Rina Bardfield, Paul Clapper, Dave Peterson, Kiem Bui, Julie Hoskin, Bongim Jun, SK Sharma,
and Jim Hanley
ABSTRACT cost, mass, and cycle time savings versus panels of the
same size populated with standard product. The product
Spectrolab initiated qualification of the “LEONE” introduction goals for the UTJ LEONE product relative
(>50cm2) UTJ solar cell with a goal of reducing cost, to the standard UTJ 26.62cm2 product are depicted in
add-on mass, and cycle time for panel deliveries. In Figure 2.
flight production since 2007, the UTJ LEONE design has
now completed qualification to 15,549 GEO and 66,060 Leone Product Introduction Goals 2 per std
INTRODUCTION
-3
BOL precond tvac 1863 2236 8416 9962 14432 15549
QUALIFICATION HERITAGE
Figure 5. GEO coupon electrical performance
Table 2 summarizes all of the qualification tests
I @ load vs breakpoint
performed on the UTJ LEONE product [1,2]. A picture 3
of the LEONE CIC is shown in Figure 4. Bold series = average performance for each coupon
1
Table 2. LEONE Qualification Summary
TEST TEST ARTICLE QUANTITIES STATUS 0
-1
Contact Integrity-Tape Peel IC 1 wing per wafer PASS
8 wings or CICs -2
Contact Integrity-Weldability Bare/CIC per lot PASS
-3
LIV Bare/CIC 100% COMPLETE
Initial 10 10 TV 60 6250 20,060 40,060 Ambient Ambient 3 TV
10 bare and 10
Ambient Ambient Ambient Ambient Ambient 60,060 66,060
Bow Bare/CIC CICs (1 pers) COMPLETE
TC TC TC TC T/C T/C TC
Bend CIC 10 CICs (1 pers) PASS
10 bare and 10 Figure 6. LEO coupon electrical performance
Instron Bare/CIC CICs (1 pers) COMPLETE
CIC Thermal Cycle (2000 cycles, -180C to
+161C) CIC 10 CICs (1 pers) PASS
GEO Coupon Thermal Cycle (7 tvac +
15549 thermal cycles; worst case temps - 150 1pers and
177C to +140C) CICs on Coupons 150 2 pers PASS
LEO Coupon Thermal Cycle (10 tvac +
66060 thermal cycles, worst case temps - 72 1 pers and 36
130C to +125C) CICs on Coupons 2 pers PASS
-2.40
the panel. The test voltages between strings were set to -6.40
-10.40
either 55 or 105 V, with a current limit of 1 A. The -14.40
CKT 1
-18.40
gradient was 3.5kV. -22.40
CKT 2
CKT 3
-26.40
-30.40
For the normal gradient test, the test voltages between -34.40
-38.40
strings were again set to either 55 or 110 V, with a
s
s
ac
00
l
le
le
ac
a
50
82
-v
iti
yc
yc
20
tv
in
tT
0
10
20
P
SUMMARY
60 cm 2 cell
150mm mfg
2
(~70cm cell)
$300
equiv. # of
$275 Upright MJ Cell Technology
"standard"
Orbit cell size #cells on panel size cells
$250
61440 total 27000
1Q '07
2Q '07
4Q '07
1Q '08
2Q '08
1Q '09
2Q '09
3Q '09
1Q '10
2Q '10
3Q '10
1Q '11
2Q '11
2014
2017
3Q '07
3Q '08
4Q '08
4Q '09
4Q '10
3Q '11
4Q '11
2012
2013
2015
2016
2
LEO 59.65cm delivered 122880
2
GEO 53.3cm 33872 67744 Figure 13. Spectrolab product configuration roadmap
TOTAL 95312 190624
ACKNOWLEDGEMENTS
Due to differences in panel size and mission environment
for delivered product on recurring programs using
The authors would like to acknowledge the following
Spectrolab’s standard 26.62cm2 cell and the delivered
individuals and organizations for their support of the
hardware to date using the 59.65cm2 LEONE cell,
LEONE product configuration and the work reported
production actuals have been normalized to the available
herein: Phil Leung and Marc Breen of Boeing El
panel area in figure 12 for comparison purposes.
Segundo; ONERA; Thales Alenia Space; and ATK. We
would also like to acknowledge the efforts of the entire
Comparison of LEONE introduction goal vs. 2 per std
production actuals Leone target
Team at Spectrolab for making the LEONE goals a
1.1 production actual production reality.
1
0.9
0.8
REFERENCES
0.7
0.6 [1] LEONE QDD, 044401
0.5
0.4
[2] “Program” Test Report, 044723
cost on panel ($/m2) cycle time (w eeks/m2) add-on mass (kg/m2) [3] ESD Testing of LEONE CICs, 220-2463
[4] ESD Susceptibility Test Plan & Procedure, 045395
Figure 12. LEONE production actuals versus product [5] Qualification Test Plan & Procedure, 045820
introduction goals and standard 26.62cm2 product [6] ESD Test Results for Large Area UTJ CICs (53.3-
59.65cm2) and Solar Panel Coupons, 046034
The improvement in cycle time depicted in Figure 12 is [7] Final Qualification Test Results of XTJ Triple
mostly due to the reduced piece part handling and Junction Space Solar Cell to AIAA-S-111-2005 and
reduced wiring, but is also partly due to implementation Spectrolab Test Standards, B. Jun et al, IEEE-PVSC
of a LEAN manufacturing philosophy for the solar 2010