This document summarizes the calibration of 15 pressure relief valves (PRVs) at an FSY 01 facility between December 3-5, 2020. It lists the PRV identification number, the pressure reading before and after calibration, and the date tested. All PRVs were successfully calibrated and serviced, with pressure readings mostly adjusted from 100-150 to 80 or 150. The calibration work was tested by TG JASA ENTERPRISE SDN BHD and verified by PETRONAS DAGANGAN BERHAD.
This document summarizes the calibration of 15 pressure relief valves (PRVs) at an FSY 01 facility between December 3-5, 2020. It lists the PRV identification number, the pressure reading before and after calibration, and the date tested. All PRVs were successfully calibrated and serviced, with pressure readings mostly adjusted from 100-150 to 80 or 150. The calibration work was tested by TG JASA ENTERPRISE SDN BHD and verified by PETRONAS DAGANGAN BERHAD.
This document summarizes the calibration of 15 pressure relief valves (PRVs) at an FSY 01 facility between December 3-5, 2020. It lists the PRV identification number, the pressure reading before and after calibration, and the date tested. All PRVs were successfully calibrated and serviced, with pressure readings mostly adjusted from 100-150 to 80 or 150. The calibration work was tested by TG JASA ENTERPRISE SDN BHD and verified by PETRONAS DAGANGAN BERHAD.