You are on page 1of 1

PT.

KOREA TELECOM INDONESIA


Ruko Crown Palace Blok D No. 15, Jl. Prof Soepomo No. 231 RT 007 RW 001
Tebet, Jakarta Selatan 12870, DKI Jakarta, Indonesia
Tel. +62 21 2217 1617
QUOTATION
To : PT. S-Net Indonesia Date : 2023-05-24
Page : 1
Attn : Mr. Jang Sang Won Hong Seung Soo
HP : +62-821-2320-5351 +62 812 8100 5468
Email : jjang@snetsystems.co.kr sshong.kti@gmail.com

Yours faithfully,
In connection with your company's needs for the materials below, we hereby submit an offer with the following details:
IDR
No Item Q`ty Unit Price Amount
1 UTP Cable Cat 6 Belden 300 meter/box 10 2,250,000 22,500,000
2 OTB (Optica Termination Box) 12 Core SC Connector included Cassette 9 950,000 8,550,000
3 Patchcord Single-Mode SC-LC Duplex 1 meter 30 125,000 3,750,000
4 NISO Slotted Cable Duct PMD Pro Series Grey 45x45mm 1.7 meter/bar 200 45,000 9,000,000
5 Besi Pipa Galvanis 1/2 inch x 6 M, 18 mm 20 125,000 2,500,000
6 Custom Bracket for AP 25 250,000 6,250,000
7 Accessories for installation (Clamp, flexible, cable ties, connector rj45, plugbooth , label) 1 3,500,000 3,500,000
8 Fiber Optic Cable Jointing work 60 Core 60 65,000 3,900,000
Installation Services (Pulling cable UTP with pipe, crimping, labeling) 6 M/M on site
9 6 14,500,000 87,000,000
Include cutting pipe, welding work and rental Scafolding or Scissor lift
TOTAL 146,950,000
Tax 11% 16,164,500
Note : TOTAL 163,114,500
1. Price valid for 7 working days
2. Material Pirices included delivery charge to site
3. Payment Condition
- Advance payment 50% after contract, Balance payment 50% when finished all working.

Thus we convey this offer, we hope to be able to work with you. Thank you for your attention.

PT. Korea Telecom Indonesia

Hong Seung Soo


President Director

You might also like