You are on page 1of 1

PRODUCED BY AN AUTODESK STUDENT VERSION

Min. 25mm
cover 1.0m Minimum
1163.590

RCC CLADDING WALL 1 2 2222222 1


Detail- D 3 Varies
CH-100+460-100+520 3
1
2

1.0m Minimum
3 2
2
1074.98 2
HFL 3
2
2
Min. 50mm
2 cover

3.00
4.00 Anchors 2m long, Ø = 25mm 3
2
2

Top Anchor:
Spurs (Gabion) SDA/CTA Spacing = 2m c/c in SDA/CTA Anchors @
3
2
2

3 m long, 25mm Ø, 2
30m C/C Longitudinal Directions 1.5 m c/c spacing in
1
2 8mm dia. bars (Fe 500)
Longitudinal directions at 150mm c/c spacing
LWL 3.00 7.50
BED LEVEL 1 4 No.s 25mm dia. (Fe-500) bars of Corners.

PRODUCED BY AN AUTODESK STUDENT VERSION


HIGHT VARIES UPTO
PRODUCED BY AN AUTODESK STUDENT VERSION

1068.35 GEOMAT 47 MTR. 2 16mm dia. (Fe-500) bars each at both top
Non Woven Geotextile and bottom i.e., at maximum 140mm clear
spacing.
DETAIL-A Rhomboidal steel wire cable rope
panel+hexagonal DT Mesh
3 16mm dia. (Fe-500) bars each on both
SDA/CTA Anchors @ sides i.e., at maximum 300mm clear
3 m long, 25mm Ø, spacing.
Existing Profile
3 m c/c spacing in both
directions
DETAIL-D
80°

RR Wall
REINFORCEMENT DETAILS OF
100+415-100+595 CLADDING WALL
W-Beam Metal Bottom Anchor:
1119.829
Crash Barrier SDA/CTA Anchors @
3 m long, 25mm Ø,
1116.590 12.00 3 m c/c spacing in
3.00
Road Transverse directions
RR Wall 1.00

Kerb Stone
100+596-100+612 Non Woven Geotextile
PCC 100MM(M15)

PCC Road Side Drain

WEEP HOLE

3.0
Existing Profile
PCC M15

Detail- A
RCC CLADDING WALL
CH-100+460-100+520
Detail- D 0.5 1.8
HFL
1074.98 DETAILS OF BREAST WALL
4.00
3.00
Spurs (Gabion)
30m C/C Anchors 2m long, Ø = 25mm
LWL 3.00 7.50 SDA/CTA Spacing = 2m c/c in
BED LEVEL Longitudinal Directions
1068.35
Non Woven Geotextile PROJECT :
PROTECTION WORKS OF LANDSLIDE AT BARETI

AUTHORITY AUTHORITY PROOF CHECKING SAFETY TECHNOLOGY PARTNER EPC CONTRACTOR DRAWING TITLE:
ENGINEER CONSULTANT CONSULTANT TYPICAL CROSS SECTION OF LANDSLIDE MITIGATION WORKS AT BARETHI
M/s BHARAT CONSTRUCTION (FROM CH: 100+500 TO 100+600
TECHNOLOGY SPECIALIST AND SYSTEM PROVIDER FOR SLOPE
Genstru Consultants Pvt Ltd PROTECTION AND GROUND IMPROVEMENT MEASURES
R2 DRAWING REVISED UP-TO-DATE DRG. NO.: IND-NH-2020-3475-MX/04 Date:
Unit no.403-409, Fourth Floor, Suncity Success --
B-415, Ganga Osian Square, Survey R1 23.03.2018 Second Submission
Tower, Main Golf Course Extension Road, Sector Sheet No: Designed Checked: Process Approved: Status: Scale:
National Highways & Infrastructure No.249/250, Mankar Uday Vihar, 9 PPCL Colony,
-65, Gurugram, Haryana Check: NTS
Development Corporation Limited Chowk,Wakad,Pune-411057 Haridwar Bypass Road, Dehradun (UK) R0 01.03.2018 First Submission
Email:email@genstru.com
Ph No.0124 - 2841400 4 of 12 Rev No:
PRODUCED BY AN AUTODESK STUDENT VERSION
Website: www.maccaferri.com/in REV. NO. DATE DESCRIPTION DSK KP/SC - - FOR APPROVAL 2

You might also like