6. (a) What is water resources planning? Briefly discuss about Indian water resource. 8+12-20
(b) What are the purposes of water resources development? Classity the water resources devel.
project.
(c) What is Culvert and Submersible bridge? What is Afflux? How is it computed?
2+4+4+4+3+3-20
BE-VIVI6/CE-606
=1½:1
(ii) Side slope
Assume reasonable data, if Frequired.
10+5=15
3
BE-VI/CE-606/18
Full Marks: 70
Time: 3 Hours
Figures in the margin indicate full marks.
Answer Question No. 1 and any four from the rest.
5x2=10
terms
1. Define the
(a) Lift Irrigation
Area (CCA)
(b) Culturable Command
(c) Overlap Allowance
of water
(d) Consumptive use
(e) Watershed Management
disadvantages of Irrigation.
2. (a) Discuss in brief the
of soil mnoisture.
Describe with the help of a diagram various forms
(b) irigation of the
supply water to soil in order to ensure efficient
will you
(c) After how many days
if
given crop,
soil = 27%
(i) Field Capacity of the
14%
(iü) Permanent Wilting Point=
15kN/m
(ii) Dry density of soil =
75cm 3+5+7=l5
(iv) Effective root zone depth =
use of water = llmm
( )Daly consumptive
irigation.
yarious methods of surface
D (a) Discuss in brief
and Duty (D).
between Base (B). Delta (4) Time Factor may
(D) Establish a relation the following data. The value of
discharge of a canal from 6+3+6=15
() Determine the head
be assumed as 0.75. Duty (hec/cemec)
Period (days) Area (hectares)
Crop Base 1500
4000
Rice 120 2000
3500
Wheat 120 1200
3000
310
Sugarcane
4. (a) Describe about the types of canal lining.
(b) What are the merits & demerits of canal lining?
Please Turn Over
BE-VI/CE-606/18 (2 )
(c) Acanal of length Skm and of discharge capacity 3:5 cumec is
proposed to be lined
lining. The total cost of lining is estimated as 4lakhs. The life of
the lining is with boulder
60 years. Justify the lining in the canal from the following data:
()) Rate of interest 8% considered as
(ii) Seepage loss = 2%
(ii) Revenue for irrigation water = Rs. 75-00/hec-m
(iv) Maintenance cost per km for lined canal = Rs.
1000-00
(v) Maintenance cost per km for unlined canal = Rs.
2500-00
(vì) Base period of crop = 120 days
(vii) Additional benefit/km = Rs. 1000-00
5. (a) From the contour map of a
water logged area, the following data was recorded:
4+447=15
Contour (m) 198-0 198-5 199-0 199-5 200-0
|Area (m?) 1750 2200 15900 19000 21000
Design a rectangular channel to drain out the
whole water collected in the above area in 2
Assume longitudinal slope as 1 in 4000, hours
not to exceed lm/sec. Assume roughness coefficient (N) as 0-01 & the velocity of floy
necessary data if required.
(b) Find the intensity of
rainfall when rainfall occurs frequently and
110 mins. the total duration of rainfall
is
6. (a) State 12+3=15
Kennedy's Theory & Lacey's Theory for unlined canal
(b) Find the section & design on alluvial soil.
maximum discharge of a channel with the
(i) Bed slop = 1 in 5000 following data 5+10-15
(ii) Lacey's silt factor = 0-95
(iüi) Side slop - 1:1
7. (a) Design a most economical
(i) Discharge of the trapezoidal section of a canal having the following data :
canal= 20m³/sec.
(ii) Permissible mean
velocity =
(iii) Bazin's constant, K = 1-30 0-85m/sec.
(iv) Side slope of canal = 1,: 1
Find also the allowable bed slope of the canal.
(b) Describe the methods of controlling water 1243-15
logging.
BE-VIICE-606(0)/19
2018-19
B.E.6th Semester Examination,
Subject : Irrigation Engineering
Paper : CE-606
(OldSyllabus)
Time: 3 Hours
FullMarks: 70
(6) What are the different types of sprinkler method of distribution of water? Describe briefly.
with neat sketches.
9) ATter how many days will you supply water to soil in order to ensure sufficient iigation ot
the given crop, if
() field capacity of the soil= 28%
(1) permanent wilting point= 13%
(ii) dry density of soil=
(iv) depth of root zone= 1-3gm/cc
70cm
(v) daily Consumptive use of water= 12mn 2+6+7=1S
0088
BA-VICE-o00(0y19 (2)
6. (a) What is water logging? What are the effects of water logging?
(b) Find the efficient cross-section of a canal having the discharge 10 cumec. Assume bed slope
1in 5000, value of N = 0-0025, C.V.R.(m) = 1, full supply depth not to exceed 1-60m and
5+10=15
side slope = 1:1.
7. (a) Design an irigation channel by Lacey's theory having the following data:
(i) F.S.D. = 5 cumec
(ii) Silt factor = 1
(iiü) Side slope =2:1
10+5=15
(b) What are the different pool levels in a reservoir? Explain with sketch.
8. (a) State the advantages and disadvantages of Canal lining.
(b) A canal of length Skm and of discharge capacity 3-5 cumec is proposed to be lne
Boulder lining. The total cost of lining is estimated at 4 lakhs. The life of the imig
consideredas 60 years. Justify the lining in the canal from the following data
(i) Rate of interest = 8%
(ii) Seepage loss= 2%
(iii) Revenue for irrigation water = 775-00/hec
(iv) Maintenance cost per km for lined canal =1000-00
(v) Maintenance cost per km for unlined canal =2500-00
(vi) Base period of crop = 120 days 5+10=15