You are on page 1of 2

LINE LAY - OUT

PACKING
ISSUE No. : 3 PAGE : 1 OF 1 APPROVED CHECKED DRAWN

MODEL : NBS28 ISSUE DATE : MAR-08-06


PRODUCT : 28 mm CURLING IRON ISSUE DEPT./SECT.: Engineering Digitally signed by
KOMINE
Digitally signed by S.
Surin

CAPACITY :…4,500.........Units/Day. PICTH TIME. :……..7.46..............Sec.


Reason: I have
Reason: I am approving reviewed this
this document document

PK.WS-01 PK.IS-02
- TAKE OFF CARTRIDGE FROM 1 - DISPLAY BOX INSPECTION & 8.1 8.2
UNIT ASS'Y CLOSE
BALANCE WEIGHT PK.IS-01
2 - CARTRIDGE CHECK WEIGHT TAPE CUTTER PK.WS-08
RUBBER STAMP PK.WS-09
PK.WS-02 INK/PALLET PK.WS-10
- FIX HOUSING CAP-3/PUT UNITS 3.1 9,10,11 - STAMP DATE CODE ON SHIP-
INTO POLY BAG PING CARTON/FORMING
PK.WS-02 - PUT FLAT BOARD/DISPLAY -
3.2 BOX ONTO SHIPPING CARTON
- SHIPPING CARTON MOVE ON
PK.WS-03 PALLET
- INSERT PACKAGE FORMING 4.1

PK.WS-03
4.2

PK.WS-04
- PUT UNITS/CARTRIDGE ONTO 5.1
INSERT PACKAGE
PK.WS-04
5.2

PK.WS-04
5.3

PK.WS-04
5.4

PK.WS-04
5.5

PK.WS-05
6.1 - DISPLAY BOX FORMING

PK.WS-05
6.2

PK.WS-06
7.1 - PUT INSERT PACKAGE/INSTRUC-
TION BOOK/CAUTION SHEET
PK.WS-06 ONTO DISPLAY BOX
7.2

PK.WS-06
7.3

REMARK :

= ADD

= REVISE

Issue No. 1 2 3 4 5 6
Man power - 20 21
EGF-024 MANICA-THAI CORP., LTD.
ENG. DEPT.
REFERENCE
DOCUMENT CONTROL / REVISE HISTORY RECORD
STANDARD No. : NBS28
DOCUMENT DESCRIPTION LINE LAY-OUT ( PACKING )
REV. DATE
REVISE PHASE REVISE CONTENTS SUBMIT NO.
No. REVISED
3 MAR-08-06 1/1 CANCELLED PROCESS PK.WS-07 AND ADD MANPOWER PROCESS PK.WS-04 FROM 4 TO 5 PERSON,
" " " PK.WS-06 FROM 2 TO 3 PERSONS. EG 06276

IMP/EXP AS(PRO IMP/EXP


Issue dept. REFERENCE
PSD MD DMD JB GA PU
(IE)
AC PC QC
D)
AS(PE) EG PP
(WH)
QC(ICC) BIZ

Sign received

Review date

Acknowledge
recall
MIF-003A MANICA-THAI CORP., LTD.
\\Eg05\D\PAT\PAT\NBS 28\L-out\NBS 28(L-PK).xls ISO CENTER

You might also like