0.8 4.55 2 5.824
C11 0.8 0.6 4.55 2 4.368
C12 1 0.5 4.55 8 18.2
C13 0.8 0.4 4.55 6 8.736
C14 1.4 0.3 4.55 2 3.822
C16 1.2 0.5 4.55 4 10.92
m3 4.55 0
total 176.3035

col concrete GROUND FLOOR


description unit length width height no.of item qty
c2 m3 3.85 0
c3 m3 3.85 0
c5 m3 3.85 0
c6 m3 3.85 0
c7 m3 3.85 0
c8 m3 3.85 0
c9 m3 3.85 0
c10 m3 3.85 0
c12 m3 3.85 0
c13 m3 3.85 0
m3 3.85 0
total 0
Formwork
m2
139.12
114.7
57.72
74.74
88.8

59.2
53.761
4.6
0.92

584.361

Formwork
m2
171.08
141.05
70.98
91.91
109.2

72.8
66.1115
13.8
2.76

712.0915

qty final qty


qty final qty Formwork m2
5733.756

89.22

44.366 ###
50.652

44.366

5962.36

20.4

3.15

5.88

3.15 block shuttering


32.58

5929.78 357.6 m2

Formwork
m2
29.6
32.56
68.08
0
70.3
50.32
50.32
0
88.8
44.4
0
434.38
Formwork
m2

26
26
20.8
101.4
0
9.545
0
46.72
18.98
0
49.14
36.4
40.04
62.79
38.22
86.45
61.88
108.29
29.12
25.48
109.2
65.52
30.94
61.88
0
1054.795

Formwork
m2
0
0
0
0
0
0
0
0
0
0
0
0
100MM BLINDING CONCRETE
CONCRETE FORMWORK
FOOTING TYPE length width height NO'S
QTY (M2) QTY (M2)
F1 1.6 1.2 0.1 2 3.84 1.12
F2 1.8 1.4 0.1 9 22.68 5.76
F3 2 1.6 0.1 9 28.8 6.48
F4 2.2 1.8 0.1 2 7.92 1.6
F5 1.4 1.4 0.1 1 1.96 0.56
CF1 1.8 1.8 0.1 1 3.24 0.72
0 0
total 68.44 16.24

50MM SCREED CONCRETE


CONCRETE FORMWORK
FOOTING TYPE length width height NO'S
QTY (M2) QTY (M2)
F1 1.4 1 0.05 2 2.8 0.48
F2 1.6 1.2 0.05 9 17.28 2.52
F3 1.8 1.4 0.05 9 22.68 2.88
F4 2 1.6 0.05 2 6.4 0.72
F5 1.2 1.2 0.05 1 1.44 0.24
CF1 1.6 1.6 0.05 1 2.56 0.32
0 0
total 53.16 7.16

FOOTING CONCRETE
CONCRETE FORMWORK
FOOTING TYPE length width height NO'S QTY (M3) QTY (M2)
F1 1.4 1 0.35 2 0.98 3.36
F2 1.6 1.2 0.4 9 6.912 20.16
F3 1.8 1.4 0.4 9 9.072 23.04
F4 2 1.6 0.45 2 2.88 6.48
F5 1.2 1.2 0.35 1 0.504 1.68
CF1 1.6 1.6 0.4 1 1.024 2.56
0 0
total 21.372 57.28

NECK COLUMN CONCRETE


CONCRETE FORMWORK
COLUMN TYPE length width height NO'S QTY (M3) QTY (M2)
C1 0.2 0.3 1.25 2 0.15 2.5
C2 0.2 0.4 1.2 9 0.864 12.96
C3 0.2 0.5 1.2 9 1.08 15.12
C4 0.2 0.7 1.15 2 0.322 4.14
C5 0.4 0.6 1.25 1 0.3 2.5
C6 0.34 1.2 1 0.408 3.6

total 3.124 40.82

G/F COLUMN CONCRETE


CONCRETE FORMWORK
COLUMN TYPE length width height NO'S
QTY (M3) QTY (M2)
0.15
C2 0.2 0.4 3.75 4 1.2 18
C3 0.2 0.5 3.75 3 1.125 15.75
0.16
C2 0.2 0.4 3.74 4 1.1968 17.952
C3 0.2 0.5 3.74 1 0.374 5.236
0.3
C1 0.2 0.3 3.6 2 0.432 7.2
C2 0.2 0.4 3.6 1 0.288 4.32
C3 0.2 0.5 3.6 5 1.8 25.2
C4 0.2 0.7 3.6 2 1.008 12.96
0.12
C5 0.4 0.6 3.78 1 0.9072 7.56
C6 0.34 3.78 1 1.2852 11.34

total 9.6162 125.518

G/F COLUMN CONCRETE


CONCRETE FORMWORK
COLUMN TYPE length width height NO'S
QTY (M3) QTY (M2)
0.15
C2 0.2 0.4 3.75 4 1.2 18
C3 0.2 0.5 3.75 3 1.125 15.75
0.16
C2 0.2 0.4 3.74 4 1.1968 17.952
C3 0.2 0.5 3.74 1 0.374 5.236
0.3
C1 0.2 0.3 3.6 2 0.432 7.2
C2 0.2 0.4 3.6 1 0.288 4.32
C3 0.2 0.5 3.6 5 1.8 25.2
C4 0.2 0.7 3.6 2 1.008 12.96
0.12
C5 0.4 0.6 3.78 1 0.9072 7.56
C6 0.34 3.78 1 1.2852 11.34

total 9.6162 125.518


340,000.00
5,079,945,315.72
305,822.79
EXCAVATION AND EARTH WORK

Sr.no description unit length width height

1 site clearance m2

2 top soil removal 150 mm thk m2

3 excavation m3 8.9

add elevator pit 1.2

sum pit 1 1.4

sumpit2 1.4

4 disposal (excavation qty +top so m3

5 Anti-termite (ver.area +hor.ar m2 305.82 9.05

6 backfilling m3 9.05

description unit length width height no.of item


concrete work
plain concrete
100 mm blinding m2
dedt area
ele.pit - plan area
sumpit-1 - plan area
sumpit-2 - plan area

sub-total
add
ele.pit - plan area
slope area 36.2 1.69
sumpit-1 - plan area
slope area 21 1.98
sumpit-2 - plan area
slope area 21 1.98

final total
description unit length width height no.of item
concrete work
plain concrete
50 mm SCREED m2
dedt area
ele.pit - plan area
sumpit-1 - plan area
sumpit-2 - plan area

sub-total
add
ele.pit - plan area
slope area 36.2 1.69
sumpit-1 - plan area
slope area 21 1.98
sumpit-2 - plan area
slope area 21 1.98

final total

description unit length width height no.of item


raft foundation m3 1.2
add
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4

dedt
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4

col concrete bs2 m3


area qty final qty

5080 5080

5080 5080

5080 45212 45,451

94.5 113.4

44.89 62.846

44.89 62.846 301,861,973.69


46,213.09 5,079,945,315.72

5080 7,847.67

301.86 2,731.83

area qty final qty

4808

94.5
44.89
44.89

4,623.72

51.06
61.178
15.21
41.58
15.21
41.58

225.82
4,849.54
area qty final qty

4778

94.5
44.89
44.89

4,593.72

51.06
61.178
15.21
41.58
15.21
41.58

225.82
4,819.54

Formwo
area qty final qty rk m2
4778 5733.6

72.28 86.736
30.05 42.07
30.05 42.07

5904.476
17 20.4
2.25 3.15 294,823,703.83
2.25 3.15 perimeter 71000.5865
block shuttering
26.7
5877.776 357.6
EXCAVATION AND EARTH WORK

Sr.no description unit length width

1 site clearance m2

2 top soil removal 150 mm thk. m2

3 excavation m3

4 disposal (excavation qty +top soil qty) m3

5 Anti-termite (ver.area +hor.area) m2 71

6 backfilling m3

filling sand sbove ground level m3

100MM BLINDING CONCRETE


FOOTING TYPE length width height NO'S

F1 1.6 1.2 2
F2 1.8 1.4 9
F3 2 1.6 9
F4 2.2 1.8 2
F5 1.4 1.4 1
CF1 1.8 1.8 1

total

50MM SCREED CONCRETE


FOOTING TYPE length width height NO'S

F1 1.4 1.2 2
F2 1.6 1.4 9
F3 2 1.6 9
F4 2.2 1.8 2
F5 1.4 1.4 1
CF1 1.8 1.8 1

total

FOOTING CONCRETE
FOOTING TYPE length width height NO'S

F1 1.4 1 2
F2 1.6 1.4 9
F3 1.8 1.2 9
F4 2 1.8 2
F5 1.2 1.4 1
CF1 1.6 1.8 1

total

NECK COLUMN
FOOTING TYPE length width height NO'S

F1 1.4 1 2
F2 1.6 1.4 9
F3 1.8 1.2 9
F4 2 1.8 2
F5 1.2 1.4 1
CF1 1.6 1.8 1

total
qty final qty
height area
(m3/m2) (m3/m2)

294.83 294.83

294.83 294.83

1.35 294.83 398

442.25

1.5 294.83 401.33

0.25 222.64 55.66

CONCRET FORMWO
E QTY RK QTY
(M2) (M2)
3.84 0
22.68 0
28.8 0
7.92 0
1.96 0
3.24 0
0 0
68.44 0

CONCRET FORMWO
E QTY RK QTY
(M2) (M2)
3.36 0
20.16 0
28.8 0
7.92 0
1.96 0
3.24 0
0 0
65.44 0

CONCRET FORMWO
E QTY RK QTY
(M2) (M2)
2.8 0
20.16 0
19.44 0
7.2 0
1.68 0
2.88 0
0 0
54.16 0

CONCRET FORMWO
E QTY RK QTY
(M2) (M2)
2.8 0
20.16 0
19.44 0
7.2 0
1.68 0
2.88 0
0 0
54.16 0
ITEM NO DISCRIPTION UNIT QTY RATE (QR) AMOUNT (QR)

1 site clearance M2 5,080.00 10 50,800.00


-
2 top soil removal 150 mm thk. M2 5,080.00 15 76,200.00
-
3 excavation M3 45,451.09 35 1,590,788.22
-
4 disposal M3 46,213.09 12 554,557.10
-
5 Anti-termite M2 7,847.67 15 117,715.07
-
6 backfilling M3 2,731.83 25 68,295.83

TOTAL CARRIED TO SUMMARYY 2,458,356.21


EXCAVATION FOR FOUNDATION

Excavation
S.No Description Unit No Length Width Hight Area

1 site clearing m² 294.82

2 top soil removeing m² 294.82

3 excavation
f1 m³ 2 1.6 1.2 1.35
f2 9 1.8 1.4 1.35
f3 9 2 1.6 1.35
f4 2 2.2 1.8 1.35
f5 1 1.4 1.4 1.35
cf1 1 1.8 1.8 1.35

plinth beam m³

P2-P5 , P7,P9 43.25 0.4 0.1


P6,P10 41.51 0.4 0.2

4 Anty-termaite m²
for footing
f1 2 1.6 1.2 1.35 15.12
f2 9 1.8 1.4 1.35 77.76
f3 9 2 1.6 1.35 87.48
f4 2 2.2 1.8 1.35 21.60
f5 1 1.4 1.4 1.35 7.56
cf1 1 1.8 1.8 1.35 9.72

P2-P5 , P7,P9 43.25 0.1 4.33


P6,P10 41.51 0.2 8.30
for top soil

5 backfilling
disposal qty
dedt
blinding+screed+footing
neck column
blinding under beams
100MM BLINDING CONCRETE
FORMW
FOOTING TYPE length width height NO'S CONCRETE ORK QTY
QTY (M2)
(M2)
F1 1.6 1.2 0.1 2 3.84 1.12
F2 1.8 1.4 0.1 9 22.68 5.76
F3 2 1.6 0.1 9 28.8 6.48
F4 2.2 1.8 0.1 2 7.92 1.6
F5 1.4 1.4 0.1 1 1.96 0.56
CF1 1.8 1.8 0.1 1 3.24 0.72
0 0
total 68.44 16.24

50MM SCREED CONCRETE

CONCRETE FORMW
FOOTING TYPE length width height NO'S ORK QTY
QTY (M2) (M2)

F1 1.4 1 0.05 2 2.8 0.48


F2 1.6 1.2 0.05 9 17.28 2.52
F3 1.8 1.4 0.05 9 22.68 2.88
F4 2 1.6 0.05 2 6.4 0.72
F5 1.2 1.2 0.05 1 1.44 0.24
CF1 1.6 1.6 0.05 1 2.56 0.32
0 0
total 53.16 7.16

FOOTING CONCRETE

CONCRETE FORMW
FOOTING TYPE length width height NO'S ORK QTY
QTY (M3) (M2)

F1 1.4 1 0.35 2 0.98 3.36


F2 1.6 1.2 0.4 9 6.912 20.16
F3 1.8 1.4 0.4 9 9.072 23.04
F4 2 1.6 0.45 2 2.88 6.48
F5 1.2 1.2 0.35 1 0.504 1.68
CF1 1.6 1.6 0.4 1 1.024 2.56
0 0
total 21.372 57.28

NECK COLUMN
COLUMN TYPE length width height AREA PERIMETER NO'S
C1 0.3 0.2 1.25 2
C2 0.4 0.2 1.2 9
C3 0.5 0.2 1.2 9
C4 0.7 0.2 1.15 2
C5 0.6 0.4 1.25 1
C6 1.2 0.34 3 1

total

GROUND FLOOR COLUMN


COLUMN TYPE length width height AREA PERIMETER NO'S
150MM
C3 0.5 0.2 3.75 3
C2 0.4 0.2 3.75 3
160MM
C3 0.5 0.2 3.74 2
C2 0.4 0.2 3.74 4
300MM
C1 0.3 0.2 3.6 2
C3 0.5 0.2 3.6 4
C2 0.4 0.2 3.6 1
C4 0.7 0.2 3.6 2

120MM
C5 0.6 0.4 3.78 1
C6 3.78 0.34 3 1

total
1ST FLOOR COLUMN
COLUMN TYPE length width height NO'S
150MM
C3 0.5 0.2 3.75 3
C2 0.4 0.2 3.75 4
160MM
C3 0.5 0.2 3.74 2
C2 0.4 0.2 3.74 4
300MM
C1 0.3 0.2 3.6 2
C3 0.5 0.2 3.6 4
C2 0.4 0.2 3.6 1
C4 0.7 0.2 3.6 2

120MM
C5 0.6 0.4 3.78 1
C6 0.4 0.2 3.78

total

ROOF FLOOR COLUMN


COLUMN TYPE length width height AREA PERIMETER NO'S
150MM
C3 0.5 0.2 3.25 2
180MM
C3 0.5 0.2 3.22 2
C2 0.4 0.2 3.22 2
120MM
PC2 3.28 0.12 1.6 2
PC1 0.4 0.2 3.28 1
C3 0.5 0.2 3.28 4
total

GROUND FLOOR SLAB


AREA CON.QTY SOFFIT AREA F/W QTY
SLAB TYPE THK. PERIMETER M
M2 M3 M2 M2
100MM 252.62 0.1 25.262 67.4 6.74
TOTAL 25.262 6.74

1ST FLOOR SLAB

SLAB TYPE AREA THK. CON.QTY SOFFIT AREA PERIMETER M F/W QTY
M2 M3 M2 M2
S1,S2,S5 150MM 78.92 0.15 11.838 70.12 40.87 76.2505
S3 160MM 102.48 0.16 16.3968 92.89 34.17 98.3572
S4 120 M 18.24 0.12 2.1888 16.18 9.9 17.368
EXTRA F/W 0.15 6.74 1.011
0.14 2.54 0.3556
0.18 1.8 0.324
0.14 1.7 0.238
0.04 4.3 0.172

TOTAL 30.4236 194.0763

1ST FLOOR RIB SLAB


AREA CON.QTY SOFFIT AREA F/W QTY
SLAB TYPE THK. PERIMETER M
M2 M3 M2 M2
300MM 38.94 0.3 11.682 38.94 2.4 39.66
DEDT BLOCK 6.88 0.2 -1.376

TOTAL 10.306 39.66

PLINTH BEAM CONCRETE


CONCRETE FORMWORK
BEAM TYPE length width height QTY (M3) QTY (M2)

P6 7.5 0.2 0.5 0.75 7.5


P10 6.4 0.2 0.5 0.64 6.4
0 0
0 0
0 0

total 1.39 13.9

1ST BEAM CONCRETE


BEAM TYPE length width height CONCRETE FORMWORK
QTY (M3) QTY (M2)
B2 4.8 0.2 0.45 0.432 5.28
B3 2.5 0.2 0.3 0.15 2
B3 2.3 0.2 0.45 0.207 2.53
B1 2.5 0.2 0.3 0.15 2
B1 2.3 0.2 0.44 0.2024 2.484

total 1.1414 14.294

STRUCTURAL - STAIRS
NO length Width height area Total-Qty
Stair case -01
Riser Hight 0.15 Flight conc
Step Width 0.3
stair slab thick 0.18
Stair width 1.3
No.of Steps 24

Landing 0.2 4.32 landing co


Quantity TO.Qty

294.82

294.82

5.18 97.44
30.62
38.88
10.69
2.65
4.37

1.73
3.32

231.87

141.67

-30.87
-2.47
6.844 m3

2.658 m3
CONCRE FORMWORK QTY
TE QTY (M2)
(M3) h volumn
0.15 2.5 1.6 0.35 1 0.12
0.864 12.96 1.6 0.4 0.95 0.684
1.08 15.12 1.6 0.4 0.95 0.855
0.322 4.14 1.6 0.45 0.9 0.252
0.3 2.5 1.6 0.35 1 0.24
0.408 3.6 1.6 0.4 0.95 0.323
2.474
3.124 40.82

CONCRE FORMWORK QTY


TE QTY (M2)
(M3)

1.125 15.75
0.9 13.5

0.748 10.472
1.1968 17.952

0.432 7.2
1.44 20.16
0.288 4.32
1.008 12.96

0.9072 7.56
1.2852 11.34

9.3302 121.214
CONCRE FORMWORK QTY
TE QTY
(M3) (M2)

1.125 15.75
1.2 18

0.748 10.472
1.1968 17.952

0.432 7.2
1.44 20.16
0.288 4.32
1.008 12.96

0.9072 7.56
0 0

8.345 114.374

CONCRE
FORMWORK QTY
TE QTY (M2)
(M3)

0.65 9.1

0.644 9.016
0.5152 7.728

0.7872 10.496
0.2624 3.936
1.312 18.368
4.1708 58.644

252,620,004.43
Total-Qty Unit

2.59 m3

0.86 m3
3.45