You are on page 1of 1

Building Control & Town Planning Regulations 2011

Pakistan Defence Officers Housing Authority Karachi


BUILDING CONTROL & TOWN PLANNING REGULATIONS 2011
PAKISTAN DEFENCE OFFICERS HOUSING AUTHORITY KARACHI

PDOHA FORM 5

VERIFICATION OF BUILDING AT DIFFERENT CONSTRUCTION STAGES

The Administrator
PDOHA, Karachi.

I/We hereby inform that I/We have commenced the building works on Plot
No.__________________________ located at _________________________________
PDOHA Karachi and also to bring into your notice that the following important stage of
construction of building has been completed i.e. the foundation, plinth and pouring of all
roof levels:
_____________________________________________________________
_____________________________________________________________

2. You are, therefore, requested to depute a representative to verify the building line
at the above mentioned foundation level/plinth level/roof levels so as to enable me/us to
carry out the building work.

Owner's Signature & Address: __________________________


__________________________
__________________________

ARCHITECT'S CERTIFICATE

I/We hereby certify that the construction of building on Plot No.


_______________________ situated at ______________________________________
PDOHA Karachi has been carried out in accordance with the sanctioned plan (s).

Registered Architect/Engineer __________________________


Signature: __________________________
PDOHA Regn No. __________________________
PEC/PCATP Regn No. __________________________

62

You might also like