You are on page 1of 3

78 Apollo St., Aurora Blvd.

, Tramo Pasay City


Contact #: 0927-5941048/09330387469/ 775-75-16
Website: www.nrnwelldrilling.com
Email: nrn_trading@yahoo.com
renato.tolentino1956@yahoo.com

NRN
Services Offered:
DEEPWELL DRILLING PUMP/MOTOR REPLACEMENT
SUBMERSIBLE/MOTOR/DRILLING REPAIR WATER TESTING
INSTALLATION OF MOTOR SYSTEM PIPE FISHING/CASING/FITTING
MAINTENANCE SUBMERSIBLE PUMP INSTALLATION
WELL PRESERVATION/CLEANING/DEEPENING BRUSH AND BAILING
ELEVATED WATER TANK FABRICATION

February 12, 2018

Attention : Mr. Jonathan Vivo


Project : Deepwell
Location : Rosario, Batangas

SUBJECT : DEEPWELL DRILLING AND INSTALLATION OF 7.5HP SUBMERSIBLE PUMP

WELL SPECIFICATION:

Well Casing Diameter 6’’ 6”  x 300 ft.


Approximate Depth of Drill 300 ft. more or less
Type of Casing Straight Casing

SCOPE OF WORKS:

 Mobilization / Demobilization of equipment.


 Drilling of 300 ft. depth with 8” diameter Borehole.
 Perforation of pipe casing 100 feet long.
 Electric logging.
 Installation of pump/motor/riser pipe and submersible cables.
 Installation of pump cover and top pipe.
 Installation of cable to control panel.
 Pump test for 24hrs.
 Cement grouting.

SCOPE OF WORKS AND CHARGES:


1. Labor for moving equipment’s in and out of site Php. 60,000.00
2. PPE’s Safety requirements 5,000.00
3. Temporary accommodation for personnel 25,000.00
3. Labor for drilling the well to the total depth of 300ft. 600,000.00
4. Perforation of pipes casing 100 feet long 50,000.00
5. Electric Logging 25,000.00
6. Beveling & Welding of 15 joints 25,000.00
7. Steel drive shoe. 15,500.00
8. For pumping test of well 24 hours. 35,000.00
9. For seal grouting 40 feet. 60,000.00
10. 15pcs BI Pipe Sch40 6” x 20’ 271,905.00
11. 14 pcs GI Super Pipe 2 ’’ x 20’ 114,380.00
12. 3pcs BI Pipe Sch30 8” x 20ft. stand pipe 49,368.00
13. Supervision 50,000.00
14. Consumables 8,000.00

SUBMERSIBLE PUMP & MOTOR: Php. 138,000.00

1 Unit Submersible Pump GOULDS M75432(USA) coupled with FRANKLIN Submersible Motor water
lubricated suited for 6’’Ǿ casing or larger well with following data and specifications.
Motor Output 7.5 HP
Voltage 230 Phase
Frequency 60 Cycles
Speed 3450 RPM
Capacity 60 GPM
TDH 400 Feet
Pump setting 280 Feet

Submersible pump Goulds (USA) 2”discharge 60gpm at 400ft.tdh.coupled with franklin submersible motor 7.5HP
Three Phase 230v.60hz.3450rpm with control box.

ACCESSORIES:

105mtrs Submersible Cable (# 8/3) 103,530.00


1 Set FUJIsimplex magnetic starter with thermal over load relay circuit
breaker start stop push button pilot light H.O.A selector switch with
volt meter ,ammeter ANLY Liquid level switch water electrode
lighting arrester nema 12 enclosure 48,000.00

105mtrs Suspension wire electrode. 41,475.00


1pc Well Seal 6” x 1 ¼” x 24”. 18,000.00
1set Rubber Tape/Splicing Kit 3M. 3,500.00
10pcs Electrical Tape. 700.00
1 lot Installation Charge. 40,000.00
===============
TOTAL COST OF LABOR AND MATERIALS -------------------------------------- PHP 1,787,358.00
Vat Exclusive

WARRANTY: ONE ( 1 ) YEAR AGAINST MECHANICAL DEFECT UNDER NORMAL OPERATIONS


ESTIMATED TIME TO BE FINISHED: 60 WORKING DAYS
NOTE: CAPACITY(60 GALLONS PER MINUTE)
IMPORTANT PROVISIONS IN THE CONTRACT:

Terms and Condition:

a) Total cost for the project is Php. 1,787,358.00


b) All payments should be made payable to Renato Tolentino
c) Our price is base in our plan and specifications.
d) An advance payment in the amount of 50% will be provided to the contractor at least seven (7)
days prior to the commencement of project.
e) Remaining balance - progress payment of 40% will be provided to the contractor at 50%
completion, and the 10% will be paid upon full and satisfactory completion of the work.
f) Payment for the above subject will be a total of One Million Seven Hundred Eighty Seven
Thousand Three Hundred Fifty Eight Pesos Only, plus any additional work request by the client.
g) Commencement of project: ______________________
h) Expected date of completion: Within 60 days upon receipt of Down Payment.
i) Owner will provide, water and power supply at no cost to the contractor.
j) Permit and licenses to be secured by the client.
k) All materials shall be delivered by the contractor on site.
l) Any revised of plan shall be charge addendum or diddum.

Note : We do not guarantee the quality of the water under the ground.

ACCEPTANCE

The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do
the work as specified. Payment will be made as outlined above.

ACCEPTED BY:

COMPLETE NAME & SIGNATURE:_________________________________ Date: ___________

C O N F O R M E

_____________________ ________________________________
Engr. Renato Tolentino AE Proteina Industries, Inc.