You are on page 1of 1

MENTIONED OTHERWISE

SPECIFIC NOTES
1
2
3
4

UNLESS MENTIONED OTHERWISE


11125.20
4260.00 2800.00 1400.00

3. GRID LINES ARE PASSING THROUGH CENTRE


1115.64

OF COLUMNS UNLESS MENTIONED OTHERWISE


2. ALL DIMENSIONS ARE TO MASONRY/RCC FACES
1. ALL DIMENSIONS ARE IN FEET& INCHES UNLESS
15

4. READ THIS DRAWING IN CONJUCTION WITH A-2-2-1


77
.72

1115.60

OTHERWISE

SPECIFICATIONS
3540.00

UNTIL PLINTH BEAMS ARE CAST.


B

7. ALL RCC WORKS SHALL BE DONE IN ACCORDANCE


WITH STRUCTURAL CONSULTANT'S DRAWINGS AND
2060.00

6. PILLARS MADE FOR GRID LINES SHALL BE RETAINED


5. COLUMN SIZES ARE INDICATIVE UNLESS MENTIONED
C

CENTER LINE
D
15240.00
265.00 3050.00

COLUMN ORIENTATIONS.
E

CHECK FOR GRID LINES MARKING AND


APPROVALS FROM ARCHITECTS OFFICE

ON COMPLETION OF PCC BASE FOR COLUMN FOOTINGS -


3430.00

F
23
59
.54
1779.40

1549.56

10.0M W I D E R O A D

THIS DRAWING IS THE PROPERTY OF BHOSHO ARCHITECTS PVT. LTD. KEY. PROJECT : TITLE :
HALLMARK PIPELINE,
AND IS NOT TO BE COPIED OR USED WITHOUT PRIOR PERMISSION. COLUMN CENTERLINE LAYOUT
GROUP HOUSING AT VELIMALA, TS.
GENERAL NOTES
CLIENT : STAGE: REV NO:
THIS DRAWING SHALL NOT BE MEASURED AND ONLY WRITTEN
DIMENSIONS SHALL BE FOLLOWED.
HALLMARK BUILDERS CONSTRUCTION R1
ALL DIMENSIONS SHALL BE CO-RELATED WITH STRUCTURAL
AND SERVICE DRAWINGS AND ANY AMBIGUITY SHALL BE
ORIENTATION DRAWING NO: a r c h i t e c t s
DRAWN SIMRAN
: SCALE 1"
: : 6'-0"
IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT
BEFORE THE COMMENCEMENT OF WORK. BHOSHO ARCHITECTS PVT.LTD.
FLAT-202,SECOND FLOOR,GOOD EARTH
REV NO. DATE OF REV. DESCRIPTION OF REVISION CHECKED : RAVI DATE : APARTMENT,JAYABHERI PINE VALLEY,
THIS DRAWING SHALL SUPERCEDE ITS PREVIOUS REVISIONS. ID: E-200 BESIDE CYBERABAD COMMISSIONERATE,
GACHIBOWLI. HYDERABAD -32.
ALL DIMENSIONS ARE IN FEET AND INCHES UNLESS MENTIONED (EAST TEL: +91 88850 44248.
OTHERWISE.
REVISIONS APPROVEDBHUPAL
: PROJECT NO:153 E-MAIL: bhoshodesigngroup@gmail.com
N FACING)

You might also like