1 2 3 4 5 6 7 8 9 10 11 12

A
Passenger Circulation Area Requirements Minimum Clearances Required Electrical entry position Barriers at Landings

min. 25-max. 100

min. 25-max. 100


1xOutside of
Handrail Dimension
2x(Outside of
Handrail Dimension
.
A
View A
Plus 80 mm Each Side Plus 80 mm Each Side) C .
B
.

min. 100

min. 100
A

min.2300
. .
.
min. 80-max. 120 . .
min. 80-max. 120

min.2100
Landing surface
208 208

.
.
min.2000
. .
min.2500

.
.

.
.

2x(Outside of 490

.
Handrail Dimension
Plus 80 mm Each Side) A = 80mm minimum clearance between the edge of a . .

handrail & wall or other obstacles.


.

2x(Outside of
80 80

40
Ø
. .

Handrail Dimension B = If this dimension is less than 400mm

40

Ø
B Plus 80 mm Each Side)
.
a headguard is required.
C = For adjacent escalators the distance

min.2000
80 .

between adjacent handrails shall not be


80 less than 160mm.
.
.

max.120 . .
max.120

Visual Features
C 1
Diagonal Dimension Escalator Mounting Detail X / Y 3
( X mirrored ) 3 2

4 5
FFL Permanent elastic
11 joint by others 6
2 .
57 8
.

200 12
8
.

Landing Plate Final Floor


.

120 . (By Customer)


.

Side Elevation
10 7
FFL

135
.
(*)Steel plate .

Escalator (*)By
(*)Rubber 9
KONE
.

(*)Steel plate .
11
D
.

Hexagon socket set screw Access Cover Detail Plan View


50 200 Part Section
Support angle . . .

Ref. Part Finish


1 Handrail Black
2 Handrail profile Stainless Steel 430#
3 Balustrade Slim Type(safety glass 10mm)
4 Inner Decking Hairline stainless steel 304#
5 Outer Decking Hairline stainless steel 304#
6 Skirting 2mm Sh. St. w bla antifri
7 Step Aluminium
E 8 Side Cladding Aluminium
9 Soffit Cladding Aluminium
10 Access Cover Ribbed AL natural colour
11 Comb Plate AL comb w yellow coat(RAL1023)
12 Skirt brush deflector Skirt brush w black aluminum holder

Note:
EN115 version EN115-1:2008+A1:2010 1. All dimensions are in millimeters.
2. Access opening 2500mm wide and 3300mm high into and through the building is required.
3. EN115-1, GB 16899 requirement for the minimum free clearance. Checking is required to
F ensure that the shown building layout is in compliance. Indication of the code requirement in
the drawing does not confirm that this requirement is fulfilled.
End Supports Without
4. It is forbidden to drill any holes on escalator truss. As the truss integrity will be impacted.
5. The precision of weight within 0%~+7%, the section weight without disassembly component.
6. FF, DD and EE should be +33mm in seismic cases.
C KONE Corporation

Seismic peak ground agRU


\+2640.5m/s2 (very low )
acc.(m/s2) Prior To Installation
Clean Site & Storage
Ensure the working and storage areas are clean, dry and protected from the weather.
3-Phase Power Supply
Ensure permanent 3-phase power is available for the assembly and testing of the escalator,
Esc. building story provide 300mA earth leakage protection.
0
drift [mm] Protection from Damage
Transportation Detail (Floor 0-1) Ensure protection of the escalator equipment from damage by other trades is provided
(during the whole project).

G Standard location of controller is in upper end.


Balustrade Removed For Step Speed: 0.5 m/s, 3 x 415 V, 50 Hz, 240 V
Transportation Purposes 1 6/23/2023 Pit Removed as per FL request Keikram3

Electrical Loadings - 4/21/2023 Ankit Mishra Ankit Mishra


1547 .
11805 .

Version Date Description Designed by Checked by Approved by


Escalator No. 45151870 45151871 Project name
Amrapali Corp Hub - Krishna Constructions
Motor Power(kW) 5.5 5.5
Starting Mode
2198

Star delta Star delta


Site address
.

Approx. S.C(amps) 26 26 9W7P+86 G, SECTOR 2, IMT MANESAR , GURGAON


KONE Elevators Co. Ltd.
Approx. R.C(amps) 12 12
.

Total Power (kW) 5.5 5.5 No.88 Middle GuCheng Road Type
140

Power Supply (kVA) 10 10 TM110/100/35 -2 -4000 22.2


H Yushan Town KunShan
Comb Heating (kW) 0 0
Approx. Weight:5105kg Jiangsu province 215300 Escalator No.
Truss Heating (kW) 0 0
China 45151870
45151871
Project No. Drawing No. 6722626_2_1 Scale Version Page
6722626 DNC 1 2
Customer No.