This document contains the results of CBR (California Bearing Ratio) tests conducted at multiple locations along a road section from chainage 31+250 to 33+375. CBR tests were conducted on the loaded area, centerline, and empty areas of each location on different dates to determine the soil bearing capacity. The results include the CBR percentages for penetrations of 2.54mm and 5.08mm at each location and date. Some locations required treatment with cement to improve soil strength.
This document contains the results of CBR (California Bearing Ratio) tests conducted at multiple locations along a road section from chainage 31+250 to 33+375. CBR tests were conducted on the loaded area, centerline, and empty areas of each location on different dates to determine the soil bearing capacity. The results include the CBR percentages for penetrations of 2.54mm and 5.08mm at each location and date. Some locations required treatment with cement to improve soil strength.
This document contains the results of CBR (California Bearing Ratio) tests conducted at multiple locations along a road section from chainage 31+250 to 33+375. CBR tests were conducted on the loaded area, centerline, and empty areas of each location on different dates to determine the soil bearing capacity. The results include the CBR percentages for penetrations of 2.54mm and 5.08mm at each location and date. Some locations required treatment with cement to improve soil strength.