JOURNAL OF DAILY ACTIVITIES

KKN MBKM BUILDS VILLAGE


ULANTA VILLAGE, SUWAWA DISTRICT, BONE BOLANGO REGENCY
Submitted as history, proof of activity, and course value conversion requirements
 
Field Supervisor: 1. Dewi Diana Paramata, S.Pd., M.Pd
  2. Dr. Masri K. Umar, S.Pd., M.Pd
  3. Dewa Gede Eka Setiawan, S.Pd., M.Pd
 
Compiled By:
Name : Sudartik
Nim : 421419008
Study Programs/Departments : S1-Physics/Physics Education
 
 
 
 
 
 
 
 
 
 
GORONTALO STATE UNIVERSITY
INSTITUTE FOR RESEARCH AND COMMUNITY SERVICE
2022

 
Day, date : Monday, February 7, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Provision of the KKN - Campus 4 100 % Done
MBKM program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Provision of the KKN- Campus 4 100% Done
MBKM program UNG
 
Day, date : Tuesday, February 8, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Provision of the KKN - Campus 4 100 % Done
MBKM program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Provision of the KKN- Campus 4 100% Done
MBKM program UNG
 
Day, date : Wednesday, February 9, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Provision of the KKN - Campus 4 100 % Done
MBKM program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Provision of the KKN- Campus 4 100% Done
MBKM program UNG
 
Day, date : Thursday, February 10, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Provision of the KKN - Campus 4 100 % Done
MBKM program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Provision of the KKN-Campus 4 100% Done
MBKM program UNG
Day, date : Friday, February 11, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Provision of the KKN - Campus 4 100 % Done
MBKM program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Provision of the KKN- Campus 4 100% Done
MBKM program UNG
 
Day, date : Saturday, February 12, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Provision of the KKN - Campus 4 100 % Done
MBKM program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Provision of the KKN- Campus 4 100% Done
MBKM program UNG
 
Day, date : Sunday, February 13, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Provision of the KKN - Campus 4 100 % Done
MBKM program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Provision of the KKN- Campus 4 100% Done
MBKM program UNG
 
Day, date : Monday, February 14, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of the KKN Campus 4 100 % Done
-MBKM work program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of the Campus 4 100% Done
KKN-MBKM work UNG
program
Day, date : Tuesday, February 15, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of the KKN Campus 4 100 % Done
-MBKM work program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of the Campus 4 100% Done
KKN-MBKM work UNG
program
 
Day, date : Wednesday, February 16, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of the KKN Campus 4 100 % Done
-MBKM work program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of the Campus 4 100% Done
KKN-MBKM work UNG
program
 
Day, date : Thursday, February 17, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of the KKN Campus 4 100 % Done
-MBKM work program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of the Campus 4 100% Done
KKN-MBKM work UNG
program
 
Day, date : Friday, February 18, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of the KKN Campus 4 100 % Done
-MBKM work program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of the Campus 4 100% Done
KKN-MBKM work UNG
program
 
Day, date : Saturday, February 19, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of the KKN Campus 4 100 % Done
-MBKM work program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of the Campus 4 100% Done
KKN-MBKM work UNG
program
 
Day, date : Sunday, February 20, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of the KKN Campus 4 100 % Done
-MBKM work program UNG
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of the Campus 4 100% Done
KKN-MBKM work UNG
program
 
Day, date : Monday, February 21, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
Day, date : Tuesday, February 22, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
Day, date : Wednesday, February 23, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
Day, date : Thursday, February 24, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
Day, date : Friday, February 25, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
 
 
Day, date : Saturday, February 26, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
Day, date : Sunday, February 27, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
Day, date : Monday, February 28, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation of Campus 4 100 % Done
proposals for the KKN- UNG
MBKM activity
program
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation of Campus 4 100% Done
proposals for the KKN- UNG
MBKM activity
program
 
Day, date : Tuesday, March 1, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of the Ulanta 100 % Done
location of KKN- Village
MBKM
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of the Ulanta 100% Done
location of KKN- Village
MBKM
 
Day, date : Wednesday, March 2, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of the Ulanta 100 % Done
location of KKN- Village
MBKM
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of the Ulanta 100% Done
location of KKN- Village
MBKM
 
Day, date : Thursday, March 3, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of the Ulanta 100 % Done
location of KKN- Village
MBKM
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of the Ulanta 100% Done
location of KKN- Village
MBKM
 
Day, date : Friday, March 4, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 School observations Ulanta 100 % Done
Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Evaluation meeting Ulanta 100% Done
Village
 
Day, date : Saturday, March 5, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 School observations Ulanta 100 % Done
Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Evaluation meeting Ulanta 100% Done
Village
 
 
Day, date : Monday, March 7, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of out-of- Ulanta 100 % Done
school children Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of out-of- Ulanta 100% Done
school children Village
 
Day, date : Tuesday, March 8, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of out-of- Ulanta 100 % Done
school children Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of out-of- Ulanta 100% Done
school children Village
 
Day, date : Wednesday, March 9, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of out-of- Ulanta 100 % Done
school children Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of out-of- Ulanta 100% Done
school children Village
 
Day, date : Thursday, March 10, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of children Ulanta 100 % Done
with special needs Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of children Ulanta 100% Done
with special needs Village
 
 
 
 
Day, date : Friday, March 11, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of children Ulanta 100 % Done
with special needs Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of children Ulanta 100% Done
with special needs Village
 
Day, date : Saturday, March 12, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Observation of children Ulanta 100 % Done
with special needs Village
12:01 12:45 ISHOMA Ulanta 100% Done
Village
13:00 17:00 Observation of children Ulanta 100% Done
with special needs Village
 
Day, date : Sunday, March 13, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 12:00 Preparation for the Campus 4 100 % Done
release of KKN- UNG
MBKM students
12:01 12:45 ISHOMA Campus 4 100% Done
UNG
13:00 17:00 Preparation for the Campus 4 100% Done
release of KKN- UNG
MBKM students
 
Day, date : Monday, March 14, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 11:57 Release of KKN Campus 4 100 % Done
MBKM students UNG
12:00 13:00 ISHOMA Campus 4 100% Done
UNG
13:00 15:00 Handover and release Ulanta 100% Done
of MBKM KKN Village
students at ulanta Office
village office
15:00 17:00 Briefing penyusunan KKN-MBKM 100% Done
schedule of activities Post
per day
 
Day, date : Tuesday, March 15, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the post KKN-MBKM 100% Done
Post
08:30 09:00 Fill out the KKN-MBKM 100% Done
attendance list Post
09:00 10:40 Consumption KKN-MBKM 100% Done
pickets Post
11:00 13:00 ISHOMA KKN-MBKM 100% Done
Post
14:00 17:00 Briefing KKN-MBKM 100% Done
Post
 
Day, date : Wednesday, March 16, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 09:00 Village Office Ulanta Village 100% Done
  Cleanliness Picket Office  

09:00 09:30 Fill out the KKN-MBKM 100% Done


attendance list Post

09:30 11:30 Socialize with the Ulanta Village 100% Done


local community

11:30 13:00 rest KKN-MBKM 100% Done


Post

14:00 17:00 Work program KKN-MBKM 100% Done


briefing Post

20:00 21:50 Attending the Ulanta Village 100% Done


Opening ceremony Volleyball
of Activities from Court Hamlet 03
KKS-IAIN Sultan
Amai students
 
Day, date : Thursday, March 17, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the Post KKN-MBKM 100% Done
Post
08:30 09:00 Fill out the KKN-MBKM 100% Done
attendance list Post
09:00 11:30 Socialize with the Ulanta Village 100% Done
community
11:30 13:00 Rest KKN-MBKM 100% Done
Post
14:00 17:00 Work program KKN-MBKM 100% Done
briefing Post
17:00 19:00 Rest KKN-MBKM 100% Done
Post
19:23 20:34 Attending do'a Al-Ikhlas 100% Done
Nisfu Sya'ban Mosque
Hamlet 02,
Ulanta Village
 
Day, date : Friday, March 18, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the post KKN-MBKM 100% Done
Post
08:30 am 11:30 pm Picket assists Kantor Ulanta 100% Done
officials at village Village
office
11:30 13:00 ISHOMA Ulanta Village 100% Done
Office
13:00 17:00 Picket assists Ulanta Village 100% Done
officials at village Office
office
 
Day, date : Saturday, March 19, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the post KKN- 100% Done
MBKM Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM Post
09:00 11:00 Consumption pickets KKN- 100% Done
MBKM Post
11:00 13:00 Rest KKN- 100% Done
MBKM Post
14:00 17:00 Briefing KKN- 100% Done
MBKM Post
17:00 20:00 Rest KKN- 100% Done
MBKM Post
20:05 21:20 Attended a visiting Hamlet 03 100% Done
event for one of the Ulanta
residents of Ulanta Village
Village
21:25 23:00 Attending KKS-T IAIN Ulanta 100% Done
Sultan Amai Gorontalo Village
student activities Volleyball
Court
 
Day, date : Sunday, March 20, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:20 Morning Exercises Hamlet 02 100% Done
Ulanta
Village
07:30 10:00 Healthy Path Pioneer Lake 100% Done

10:00 13:00 Rest KKN- 100% Done


MBKM Post
14:00 17:00 Briefing KKN- 100% Done
MBKM Post
 
Day, date : Monday, March 21, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the post KKN- 100% Done
MBKM Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM Post
09:00 17:00 SDGs data collection Ulanta 100% Done
with village officials Village

17:00 20:00 Rest KKN- 100% Done


MBKM Post

20:05 22:00 Breafing KKN- 100% Implemented


MBKM Post
 
Day, date : Tuesday, March 22, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the post KKN- 100% Done
MBKM Post

08:30 09:00 Fill out the attendance KKN- 100% Done


list MBKM Post

09:00 10:00 Socialize with the local Ulanta 100% Done


community village
10:00 11:30 SDGs data collection Ulanta 100% Done
with village officials Village
Office
11:30 13:00 Rest KKN- 100% Done
MBKM Post

13:00 17:00 Data collection of local Ulanta 100% Done


community SDGs Village

17:00 20:00 Rest KKN- 100% Done


MBKM Post

20:30 22:00 Briefing KKN- 100% Done


MBKM Post

 
Day, date : Wednesday, March 23, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
 
Results (%)
08:00 09:00 Hygiene Picket at the Ulanta 100% Done
village office Village  
Office
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM  
Post
09:35 11:30 SDGs data collection Ulanta 100% Done
with village officials Village  
Office
11:30 13:00 Rest KKN- 100% Done
MBKM  
Post
13:00 17:00 SDGs data collection Ulanta 100% Done
with village officials Village  

17:00 20:00 Rest KKN- 100% Done


MBKM  
Post
20:00 22:40 Breifing KKN- 100% Done
MBKM  
Post
 
Day, date : Thursday, March 24, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
 
Results (%)
08:00 08:30 Cleaning the post KKN- 100% Done
 
MBKM Post
08:30 09:00 Fill out the attendance KKN- 100% Done
 
list MBKM Post
09:00 11:30 SDGs data collection Ulanta 100% Done
with village officials Village  
Office
11:30 13:00 Rest KKN- 100% Done
 
MBKM Post
13:00 17:00 SDGs data collection Ulanta 100% Done
 
with village officials village office
17:00 20:00 Rest KKN- 100% Done
 
MBKM Post
20:05 21:35 Breifing Discusses data KKN- 100% Done
collection of children MBKM Post
 
with special needs along
with dropout rates
 
Day, date : Friday, March 25, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievemen Information
t Results (%)
08:00 08:30 Cleaning the post KKN-MBKM 100% Done
Post
08:30 09:00 Fill out the attendance list KKN-MBKM 100% Done
Post
09:30 13:30 Attended the Halal bii Ulanta Village 100% Done
  halal event with the ulanta Office Hall
village government as
well as the farewell of
IAIN KKS-T students
Sultan Amai Gorontalo
13:30 14:00 Rest KKN-MBKM 100% Done
Post
14:15 17:00 Briefing KKN-MBKM 100% Done
Post
19:10 21:50 A visit to the house of the Ulanta 100% Done
head of the hamlet 03 Village Hamlet
03
 
Day, date : Saturday, March 26, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:00 11:00 Consumption pickets KKN- 100% Done
MBKM
Post
11:00 13:00 Rest KKN- 100% Done
MBKM
Post
13:30 17:00 Socialize and mingle Ulanta 100% Done
with the local Village
community
 
Day, date : Sunday, March 27, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:00 11:30 Socialize with the Ulanta 100% Done
community Village
11:30 13:00 Rest KKN- 100% Done
MBKM
Post
14:00 17:00 Breafing on dropout KKN- 100% Done
rates and Ramadan MBKM
activities Post
19:40 21:23 Meeting with ulanta Kadus 100% Done
village cadets House 3,
discussing ramadan hamlet 03
work program ulanta
village
 
Day, date : Monday, March 28, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:50 11:30 Data Collection of Desa Ulanta 100% Done
Dropouts and Special Hamlet 02
Needs
11:30 13:00 Rest KKN- 100% Done
MBKM
Post
13:00 17:00 Data collection of Ulanta 100% Done
dropouts and special village
needs hamlet 02
18:45 22:00 Preparation for Desa Ulanta 100% Done
Ramadan activities Hamlet 03
 
Day, date : Tuesday, March 29, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
08:00 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:00 11:30 Data Collection of Ulanta 100% Done
Dropouts and Special Village
Needs
11:30 13:00 Rest KKN- 100% Done
MBKM
Post
13:00 17:00 Data collection of Ulanta 100% Done
dropouts and special village
needs
18:45 22:00 Preparation for Ulanta 100% Done
Ramadan activities Village
Hamlet 03
 
Day, date : Wednesday, March 30, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
 
Results (%)
08:00 09:00 Hygiene Pickets at the Ulanta 100% Done
Village Office Village  
Office
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM  
Post
09:30 11:00 Consumption pickets KKN- 100% Done
MBKM  
Post
11:00 14:00 Rest KKN- 100% Done
MBKM  
Post
14:15 18:00 Cucumber plant The 100% Done
management garden of
one of the
community  
leaders of
Ulanta
Village
20:30 21:20 Breafing Discusses KKN- 100% Done
Ramadan activities MBKM  
Post
 
Day, date : Thursday, March 31, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
 
Results (%)
08:00 08:30 Cleaning the Post KKN- 100% Done
MBKM  
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM  
Post
09:00 11:30 Brefing educational Ulanta 100% Done
socialization activities village  
with village heads office
11:30 13:30 Rest KKN- 100% Done
MBKM  
Post
13:35 15:00 Recapthe Dropout Rate Ulanta 100% Done
Data Village  
Office
16:25 23:35 Meeting and Desa Ulanta 100% Done
Preparation of Hamlet 03
Ramdhan Activities  
together with the cadets
of ulanta village
 
Day, date : Friday, April 1, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
 
Results (%)
07:00 09:45 Friday Clean Desa Ulanta 100% Done
 
Hamlet 01
09:50 10:30 Fill out the attendance KKN- 100% Done
list MBKM  
Post
10:30 13:00 Rest KKN- 100% Done
MBKM  
Post
13:30 16:00 Briefing KKN- 100% Done
MBKM  
Post
16:25 23:00 Meetings and assisting Hamlet 3, 100% Done
in the Preparation of Ulanta
 
Ramdhan Activities Village
together with cadets
 
Day, date : Saturday, April 02 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:20 08:00 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:30 11:00 Consumption pickets KKN- 100% Done
MBKM
Post
11:45 13:30 Istirhata KKN- 100% Done
MBKM
Post
14:00 16:30 Briefing KKN- 100% Done
MBKM
Post
 
Day, date : Sunday, April 03 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
 
Results (%)
06:30 08:00 Gymnastics and Ulanta 100% Done
 
morning walk Village
08:10 09:00 Cleaning the post KKN- 100% Done
MBKM  
Post
09:20 09:40 Fill out the attendance KKN- 100% Done
list MBKM  
Post
10:00 11:30 Socialize with the local Ulanta 100% Done
 
community Village
12:00 14:00 Rest KKN- 100% Done
MBKM  
Post
14:30 16:30 Briefing KKN- 100% Done
MBKM  
Post
21:20 pm 23:10 pm Preparatory meeting for Ulanta 100% Done
Ramadan activities Village  
(RAME) Hamlet 03
 
Day, date : Senin, April 04 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:00 Cleaning the Post KKN- 100% Done
MBKM
Post
08:00 08:45 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:00 10:50 Socialize with the Ulanta 100% Done
community Village
11:00 14:00 Rest KKN- 100% Done
MBKM
Post
14:30 16:00 Briefing with cadets KKN- 100% Done
MBKM
Post
17:30 18:20 Attend an open Ulanta 100% Done
invitation together village
 
 
Day, date : Selasa, April 05 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:00 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Filling out the KKN- 100% Done
Attendance List MBKM
Post
09:30 14:30 Helping village Ulanta 100% Done
officials Village
Office
14:45 16:30 Rest KKN- 100% Done
MBKM
Post
 
Day, date : Wednesday, April 6, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:20 8:00am Village Office Ulanta 100% Done
Cleanliness Picket Village
Office
08:30 09:00 Filling out the KKN- 100% Done
Attendance List MBKM
Post
09:20 14:00 Helping village Ulanta 100% Done
officials Village
Office
14:30 16:30 Rest KKN- 100% Done
MBKM
Post
21:00 22:20 Discussion with cadets Hamlet 3, 100% Done
Ulanta
Village
Day, date : Thursday, April 7 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
 
Results (%)
07:00 08:00 Cleaning the Post KKN- 100% Done
MBKM  
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM  
Post
09:30 14:00 Helping village Ulanta 100% Done
officials Village  
Office
14:30 16:00 Rest KKN- 100% Done
MBKM  
Post
16:30 17:30 Preparing the iftar KKN- 100% Done
menu MBKM  
Post
21:00 23:10 Conceptualizing Ulanta 100% Done
Ramadan Activities Village  
(RAME)
 
Day, date : Friday, April 08 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:00 08:00 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:30 11:00 Assisting officials at Ulanta 100% Done
the village office Village
Office
11:45 14:30 Rest KKN- 100% Done
MBKM
Post
15:20 17:20 Preparing the iftar KKN- 100% Done
menu MBKM
Post
21:30 23:00 Brifieng KKN- 100% Done
MBKM
Post
 
Day, date : Saturday, April 9 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM Post
10:00 11:30 Mingle with the local Ulanta 100% Done
community Village
11:42 14:00 Rest KKN- 100% Done
MBKN Post
14:30 16:00 Decorating the Ulanta 100% Done
Ramadan Activities Village
Stage Volleyball
Court
Hamlet 03
 
Day, date : Sunday, April 10 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:20 Morning walk Ulanta 100% Done
Village
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 a.m. 13:00 pm Preparing and Ulanta 100% Done
decorating the stage of Village
Ramadan activities Hamlet 03
(Volleyball
Court)
13:30 16:00 Rest KKN- 100% Done
MBKM
Post
17:40 pm 18:20 pm Open Bersama at Al- Al Ikhlas 100% Done
Ikhlas Mosque Mosque
21:00 22:40 pm Continuing to prepare Desa Ulanta 100% Done
for Ramadan activities Hamlet 03
(Volleyball
Court)
 
Day, date : Monday, April 11, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:00 Cleaning the Post KKN- 100% Done
MBKM
Post
8:30 a.m. 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:30 14:00 Preparing and Hamlet 3 100% Done
decorating the stage of Ulanta
Ramadan activities Village
14:30 16:00 Rest KKN- 100% Done
MBKM
Post
19:40 22:00 pm Opening drama Ulanta 100% Done
rehearsals at Ramadan Village
activities Volleyball
Court
Hamlet 03
 
Day, date : Tuesday, April 12, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:00 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:30 12:30 Rest KKN- 100% Done
MBKM
Post
13:00 16:00 Rehearsal preparation Hamlet 3 100% Done
of activities Ulanta
Village
17:45 18:30 Breaking the Fast Al-Ikhlas 100% Done
Together at Al-Ikhlas Mosque
Mosque
20:30 23:00 Opening Ceremony of Ulanta 100% Done
Ramadan Activities Village
(RAME) Hamlet 03
(Volleyball
Court)
23:00 23:55 Briefing KKN- 100% Done
MBKM
Post
 
Day, date : Wednesday, April 13, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:40 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 14:00 Rest KKN- 100% Done
MBKM
Post
14:30 16:30 Preparing the iftar KKN- 100% Done
menu MBKM
Post
20:30 23:00 Ramadhan Activity Ulanta 100% Done
Competition (RAME) Village
Day 2 Hamlet 03
(Volleyball
Court)
23:00 23:55 Briefing KKN- 100% Done
MBKM
Post
 
Day, date : Thursday, April 14, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 15:00 Inputting SDGs data Ulanta 100% Done
online Village
Office
15:30 16:30 Rest KKN- 100% Done
MBKM
Post
20:30 22:50 Ramadhan Activity Ulanta 100% Done
Competition (RAME) Village
Day 3 Hamlet 03
(Volleyball
Court)
 
Day, date : Friday, April 15, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 11:30 Inputting SDGs data Ulanta 100% Done
Village
Office
12:00 16:00 Rest KKN- 100% Done
MBKM
Post
20:30 23:00 Ramadhan Activity Ulanta 100% Done
Competition (RAME) Village
Day 4 Hamlet 03
(Volleyball
Court)
23:00 23:55 Brifieng KKN- 100% Done
MBKM
Post
 
Day, date : Saturday, April 16, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 14:30 Preparation for the Hamlet 3 100% Done
closing ceremony of Ulanta
Ramadan activities Village
20:30 23:00 Closing Ceremony of Ulanta 100% Done
Ramadan Activities Village
(RAME) Hamlet 03
(Volleyball
Court)
23:00 23:55 Briefing KKN- 100% Done
MBKM
Post
 
Day, date : Sunday, April 17, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:30 Morning walk Ulanta 100% Done
Village
08:00 09:00 Cleaning the post KKN- 100% Done
MBKM
Post
09:30 10:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:20 12:00 Briefing KKN- 100% Done
MBKM
Post
13:00 14:30 Rest KKN- 100% Done
MBKM
Post
3:30 p.m. 16:50 Cleaning the stage of Ulanta 100% Done
Ramadan activities Village
(RAME) Hamlet 03
(Volleyball
Court)
 
Day, date : Monday, April 18, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:00 Cleaning the Post KKN- 100% Done
MBKM
Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
09:30 16:00 Inputting SDGs data Ulanta 100% Done
online Village
Office
 
Day, date : Tuesday, April 19, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM Post
10:00 11:20 Socialize with Ulanta 100% Done
community members Village
11:45 14:00 Rest KKN- 100% Done
MBKM post
14:30 16:00 Briefing KKN- 100% Done
MBKM Post
 
Day, date : Wednesday, April 20, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 13:00 Helping village Ulanta 100% Done
officials Village
Office
13:30 14:45 Rest KKN- 100% Done
MBKM
Post
15:05 PM 16:30 pm Brifieng KKN- 100% Done
MBKM
Post
 
Day, date : Thursday, April 21, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 13:30 Helping village Ulanta 100% Done
officials Village
Office
14:00 16:00 Rest KKN- 100% Done
MBKM
Post
 
Day, date : Friday, April 22, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 16:00 Fill in SDGs data Ulanta 100% Done
Village
Office
 
Day, date : Saturday, April 23, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:00 11:45 pm Carpet Washing River in the 100% Done
hamlet 03

12:00 16:00 Rest KKN- 100% Done


MBKM
Post
 
Day, date : Sunday, April 24, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:30 Morning walk Ulanta 100% Done
Village
08:00 09:00 Cleaning the Post KKN- 100% Done
MBKM
Post
09:30 10:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:30 16:00 Helping officials fill in Ulanta 100% Done
SDGs data online Village
Office
 
Day, date : Monday, April 25, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. - Cleaning the Post KKN- 100% Done
MBKM
Post
08:00 - Fill out the attendance KKN- 100% Done
list MBKM
Post
 
Day, date : Tuesday, May 10, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
7:30 a.m. 08:00 Fill out the attendance KKN- 100% Done
list MBKM Post
09:00 11:45 School observations SMPN 3 100% Done
Suwawa
12:00 14:00 Rest KKN- 100% Done
MBKM Post
14:30 17:00 Briefing KKN- 100% Done
MBKM Post
 
 
Day, date : Wednesday, May 11, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
08:00 11:45 Teaching in schools SMPN 3 100% Done
Suwawa
12:00 13:30 Rest KKN- 100% Done
MBKM Post
14:00 14:30 Fill out the attendance KKN- 100% Done
list MBKM Post
15:10 17:00 Briefing KKN- 100% Done
MBKM Post
 
Day, date : Thursday, May 12, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
08:00 11:45 Helping at school SMPN 3 100% Done
Suwawa
12:00 13:30 Rest KKN- 100% Done
MBKM Post
14:00 14:30 Fill out the attendance KKN- 100% Done
list MBKM Post
15:30 5:40 p.m. Distributing PDAM Ulanta 100% Done
pipes to the community Village
with Karang Taruna
Ulanta Village
 
Day, date : Friday, May 13, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
08:00 10:30 Devotional Work Ulanta 100% Done
Village
11:00 12:45 Rest KKN- 100% Done
MBKM Post
13:00 14:00 Visit of DPL KKN- KKN- 100% Done
MBKM MBKM Post

14:30 15:00 Fill out the attendance KKN- 100% Done


list MBKM Post

15:30 17:00 Briefing KKN- 100% Done


MBKM Post

 
Day, date : Saturday, May 14, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
07:30 07:55 Fill out the attendance KKN- 100% Done
list MBKM Post
08:10 11:00 Helping at posyandu Hamlet 3 100% Done
Ulanta
Village
11:30 13:30 Rest KKN- 100% Done
MBKM Post
14:00 15:30 Cleaning the Beds Ulanta 100% Done
Village
Office Bed
15:40 17:40 Clearing the field for Ulanta 100% Done
PORDES activities Village
Football
Field
 
Day, date : Sunday, May 15, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:30 Morning walk Ulanta 100% Done
Village
08:00 08:30 Cleaning the Post KKN- 100% Done
MBKM Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM Post
10:00 14:00 Attending the Eid Ulanta 100% Done
festival Village
Hamlet 01
14:30 15:00 Rest KKN- 100% Done
MBKM Post
15:30 17:00 Briefing KKN- 100% Done
MBKM Post
 
Day, date : Monday, May 16, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
08:00 11:45 Teaching in schools SMPN 3 100% Done
Suwawa
12:00 13:00 Rest KKN- 100% Done
MBKM Post
13:30 14:00 Fill out the attendance KKN- 100% Done
list MBKM Post
14:00 16:00 Installation of pennant Ulanta 100% Done
Village
21:00 pm 22:50 Brifieng KKN- 100% Done
MBKM Post

 
Day, date : Tuesday, May 17 , 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:00 08:00 Cleaning the post and KKN- 100 % Done
cooking MBKM Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM Post
09:20 11:00 Preparing the place of Desa Ulanta 100% Done
ramadan gebyar Hamlet 03
activities
14:30 16:30 Preparing a place for Ulanta 100% Done
educational Village
socialization Office
20:10 21:40 Briefing KKN- 100% Done
MBKM Post

 
Day, date : Wednesday, May 18, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:10 Cleaning the Post KKN- 100% Done
MBKM Post
07:20 08:00 Fill out the attendance KKN- 100% Done
list MBKM Post
09:00 12:20 Seminar/Socialization Ulanta 100% Done
of Education About Village
Dropout Rates Office
12:45 15:00 Rest KKN- 100% Done
MBKM Post
15:30 17:00 Briefing KKN- 100% Done
MBKM Post
 
Day, date : Thursday, May 19, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM
Post
07:20 07:50 Fill out the attendance KKN- 100% Done
list MBKM
Post
08:00 11:45 Helping at school SMPN 3 100% Done
Suwawa
20:10 22:00 Brifieng KKN- 100% Done
MBKM
Post
 
Day, date : Friday, May 20, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
07:10 07:40 Fill out the attendance KKN- 100% Done
list MBKM Post
09:00 17:00 Preparation of Ulanta 100% Done
Ramadan Gebyar Village
Activities Hamlet 03
 
Day, date : Saturday, May 21, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM Post
11:00 pm 17:00 Preparation of Ulanta 100% Done
Ramadan Gebyar Village
Activities Hamlet 03
22:10 23:05 Brifieng KKN- 100% Done
MBKM Post

 
Day, date : Sunday, May 22, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:00 08:00 Cleaning the Post KKN- 100% Done
MBKM Post
08:30 09:00 Fill out the attendance KKN- 100% Done
list MBKM Post
13:00 17:00 Opening of Gebyar Ulanta 100% Done
Ramadhan and Village
PORDES Activities Hamlet 03
 
Day, date : Monday, May 23, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN-MBKM 100% Done
Post
08:00 09:00 Following The Ulanta Village 100% Done
Morning Apple At Office
Ulanta Village Office
10:00 10:30 Fill out the attendance KKN-MBKM 100% Done
list Post
11:00 13:00 Rest KKN-MBKM 100% Done
Post
14:00 16:00 Briefing KKN-MBKM 100% Done
Post
19:30 22:30 PORDES Activities Ulanta Village 100% Done
Football Field

 
Day, date : Tuesday, May 24, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM
Post
07:10 07:40 Fill out the attendance KKN- 100% Done
list MBKM
Post
08:00 11:45 Teaching in schools SMPN 3 100% Done
Suwawa
15:20 16:10 Planting Vegetable Ulanta 100% Done
Seedlings Village
Office Bed
19:30 22:30 PORDES Activities Ulanta 100% Done
Village
Football
Field
 
Day, date : Wednesday, May 25, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM
Post
07:10 07:40 Fill out the attendance KKN- 100% Done
list MBKM
Post
08:00 11:45 Helping at school SMPN 3 100% Done
Suwawa
19:30 22:00 PORDES Activities Ulanta 100% Done
Village
Volleyball
Court
Hamlet 03
 
Day, date : Thursday, May 26, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
10:50 14:10 Picking bamboo for Ulanta 100% Done
cucumber vegetable Village
plant support
19:30 22:30 PORDES Activities Ulanta 100% Done
Village
Football
Field
 
 
Day, date : Friday, May 27, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish  Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM
Post
07:10 07:40 Fill out the attendance KKN- 100% Done
list MBKM
Post
08:00 11:00 Helping at school SMPN 3 100% Done
Suwawa
11:45 14:00 Rest KKN- 100% Done
MBKN
Post
14:30 17:00 Briefing KKN- 100% Done
MBKM
Post
19:30 22:00 PORDES Activities Ulanta 100% Done
Village
Football
Field
 
Day, date : Saturday, May 28, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM Post
09:00 09:30 Filling out the table of KKN- 100% Done
contents MBKM Post
14:00 16:00 pm Picking bamboo for Ulanta 100% Done
cucumber vegetable Village
plant support
20:00 22:30 PORDES Activities Ulanta 100% Done
Village
Football
Field
 
Day, date : Sunday, May 29, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:30 07:30 Morning walk Ulanta 100% Done
Village
08:00 09:00 Cleaning the Post KKN- 100% Done
MBKM Post
09:30 10:00 Fill out the attendance KKN- 100% Done
list MBKM Post
15:30 pm 17:30 Cleaning the Beds Ulanta 100% Done
Village
Office Bed
20:00 22:30 PORDES Activities Ulanta 100% Done
Village
Football
Field
 
Day, date : Monday, May 30, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM Post
08:00 11:45 a.m. Teaching in skolah N 3 Suwawa 100% Done
Junior High
School
13:00 13:30 Fill out the attendance KKN- 100% Done
list MBKM Post
20:00 22:30 PORDES Activities Ulanta 100% Done
Village
Football
Field
 
Day, date : Tuesday, May 31, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM
Post
07:10 07:40 Fill out the attendance KKN- 100% Done
list MBKM
Post
08:00 11:45 Helping at school SMPN 3 100% Done
Suwawa
20:00 22:00 PORDES Activities Ulanta 100% Done
Village
Volleyball
Court
 
Day, date : Wednesday, June 1, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM Post
15:00 pm 18:45 Picking Up Tree Permanent 100% Done
Seedlings For Greening Seedbed of
Gorontalo
20:00 22:30 PORDES Activities Ulanta 100% Done
Village
Football
Field
 
Day, date : Thursday, June 02, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
6:30 a.m. 07:00 Cleaning the Post KKN- 100% Done
MBKM
Post
07:10 07:40 Fill out the attendance KKN- 100% Done
list MBKM  
Post
08:00 11:45 Help teach in schools SMPN 3 100% Done
Suwawa
15:30 pm 17:10 Watering cucumber Ulanta 100% Done
vegetable crops Village
Office Bed
20:30 22:30 PORDES Activities Ulanta 100% Done
Village
Volleyball
Court
 
Day, date : Friday, June 03, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:00 07:30 Cleaning the Post KKN- 100% Done
MBKM Post
08:00 08:40 Fill out the attendance KKN- 100% Done
list MBKM Post
08:55 11:00 Helping village Ulanta 100% Done
officials village office
19:30 22:30 PORDES Activities Ulanta 100% Done
Village
Volleyball
Court
 
Day, date : Saturday, June 04, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
07:30 08:30 Cleaning the Post KKN- 100% Done
MBKM
Post
09:00 09:30 Fill out the attendance KKN- 100% Done
list MBKM
Post
15:30 16:45 Harvesting fruits in the Hamlet 3 100% Done
garden Ulanta
Village
20:00 22:00 Brifieng KKN- 100% Done
MBKM
Post
 
Day, date : Sunday, June 5, 2022
TIME/HOUR DUTIES/ACTIVITIES IMPLEMENTATION
  EVALUATION
Begin Finish Activities Location Achievement Information
Results (%)
06:00 11:00 Greening Hamlet 3 100% Done

11:45 13:00 Rest KKN- 100% Done


MBKM
Post
13:30 14:00 Fill out the attendance KKN- 100% Done
list MBKM
Post
21:00 22:30 Final Evaluation KKN- 100% Done
Briefing for MBKM MBKM
KKN Students Post
 
 
  Know  
Ulanta Village Head Village Coordinator Participants of KKN MBKM
     
     
     
Like E. Ambouw Yuliana Lupoyo .................................