This document contains the results of CBR (California Bearing Ratio) tests conducted at multiple locations along a road section from 31+250 to 33+375. CBR tests were conducted on the loaded area, centerline, and empty areas of each location on different dates to determine the soil strength and suitability. The CBR percentages are reported for penetrations of 2.54mm and 5.08mm at each location and date. Locations with CBR test results below requirements were treated with cement to improve the soil strength.
This document contains the results of CBR (California Bearing Ratio) tests conducted at multiple locations along a road section from 31+250 to 33+375. CBR tests were conducted on the loaded area, centerline, and empty areas of each location on different dates to determine the soil strength and suitability. The CBR percentages are reported for penetrations of 2.54mm and 5.08mm at each location and date. Locations with CBR test results below requirements were treated with cement to improve the soil strength.
This document contains the results of CBR (California Bearing Ratio) tests conducted at multiple locations along a road section from 31+250 to 33+375. CBR tests were conducted on the loaded area, centerline, and empty areas of each location on different dates to determine the soil strength and suitability. The CBR percentages are reported for penetrations of 2.54mm and 5.08mm at each location and date. Locations with CBR test results below requirements were treated with cement to improve the soil strength.