This presentation includes certain estimates, projections and “forward looking statements”
within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended that have
been provided by the Company with respect to its anticipated future performance. Such forward
looking statements reflect various assumptions by the Company concerning anticipated results,
which assumptions may or may not prove to be correct. No representations are made as to the
accuracy of such statements, estimates or projections. These forward-looking statements are
made pursuant to the “safe harbor” provisions of the Private Securities Litigation Reform Act of
1995. While these statements are made to convey the Company's progress, business
opportunities and growth prospects, such forward-looking statements represent management's
opinion. Whereas management believes such representations to be true and accurate based on
information and data available to the Company at this time, actual results may differ materially
from those described. The Company's operations and business prospects are always subject to
risks and uncertainties.
2
Strategy
3
Diversifying for Sustainability
4
Mine Developer Team
5
Developing Assets: Organic Growth
MALAYSIA GOLD PRODUCTION - Selinsing Gold Mine
• Fiscal 2014 (Ended June 30 2014): produced 35,983 ounces at US$613/oz
• Fiscal 2014 exploration drill program at Selinsing, Buffalo Reef, and FELDA properties consisted of 119
diamond drill holes totaling 10,039 metres
• Fiscal 2015 exploration is focused on replacement of oxide ore and further studies of regional geological
structures to effectively define new targets
• R&D work- Secured Intec License for Sulphide Gold Recovery Technology
Selinsing
Gold
BR Sulfide
Gold
GOLD
FELDA
Famehub
Murchison
Gold
POLYMETALLIC
Mengapur
(Cu, Au, Ag, S, Fe)
7
Selinsing Gold Mine
8
Selinsing Mine Aerial View
9
Selinsing-Buffalo Reef Area
10
Selinsing Plant Area
11
Selinsing Gold Mine Open Pit
12
Selinsing Gold Mine Performance
*Total cash cost includes production costs such as mining, processing, tailing facility maintenance and camp administration, royalties, and operating
costs such as storage, temporary mine production closure, community development cost and property fees, net of by-product credits. Cash cost
excludes amortization, depletion, accretion expenses, capital costs, exploration costs and corporate administration costs.
13
Secures Intec Technology License
14
Intec’s Plant in Burnie, Tasmania
15
Murchison Gold Project
16
Murchison Gold Project Location
17
Murchison Plant Area
18
Murchison Pit Area
19
Murchison Assets
Assets include:
20
Burnakura Location Plan & Geology
21
Burnakura Mine Site Design Diagram
Including proposed heap leach crushing, agglomerating, conveying,
stacking and processing facility
22
Murchison Development Plan
• Open pit production is a priority, plant front- end upgrade for medium to high grade
ore and exploration drilling and heap leach process facility for low grade ore in
progress
• Conceptual pad engineering and draft operating permit applications are completed,
new pad site being investigated to save haulage costs
• Independent metallurgical test work for heap leach study completed with positive
results
• Partial completed resource estimated announced February 18, 2015 (Slide 25), with
a NI 43-101 Technical Report on the Alliance & New Alliance gold deposits
Burnakura, Western Australia (Amended) filed August 12, 2015
• Plant front-end crushing and screening being re-designed for more efficient lower
cost operation
• Acquired the Tuckanarra Gold Project in November 2014 - a strategic move to
consolidate a large land position in the Murchison region which is accretive to the
project
• Copper potential at Gabanintha being followed up
23
Murchison Drill Program
• Murchison Drill program designed to validate the
historical resource, increase the grade and
geological continuity of the mineralization through
infill drilling, test for resource extensions and define
further exploration targets
• 151 RC holes for 13,123m have been completed at
Alliance and New Alliance (Announced Jan. 19,
2015)
• The Assay Results further confirm favorable
mineralization targets at Alliance and New Alliance
• 74 RC holes for 4,676m have been completed at
Federal City (Announced Jan. 19, 2015)
• Feb. 18, 2015 announced a mineral resource
estimate for the Alliance/New Alliance areas of the
Murchison Gold Project
• August 12, 2015 filed (Amended) NI 43-101
Technical Report on the Alliance and New Alliance
Gold Deposits Burnakura, Western Australia
• The ongoing drill program work will contribute to
the current suite of technical studies on the project
24
Alliance/New Alliance Mineral
Resource Estimate
Table1. Mineral Resource for Alliance and New Alliance at a 0.5g/t Au cut-off
Indicated Inferred
Contained
Deposit Density Tonnes Au
Au
Density Tonnes Au Contained Au
New Alliance 2.3 1.24 1.2 47.6 2.7 0.08 1.5 3.7
25
Mengapur Polymetallic Project
26
Mengapur Plant Area
27
Mengapur Copper/Iron Plant Work
Former Production Plant Rehabilitated as 1,000 tonne per day pilot plant
targeting Copper with contained Iron by-product
28
Iron Ore Washing Plant Diagram
29
Mengapur: A large, multi-metal resource
32
Investor Relations Contacts
Visit to Selinsing Mine by JMG (Jabatan Minerals & Geoscience Department, Malaysia)
33
APPENDIX
Property Locations
35
Selinsing Production Data
Selinsing Gold Mine Fiscal 2010 Fiscal 2011 Fiscal 2012 Fiscal 2013 Fiscal 2014
Operating results
Ore mined (tonnes) 662,330 740,909 501,882 882,159 494,141
Ore processed (tonnes) 272,120 351,999 364,680 938,498 1,018,972
Average ore head grade (g/t Au) 3.08 4.31 4.24 2.07 1.31
Process recovery rate 58.70% 92.90% 93.7% 87.0% 75.87%
Gold production (ounces) 13,793 44,438 44,585 52,982 35,983
Gold sold (ounces) 13,793 40,438 36,938 57,905 36,938
Financial results
Gold sales (US$’000)(a) 16,316 56,627 61,709 91,277 48,583
Per ounce data
Cash cost per ounce (US$/ounce) 216 242 306 400 613
Average spot gold price, US$/ounce 1,089 1,372 1,673 1,573 1,296
Average realized gold price, US$/ounce 1,183 1,400 1,671 1,576 1,290
36
Selinsing-Buffalo Reef Resource
Selinsing-Buffalo Reef Resource as of August 31, 2012 (Practical Mining, May 23, 2013)
Category OXIDE SULPHIDE OXIDE + SULPHIDE
kTonnes g/t Au (kOz) kTonnes g/t Au (kOz) kTonnes g/t Au (kOz)
Reserves (based on a USD1550/oz gold price)
Proven 2,360 0.7 54.6 266 2.5 21.4 2,626 0.9 76.0
Probable 496 1.7 26.7 1,768 2.1 120.2 2,264 2.0 146.9
P+P 2,857 0.9 81.3 2,034 2.2 141.7 4,890 1.4 222.9
Resources including Reserves (based on a USD1700/oz gold price)
Measured 2,361 0.7 54.6 322 2.1 21.7 2,682 0.9 76.3
Indicated 588 1.6 29.5 3,036 1.9 183.6 3,624 1.8 213.0
M+I 2,949 0.9 84.1 3,358 1.9 205.3 6,307 1.4 289.4
Inferred 268 1.2 10 801 1.5 38.0 1,070 1.4 48.0
The 2012 Selinsing and Buffalo Reef mineral resources were estimated by Mark Odell, P.E. and owner of Practical Mining LLC, who is the
independent Qualified Person for the August 31, 2012 Mineral Resources and Reserves as defined by NI 43-101. Read the complete
Technical Report, which is available on Monument’s SEDAR profile at www.sedar.com filed May 23, 2013. The information in this
presentation is qualified in its entirety by the limitations described in the Technical Report.
37
Mengapur Historic Resource
Note: The data presented in the table have been produced at a cut-off grade of 0.336% EQV Cu reflecting
the available information in 1990 commodity prices, operating costs, and plant recoveries
This presentation includes historical estimates and related information, which has not been verified by Monument. Read the complete
Technical Report, which is available on Monument’s SEDAR profile at www.sedar.com filed Feb. 29, 2012.
The information in this presentation is qualified in its entirety by the limitations described in the Technical Report.
38
Capital Structure (As of August 12, 2015)
39