You are on page 1of 2

Tienko Gold Project, Ivory Coast

Investment Highlights Tienko Tenure and Project Overview

Location and Geology


Located in lucrative,
established gold district West Africa is one of the
Tienko (343 km2 ) world’s major gold
Ivory Coast is Africa’s fastest destinations with +200
growing economy and one of
million ounces of gold
the fastest developing gold
provinces
reserves already reported
from a number of gold
Tienko is situated within highly deposits. These gold
prospective well known WA deposits are all hosted
Birimian Belts within well
within typical Birimian
known structural belts
Greenstone Belts, 35% of
Opportunity to acquire which are situated in Ivory
strong foothold & Coast. However, Ivory
inexpensive entry into Coast only hosts 5% of the
Ivory Coast gold discovered to date,
illustrating the country’s
Advanced permit well explored WAME Permits within Birimian Greenstone Belts in West Africa open potential.
with target corridors delineated

Developed infrastructure Gold is mainly associated


& good operating with fine disseminated
sulphide mineralization as
environment
well as within silicified
Excellent Infrastructure: tarred veins.
national roads, abundant water,
grid power to mine gate, easy
Tenure and Holding
procurement, good
telecommunications The Tienko licence, Tienko Permit PR0886 Outline
PR0886 is situated in the
No community impediments
NW corner of the Ivory
Labour and Security Coast, connected to
Bamako, the capital of
Low sovereign risk & stable
jurisdiction Mali by a well maintained
245 km road, as well as tar
Skilled labour – friendly mining roads from Abidjan. This
culture and Artisanal free project is at advanced
CDI partner has supportive exploration stage and
relationship with local requires additional drilling
community to fully realize its
Blue Sky potential.
Option to acquire 100%
Significant potential to grow interest in Tienko project.
both Oxide and Sulphide (excluding state
resource base participation) Work Conducted on permit
Exploration initiated to pre-Goldrange:
advance Tienko project Mapping & surveying
Geochemical survey
10,000m RC and Diamond
• BLEG sampling, 6,538 samples
drilling campaign commenced
December 2021. RAB Drilling on Tienko &
Nabagala trend:
Ivory Coast - first African • 552 boreholes 17,341m
country to launch the • Gold assays 9,918
Covax vaccination drive RC Drilling Tienko trend:
• 21 boreholes 1,991m
• Gold assays 2,209
Geophysics–Groundmagnetic
Survey and trenches
Tienko Gold Project, Ivory Coast
F2 Section KRC014 looking NW F2F2Section KRC018 looking NW
F2
F2

Significant intersections include


• 21m @ 3.62g/t, which includes 8m @ 7.36g/t
• 8m @ 3.25g/t
• 4m @ 2.12g/t
• 25m @ 0.99g/t

Konela Trend Current Tienko US$3M Programme


• 10 km trend tested with 21 widely spaced RC holes Infill Resource definition drilling for 8,000m RC and
• Open in both directions and at depth 2000m DDH on prioritized target zones commenced
• Strong mineralization in Oxide and Transition Zones in December 2021.
• New propective areas recently identified by
Goldrange field work on Tienko permit. Subparallel • Twin drilling of holes which terminated in ore to
structures and mineralization to main Konela Trend verify previous quality of core recoveries.
• Recent sampling (October 2021) identified new
• 2500 drill samples being assayed at Bureau
mineralized areas including 10.16 g/t Au over 2
meters NE of Nabagala Zone. Veritas, Abidjan
• Infill, extension and down dip drilling to allow for
Structurally resource determination.
deformed gold • Ore deportment and initial metallurgical testwork
rich quartz
underway at SGS, Johannesburg
vein with
sulphide • Planned trenching by excavator over areas
mineralization
identified by new artisanal workings

For additional information or inquiries, please contact:


Helen Ruth Pein, CEO, investors@goldrangeresources.com JANUARY 2022
The foregoing brief project description is provided for initial information purpose only to parties who may be in interested in the investment opportunity. The information
contained herein is not intended to be relied upon as the basis for any investment decision and any representations and warranties regarding the project shall only be made in
definitive and binding documentation.

You might also like