The document shows two building sections labeled AA' and BB'. It depicts a parapet wall at a height of 1 meter above the parapet level. The parapet level is at 4.15 meters above the first floor level. The first floor level is 9.3 meters above the finished floor level, which is 0.45 meters above the ground line.
The document shows two building sections labeled AA' and BB'. It depicts a parapet wall at a height of 1 meter above the parapet level. The parapet level is at 4.15 meters above the first floor level. The first floor level is 9.3 meters above the finished floor level, which is 0.45 meters above the ground line.
The document shows two building sections labeled AA' and BB'. It depicts a parapet wall at a height of 1 meter above the parapet level. The parapet level is at 4.15 meters above the first floor level. The first floor level is 9.3 meters above the finished floor level, which is 0.45 meters above the ground line.