You are on page 1of 2

Estimate

# EST-007157

PT Mitra Energi Abadi


Cipondoh Makmur
Blok F5/18 Kecamatan Cipondoh
Tangerang 15148
Indonesia

Estimate Date : 05 Apr 2023


Bill To
PT Rich Products Manufacturing Indonesia Expiry Date : 19 Apr 2023

Ferdiansyah
+6285945196052
ferdiansyah@rich.com

# Item & Description Qty Rate Amount

1 Penangkal Petir Head Kurn R-80 1.00 2,500,000.00 2,500,000.00


Kurn R-80
Early Streamer Emission
Radius max. 80 meter
Warranty 1 Years
Non radioaktif

2 FRP @1m 1.00 1,250,000.00 1,250,000.00

3 Kabel NYA 1x50mm 30.00 115,000.00 3,450,000.00

4 Grounding Penangkal Petir 1.00 5,000,000.00 5,000,000.00


Copper Bonded Rod 5/8""
Connector for Rod
Clamp
Other Accessories for Grounding
Hasil Resistensi Max 5 Ohm (Mengacu Aturan Disnaker)

5 Tiang Monopole 3 Meter (Rooftop) 1.00 3,000,000.00 3,000,000.00


Pipa GIP 2"
Include :
Aksesories

6 Grounding Pit 1.00 950,000.00 950,000.00


Grounding Control Box
30cm x 30cm
Material PVC

7 Consumable Material, Assesories + Small Help Component : 1.00 2,500,000.00 2,500,000.00


- PVC Conduit
- Sock Conduit
- Clamp Conduit
- Cable Shoe
- Etc

1
# Item & Description Qty Rate Amount

8 Jasa Instalasi Pemasangan (Instalasi Penangkal Petir, Instalasi 1.00 6,500,000.00 6,500,000.00
Tiang, Instalasi Grounding)

9 Akomodasi dan Transportasi (Man Power 3 orang & Material) 1.00 2,500,000.00 2,500,000.00

Sub Total 27,650,000.00

Total IDR27,650,000.00

Notes
Bank Mandiri
A.N : PT Mitra Energi Abadi
155 000 649 192 5

Terms & Conditions


1. Term Of Payment : DP 50% - CBD 50%
2. Fabrication : 2 Working Days, Installation : 3 Working Days
3. Franco : Cikande
4. Price Exclude VAT

You might also like