16,350.00 3920
Besi Kg/M' Kg/Btg'
D6 0.222 2.660
D7 0.303 3.630
D8 0.395 4.740
D9 0.500 6.000
D10 0.617 7.400
D12 0.892 10.700
D16 1.583 19.000
D19 2.233 26.800
D22 2.983 35.800
D25 3.850 46.200
15,400.00 30 14,450.00
DAFTAR HARGA SATUAN UPAH
Basic Price Semester II Tahun 2022 - Provinsi Maluku
( Update : 01 September 2022 )
Kode Region IV
Page 4 BHN
NO MATERIAL SAT HARGA (Rp) KETERANGAN
Page 5 BHN
NO MATERIAL SAT HARGA (Rp) KETERANGAN
I. BAHAN KACA
2 Kaca Polos 3 mm ( ASAHI ) m2 - On Site
3 Kaca Polos 5 mm ( ASAHI ) m2 174,000.00 On Site
4 Kaca Polos 8 mm ( ASAHI ) m2 434,000.00 On Site
5 Kaca Rayband 3 mm ( ASAHI ) m2 - On Site
6 Kaca Rayband 5 mm ( ASAHI ) m2 979,000.00 On Site
7 Kaca Rayband 8 mm ( ASAHI ) m2 - On Site
9 Kaca cermin 5 mm m2 - On Site
10 Kaca cermin 6 mm m2 - On Site
11 Kaca cermin 8 mm m2 - On Site
15 Glass Block DN 20 x 20 ( Kedawung ) bh 65,000.00 On Site
16 Glass Block DN 20 x 20 Ex LN bh 65,000.00 On Site
17 Sealant kg 55,000.00 On Site
Page 6 BHN
NO MATERIAL SAT HARGA (Rp) KETERANGAN
K. BAHAN PERPIPAAN
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 388,000.00 On Site
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 416,000.00 On Site
16 Pipa GIP Medium A 1" ( 6 m1 ) bt - On Site
20 Pipa GIP Medium A 2" ( 6 m1 ) bt - On Site
34 Pipa PVC WAVIN type AW 1/2" x 4 m' bt 104,000.00 On Site
35 Pipa PVC WAVIN type AW 3/4" x 4 m' bt 121,000.00 On Site
39 Pipa PVC WAVIN type AW 2" x 4 m' bt 287,000.00 On Site
40 Pipa PVC WAVIN type AW 2 1/2" x 4 m' bt 392,000.00 On Site
41 Pipa PVC WAVIN type AW 3" x 4 m' bt 287,000.00 On Site
42 Pipa PVC WAVIN type AW 4" x 4 m' bt 287,000.00 On Site
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 104,000.00 On Site
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 121,000.00 On Site
50 Pipa PVC MASPION ABU ( AW ) 2" bt 287,000.00 On Site
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt 392,000.00 On Site
52 Pipa PVC MASPION ABU ( AW ) 3" bt 400,000.00 On Site
53 Pipa PVC MASPION ABU ( AW ) 4" bt 526,000.00 On Site
L. BAHAN SANITAIR
1 Stop Kran Hendel 3/4" KIT bh 118,000.00 On Site
11 Saringan Air Lt. KM Stainless Steel bh 41,000.00 On Site
Saringan Air Lt. KM Plastik bh 35,000.00 On Site
13 Kran Stainless Lokal Kait bh 42,000.00 On Site
16 Kran Tembok Sun Eui dia. 3/4" bh 42,000.00 On Site
17 Kran Tembok ITAP dia. 1/2" bh 42,000.00 On Site
18 Kran Bebek Sun Eui 1/2" bh 45,000.00 On Site
19 Kran Bebek ITAP 1/2" bh 89,000.00 On Site
23 Wastafel Lengkap TOTO LW 230 unit - On Site
24 Wastafel Amerika Standard (Kecil) unit 410,000.00 On Site
25 Wastafel Amerika Standard (Besar) unit 1,899,000.00 On Site
26 Closet Jongkok Poslin Warna TOTO unit 270,000.00 On Site
27 Closet Jongkok Putih Poslin Amerikan Standard unit 460,000.00 On Site
28 Closet Jongkok Poslin Merk CONTINENTAL unit 257,000.00 On Site
29 Closet Jongkok Lengkap Sistem Jet TOTO unit - On Site
30 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 2,171,000.00 On Site
31 Closet Duduk Warna Amerika Standard Lengkap unit 2,132,000.00 On Site
32 Closet Duduk Warna Standard PARMA bh 1,642,000.00 On Site
33 Urinoir Lengkap TOTO Warna Standard Lengkap unit 3,207,000.00 On Site
34 Penyekat Poslin Urinoar TOTO lbr 590,000.00 On Site
Urinoir Lokal Putih Standard Lengkap unit 780,000.00 On Site
35 Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) bh 226,000.00 On Site
Kitchen Zink Stainless Standard Lokal ( 2 Lubang ) bh 765,000.00 On Site
36 Kitchen Zink Stainless Non Standard Franke ( 1 Lubang ) bh 765,000.00 On Site
Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) bh 865,000.00 On Site
37 Talang PVC U - 15 cm m' 104,000.00 On Site
Page 7 BHN
NO MATERIAL SAT HARGA (Rp) KETERANGAN
N. BAHAN MEKANIKAL
O. BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Eterna/Prima ( 1 rol = 50 m' ) ROLL - On Site
2 Kabel NYA 1 x 2.5 Eterna/Prima ( 1 rol = 50 m' ) ROLL - On Site
3 Kabel NYM 2 x 1.5 Eterna/Prima ( 1 rol = 50 m' ) m' 15,000.00 On Site
4 Kabel NYM 2 x 2.5 Eterna/Prima ( 1 rol = 50 m' ) m' 17,000.00 On Site
5 Kabel NYM 3 x 1.5 Eterna/Prima ( 1 rol = 50 m' ) m' 16,000.00 On Site
6 Kabel NYM 3 x 2.5 Eterna/Prima ( 1 rol = 50 m' ) m' 23,000.00 On Site
7 Kabel NYM 4 x 2.5 Eterna/Prima ( 1 rol = 50 m' ) m' 29,000.00 On Site
10 Kabel NYM 4 x 4 Eterna/Prima ( 1 rol = 50 m' ) m' 42,000.00 On Site
18 Kabel NYY 2 x 1,5 Eterna ( 1 rol = 50 m' ) m' 15,000.00 On Site
19 Kabel NYY 2 x 2,5 Eterna ( 1 rol = 50 m' ) m' 17,000.00 On Site
20 Kabel NYY 3 x 1,5 Eterna ( 1 rol = 50 m' ) m' 16,000.00 On Site
21 Kabel NYY 3 x 2,5 Eterna ( 1 rol = 50 m' ) m' 23,000.00 On Site
22 Kabel NYY 4 x 2,5 Eterna ( 1 rol = 50 m' ) m' 29,000.00 On Site
23 Kabel NGA 1,5 mm m' 11,500.00 On Site
24 Kabel NGA 2,5 mm m' 12,500.00 On Site
25 Kabel NYA warna 1 x 2,5 mm Supreme ( 1 rol = 50 m' ) m' 14,700.00 On Site
28 Kabel Feeder NFGBY 4 x 6 mm m' 88,000.00 On Site
31 Rumah Panel 30 x 60 cm ( Kosong ) unt 180,000.00 On Site
32 Skring Kas 2 grop Biasa unt 208,000.00 On Site
33 Skring Kas 3 grop Biasa unt 226,000.00 On Site
34 Skring Kas 5 grop Biasa unt 468,000.00 On Site
Page 8 BHN
NO MATERIAL SAT HARGA (Rp) KETERANGAN
Page 9 BHN
NO MATERIAL SAT HARGA (Rp) KETERANGAN
T. ALAT TUKANG
V. BAHAN PAGAR
W. BIDANG PERTAMANAN
Page 10 BHN
DAFTAR HARGA
UPAH DAN BAHAN
OVERHEAD
KWARI/CHK. ONGKS.ANGKU GALIAN "C" HARGA DI ASTEK
10% - 15% TOTAL HARGA DIBULATKAN
T KE PROYEK 20% LOKASI 5%
(Rp) (Rp)
NO. JENIS MATERIAL YANG DIPAKAI SATUAN (Rp) (Rp) (Rp) (Rp) (Rp)
(Rp)
(1) (2) (3) (4) (5) (6) (7) (8)
(1)+(2)+(3) 5% x (4) 10% x (4) (4)+(5)+(6)
I SATUAN UPAH
1 Pekerja / Hari 120,000.00 120,000.00 - - 120,000.00 120,000.00
2 Tukang Batu, Kayu, Besi, Cat, Listrik, Pipa, Alluminium / Hari 164,000.00 164,000.00 - - 164,000.00 150,000.00
3 Kepala tukang / Hari 175,000.00 175,000.00 - - 175,000.00 175,000.00
4 Mandor / Hari 200,000.00 200,000.00 - - 200,000.00 200,000.00
II SATUAN BAHAN
A. Batu kali
1 Batu Belah Pondasi / Batu Kali / Batu Karang / M3 450,000.00 - 450,000.00 - 450,000.00 450,000.00
2 Batu Pecah Mesin 1/2 cm (m3) / M3 550,000.00 - 550,000.00 - 550,000.00 550,000.00
3 Batu Pecah Mesin 1/2 cm (Kg) / Kg 407.41 - 407.41 - 407.41 407.00
4 Batu Pecah 2/3 cm (m3) / M3 550,000.00 - 550,000.00 - 550,000.00 550,000.00
5 Batu Pecah 2/3 cm (Kg) / Kg 407.41 - 407.41 - 407.41 407.00
6 Batu Kerikil Sungai (m3) / M3 450,000.00 - 450,000.00 - 450,000.00 450,000.00
7 Batu Kerikil Sungai (Kg) / Kg 333.33 - 333.33 - 333.33 333.00
8 Batu Bata merah / Bh 3,300.00 - 3,300.00 - 3,300.00 3,300.00
9 Batu Bataco Semen uk. 23 x 12 x 8 Bh 4,000.00 - 4,000.00 - 4,000.00 4,000.00
10 Batu Conblock HB10 uk. 30 x 13 x 9 Bh 10,000.00 - 10,000.00 - 10,000.00 10,000.00
B. Pasir/ Tanah
1 Pasir Urug / M3 326,000.00 - 326,000.00 - 326,000.00 326,000.00
2 Pasir Pasir Pasang / Kali / Pantai (M3) / M3 450,000.00 - 450,000.00 - 450,000.00 450,000.00
3 Pasir Pasir Pasang / Kali / Pantai (Kg) / Kg 321.43 - 321.43 - 321.43 321.00
4 Pasir Beton / M3 / M3 450,000.00 - 450,000.00 - 450,000.00 450,000.00
5 Pasir Beton / Kg / Kg 321.43 - 321.43 - 321.43 321.00
6 Tanah Urug / Timbunan Biasa / M3 400,000.00 - 400,000.00 - 400,000.00 400,000.00
7 Tanah Urug / Sirtu Padat / M3 450,000.00 - 450,000.00 - 450,000.00 450,000.00
D. Bahan Atap
1 Bumbungan Genteng Metal / Lbr 78,000.00 78,000.00 - 78,000.00 78,000.00
2 Zink datar BJLS 0.25 (914 x 1829 mm) / Lbr 72,000.00 72,000.00 - 72,000.00 72,000.00
3 Zink datar BJLS 0.30 (914 x 1829 mm) / Lbr 82,000.00 82,000.00 - 82,000.00 82,000.00
4 Zink gelombang BJLS 0.25 (914 x 1829 mm) / Lbr 113,000.00 113,000.00 - 113,000.00 113,000.00
5 Zink gelombang BJLS 0.30 (914 x 1829 mm) / Lbr 113,000.00 113,000.00 - 113,000.00 113,000.00
6 Atap Zincalum Almunium/Spandek, tbl. 0,25 mm / Lbr 238,000.00 238,000.00 - 238,000.00 238,000.00
7 Atap Zincalum Almunium/Spandek, tbl. 0,25 mm / M2 90,666.67 90,666.67 - 90,666.67 90,600.00
8 Nok standar 40 cm 18, SWG 22 / M2 68,000.00 68,000.00 - 68,000.00 68,000.00
OVERHEAD
KWARI/CHK. ONGKS.ANGKU GALIAN "C" HARGA DI ASTEK
10% - 15% TOTAL HARGA DIBULATKAN
T KE PROYEK 20% LOKASI 5%
(Rp) (Rp)
NO. JENIS MATERIAL YANG DIPAKAI SATUAN (Rp) (Rp) (Rp) (Rp) (Rp)
(Rp)
(1) (2) (3) (4) (5) (6) (7) (8)
(1)+(2)+(3) 5% x (4) 10% x (4) (4)+(5)+(6)
E. Bahan Kayu, Gipsum & Wallpaper
1 Kayu Kls. I (5/10, 6/12, 10/10) / M3 8,484,000.00 8,484,000.00 - 8,484,000.00 8,480,000.00
2 Kayu papan Kls. I semua ukuran / M3 8,484,000.00 8,484,000.00 - 8,484,000.00 8,480,000.00
3 Kayu Kls. II semua ukuran (Kayu makila, meranti) / M3 4,848,000.00 4,848,000.00 - 4,848,000.00 4,840,000.00
4 Kayu papan Kls. II semua ukuran / M3 4,848,000.00 4,848,000.00 - 4,848,000.00 4,840,000.00
5 Kayu Kls. III semua ukuran / M3 3,121,000.00 3,121,000.00 - 3,121,000.00 3,120,000.00
6 Kayu papan Kls. III semua ukuran / M3 3,121,000.00 3,121,000.00 - 3,121,000.00 3,120,000.00
7 Tripleks tebal 4 mm / Lbr 243,000.00 243,000.00 - 243,000.00 243,000.00
8 Tripleks tebal 9 mm / Lbr 571,000.00 571,000.00 - 571,000.00 571,000.00
9 List kayu klas I profil lebar 8 cm / M' 23,500.00 23,500.00 - 23,500.00 23,500.00
10 Kalsiboard, tebal 5 mm / Lbr 195,980.00 195,980.00 - 195,980.00 195,900.00
11 Gypsum board, t=9 mm / Lbr 183,000.00 183,000.00 - 183,000.00 183,000.00
12 Papan GRC Board 30 cm, t = 9 mm (400 cm) / Lbr 90,000.00 90,000.00 - 90,000.00 90,000.00
13 Dolken kayu Ø8-10 mm / 4 m / Btg 60,000.00 60,000.00 - 60,000.00 60,000.00
F. Kawat
1 Kawat bendrat / KG 41,000.00 41,000.00 - 41,000.00 41,000.00
2 Kawat Las 3.2 mm / KG 58,000.00 58,000.00 - 58,000.00 58,000.00
H. Bahan Kaca
1 Kaca Bening 5 mm / M2 174,000.00 174,000.00 - 174,000.00 174,000.00
2 Kaca Raibend 5 mm / M2 979,000.00 979,000.00 - 979,000.00 979,000.00
I. Bahan Listrik
1 Titik Cahaya / Ttk 200,000.00 200,000.00 - 200,000.00 200,000.00
2 Titik Stop Kontak / Ttk 200,000.00 200,000.00 - 200,000.00 200,000.00
3 Saklar tunggal inbow broco / Bh 31,000.00 31,000.00 - 31,000.00 31,000.00
4 Saklar ganda inbouw broco / Bh 31,000.00 31,000.00 - 31,000.00 31,000.00
5 Stop kontak inbouw broco / Bh 28,000.00 28,000.00 - 28,000.00 28,000.00
6 Lampu SL esensial Phillips 11 Watt / Bh 31,000.00 31,000.00 - 31,000.00 31,000.00
7 Lampu SL esensial Phillips 18 Watt / Bh 43,000.00 43,000.00 - 43,000.00 43,000.00
8 Lampu SL esensial Phillips 10 Watt (LED) / Bh 45,000.00 45,000.00 - 45,000.00 45,000.00
9 Lampu philips SL 25 Watt feting tempel (lengkap) / Bh 318,000.00 318,000.00 - 318,000.00 318,000.00
10 Lampu philips SL 18 Watt feting tempel (lengkap) / Bh 286,200.00 286,200.00 - 286,200.00 286,200.00
11 Kabel NYM 3 x 2,5mm (1 rol = 50 M') / Roll 1,150,000.00 1,150,000.00 - 1,150,000.00 1,150,000.00
12 Kabel NYM 3 x 2,5mm /M 23,000.00 23,000.00 - 23,000.00 23,000.00
13 T doz / Bh 6,000.00 6,000.00 - 6,000.00 6,000.00
14 Lasdop / Bh 1,500.00 1,500.00 - 1,500.00 1,500.00
15 Benang Tukang / Bh 9,000.00 9,000.00 - 9,000.00 9,000.00
16 Isolasi / Bh 16,000.00 16,000.00 - 16,000.00 16,000.00
17 Fitting tempel plafond / Bh 47,000.00 47,000.00 - 47,000.00 47,000.00
OVERHEAD
KWARI/CHK. ONGKS.ANGKU GALIAN "C" HARGA DI ASTEK
10% - 15% TOTAL HARGA DIBULATKAN
T KE PROYEK 20% LOKASI 5%
(Rp) (Rp)
NO. JENIS MATERIAL YANG DIPAKAI SATUAN (Rp) (Rp) (Rp) (Rp) (Rp)
(Rp)
(1) (2) (3) (4) (5) (6) (7) (8)
(1)+(2)+(3) 5% x (4) 10% x (4) (4)+(5)+(6)
J. Alat Penggantun / Pengunci
1 Kunci pintu tanam kaca 2 slag / Bh 267,000.00 267,000.00 - 267,000.00 267,000.00
2 Engsel pintu nilon 4" / Psg 90,000.00 90,000.00 - 90,000.00 90,000.00
3 Engsel jendela nilon 3" / Psg 69,000.00 69,000.00 - 69,000.00 69,000.00
4 Engsel pintu angin 4" / Psg 51,000.00 51,000.00 - 51,000.00 51,000.00
5 Grendel Pintu / Bh 57,000.00 57,000.00 - 57,000.00 57,000.00
6 Grendel jendela, ventilasi / Bh 13,000.00 13,000.00 - 13,000.00 13,000.00
7 Kait angin 4" jendela/ ventilasi / Bh 41,000.00 41,000.00 - 41,000.00 41,000.00
K. Bahan Paku
1 Paku Semua Ukuran / KG 42,000.00 42,000.00 - 42,000.00 42,000.00
2 Paku Genteng / KG 280,000.00 280,000.00 - 280,000.00 280,000.00
3 Paku Skrup (bh) / Bh 580.00 580.00 - 580.00 500.00
4 Paku Skrup (kg) / KG 280,000.00 280,000.00 - 280,000.00 280,000.00
5 Skrup fixer / Bh 580.00 580.00 - 580.00 500.00
6 Paku beton semua ukuran / Dos 51,000.00 51,000.00 - 51,000.00 51,000.00
L. Bahan Besi
1 Besi Beton U-24 Rata-rata (polos) / KG 16,475.00 16,475.00 - 16,475.00 16,400.00
2 Besi Beton U-39 / U-32 Rata-rata (ulir) / KG 17,840.00 17,840.00 - 17,840.00 17,800.00
3 Besi strip 5 mm / Btng 168,750.00 168,750.00 - 168,750.00 168,700.00
4 Besi strip 5 mm / Kg 28,000.00 28,000.00 - 28,000.00 28,000.00
5 Baja Ringan Canai Dingin C 75 x 35,5 x 0.75 mm / M' 38,330.00 38,330.00 - 38,330.00 38,300.00
6 Baten / Reng U 50 x 30 x 0,5 / M' 14,580.00 14,580.00 - 14,580.00 14,500.00
7 Baut Dril Skrel dia. 12 mm 14 x 16 / Bh 1,150.00 1,150.00 - 1,150.00 1,100.00
8 Baut Dril Skrel dia. 12 mm 16 x 20 / Bh 1,150.00 1,150.00 - 1,150.00 1,100.00
9 Dinabold/Fisher Beton dia. 10 mm / Bh 9,000.00 9,000.00 - 9,000.00 9,000.00
10 Talang / Jurai Canai Dingin / M' 104,000.00 104,000.00 - 104,000.00 104,000.00
A.2.3.1.9. Pengurugan kembali1M3 galian dihitung dari 1/3kali dari koefisien pekerjaan galian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.500 120,000.00 60,000.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 70,000.00
B. BAHAN -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 70,000.00
Lembaran -17
A.4.4.1.10. Pemasangan 1 M2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.300 120,000.00 36,000.00
Tukang Batu L.02 Oh 0.100 150,000.00 15,000.00
Kepala Tukang L.03 Oh 0.010 175,000.00 1,750.00
Mandor L.04 Oh 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 55,750.00
B. BAHAN
Bata merah M3 70.000 3,300.00 231,000.00
Semen portland Kg 9.680 3,000.00 29,040.00
Pasir pasang M3 0.045 450,000.00 20,250.00
JUMLAH HARGA BAHAN 280,290.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 336,040.00
E. Overhead & Profit 12% x D 40,324.80
F. Harga Satuan Pekerjaan (D+E) 376,364.00
Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 1.6500 120,000.00 198,000.00
Tukang Batu L.02 Oh 0.2750 150,000.00 41,250.00
Kepala Tukang L.03 Oh 0.0280 175,000.00 4,900.00
Mandor L.04 Oh 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 260,750.00
B. BAHAN
Semen portland kg 299.000 3,000.00 897,000.00
Pasir beton kg 799.000 321.00 256,479.00
Kerikil (Maks 30mm) kg 1,017.000 407.00 413,919.00
Air Liter 215.000 200.00 43,000.00
JUMLAH HARGA BAHAN 1,610,398.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 1,871,148.00
E. Overhead & Profit 12% x D 224,537.76
F. Harga Satuan Pekerjaan (D+E) 2,095,685.00
*) Catatan : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %
A.4.1.1.5. Membuat 1 M3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 · ·2) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 1.6500 120,000.00 198,000.00
Tukang Batu L.02 Oh 0.2750 150,000.00 41,250.00
Kepala Tukang L.03 Oh 0.0280 175,000.00 4,900.00
Mandor L.04 Oh 0.0830 200,000.00 16,600.00
JUMLAH TENAGA KERJA 260,750.00
B. BAHAN
Semen portland kg 326.000 3,000.00 978,000.00
Pasir beton kg 760.000 321.00 243,960.00
Kerikil (Maks 30mm) kg 1,029.000 407.00 418,803.00
Air Liter 215.000 200.00 43,000.00
JUMLAH HARGA BAHAN 1,683,763.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 1,944,513.00
E. Overhead & Profit 12% x D 233,341.56
F. Harga Satuan Pekerjaan (D+E) 2,177,854.00
*) Catatan : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %
A.4.6.1.5. Pembuatan dan pemasangan 1 M2 daun pintu panel, kayu klas I atau II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 1.000 120,000.00 120,000.00
Tukang Kayu L.02 Oh 3.000 150,000.00 450,000.00
Kepala Tukang L.03 Oh 0.300 175,000.00 52,500.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 632,500.00
B. BAHAN
Papan Kayu Kelas I M3 0.040 8,480,000.00 339,200.00
Lem kayu Kg 0.500 55,000.00 27,500.00
JUMLAH HARGA BAHAN 366,700.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 999,200.00
E. Overhead & Profit 12% x D 119,904.00
F. Harga Satuan Pekerjaan (D+E) 1,119,104.00
A.4.6.1.6. Pembuatan dan pemasangan 1 M2 pintu dan jendela kaca, kayu klas I atau II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.800 120,000.00 96,000.00
Tukang Kayu L.02 Oh 2.400 150,000.00 360,000.00
Kepala Tukang L.03 Oh 0.240 175,000.00 42,000.00
Mandor L.04 Oh 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 506,000.00
B. BAHAN
Papan Kayu Kelas I M3 0.024 8,480,000.00 203,520.00
Lem kayu Kg 0.300 55,000.00 16,500.00
JUMLAH HARGA BAHAN 220,020.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 726,020.00
E. Overhead & Profit 12% x D 87,122.40
F. Harga Satuan Pekerjaan (D+E) 813,142.00
A.4.6.1.8. Pembuatan 1 M2 daun pintu plywood rangkap, rangka kayu klas II tertutup (lebar sampai 90 cm)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.700 120,000.00 84,000.00
Tukang Kayu L.02 Oh 2.100 150,000.00 315,000.00
Kepala Tukang L.03 Oh 0.210 175,000.00 36,750.00
Mandor L.04 Oh 0.035 200,000.00 7,000.00
JUMLAH TENAGA KERJA 442,750.00
B. BAHAN
Papan Kayu Kelas II M3 0.025 4,840,000.00 121,000.00
Paku 1 cm - 2,5 cm Kg 0.030 42,000.00 1,260.00
Lem kayu Kg 0.500 55,000.00 27,500.00
Plywood tebal 4 mm ukuran (90 x 220) cm Lembar 1.000 243000 243,000.00
JUMLAH HARGA BAHAN 392,760.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 835,510.00
E. Overhead & Profit 12% x D 100,261.20
Lembaran -31
SNI A.4.6.1.13. Pembuatan 1 M3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 4.000 120,000.00 480,000.00
Tukang Kayu L.02 Oh 12.000 150,000.00 1,800,000.00
Kepala Tukang L.03 Oh 1.200 175,000.00 210,000.00
Mandor L.04 Oh 0.200 200,000.00 40,000.00
JUMLAH TENAGA KERJA 2,530,000.00
B. BAHAN
Balok kayu M3 1.100 8,480,000.00 9,328,000.00
Besi strip tebal 5mm Kg 15.000 28,000.00 420,000.00
Paku 12 cm Kg 5.600 42,000.00 235,200.00
JUMLAH HARGA BAHAN 9,983,200.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 12,513,200.00
E. Overhead & Profit 12% x D 1,501,584.00
F. Harga Satuan Pekerjaan (D+E) 14,014,784.00
A.4.6.1.22. Pemasangan 1 M' listplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.100 120,000.00 12,000.00
Tukang Kayu L.02 Oh 0.200 150,000.00 30,000.00
Kepala Tukang L.03 Oh 0.020 175,000.00 3,500.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 46,500.00
B. BAHAN
Papan kayu Kls.2 M3 0.011 4,840,000.00 53,240.00
Paku 5 dan 7 cm Kg 0.050 42,000.00 2,100.00
JUMLAH HARGA BAHAN 55,340.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 101,840.00
E. Overhead & Profit 12% x D 12,220.80
F. Harga Satuan Pekerjaan (D+E) 114,060.00
Lembaran -33
A.4.6.1.20. Pemasangan 1 M2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.200 120,000.00 24,000.00
Tukang Kayu L.02 Oh 0.300 150,000.00 45,000.00
Kepala Tukang L.03 Oh 0.030 175,000.00 5,250.00
Mandor L.04 Oh 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 76,250.00
B. BAHAN
Kaso-kaso 5 x 7 cm M3 0.016 4,840,000.00 78,892.00
Paku 7 - 10 cm Kg 0.250 42,000.00 10,500.00
JUMLAH HARGA BAHAN 89,392.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 165,642.00
E. Overhead & Profit 12% x D 19,877.04
F. Harga Satuan Pekerjaan (D+E) 185,519.00
A.4.5.1.5. Pemasangan 1 M2 langit-langit tripleks (120 x 240) cm, tebal 3mm, 4mm & 6 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.100 120,000.00 12,000.00
Tukang Kayu L.02 Oh 0.100 150,000.00 15,000.00
Kepala Tukang L.03 Oh 0.010 175,000.00 1,750.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 29,750.00
B. BAHAN
Tripleks Lembar 0.375 243,000.00 91,125.00
Paku tripleks Kg 0.030 42,000.00 1,260.00
JUMLAH HARGA BAHAN 92,385.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 122,135.00
E. Overhead & Profit 12% x D 14,656.20
F. Harga Satuan Pekerjaan (D+E) 136,791.00
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.350 120,000.00 42,000.00
Tukang Kayu L.02 Oh 0.350 150,000.00 52,500.00
Kepala Tukang L.03 Oh 0.035 175,000.00 6,125.00
Mandor L.04 Oh 0.018 200,000.00 3,600.00
JUMLAH TENAGA KERJA 104,225.00
B. BAHAN
Rangka metal hollow 40.40.2 mm & 20.40.2 mm M1 4.000 14,700.00 58,800.00
Assesoris (perkuatan, las dll), 60% x rangka % 0.600 58,800.00 35,280.00
JUMLAH HARGA BAHAN 94,080.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 198,305.00
E. Overhead & Profit 12% x D 23,796.60
F. Harga Satuan Pekerjaan (D+E) 222,101.00
A.4.5.1.5. Pemasangan 1 M2 langit-langit KALSIBOARD (120 x 240) cm, tebal 4mm & 6 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.100 120,000.00 12,000.00
Tukang Kayu L.02 Oh 0.100 150,000.00 15,000.00
Kepala Tukang L.03 Oh 0.010 175,000.00 1,750.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 29,750.00
B. BAHAN
Kalsiboard, tebal 5 mm Lembar 0.375 195,900.00 73,462.50
Paku tripleks Kg 0.030 42,000.00 1,260.00
JUMLAH HARGA BAHAN 74,722.50
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 104,472.50
E. Overhead & Profit 12% x D 12,536.70
F. Harga Satuan Pekerjaan (D+E) 117,009.00
Lembaran -34
A.5.1.1 4a. (K3) Pemasangan 1 buah klosed duduk pakai tabung komplit.
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 1.200 120,000.00 144,000.00
Tukang Batu L.02 Oh 1.450 150,000.00 217,500.00
Kepala Tukang L.03 Oh 0.010 175,000.00 1,750.00
Mandor L.04 Oh 0.060 200,000.00 12,000.00
JUMLAH TENAGA KERJA 375,250.00
B. BAHAN
klosed Duduk Pakai Tabung (komplit) Unit 1.000 2,132,000.00 2,132,000.00
Semen Portland Kg 6.000 3,000.00 18,000.00
Pasir pasang M3 0.010 450,000.00 4,500.00
Perlengkapan 12% % 0.120 2,154,500.00 258,540.00
JUMLAH HARGA BAHAN 2,413,040.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 2,788,290.00
E. Overhead & Profit 12% x D 334,594.80
Lembaran -41
A.5.1.1.5a. (K3) Pemasangan 1 buah Wastafel Kitchen Zink Metalco Single Bowls
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 1.200 120,000.00 144,000.00
Tukang Kayu L.02 Oh 1.450 150,000.00 217,500.00
Kepala Tukang L.03 Oh 0.010 175,000.00 1,750.00
Mandor L.04 Oh 0.060 200,000.00 12,000.00
JUMLAH TENAGA KERJA 375,250.00
B. BAHAN
Kitchen Zink Metalco Single Bowls MS42/20 Unit 1.000 226,000.00 226,000.00
Semen Portland Kg 6.000 1,690.00 10,140.00
Pasir pasang M3 0.010 255,000.00 2,550.00
Perlengkapan 12% % 0.120 238,690.00 28,642.80
JUMLAH HARGA BAHAN 267,332.80
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 642,582.80
E. Overhead & Profit 12% x D 77,109.94
F. Harga Satuan Pekerjaan (D+E) 719,692.00
(RSNIT 2002 6.32) Memasang 1m' Saluran Keliling Bangunan ukuran (25 x 40) cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
B. BAHAN
Galian tanah m³ 0.1650 106,400.00 17,556.00
Urugan Pasir tbl. 5 cm dibawah rabat saluran m³ 0.0138 480,704.00 6,633.72
Rabat Beton 1 : 3 : 5, tbl. 8 cm (K-100) m³ 0.0220 1,759,268.00 38,703.90
Pasangan bata semen ad. 1pc : 4ps m² 0.0990 438,748.00 43,436.05
Plesteran 1 pc : 2 Ps m² 1.5400 116,252.00 179,028.08
JUMLAH HARGA BAHAN 285,357.74
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 285,357.74
E. Overhead & Profit 12% x D 34,242.93
F. Harga Satuan Pekerjaan (D+E) 319,600.00
Lembaran -43
A.4.7.1.4. 1 M2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 Oh 0.070 120,000.00 8,400.00
Tukang Cat L.02 Oh 0.009 150,000.00 1,350.00
Kepala Tukang L.03 Oh 0.006 175,000.00 1,050.00
Mandor L.04 Oh 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 11,400.00
B. BAHAN
Cat menie Kg 0.200 68,000.00 13,600.00
Plamuur Kg 0.150 7,400.00 1,110.00
Cat penutup Kg 0.260 96,000.00 24,960.00
Kuas Bh 0.010 24,000.00 240.00
Pengencer Kg 0.030 74,500.00 2,235.00
Amplas Lbr 0.200 16,000.00 3,200.00
JUMLAH HARGA BAHAN 26,070.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 37,470.00
E. Overhead & Profit 12% x D 4,496.40
F. Harga Satuan Pekerjaan (D+E) 41,966.00
C. PERALATAN
JUMLAH HARGA ALAT -
D. JUMLAH (A+B+C) 136,800.00
E. Overhead & Profit 12% x D 16,416.00
F. Harga Satuan Pekerjaan (D+E) 153,216.00
Lembaran -47
Konsultan Perencana
CV. ................................
............................
Direktur
EGINEER ESTIMATE (EE)
PEKERJAAN :
LOKASI :
SMA NEGERI 4 SERAM BAGIAN TIMUR
( Kabupaten Maluku Tengah )
SUMBER DANA :
Dana Alokasi Khusus (DAK)
Tahun Anggaran 2022
Konsultan Perencana
JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp)
#NAME?
Keterangan : Harga Tersebut sudah termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
Konsultan Perencana
CV. ................................
............................
Direktur
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 1,286,293,093.19
D. PPn 11% Rp 141,492,240.25
E. Total (D + E) Rp 1,427,785,333.44
PEMBULATAN Rp 1,427,785,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU (RKB) BESERTA PERABOTNYA
VOLUME : 3 RKB
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
A. PEKERJAAN PEMBANGUNAN 3 RKB Rp. 1,136,658,493.19
I. PEKERJAAN TANAH Rp. 87,011,472.30
II. PEKERJAAN PASANGAN BATU & BETON Rp. 313,511,956.79
III. PEKERJAAN PLESTERAN & ACIAN DINDING Rp. 97,449,650.05
IV. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp. 61,210,627.64
V. PEKERJAAN KERAMIK Rp. 96,248,530.80
VI. PEKERJAAN KACA Rp. 4,404,342.83
VII. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp. 369,930,658.03
VIII. PEKERJAAN LISTRIK Rp. 21,634,802.00
IX. PEKERJAAN PENGECATAN Rp. 42,243,107.05
X. PEKERJAAN SANITAIR Rp. 26,654,640.00
XI. PEKERJAAN TEMPAT CUCI TANGAN ( Vol = 03 Bh ) Rp. 16,358,705.72
B. PEKERJAAN PENGADAAN PERABOT RKB - 3 RKB Rp. 149,634,600.00
JUMLAH Rp. 1,286,293,093.19
PEMBULATAN Rp 1,286,293,000.00
#NAME?
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 760,266,381.28
D. PPn 11% Rp 83,629,301.94
E. Total (D + E) Rp 843,895,683.22
PEMBULATAN Rp 843,895,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM FISIKA BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
A. PEKERJAAN PEMBANGUNAN 1 RUANG Rp. 732,576,681.28
I. PEKERJAAN TANAH Rp. 59,597,047.27
II. PEKERJAAN PASANGAN BATU & BETON Rp. 205,485,414.40
III. PEKERJAAN PLESTERAN & ACIAN DINDING Rp. 62,570,652.67
IV. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp. 41,818,009.89
V. PEKERJAAN KERAMIK Rp. 53,270,943.15
VI. PEKERJAAN KACA Rp. 2,049,165.41
VII. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp. 218,762,384.48
VIII. PEKERJAAN LISTRIK Rp. 15,475,625.00
IX. PEKERJAAN PENGECATAN Rp. 26,662,623.78
X. PEKERJAAN SANITAIR Rp. 27,356,400.00
XI. PEKERJAAN MEJA BETON Rp. 19,528,415.24
B. PEKERJAAN PENGADAAN PERABOT / MEUBELER Rp. 27,689,700.00
JUMLAH Rp. 760,266,381.28
PEMBULATAN Rp 760,266,000.00
#NAME?
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 750,281,014.64
D. PPn 11% Rp 82,530,911.61
E. Total (D + E) Rp 832,811,926.25
PEMBULATAN Rp 832,811,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM BILOGI BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
A. PEKERJAAN PEMBANGUNAN 1 RUANG Rp. 722,591,314.64
I. PEKERJAAN TANAH Rp. 59,641,170.62
II. PEKERJAAN PASANGAN BATU & BETON Rp. 199,960,820.45
III. PEKERJAAN PLESTERAN & ACIAN DINDING Rp. 59,924,733.14
IV. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp. 38,761,808.79
V. PEKERJAAN KERAMIK Rp. 53,416,877.40
VI. PEKERJAAN KACA Rp. 2,245,533.44
VII. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp. 218,654,450.61
VIII. PEKERJAAN LISTRIK Rp. 14,809,113.00
IX. PEKERJAAN PENGECATAN Rp. 25,792,575.00
X. PEKERJAAN SANITAIR Rp. 27,356,400.00
XI. PEKERJAAN MEJA BETON Rp. 22,027,832.19
B. PEKERJAAN PENGADAAN PERABOT / MEUBELER Rp. 27,689,700.00
JUMLAH Rp. 750,281,014.64
PEMBULATAN Rp 750,281,000.00
#NAME?
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 749,081,269.91
D. PPn 11% Rp 82,398,939.69
E. Total (D + E) Rp 831,480,209.60
PEMBULATAN Rp 831,480,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KIMIA BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
A. PEKERJAAN PEMBANGUNAN 1 RUANG Rp. 721,391,569.91
I. PEKERJAAN TANAH Rp. 59,641,170.62
II. PEKERJAAN PASANGAN BATU & BETON Rp. 200,817,082.85
III. PEKERJAAN PLESTERAN & ACIAN DINDING Rp. 61,054,138.94
IV. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp. 35,966,929.84
V. PEKERJAAN KERAMIK Rp. 53,416,877.40
VI. PEKERJAAN KACA Rp. 1,702,888.67
VII. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp. 218,654,450.61
VIII. PEKERJAAN LISTRIK Rp. 14,809,113.00
IX. PEKERJAAN PENGECATAN Rp. 25,944,685.79
X. PEKERJAAN SANITAIR Rp. 27,356,400.00
XI. PEKERJAAN MEJA BETON Rp. 22,027,832.19
B. PEKERJAAN PENGADAAN PERABOT / MEUBELER Rp. 27,689,700.00
JUMLAH Rp. 749,081,269.91
PEMBULATAN Rp 749,081,000.00
#NAME?
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 498,970,325.67
D. PPn 11% Rp 54,886,735.82
E. Total (D + E) Rp 553,857,061.49
PEMBULATAN Rp 553,857,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
INSTANSI : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
A. PEKERJAAN PEMBANGUNAN 1 RUANG Rp. 468,059,325.67
I. PEKERJAAN TANAH Rp. 37,439,964.30
II. PEKERJAAN PASANGAN BATU & BETON Rp. 135,539,731.85
III. PEKERJAAN PLESTERAN & ACIAN DINDING Rp. 41,969,636.15
IV. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp. 26,613,651.80
V. PEKERJAAN KERAMIK Rp. 32,196,132.90
VI. PEKERJAAN KACA Rp. 1,356,611.93
VII. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp. 142,747,150.03
VIII. PEKERJAAN LISTRIK Rp. 11,466,374.00
IX. PEKERJAAN PENGECATAN Rp. 17,667,523.48
X. PEKERJAAN SANITAIR Rp. 15,021,200.00
XI. PEKERJAAN TEMPAT CUCI TANGAN ( Vol = 01 Bh ) Rp. 6,041,349.24
B. PEKERJAAN PENGADAAN PERABOT LAB KOMPUTER Rp. 30,911,000.00
JUMLAH Rp. 498,970,325.67
PEMBULATAN Rp 498,970,000.00
#NAME?
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
A. PEKERJAAN PERSIAPAN DAN SMK3 KONSTRUKSI Rp 9,800,000
B. PEKERJAAN PEMBANGUNAN 2 (DUA) LOKAL Rp 520,541,542.87
I. PEKERJAAN TANAH Rp 10,628,181.20
II. PEKERJAAN PASANGAN BATU & BETON Rp 179,254,960.42
III. PEKERJAAN PLESTERAN & ACIAN DINDING Rp 59,925,127.80
IV. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp 50,547,976.89
V. PEKERJAAN KERAMIK Rp 33,499,563.64
VI. PEKERJAAN KACA Rp 1,642,801.29
VII. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp 117,566,586.29
VIII. PEKERJAAN LISTRIK Rp 13,526,840.00
IX. PEKERJAAN PENGECATAN Rp 40,751,863.33
X. PEKERJAAN SANITAIR Rp 13,197,642.00
#NAME?
Konsultan Perencana
CV. ................................
............................
Wakil Direktur
RENCANA ANGGARAN BIAYA (RAB)
INSTANSI : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUMAH DINAS GURU BESERTA PERABOTNYA
VOLUME : 1 KOPEL / 2 LOKAL
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 56 MALUKU TENGAH
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
BACK UP DATA
URGAN KEMBALI
Rumus Panjang Lebar Tinggi Volume Satuan
Jumlah total - 27
SKETSA
BATU KOSONG
Rumus Panjang Lebar Tinggi Volume Satuan
Jumlah total - 11
SKETSA
URUG PASIR BAWAH PONDASI
Rumus Panjang Lebar Tinggi Volume Satuan
Jumlah total - 4
SKETSA
SLOOF15/20
Rumus Panjang Lebar tebal Vol x2
Jumlah total 4
SKETSA
KOLOM 15/15
Rumus Tinggi Lebar tebal jml x2
BALOK 15/20
Rumus Panjang Lebar tebal jml x2
PLAT ATAP
Rumus Tinggi Lebar tebal jml x2
ACIAN
Rumus Panjang Lebar Pintu Jendela Satuan
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 925,620,242.66
D. PPn 11% Rp 101,818,226.69
E. Total (D + E) Rp 1,027,438,469.35
PEMBULATAN Rp 1,027,438,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN ASRAMA SISWA BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 25.00 Bh 100,000.00 2,500,000.00
2 Sarung Tangan (Safeti Gloves) 25.00 Psg 15,000.00 375,000.00
3 Sepatu Keselamatan (Safety Shoes) 25.00 Psg 200,000.00 5,000,000.00
4 Rompi Keselamatan (Safety Vest) 25.00 Bh 50,000.00 1,250,000.00
sub total 9,125,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 11,325,000.00
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
D. Jumlah Rp 358,108,359.56
E. PPn 11% Rp 39,391,919.55
F. Total (D + E) Rp 397,500,279.11
PEMBULATAN Rp 397,500,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG TATA USAHA BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
BACK UP DATA
Jumlah total - m3
SKETSA
V=PxLxT
V=PxLxT
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
- Pekerjaan Sloof 12/15 (pembagian ruangan)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
Jumlah total - m3
- Pekerjaan Balok 15/20 (Keliling ruangan)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
Jumlah total - m3
- Pekerjaan Balok 12/15 (balok latei)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
V = L x t x jumlah
Plesteran Kolom Utama 0.46 3.30 8.00 12.14 m2
Plesteran Kolom teras 0.60 3.30 2.00 3.96 m2
V = L x t x jumlah
V=PxLxT
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
Lantai WC/KM 2.38 1.38 - 3.28 m3
m2
V=PxL
V=PxL
Kaca Mati
Rumus Panjang Lebar Jumlah Volume Satuan
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Jumlah total 141.240 m2
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
V=PxL - 0.30 - -
Jumlah total - m2
SKETSA
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
D. Jumlah Rp 386,756,825.78
E. PPn 11% Rp 42,543,250.84
F. Total (D + E) Rp 429,300,076.62
PEMBULATAN Rp 429,300,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG BIMBINGAN KONSELING BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN RUANG BIMBINGAN KONSELING BESERTA PERABOTNYA
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
BACK UP DATA
Jumlah total - m3
SKETSA
V=PxLxT
V=PxLxT
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
- Pekerjaan Sloof 12/15 (pembagian ruangan)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
Jumlah total - m3
- Pekerjaan Balok 15/20 (Keliling ruangan)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
Jumlah total - m3
- Pekerjaan Balok 12/15 (balok latei)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
V = L x t x jumlah
Plesteran Kolom Utama 0.46 3.30 8.00 12.14 m2
Plesteran Kolom teras 0.60 3.30 2.00 3.96 m2
V = L x t x jumlah
V=PxLxT
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
Lantai WC/KM 2.38 1.38 - 3.28 m3
m2
V=PxL
V=PxL
Kaca Mati
Rumus Panjang Lebar Jumlah Volume Satuan
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Jumlah total 141.240 m2
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
V=PxL - 0.30 - -
Jumlah total - m2
SKETSA
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
D. Jumlah Rp 386,756,978.70
E. PPn 11% Rp 42,543,267.66
F. Total (D + E) Rp 429,300,246.35
PEMBULATAN Rp 429,300,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG OSIS BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
JUMLAH - B 29,751,300.00
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
BACK UP DATA
Jumlah total - m3
SKETSA
V=PxLxT
V=PxLxT
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
V = L x t x jumlah
V=PxLxT
V=PxL
V=PxL
V=PxL
Ruang Pramuka 7.88 2.88 - 22.69 m3
Ruang Osis 7.88 2.88 - 22.69 m3
Ruang PMR 7.88 2.88 - 22.69 m3
V=PxL
V=PxL
Lantai WC/KM m3
m2
Jumlah total - m2
SKETSA
V=PxL
Sekmen I m2
Sekmen II m2
Sekmen III m2
Sekmen IV m2
V=PxL
Kaca Mati
Rumus Panjang Lebar Jumlah Volume Satuan
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Jumlah total 141.240 m2
SKETSA
Sekmen I
v = 1/2 (a+b) x t 1.00 11.00 7.49 1.00 44.94 m2
Sekmen II
v = 1/2 (a+b) x t 1.00 11.00 5.77 1.00 34.62 m2
Sekmen III
v = 1/2 (a) x t 10.00 5.77 2.00 57.70 m2
V=PxL
V=PxL
m3
m3
V= luas plafond 117.46 m3
m3
m3
m3
m3
m3
m2
m2
m2
Panjang list x lebar 130.08 0.10 13.01 m2
m2
m2
m2
m2
m2
m2
m2
Jumlah total 37.05 m2
SKETSA
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
V=PxL - 0.30 - -
Jumlah total - m2
SKETSA
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
D. Jumlah Rp 386,756,899.96
E. PPn 11% Rp 42,543,259.00
F. Total (D + E) Rp 429,300,158.95
PEMBULATAN Rp 429,300,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
JUMLAH - C 36,674,900.00
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
BACK UP DATA
Jumlah total - m3
SKETSA
V=PxLxT
V=PxLxT
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
V = L x t x jumlah
V=PxLxT
V=PxL
V=PxL
V=PxL
Ruang Pramuka 8.88 7.88 - 69.97 m3
Ruang Osis m3
Ruang PMR m3
V=PxL
V=PxL
Lantai WC/KM m3
m2
Jumlah total - m2
SKETSA
V=PxL
Sekmen I m2
Sekmen II m2
Sekmen III m2
Sekmen IV m2
V=PxL
Kaca Mati
Rumus Panjang Lebar Jumlah Volume Satuan
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Jumlah total 141.240 m2
SKETSA
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Jumlah total 141.240 m2
V=PxL
V=PxL
m3
m3
V= luas plafond 111.40 m3
m3
m3
m3
m3
m3
m2
m2
m2
Panjang list x lebar 130.08 0.10 13.01 m2
m2
m2
m2
m2
m2
m2
m2
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
V=PxL - 0.30 - -
Jumlah total - m2
SKETSA
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
D. Jumlah Rp 358,108,371.11
E. PPn 11% Rp 39,391,920.82
F. Total (D + E) Rp 397,500,291.94
PEMBULATAN Rp 397,500,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUANG UNIT KESEHATAN SEKOLAH BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
A. PEKERJAAN PERSIAPAN DAN SMK3 KONSTRUKSI Rp. 347,608,371.11
I. PEKERJAAN PERSIAPAN DAN SMK3 KONSTRUKSI Rp. 10,500,000.00 Rp. 10,500,000.00
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
BACK UP DATA
Jumlah total - m3
SKETSA
V=PxLxT
V=PxLxT
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
- Pekerjaan Sloof 12/15 (pembagian ruangan)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
Jumlah total - m3
- Pekerjaan Balok 15/20 (Keliling ruangan)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
Jumlah total - m3
- Pekerjaan Balok 12/15 (balok latei)
Rumus Panjang Lebar Tinggi Jumlah Volume Satuan
V = L x t x jumlah
Plesteran Kolom Utama 0.46 3.30 8.00 12.14 m2
Plesteran Kolom teras 0.60 3.30 2.00 3.96 m2
V = L x t x jumlah
V=PxLxT
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
Lantai WC/KM 2.38 1.38 - 3.28 m3
m2
V=PxL
V=PxL
Kaca Mati
Rumus Panjang Lebar Jumlah Volume Satuan
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Sekmen I
v = 1/2 (a+b) x t 11.00 1.04 5.94 2.00 71.52 m2
Sekmen II
v = 1/2 (a) x t 10.27 5.85 1.00 30.04 m2
Sekmen III
v = 1/2 (a+b) x t 5.27 3.03 1.00 7.98 m2
Sekmen IV 22.06 m2
v = sekmen II-sekmen III
Sekmen V
v=axt 1.96 2.46 2.00 9.64 m2
Jumlah total 141.240 m2
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
V=PxL - 0.30 - -
Jumlah total - m2
SKETSA
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
D. Jumlah Rp 484,494,487.09
E. PPn 11% Rp 53,294,393.58
F. Total (D + E) Rp 537,788,880.67
PEMBULATAN Rp 537,788,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN TOILET/JAMBAN BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
31.14 8.75
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
### sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
BACK UP DATA
Jumlah total - m3
SKETSA
V=PxLxT
V=PxLxT
Balok 15/20
Balok 15/15
Balok Teras 16.00 0.12 0.15 1.00 0.29
Balok Atap 33.00 0.12 0.15 1.00 0.59
Jumlah total 0.882 m3
m3
V = L x t x jumlah
V = L x t x jumlah
V=PxLxT
V=PxL
V=PxL
Jumlah total - m2
SKETSA
P1 - 2.00 -
- Buah
- Buah
V=PxL
Keramik Lantai
Lantai WC Putra 23.60 m3
Lantai WC Putri 19.50 m3
Lantai Ruang Orinoir m3
m3
m3
m3
V=PxL
V=PxL
m2
V=PxL
J1 - 0.46 12.00 - m2
J2 - 0.46 2.00 - m2
Jumlah total - m2
Kaca Mati
Rumus Panjang Lebar Jumlah Volume Satuan
J1 - 0.48 12.00 - m2
J2 - 0.48 2.00 - m2
-
p1 - 0.48 2.00 - m2
p2 - 0.48 1.00 - m2
V1 - 0.40 2.00 -
Jumlah total - m2
V=PxL
V=PxL
Jumlah total - m2
SKETSA
m2
m2
P1 5.000 0.235 - 12.00 14.100 m2
m2
m2
m2
V=PxLxT
J1 m2
J2 m2
P1 m2
P2 m2
P3 2.100 0.700 2.00 12.00 35.280 m2
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
Jumlah total - m2
SKETSA
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 322,297,359.41
D. PPn 11% Rp 35,452,709.54
E. Total (D + E) Rp 357,750,068.95
PEMBULATAN Rp 357,750,000.00
Terbilang :
Konsultan Perencana
CV. ................................
............................
Direktur
BACK UP DATA
V=PxLxT m3
Jumlah total - m3
SKETSA
V=PxLxT m3
Jumlah total - m3
SKETSA
V = a-(b+c+d) m3
Jumlah total - m3
SKETSA
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Jumlah total 0 m3
SKETSA
5. Pekerjaan urug pasir bawah lantai
Rumus Panjang Lebar Tinggi Volume Satuan
V=PxLxT
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
V=PxL - 0.46 - - m2
Jumlah total - m2
SKETSA
m2
m2
m2
m2
m2
m2
Jumlah total - m2
SKETSA
m2
m2
m2
m2
m2
m2
Jumlah total x 2 sisi - m2
SKETSA
m2
m2
Jumlah total - m2
m2
m2
m2
m2
m2
m2
Jumlah total x 2 sisi - m2
SKETSA
m2
m2
Jumlah total - m2
V=PxLxT
m3
m3
m3
m3
m3
m3
Jumlah total - m3
SKETSA
V=PxL
V=PxL
V=PxL
m2
m2
m2
m2
m2
Jumlah total - m2
SKETSA
V=PxL
V=PxL
Sekmen I
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen II
v = 1/2 (a) x t 14.00 3.76 2.00 52.64 m2
Sekmen III
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen IV m2
v = sekmen II-sekmen III
Sekmen V
v=axt - - - - m2
Jumlah total 268.192 m2
SKETSA
Sekmen I
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen II
v = 1/2 (a) x t - 14.00 3.76 2.00 52.64 m2
Sekmen III
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen IV m2
v = sekmen II-sekmen III
Sekmen V
v=axt - 2.46 2.00 - m2
Jumlah total 268.192 m2
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
V=PxLxT
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : REHABILITASI LABORATORIUM FISIKA BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 322,297,359.41
D. PPn 11% Rp 35,452,709.54
E. Total (D + E) Rp 357,750,068.95
PEMBULATAN Rp 357,750,000.00
Terbilang :
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : REHABILITASI LABORATORIUM KIMIA BESERTA PERABOTNYA
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
BACK UP DATA
V=PxLxT m3
Jumlah total - m3
SKETSA
V=PxLxT m3
Jumlah total - m3
SKETSA
V = a-(b+c+d) m3
Jumlah total - m3
SKETSA
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Jumlah total 0 m3
SKETSA
5. Pekerjaan urug pasir bawah lantai
Rumus Panjang Lebar Tinggi Volume Satuan
V=PxLxT
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
V=PxL - 0.46 - - m2
Jumlah total - m2
SKETSA
m2
m2
m2
m2
m2
m2
Jumlah total - m2
SKETSA
m2
m2
m2
m2
m2
m2
Jumlah total x 2 sisi - m2
SKETSA
m2
m2
Jumlah total - m2
m2
m2
m2
m2
m2
m2
Jumlah total x 2 sisi - m2
SKETSA
m2
m2
Jumlah total - m2
V=PxLxT
m3
m3
m3
m3
m3
m3
Jumlah total - m3
SKETSA
V=PxL
V=PxL
V=PxL
m2
m2
m2
m2
m2
Jumlah total - m2
SKETSA
V=PxL
V=PxL
Sekmen I
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen II
v = 1/2 (a) x t 14.00 3.76 2.00 52.64 m2
Sekmen III
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen IV m2
v = sekmen II-sekmen III
Sekmen V
v=axt - - - - m2
Jumlah total 268.192 m2
SKETSA
Sekmen I
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen II
v = 1/2 (a) x t - 14.00 3.76 2.00 52.64 m2
Sekmen III
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen IV m2
v = sekmen II-sekmen III
Sekmen V
v=axt - 2.46 2.00 - m2
Jumlah total 268.192 m2
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
V=PxLxT
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 2,320,540,658.19
D. PPn 11% Rp 255,259,472.40
E. Total (D + E) Rp 2,575,800,130.59
PEMBULATAN Rp 2,575,800,000.00
Terbilang : #NAME?
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA
VOLUME : 12 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
JUMLAH - B 58,264,400.00
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 40.00 Bh 100,000.00 4,000,000.00
2 Sarung Tangan (Safeti Gloves) 40.00 Psg 15,000.00 600,000.00
3 Sepatu Keselamatan (Safety Shoes) 40.00 Psg 200,000.00 8,000,000.00
4 Rompi Keselamatan (Safety Vest) 40.00 Bh 50,000.00 2,000,000.00
sub total 14,600,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 16,800,000.00
BACK UP DATA
V=PxLxT
Jumlah total 30 m3
SKETSA
V=PxLxT
V = L x t x jumlah
V = L x t x jumlah
V=PxLxT
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
Sekmen I
V= P x L 23.00 - 3.41 2.00 156.86 m2
Sekmen II
v = 1/2 (a+b) x t 23.00 29.00 3.64 2.00 189.28 m2
Sekmen III
v = 1/2 (a+b) x t 4.00 12.22 4.55 2.00 73.80 m2
Sekmen IV m2
v = sekmen II-sekmen III 4.00 12.22 4.55 2.00 73.80
m2
Sekmen I
V= P x L 23.00 - 3.41 2.00 156.86 m2
Sekmen II
v = 1/2 (a+b) x t 23.00 29.00 3.64 2.00 189.28 m2
Sekmen III
v = 1/2 (a+b) x t 4.00 12.22 4.55 2.00 73.80 m2
Sekmen IV m2
v = sekmen II-sekmen III 4.00 12.22 4.55 2.00 73.80
m2
Jumlah total 493.742 m2
Jumlah total x 4 1,974.968
SKETSA
V=PxL
V=PxL
V=PxL
Dalam ruangan kelas 33.92 - 3.00 101.76 m2
V=PxL
Jumlah total m2
SKETSA
Jumlah total - m2
SKETSA
V=PxLxT
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
A. PEKERJAAN PERSIAPAN DAN SMK3 KONSTRUKSI Rp 9,800,000
B. PEKERJAAN PEMBANGUNAN 2 (DUA) LOKAL Rp 437,982,813.31
I. PEKERJAAN TANAH Rp 9,556,904.00
II. PEKERJAAN PASANGAN BATU & BETON Rp 135,623,035.74
III. PEKERJAAN PLESTERAN & ACIAN DINDING Rp 63,544,626.04
IV. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp 41,104,199.92
V. PEKERJAAN KERAMIK Rp 32,168,670.06
VI. PEKERJAAN KACA Rp 1,642,801.29
VII. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp 98,025,043.40
VIII. PEKERJAAN LISTRIK Rp 14,859,954.00
IX. PEKERJAAN PENGECATAN Rp 28,259,936.86
X. PEKERJAAN SANITAIR Rp 13,197,642.00
#NAME?
Konsultan Perencana
CV. ................................
............................
Wakil Direktur
RENCANA ANGGARAN BIAYA (RAB)
INSTANSI : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN RUMAH DINAS GURU BESERTA PERABOTNYA
1.00 VOLUME : 1 KOPEL / 2 LOKAL
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
HARGA SATUAN JUMLAH HARGA
No ITEM PEKERJAAN SAT VOL.
(Rp) (Rp)
A. PEKERJAAN PERSIAPAN
1 Pembuatan papan nama proyek Ls 1.00 250,000.00 250,000.00
2 Pembuatan gudang kerja Ls 1.00 5,000,000.00 5,000,000.00
3 Pemasangan bouwplank Ls 1.00 1,750,000.00 1,750,000.00
4 Pekerjaan SMK3 Konstruksi Ls 1.00 6,960,000.00 6,960,000.00
5 Air kerja dan listrik Ls 1.00 1,000,000.00 1,000,000.00
Jumlah - A 0.00
I. PEKERJAAN TANAH
4 Pek. Urugan pasir dibawah pondasi ( 5 cm ) M3 2.92 416,864.00 1,217,242.88
5 Pek. Urugan Pasir dibawah Lantai, tbl = 5 cm M3 3.43 416,864.00 1,429,843.52
V. PEKERJAAN KERAMIK
3 Pas. Plint Keramik 10x40 cm, Ruang Tamu (polos) M' 0.00 51,812.00 0.00
X. PEKERJAAN SANITAIR
2 Pas. Wastafel Keramik + Acc Bh 2.00 911,884.00 1,823,768.00
8 Pek. Saluran Drainase Keliling Gedung uk. 25 x 40 cm M' 48.60 278,112.00 13,516,243.20
URGAN KEMBALI
Rumus Panjang Lebar Tinggi Volume Satuan
Jumlah total - 27
SKETSA
BATU KOSONG
Rumus Panjang Lebar Tinggi Volume Satuan
Jumlah total - 11
SKETSA
URUG PASIR BAWAH PONDASI
Rumus Panjang Lebar Tinggi Volume Satuan
Jumlah total - 4
SKETSA
SLOOF15/20
Rumus Panjang Lebar tebal Vol x2
Jumlah total 4
SKETSA
KOLOM 15/15
Rumus Tinggi Lebar tebal jml x2
BALOK 15/20
Rumus Panjang Lebar tebal jml x2
PLAT ATAP
Rumus Tinggi Lebar tebal jml x2
ACIAN
Rumus Panjang Lebar Pintu Jendela Satuan
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 10.00 Bh 100,000.00 1,000,000.00
2 Sarung Tangan (Safeti Gloves) 10.00 Psg 15,000.00 150,000.00
3 Sepatu Keselamatan (Safety Shoes) 10.00 Psg 200,000.00 2,000,000.00
4 Rompi Keselamatan (Safety Vest) 10.00 Bh 50,000.00 500,000.00
sub total 3,650,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 5,850,000.00
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 116,982,663.92
D. PPn 11% Rp 12,868,093.03
E. Total (D + E) Rp 129,850,756.95
PEMBULATAN Rp 129,850,000.00
Terbilang :
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : REHABILITASI RUANG IBADAH BESERTA PERABOTNYA (SATU RUANG)
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
REKAPITULASI BIAYA
A. PEKERJAAN PERSIAPAN DAN SMK3 KONSTRUKSI Rp. 7,245,000.00
B. PEKERJAAN REHABILITASI 1 RUANG Rp. 107,337,663.92
I. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp. 4,166,300.00
II. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND Rp. 71,422,147.24
III. PEKERJAAN LISTRIK Rp. 2,647,240.00
IV. PEKERJAAN PENGECATAN Rp. 29,101,976.68
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
PEK. PINTU CAT PEK. PINTU
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 3.00 Bh 100,000.00 300,000.00
2 Sarung Tangan (Safeti Gloves) 3.00 Psg 15,000.00 45,000.00
3 Sepatu Keselamatan (Safety Shoes) 3.00 Psg 200,000.00 600,000.00
4 Rompi Keselamatan (Safety Vest) 3.00 Bh 50,000.00 150,000.00
sub total 1,095,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 3,295,000.00
REKAPITULASI BIAYA
JUMLAH HARGA
No JENIS PEKERJAAN
(Rp)
C. Jumlah Rp 179,052,639.82
D. PPn 11% Rp 19,695,790.38
E. Total (D + E) Rp 198,748,430.20
PEMBULATAN Rp 198,748,000.00
Terbilang :
Konsultan Perencana
CV. ................................
............................
Direktur
RENCANA ANGGARAN BIAYA (RAB)
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
PEKERJAAN : REHABILITASI RUANG KEPALA SEKOLAH BESERTA PERABOTNYA (SATU RUANG)
VOLUME : 1 RUANG
THN. ANGGARAN : 2023
LOKASI : SMA NEGERI 4 SERAM BAGIAN TIMUR
JUMLAH - B 3,636,400.00
REKAPITULASI BIAYA
A. PEKERJAAN PERSIAPAN DAN SMK3 KONSTRUKSI Rp. 5,495,000.00
B. PEKERJAAN REHABILITASI 1 RUANG Rp. 169,921,239.82
I. PEKERJAAN KOSEN, KUNCI & PENGGANTUNG Rp. 18,164,026.40
II. PEKERJAAN KERAMIK Rp. 929,284.58
III. PEKERJAAN KACA Rp. 300,735.60
IV. PEKERJAAN RANGKA ATAP, KUDA-KUDA & PLAFOND 126,142,673.44
V. PEKERJAAN LISTRIK Rp. 5,045,451.00
VI. PEKERJAAN PENGECATAN Rp. 19,339,068.80
Keterangan : Harga Tersebut belum termasuk Pajak Pertambahan Nilai (PPn) sebesar 11%
BACK UP DATA
V=PxLxT m3
Jumlah total - m3
SKETSA
V=PxLxT m3
Jumlah total - m3
SKETSA
V = a-(b+c+d) m3
Jumlah total - m3
SKETSA
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Jumlah total 0 m3
SKETSA
5. Pekerjaan urug pasir bawah lantai
Rumus Panjang Lebar Tinggi Volume Satuan
V=PxLxT
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
Jumlah total - m3
SKETSA
V=PxL - 0.46 - - m2
Jumlah total - m2
SKETSA
m2
m2
m2
m2
m2
m2
Jumlah total - m2
SKETSA
m2
m2
m2
m2
m2
m2
Jumlah total x 2 sisi - m2
SKETSA
m2
m2
Jumlah total - m2
m2
m2
m2
m2
m2
m2
Jumlah total x 2 sisi - m2
SKETSA
m2
m2
Jumlah total - m2
V=PxLxT
m3
m3
m3
m3
m3
m3
Jumlah total - m3
SKETSA
V=PxL
V=PxL
V=PxL
m2
m2
m2
m2
m2
Jumlah total - m2
SKETSA
V=PxL
V=PxL
Sekmen I
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen II
v = 1/2 (a) x t 14.00 3.76 2.00 52.64 m2
Sekmen III
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen IV m2
v = sekmen II-sekmen III
Sekmen V
v=axt - - - - m2
Jumlah total 268.192 m2
SKETSA
Sekmen I
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen II
v = 1/2 (a) x t - 14.00 3.76 2.00 52.64 m2
Sekmen III
v = 1/2 (a+b) x t 14.00 19.68 3.20 2.00 107.78 m2
Sekmen IV m2
v = sekmen II-sekmen III
Sekmen V
v=axt - 2.46 2.00 - m2
Jumlah total 268.192 m2
V=PxL
V=PxL
V=PxL
V=PxL
V=PxL
V=PxLxT
V=PxLxT
Meja beton
1. Meja beton
Rumus tinggi lebar tinggi jml Volume Satuan
tipe I
Pas. Bata 0.70 0.60 - 4.00 1.680 m2
Beton tulangan 1.20 0.60 0.07 1.00 0.041 m3
Plesteran 0.70 0.60 2.00 0.840 m2
keramik 40x40 1.20 0.60 1.295
Wastafel 2.000 bh
Kran air 1/2" 2.000 bh
tipe II
Pas. Bata 0.70 0.60 - 3.00 1.260 m2
Beton tulangan 3.25 0.60 0.07 1.00 0.127 m3
Plesteran 0.70 0.60 4.00 1.680 m2
keramik 40x40 3.25 0.60 1.00 1.950 m2
3.25 0.10 1.00 0.325 m2
0.70 0.10 3.000 0.210 m2
0.80 0.60 1.000 0.480 m2
V. Keramik 2.965
X PEKERJAAN SANITAIR
1. Pekerjaan Saluran keliling
2. Pekerjaan pipa pvc 3" untuk air kotor
3. Pekerjaan pipa pvc 1/2" untuk air bersih
4. Pekerjaan pas. kran 1/2" untuk air bersih
5. Pekerjaan pas. Floor drain
6. Pekerjaan pas. Wastafel zink
7. Pekerjaan pas. Bak mandi
XI PEKERJAAN SEPTINK
1. Pekerjaan Saluran keliling
RENCANA ANGGARAN BIAYA ( RAB )
SKPD : DINAS PENDIDIKAN PROVINSI MALUKU
Kegiatan : PEMBANGUNAN SARANA BELAJAR DAN PENUNJANG SMA NEGERI 4 SERAM BAGIAN TIMUR BESERTA PERABOTN
Tahun Anggaran : 2023
Sekolah / Lokasi : SMA NEGERI 4 SERAM BAGIAN TIMUR
1 2 3 4 5 6
A. PEKERJAAN SMK3 KONSTRUKSI
I PENYIAPAN RK3K
1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Set 250,000.00 250,000.00
sub total 250,000.00
II SOSIALIASI DAN PROMOSI K3
sub total -
III ALAT PELINDUNG KERJA
sub total -
IV AREA PELINDUNG DIRI
1 Topi Pelindung (Safety Net) 2.00 Bh 100,000.00 200,000.00
2 Sarung Tangan (Safeti Gloves) 2.00 Psg 15,000.00 30,000.00
3 Sepatu Keselamatan (Safety Shoes) 2.00 Psg 200,000.00 400,000.00
4 Rompi Keselamatan (Safety Vest) 2.00 Bh 50,000.00 100,000.00
sub total 730,000.00
V ASURANSI DAN PERJANJIAN
sub total -
VI PERSONIL K3
1 Petugas K3 1.00 Ob 1,000,000.00 1,000,000.00
sub total 1,000,000.00
VII FASILITAS SARANA KESEHATAN
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban) 1.00 Ob 300,000.00 300,000.00
sub total 300,000.00
VIII RAMBU-RAMBU
1 Rambu Informasi 1.00 Bh 250,000.00 250,000.00
sub total 250,000.00
IX Lain-Lain Terkait Pengendalian Resiko K3
1 Rambu Petunjuk 1.00 Bh 100,000.00 100,000.00
2 Rambu Larangan 1.00 Bh 100,000.00 100,000.00
3 Rambu Peringatan 1.00 Bh 100,000.00 100,000.00
4 Rambu Kewajiban 1.00 Bh 100,000.00 100,000.00
sub total 400,000.00
TOTAL - A 2,930,000.00
Harga Satuan Pekerjaan Konstruksi Beton
Tahun Anggaran 2023
KODE HARGA +
NO. URAIAN HASIL ANALISA
Anls. KEUNTUNGAN
a b c d
1 Hasil Analisa Pekerjaan Cor Beton Site Mix K-100 D.001 Rp 1,937,927.00
2 Hasil Analisa Pekerjaan Cor Beton Site Mix K-125 D.002 Rp -
3 Hasil Analisa Pekerjaan Cor Beton Site Mix K-150 D.003 Rp 2,095,685.00
4 Hasil Analisa Pekerjaan Cor Beton Site Mix K-100, lantai kerja D.004 Rp 1,819,039.00
5 Hasil Analisa Pekerjaan Cor Beton Site Mix K-175 D.005 Rp 2,177,854.00
6 Hasil Analisa Pekerjaan Cor Beton Site Mix K-200 D.006 Rp 2,255,700.00
7 Hasil Analisa Pekerjaan Cor Beton Site Mix K-225 D.007 Rp -
8 Hasil Analisa Pekerjaan Cor Beton Site Mix K-250 D.008 Rp 2,352,845.00
9 Hasil Analisa Pekerjaan Cor Beton Site Mix K-275 D.009 Rp -
10 Hasil Analisa Pekerjaan Cor Beton Site Mix K-300 D.010 Rp -
11 Hasil Analisa Pekerjaan Cor Beton Site Mix K-325 D.011 Rp -
12 Hasil Analisa Pekerjaan Cor Beton Site Mix K-350 D.012 Rp -
13 Hasil Analisa Pekerjaan Besi Beton Polos/Ulir/U-24 D.013 Rp 22,318.80
14 Hasil Analisa Pekerjaan Sirm & Bongkar D.033 Rp -
15 Hasil Analisa Pekerjaan Begisting Papan D.034 Rp 262,500.00
16 Hasil Analisa Pekerjaan Begisting Plywood 4 mm D.035 Rp 185,190.00
17 Hasil Analisa Pekerjaan Begisting Plywood 9 mm D.036 Rp 187,760.00
18 Hasil Analisa Pekerjaan Stoot Werk D.037 Rp 191,360.00
PENGUMPULAN :
PONDASI
PN1. BETON FOOT PLATE 150/150 x 25 CM (Besi ø16 -20 cm = 151,750 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 90.721 Kg Rp 22,318.80 Rp 2,024,790.396
- Begesting Papan (maks. 1 x pakai) 2.900 M2 Rp 262,500.00 Rp 761,250.000
Jumlah PN1. Rp 5,138,885.396
PN2. BETON FOOT PLATE 130/130 x 25 CM (Besi ø16 -20 cm = 153,431 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 121.889 Kg Rp 22,318.80 Rp 2,720,421.980
- Begesting Papan (maks. 1 x pakai) 2.383 M2 Rp 262,500.00 Rp 625,440.789
Jumlah PN2. Rp 5,698,707.770
PN3. BETON FOOT PLATE 100/100 x 25 CM (Besi ø12 -20 cm = 87,201 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 147.756 Kg Rp 22,318.80 Rp 3,297,744.689
- Begesting Papan (maks. 1 x pakai) 2.368 M2 Rp 262,500.00 Rp 621,562.500
Jumlah PN3. Rp 6,272,152.189
PN4. BETON FOOT PLATE 160/160 x 25 CM (Besi ø16 -20 cm = 151,217 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 82.957 Kg Rp 22,318.80 Rp 1,851,501.972
- Begesting Papan (maks. 1 x pakai) 2.018 M2 Rp 262,500.00 Rp 529,687.500
Jumlah PN4. Rp 4,734,034.472
BETON SLOOF
SL1. BETON SLOOF 20/30 CM (Besi 4ø16 + 6ø12 dan ø8 -15 cm = 184,953 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 204.550 Kg Rp 22,318.80 Rp 4,565,310.540
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 262,500.00 Rp 2,625,000.000
Jumlah SL1. Rp 9,543,155.540
SL2. BETON SLOOF 20/25 CM (Besi 8ø12 dan ø8 -15 cm = 141,087 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah SL2. #NAME?
SL3. BETON SLOOF 15/25 CM (Besi 4ø12, Besi 2ø12 dan ø8 -20 cm = 163,234 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah SL3. #NAME?
SL4. BETON SLOOF 15/20 CM (Besi 4ø12, Besi 2ø10 dan ø6 -15 cm = 155,204 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 155.200 Kg Rp 22,318.80 Rp 3,463,877.760
- Begesting Papan (maks. 1 x pakai) 6.670 M2 Rp 262,500.00 Rp 1,750,875.000
Jumlah SL4. Rp 7,567,597.760
SL5. BETON SLOOF 20/40 CM (Besi 8ø16 + 4ø12 dan ø8 -15 cm = 195,311 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 0.000 Kg Rp 22,318.80 Rp -
- Begesting Papan (maks. 1 x pakai) 0.000 M2 Rp 262,500.00 Rp -
Jumlah SL5. Rp 2,352,845.000
SL6. BETON SLOOF 30/50 CM (Besi 6ø16 + 3ø12 dan ø10 -15 cm = 113,728 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 177.046 Kg Rp 22,318.80 Rp 3,951,454.844
- Begesting Papan (maks. 1 x pakai) 6.667 M2 Rp 262,500.00 Rp 1,750,000.000
Jumlah SL6. Rp 8,054,299.844
BETON KOLOM
KL1. BETON KOLOM 50/50 CM (Besi 4ø19 + 8ø16 dan 2Pø10 -10/20 cm = 114,848 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 229.434 Kg Rp 22,318.80 Rp 5,120,693.275
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 262,500.00 Rp 2,625,000.000
Jumlah KL1. Rp 10,098,538.275
KL2. BETON KOLOM 30/30 CM (Besi 4ø16 + 4ø12 dan 2Pø10 -10/20 cm = 153,918 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 150.615 Kg Rp 22,318.80 Rp 3,361,553.951
- Begesting Papan (maks. 1 x pakai) 8.667 M2 Rp 262,500.00 Rp 2,275,000.000
Jumlah KL2. Rp 7,989,398.951
KL3. BETON KOLOM 20/40 CM (Besi 4ø16 + 2ø12 dan 2Pø10 -20 cm = 118,984 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 94.276 Kg Rp 22,318.80 Rp 2,104,118.225
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 262,500.00 Rp 3,500,000.000
Jumlah KL3. Rp 7,956,963.225
KL4. BETON KOLOM 25/25 CM (Besi 4ø12 + 4ø10 dan ø8 -15 cm = 104,613 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 141.456 Kg Rp 22,318.80 Rp 3,157,125.972
- Begesting Papan (maks. 1 x pakai) 17.538 M2 Rp 262,500.00 Rp 4,603,846.154
Jumlah KL4. Rp 10,113,817.126
KL5. BETON KOLOM 20/20 CM (Besi 4ø12 + 4ø10 dan ø8 -20 cm = 167,989 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 263.866 Kg Rp 22,318.80 Rp 5,889,161.467
- Begesting Papan (maks. 1 x pakai) 33.333 M2 Rp 262,500.00 Rp 8,750,000.000
Jumlah KL5. Rp 16,992,006.467
KL6. BETON KOLOM 15/15 CM (Besi 4ø12 dan ø6 -15 cm = 148,283 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) 221.210 Kg Rp 22,318.80 Rp 4,937,140.686
- Begesting Papan (maks. 1 x pakai) 16.667 M2 Rp 262,500.00 Rp 4,375,000.000
Jumlah KL6. Rp 11,489,994.686
KL7. BETON KOLOM PRAKTIS 12/12 CM (Besi 4ø10 dan 2Pø6 -20 cm = 179,303 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL7. #NAME?
KL8. BETON KOLOM BULAT DIA. 50 CM (Besi 8ø16 cm dan 2Pø10 -10/20 cm = 83,685 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL8. #NAME?
KL9. BETON KOLOM BULAT DIA. 25 CM (Besi ø12-20 cm dan ø8 -15 cm = 108,452 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL9. #NAME?
KL10. BETON KOLOM 30/40 CM (Besi 6ø12 + 4ø12 cm dan ø8 -15 cm = 78,898 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL10. #NAME?
KL11. BETON KOLOM 30/30 CM, Portal Pintu Utama (Besi 4ø12 + 4ø10 cm dan ø8 -15 cm = 77,253 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL11. #NAME?
KL12. BETON KOLOM 12/25 CM (Besi 3ø12 cm + 3ø12 cm dan ø6 -15 cm = 162,375 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL12. #NAME?
KL13. BETON KOLOM 12/25 CM (Besi 6ø12 cm dan ø6 -15 cm = 162,375 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL13. #NAME?
KL14. BETON KOLOM 12/51 CM (Besi 10ø12 cm dan ø6 -15 cm = 134,895 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL14. #NAME?
KL15. BETON KOLOM 12/38 CM (Besi 8ø12 cm dan ø6 -15 cm = 143,888 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL15. #NAME?
KL16. BETON KOLOM 12/32 CM, Pagar Depan (Besi 4ø12 cm dan ø6 -20 cm = 89,740 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL16. #NAME?
KL17. BETON KOLOM 40/60 CM (Besi 4ø19 + 8ø16 dan 2Pø10 -10/20 cm = 119,549 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL17. #NAME?
KL18. BETON KOLOM 50/60 CM (Besi 4ø19 + 10ø16 dan 2Pø10 -10/20 cm = 108,992 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL18. #NAME?
KL19. BETON KOLOM 60/60 CM (Besi 4ø19 + 12ø16 dan 2Pø10 -10/20 cm = 102,052 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL19. #NAME?
KL20. BETON KOLOM 30/50 CM (Besi 5ø16 + 5ø16 dan 2Pø10 -10/20 cm = 102,052 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah KL20. #NAME?
BETON BALOK
BL1. BETON BALOK 30/60 CM (Besi 8ø16 + 4ø12 dan 2Pø10 -10/20 cm = 124,813 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 284.367 Kg Rp 22,318.80 Rp 6,346,725.657
- Begesting Papan (maks. 1 x pakai) 10.500 M2 Rp 262,500.00 Rp 2,756,250.000
Jumlah BL1. Rp 11,455,820.657
BL2. BETON BALOK 30/50 CM (Besi 8ø16 + 2ø12 dan 2Pø10 -10/20 cm = 132,883 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 209.355 Kg Rp 22,318.80 Rp 4,672,552.675
- Begesting Papan (maks. 1 x pakai) 8.485 M2 Rp 262,500.00 Rp 2,227,272.727
Jumlah BL2. Rp 9,252,670.402
BL3. BETON BALOK 20/40 CM (Besi 4ø16 + 2ø12 dan 2Pø10 -10/20 cm = 173,043 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 181.846 Kg Rp 22,318.80 Rp 4,058,593.225
- Begesting Papan (maks. 1 x pakai) 8.205 M2 Rp 262,500.00 Rp 2,153,846.154
Jumlah BL3. Rp 8,565,284.379
BL4. BETON BALOK 20/30 CM (Besi 3ø12, Besi 3ø12 dan 2Pø8 -20 cm = 107,982 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 278.045 Kg Rp 22,318.80 Rp 6,205,632.601
- Begesting Papan (maks. 1 x pakai) 14.000 M2 Rp 262,500.00 Rp 3,675,000.000
Jumlah BL4. Rp 12,233,477.601
BL5. BETON BALOK 15/25 CM (Besi 4ø12 + 2ø12 dan 2Pø8 -20 cm = 163,234 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 142.789 Kg Rp 22,318.80 Rp 3,186,877.298
- Begesting Papan (maks. 1 x pakai) 8.000 M2 Rp 262,500.00 Rp 2,100,000.000
Jumlah BL5. Rp 7,639,722.298
BL6. BETON BALOK 15/20 CM (Besi 2ø12 + 2ø12 dan 2Pø8 -20 cm = 143,650 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) 143.650 Kg Rp 22,318.80 Rp 3,206,095.432
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 262,500.00 Rp 3,500,000.000
Jumlah BL6. Rp 8,883,949.432
BL7. BETON BALOK 12/25 CM (Besi 4ø10 + 2ø10 dan 2Pø6 -20 cm = 131,446 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) 189.186 Kg Rp 22,318.80 Rp 4,222,397.523
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 262,500.00 Rp 2,625,000.000
Jumlah BL7. Rp 9,025,251.523
BL8. BETON BALOK 20/40 CM, Portal Pintu Utama (Besi 4ø12 + 4ø10 dan 2Pø8 -20 cm = 82,669 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 142.789 Kg Rp 22,318.80 Rp 3,186,877.298
- Begesting Papan (maks. 1 x pakai) 10.500 M2 Rp 262,500.00 Rp 2,756,250.000
Jumlah BL8. Rp 8,295,972.298
BL9. BETON BALOK 12/20 CM, Pagar Depan (Besi 4ø10 dan 2Pø6 -20 cm = 113,884 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) 223.115 Kg Rp 22,318.80 Rp 4,979,662.170
- Begesting Papan (maks. 1 x pakai) 8.000 M2 Rp 262,500.00 Rp 2,100,000.000
Jumlah BL9. Rp 9,257,516.170
BL10. BETON BALOK 30/40 CM (Besi 5ø16 + 3ø16 dan 2Pø10 -10/20 cm = 145,070 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 148.309 Kg Rp 22,318.80 Rp 3,310,074.842
- Begesting Papan (maks. 1 x pakai) 13.333 M2 Rp 262,500.00 Rp 3,500,000.000
Jumlah BL10. Rp 9,162,919.842
BL11. BETON BALOK 40/60 CM (Besi 4ø19 + 6ø16 dan 2Pø10 -10/20 cm = 106,916 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
BL12. BETON BALOK 40/70 CM (Besi 4ø19 + 8ø16 dan 2Pø10 -10/20 cm = 105,740 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 #NAME? M3 Rp 2,352,845.00 #NAME?
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah BL12. #NAME?
BETON PLAT
PL1. BETON PLAT LANTAI TBL. 20 CM (Besi ø12 -20 cm = 101,055 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 110.033 Kg Rp 22,318.80 Rp 2,455,813.436
- Begesting Papan (maks. 1 x pakai) 5.000 M2 Rp 262,500.00 Rp 1,312,500.000
Jumlah PL1. Rp 6,121,158.436
PL2. BETON PLAT LANTAI TBL. 15 CM (Besi ø10 -20 cm + Besi ø10 -20 cm = 89,502 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 138.725 Kg Rp 22,318.80 Rp 3,096,173.391
- Begesting Papan (maks. 1 x pakai) 6.667 M2 Rp 262,500.00 Rp 1,750,000.000
Jumlah PL2. Rp 7,199,018.391
PL3. BETON PLAT LANTAI TBL. 12 CM (Besi ø10 -20 cm + Besi ø10 -20 cm = 108,263 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 167.771 Kg Rp 22,318.80 Rp 3,744,455.325
- Begesting Papan (maks. 1 x pakai) 8.333 M2 Rp 262,500.00 Rp 2,187,500.000
Jumlah PL3. Rp 8,284,800.325
PL4. BETON PLAT DINDING TBL. 12 CM (Besi ø10 -20 cm = 107,225 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 118.808 Kg Rp 22,318.80 Rp 2,651,662.357
- Begesting Papan (maks. 1 x pakai) 18.667 M2 Rp 262,500.00 Rp 4,900,000.000
Jumlah PL4. Rp 9,904,507.357
PL5. BETON PLAT TANGGA TBL. 10 CM (Besi ø10 -20 cm = 117,346 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 156.176 Kg Rp 22,318.80 Rp 3,485,670.684
- Begesting Papan (maks. 1 x pakai) 8.333 M2 Rp 262,500.00 Rp 2,187,500.000
Jumlah PL5. Rp 8,026,015.684
PL6. BETON PLAT KANOPI/LISPLANK TBL. 10 CM, LBR. 45 CM (Besi ø10 -15 cm = 81,753 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) 90.585 Kg Rp 22,318.80 Rp 2,021,755.013
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 262,500.00 Rp 2,625,000.000
Jumlah PL6. Rp 6,999,600.013
PL7. BETON PLAT MEJA PANTRY TBL. 10 CM, LBR. 60 CM (Besi ø10 -20 cm = 63,297 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) 70.135 Kg Rp 22,318.80 Rp 1,565,324.335
- Begesting Papan (maks. 1 x pakai) 10.000 M2 Rp 262,500.00 Rp 2,625,000.000
Jumlah PL7. Rp 6,368,178.335
PL8. BETON PLAT CETAK DITEMPAT TBL. 8 CM, LBR. 100 CM (Besi ø10 -20 cm = 68,016 Kg/m3) K-175 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-175 1.000 M3 Rp 2,177,854.00 Rp 2,177,854.000
- Besi Beton (polos/ulir) 75.364 Kg Rp 22,318.80 Rp 1,682,045.157
- Begesting Papan (maks. 1 x pakai) 12.500 M2 Rp 262,500.00 Rp 3,281,250.000
PL9. BETON PLAT LANTAI ATAP TBL. 10 CM, LBR. 100 CM (Besi ø10 -20 cm = 127,135 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah PL9. #NAME?
PL10. BETON PLAT INJAKAN TANGGA TGI. 50 CM, LBR. 100 CM (Besi ø10 -20 cm = 31,589 Kg/m3) K-250 SITE MIX BEGISTING PAPAN
- Beton Site Mix K-250 1.000 M3 Rp 2,352,845.00 Rp 2,352,845.000
- Besi Beton (polos/ulir) #NAME? Kg Rp 22,318.80 #NAME?
- Begesting Papan (maks. 1 x pakai) #NAME? M2 Rp 262,500.00 #NAME?
Jumlah PL10. #NAME?
Halaman : 273
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON SLOOF
Halaman : 274
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON KOLOM
Halaman : 275
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
Halaman : 276
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON BALOK
Halaman : 277
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
Halaman : 278
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
BETON PLAT
Halaman : 279
MENGHITUNG BERAT BESI DALAM 1 M3 BETON (BESTAT)
8 PLAT BETON CETAK SETEMPAT ( Tbl. 8 cm, lbr. 100 cm ), Besi 1 lapis
Volume Beton 0.080 x 1.000 x 12.500 = 1.000 m3
BESTAT :
Tulangan ø 10 - 20 cm 12.460 x 5.000 x 0.616 x 1.00 lps = 38.391 kg
Tulangan ø 10 - 20 cm 0.960 x 62.500 x 0.616 x 1.00 lps = 36.974 kg
Berat besi (kg) -----> = 75.364 kg
Volume Beton = 1.000 m3
Berat besi tiap 1 m3 beton 75.360 = 75.364 kg
Bekisting tiap m3 Beton 12.500 = 12.500 m2
Halaman : 280