Professional Documents
Culture Documents
10
MIRROR CLADDING BC
800 150 830 150 830 150 825 150 400 400 MR-01 REFRIGERATED GRAB & GO DISPLAY 1200X750X2000
01
440
WALL PAPER FINISH
WC-01a
BC REFRIGERATED DISPLAY 600X750X2000MM
BRASS METAL SHELF
MT-01 01A
BRASS METAL MESH
KEY PLAN
BC
550
MT-01 S/S UNDER STRUCTURE COUNTER W/ NEUTRAL STORAGE
&SPACE BELOW, DIMENSION 2450X4865X2140X800/900X850MM SHEET NOTES:
02
BC · This drawing is for design intent purposes only and is not to
800
800
CARVING STATION be scaled.
MIRROR CLADDING 03
2400
· All dimensions shown are in millimeters and are set out
450
MR-01 from the applied finish surface.
BC · All dimensions are to be verified on site by the contractor
100
800 3085 800 BUILT IN HEATED PLATE prior to creation of shop drawings, manufacture and installation.
04 · Any omissions or discrepancies found shall be reported to
STONE CLADDING the ID consultant / Engineer immediately for clarification.
ST-01a BC · This drawing is to be read in conjunction with the relevant
1255
S/S 2 DOOR CHILLER
A BRASS METAL TRIM
MT-01
06 section of the specifications, schedules and drawings referenced
· All necessary structural supports to all items including
1650
700
ceiling hung, wall hung, built-in units or cantilevered items shall be
C B AMBIENT COUNTER
STONE CLADDING
BC SS HEAT BRIDGE W/GLASS SNEEZE GUARD & STRIP HEATER HOLDER of adequate strength to ensure stability and shall be considered by
ID-2002 ID-2002 800 07 DIMENSION 2450X400MM the contractor.
ST-01a
· The contractor shall submit full shop / setting out drawings
for approval (based on site verified dimensions) prior to
BC STRIP HEATER commencement of any site works, placing any orders or
150
BRASS METAL SKIRTING 08 DIMENSION 914X153X64 MM manufacture of any fittings, fixtures and components shown.
MT-01 · All work must conform to municipality regulations, national
800
and international building code and all regulations by governing
BUFFET COUNTER authorities.
Fridge
(Kitchen equipment 1880 · The contractor must ensure all coordination between his
1880
PROPOSED MR GYPSUM
BOARD CEILING
PT-03
BRASS METAL TRIM
10
1240
MT-01
440
1 28.03.2023 DD PACKAGE REVISED SUBMISSION-01 SPS
BRASS METAL TRIM
MT-01 0 30.11.2022 DD PACKAGE SUBMISSION SPS
ADD-2002 SCALE-1:30@ A1
2400
MIRROR CLADDING
450
800 MR-01
150 1350 150
100
ST-01a
4685 CLIENT
165
915 990 230 990 660 730
BRASS METAL SKIRTING
180
MT-01
900
535
535
AcDbWipeout (WipeOut)
AcDbWipeout (WipeOut)
AcDbWipeout (WipeOut)
INTERIOR CONSULTANT
180
4 BUFFET - ELEVATION-B
AcDbWipeout (WipeOut)
ADD-2002 SCALE-1:20@ A1
HOT COUNTER
BC BC BC BC
800 04 07 BC 3085 BC 04 03
PROPOSED MR GYPSUM
AMBIENT COUNTER
AMBIENT COUNTER
08 08
800 BOARD CEILING
PT-03
1135
1550
BC
02 BRASS METAL TRIM
BUFFET MT-01
Al-Nahda First, Office 104 Saheel 2 Building Dubai, United Arab Emirates
Direct +971 50 3002975
BC COUNTER WALL PAPER FINISH
06 BC WC-01a LIGHTING CONSULTANT
450
01A
MIRROR CLADDING
MR-01
COLD COUNTER
1900
550
MT-01
MT-01
450
01
100
CLEAR GLASS
700