You are on page 1of 1

WE

THIRD FLOOR LEVEL FF +9950mm LVL THIED FLOOR LEVEL FF +9950mm LVL

THIRD FLOOE LEVEL UF +9835mm LVL

± 000 MM LVL.

SLOPE 41"
COPING

PARAPET WALL

TOILET RISEN +7000mm LVL (150mm)


SECOND FLOOR LEVEL FF +6850mm LVL SECOND FLOOR LEVEL FF +6850mm LVL
SECOND FLOOR LEVEL UF +6735mm LVL

-3310 MM LVL.

± 000 MM LVL.

STAINLESS STEEL

COPING
FIRST FLOOR LEVEL FF +3650mm LVL FIRST FLOOR LEVEL FF +3650mm LVL

FIRST FLOOR LEVEL UF +3350mm LVL FIRST FLOOR LEVEL UF +3350mm LVL

-115 MM LVL. GROUND FLOOR BEAM BOTTOM +3235mm LVL

GROUND FLOOR LEVEL +450mm LVL


GROUND FLOOR LEVEL +450mm LVL

TOILET SUNKEN +250mm LVL TOILET SUNKEN +250mm LVL


PARKING LEVEL +150mm LVL
PARKING LEVEL +150mm LVL

1400.00 2800.00 4260.00

4 3 2 1
WE

SECTION WE

THIS DRAWING IS THE PROPERTY OF STUDIO DOPE AND IS NOT TO BE COPIED OR USED
PROJECT NAME: WITHOUT PRIOR PERMISSION SHEET NAME: DATE: SHEET NO:
GENERAL NOTES
N
O ALL DIMENSIONS ARE IN FEET ADN INCHES UNLESS MENTIONED OTHERWISE DRAWN BY: AMRIT
EAST-200
HALLMARK - PIEPLINE O THIS DRAWING SHALL NOT BE MEASURED AND ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED.
O ALL DIMENSIONS SHALL BE CP-RELATED WITH STRUCTURAL AND SERVICES DRAWINGS AND
ANY AMBIGUITY SHALL BE IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT
STUDIO DOPE ELEVATION - WEST CHECKED BY: ARUN

BEFORE THE COMMENCEMENT OF WORK. SCALE:


O THIS DRAWING SHALL SUPERCEDE ITS PREVIOUS REVISIONS.

You might also like