Professional Documents
Culture Documents
CIREBON
CIREBON
JUMLAH 739,500,000 - - - 5,350,000 357,500 - - 189,000 2,087,500 500,000 - 6,627,200 266,000 14,000 - - - -
PEMASUKAN
No KETERANGAN NOMINAL (Rp)
1 SALDO TUNAI AKHIR BULAN LALU 115,904,600
2 HR (PUSAT) / TAMBAHAN MODAL (CABANG) / BANK (CABANG) 400,000,000
3 LAIN - LAIN -
4 DO 5% ( PUSAT ) / DO 10% ( CABANG ) 73,950,000
5 STORTING 177,090,000
TOTAL PEMASUKAN 766,944,600
PENGELUARAN
I. DROPPING 739,500,000
II. BIAYA TETAP PERUSAHAAN
1 Gaji Karyawan -
2 Gaji Pembantu -
3 Bonus (semua bonus) -
4 Transport 5,350,000
III. BIAYA OPERASIONAL KANTOR
5 Rekening Listrik 357,500
6 Rekening Air -
7 Rekening Telpon -
8 ATK/ Percetakan/ Fotocopy 189,000
9 Rumah Tangga 2,087,500
10 Bantuan Kost 500,000
11 Inventaris 6,627,200
12 Biaya berobat/ kecelakaan 266,000
13 Biaya Admin Bank/ Exspedisi 14,000
IV. BIAYA ANGSURAN
14 Angsuran Sewa Kantor 4,316,700
15 Angsuran Tambahan Modal/ Modal Awal -
V. BIAYA KENDARAAN
16 Perpanjangan STNK -
17 Pembelian Olie (semua olie) -
18 Pembelian Ban -
19 Service -
20 Suku Cadang -
21 Sewa Motor/ Kendaraan -
22 Biaya Perjalan Dinas -
VII.BIAYA LAIN - LAIN 2,650,000
SUB TOTAL 761,857,900
VIII.KOREKSI STORTING LEBIH -
IX.SETORAN BANK
1 Setoran DO 5 % -
2 Setoran SU -
3 Setoran HR -
4 Setoran Dana Cadangan -
5 Setoran Dana Talangan -
6 Setoran Lain - lain -
SUB TOTAL -
TOTAL PENGELUARAN 761,857,900
SALDO TUNAI AKHIR 28 Februari 2019 5,086,700
Disetujui,
Kepala Kantor/ Staff Pusat Kasir
(…………………) ( WIDANINGSIH )
* Apabila tidak di tanda tangani staff pusat/ kepala kantor (utk pusat) maka laporan ini dianggap tidak berlaku
* Laporan sudah diterima pusat paling lambat tanggal 10 setiap bulannnya