You are on page 1of 1

EE

THIED FLOOR LEVEL FF +9950mm LVL

THIRD FLOOR LEVEL FF +9950mm LVL THIRD FLOOE LEVEL UF +9835mm LVL

-5205 MM LVL.

+230 MM LVL. TOILET RISEN +7000mm LVL (150mm)


+600 MM LVL. SECOND FLOOR LEVEL FF +6850mm LVL
SECOND FLOOR LEVEL UF +6735mm LVL
SECOND FLOOR LEVEL FF +6850mm LVL

230mm WALL
+115mm LVL.
-3430 MM LVL. 115mm HALLOW SPACE

115mm WALL

+230 MM LVL. 600mm PROJECTION


FIRST FLOOR LEVEL FF +3650mm LVL

+600mm LVL. FIRST FLOOR LEVEL FF +3650mm LVL


FIRST FLOOR LEVEL UF +3350mm LVL

FIRST FLOOR LEVEL UF +3350mm LVL GROUND FLOOR BEAM BOTTOM +3235mm LVL

-3430mm LVL.

-100mm LVL.

GROUND FLOOR LEVEL +450mm LVL


GROUND FLOOR LEVEL +450mm LVL TOILET SUNKEN +250mm LVL
PARKING LEVEL +150mm LVL
TOILET SUNKEN +250mm LVL
PARKING LEVEL +150mm LVL ROAD LEVEL ±0.00mm LVL

1400.00 2800.00 4260.00

4 3 2 1 SECTION EE
EE

THIS DRAWING IS THE PROPERTY OF STUDIO DOPE AND IS NOT TO BE COPIED OR USED
PROJECT NAME: WITHOUT PRIOR PERMISSION SHEET NAME: DATE: SHEET NO:
GENERAL NOTES
N
O ALL DIMENSIONS ARE IN FEET ADN INCHES UNLESS MENTIONED OTHERWISE DRAWN BY: AMRIT
EAST-200
HALLMARK - PIEPLINE O THIS DRAWING SHALL NOT BE MEASURED AND ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED.
O ALL DIMENSIONS SHALL BE CP-RELATED WITH STRUCTURAL AND SERVICES DRAWINGS AND
ANY AMBIGUITY SHALL BE IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT
STUDIO DOPE ELEVATION - EAST CHECKED BY: ARUN

BEFORE THE COMMENCEMENT OF WORK. SCALE:


O THIS DRAWING SHALL SUPERCEDE ITS PREVIOUS REVISIONS.

You might also like