TIME SCHEDULE / S CURVE

PEKERJAAN : PEMBANGUNAN OFFICE , WORKSHOP,& WAREHOUSE FACILITY PT. SUMBAWA JUTA RAYA – SJR
LOKASI : PANGULIR GOLD PROJECT PULAU SUMBAWA,PROVINSI NUSA TENGGARA BARAT

Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23


BOBOT 1 2 3 4 5 6 7 8 9 MASA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 PEMELIHARAAN 90
NO URAIAN PEKERJAAN 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 129 136 143 150 157 164 171 178 185 192 199 206 213 220 227 234 241 248 255 262 269 Hari Kalender
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 128 135 142 149 156 163 170 177 184 191 198 205 212 219 226 233 240 247 254 261 268 275
(%) 1-Jun 8-Jun 15-Jun 22-Jun 29-Jun 6-Jul 13-Jul 20-Jul 27-Jul 3-Aug 10-Aug 17-Aug 24-Aug 31-Aug 7-Sep 14-Sep 21-Sep 28-Sep 5-Oct 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb BLN KE
7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov 10-Nov 17-Nov 24-Nov 1-Dec 8-Dec 15-Dec 22-Dec 29-Dec 5-Jan 12-Jan 19-Jan 26-Jan 2-Feb 9-Feb 16-Feb 23-Feb 2-Mar 1 2 3

1 PERSIAPAN

2 BARAK I
PEKERJAAN STRUKTUR 19.24% #REF! #REF! #REF!
PEKERJAAN PONDASI DAN SLOOF 20.43% #REF! #REF! #REF!
MINI PILE 25 x 25
FOOT PLATE TYPE I
FOOT PLATE TYPE II
SLOOF TYPE S1
SLOOF TYPE S2
SLOOF TYPE S3
PEKERJAAN STRUKTUR BETON 5.17% 2.58% 2.58%
LANTAI I
KOLOM TYPE K1
BALOK TYPE B1
BALOK TYPE B2
BALOK TYPE B3
BALOK TYPE BT
TANGGA
PLAT LANTAI
LANTAI II
KOLOM TYPE K1
BALOK TYPE B1
BALOK TYPE B2
BALOK TYPE B3
BALOK TYPE BT
TANGGA
PLAT LANTAI
LANTAI III
KOLOM TYPE K1
BALOK TYPE RB
PLAT LANTAI
PEKERJAAN STRUKTUR BAJA 4.89% 1.63% 1.63% 1.63%
PEKERJAAN ARSITEKTUR 2.57% #REF! #REF! #REF!
PEKERJAAN LANTAI I 1.10% 1.10%
LANTAI I
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN LANTAI II 0.19% 0.19%
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN LANTAI III 7.01% 0.00% 0.00% 0.00%
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN FAÇADE 6.77% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75% 0.75%
PEKERJAAN LANDSCAPE
PEKERJAAN MEP 1.29% #REF! #REF! #REF!

3 BARAK II
PEKERJAAN STRUKTUR 10.60% 1.51% 1.51% 1.51% 1.51% 1.51% 1.51% 1.51%
PEKERJAAN PONDASI DAN SLOOF 8.99% 1.50% 1.50% 1.50% 1.50% 1.50% 1.50%
MINI PILE 25 x 25 2.01% 1.01% 1.01%
FOOT PLATE TYPE I 1.90% 0.95% 0.95%
FOOT PLATE TYPE II 0.84% 0.42% 0.42%
SLOOF TYPE S1 2.06% 0.69% 0.69% 0.69%
SLOOF TYPE S2 1.19% 1.19%
SLOOF TYPE S3 3.75% 0.54% 0.54% 0.54% 0.54% 0.54% 0.54% 0.54%
PEKERJAAN STRUKTUR BETON
LANTAI I
KOLOM TYPE K1
BALOK TYPE B1
BALOK TYPE B2
BALOK TYPE B3
BALOK TYPE BT
TANGGA
PLAT LANTAI
LANTAI II
KOLOM TYPE K1
BALOK TYPE B1
BALOK TYPE B2
BALOK TYPE B3
BALOK TYPE BT
TANGGA
PLAT LANTAI
LANTAI III
KOLOM TYPE K1
BALOK TYPE RB
PLAT LANTAI
PEKERJAAN STRUKTUR BAJA
PEKERJAAN ARSITEKTUR
PEKERJAAN LANTAI I
LANTAI I
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN LANTAI II
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN LANTAI III
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN FAÇADE
PEKERJAAN LANDSCAPE
PEKERJAAN MEP

4 BARAK II
PEKERJAAN STRUKTUR
PEKERJAAN PONDASI DAN SLOOF
MINI PILE 25 x 25
FOOT PLATE TYPE I
FOOT PLATE TYPE II
SLOOF TYPE S1
SLOOF TYPE S2
SLOOF TYPE S3
PEKERJAAN STRUKTUR BETON
LANTAI I
KOLOM TYPE K1
BALOK TYPE B1
BALOK TYPE B2
BALOK TYPE B3
BALOK TYPE BT
TANGGA
PLAT LANTAI
LANTAI II
KOLOM TYPE K1
Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23
BOBOT 1 2 3 4 5 6 7 8 9 MASA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 PEMELIHARAAN 90
NO URAIAN PEKERJAAN 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 129 136 143 150 157 164 171 178 185 192 199 206 213 220 227 234 241 248 255 262 269 Hari Kalender
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 128 135 142 149 156 163 170 177 184 191 198 205 212 219 226 233 240 247 254 261 268 275
(%) 1-Jun 8-Jun 15-Jun 22-Jun 29-Jun 6-Jul 13-Jul 20-Jul 27-Jul 3-Aug 10-Aug 17-Aug 24-Aug 31-Aug 7-Sep 14-Sep 21-Sep 28-Sep 5-Oct 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb BLN KE
7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov 10-Nov 17-Nov 24-Nov 1-Dec 8-Dec 15-Dec 22-Dec 29-Dec 5-Jan 12-Jan 19-Jan 26-Jan 2-Feb 9-Feb 16-Feb 23-Feb 2-Mar 1 2 3

BALOK TYPE B1
BALOK TYPE B2
BALOK TYPE B3
BALOK TYPE BT
TANGGA
PLAT LANTAI
LANTAI III
KOLOM TYPE K1
BALOK TYPE RB
PLAT LANTAI
PEKERJAAN STRUKTUR BAJA
PEKERJAAN ARSITEKTUR
PEKERJAAN LANTAI I
LANTAI I
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN LANTAI II
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN LANTAI III
PEK. DINDING
PEK. FINISHING LANTAI
PEK. PLAFOND GYPSUM
PEK. KUSEN & JENDELA
PEK. SANITARY
PEK. LAIN - LAIN
PEKERJAAN FAÇADE
PEKERJAAN LANDSCAPE
PEKERJAAN MEP

100%
RENCANA PROGRESS MINGGUAN #REF! #REF! 3.44% 1.51% 0.00% 0.00% 0.00% 0.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF! 5.44% #REF! 0.96% 0.00% - - - - - - - - - - - - - - - - - - - - -
RENCANA KOMULATIF PROGRESS MINGGUAN - - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI PROGRESS MINGGUAN
REALISASI KOMULATIF PROGRESS MINGGUAN -
DEVIASI -
TIME SCHEDULE / S CURVE

PEKERJAAN : PENGADAAN PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT JASA RAHARJA


LOKASI : Jl. HR.Rasuna Said Kav.C-2 Kuningan 12920 Jakarta Selatan DKI Jakarta

1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180

I SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA

II AULA DENGAN MEP AULA


A. PEKERJAAN ARSITEKTUR DAN INTERIOR AULA
- Pekerjaan Dinding Lt Drop off
- Pekerjaan Langit - Langit lantai Drop Off
- Pekerjaan Pas. Lantai Drop Off
- Pekerjaan Dinding Lantai 2
- Pekerjaan Pasangan lantai 2
- Pekerjaan Atap lt.2
- Pekerjaan Langit - Langit/ plafond Lantai 2
- Pekerjaan Kusen Pintu dan Jendela + Aksesoris Lt 2 Aula
- Pekerjaan Panel Interior Lt. 2
- Pekerjaan Perkuatan Struktur Baja Plafond Aula
- Pekerjaan Arsitektur Lt. Atas
- Pekerjaan Railing Expanda/Pagar Wiremesh
- Pekerjaan Lain-lain
B. PEKERJAAN MEP AULA
- Pekerjaan Elektrikal
- Pekerjaan Access Point dan Data
- Pekerjaan Dire Fighting
- Pekerjaan Sprinkler

III LOBBY BELAKANG DENGAN MEP LOBBY BELAKANG


A. PEKERJAAN STRUKTUR LOBBY BELAKANG
- Pekerjaan Struktur Baja dan Pembesian Kolom home lift
- Pekerjaan Struktur Baja Perkuatan tangga
- Pekerjaan Pondasi strauss dia.300mm
B. PEKERJAAN STRUKTUR LT. 2
- Pekerjaan Struktur Tangga Lobby (Beton)
- Kolom Tipe K - 1, (400 cm x 400 cm )
- Balok Tipe B-1 (35cm x 60 cm)
- Balok Tipe B-2 (40cm x 60 cm)
- Balok Tipe B-3 (25cm x 40 cm)
- Balok Tipe B-4 (20cm x 30 cm)
- Pek. Struktur Dak Lantai, t = 15 cm,
C. PEKERJAAN RENOVASI LOBBY BELAKANG
- Pekerjaan Persiapan
- Pekerjaan Finishing Arsitektur
a. Pekerjaan Lt. Drop Off
b. Pekerjaan Dinding Panel 2 Sisi
c. Pekerjaan Beton Lt. Drop Off
d. Pekerjaan Plat Beton Penutup atap pit lift
e. Pekerjaan Pas. Lantai Drop Off
f. Pekerjaan Plafond
g. Pekerjaan Kusen Pintu dan Jendela + Aksesoris Lt Drop off & Lantai 2
D. PEKERJAAN ARSITEKTUR LT. 2
- Pekerjaan Panel Dinding Interior
- Pekerjaan Pasangan Lantai 2
- Pekerjaan Langit - Langit / Plafond
- Pekerjaan Pengecatan
E. PEKERJAAN HOME LIFT
- Pengadaan Home Lift
F. PEKERJAAN SANITAIR
G. TOILET RUANG MEP
H. MEP LOBBY BELAKANG
- Pekerjaan Elektrikal - Lobby Belakang
- Pekerjaan Access Point
IV PEKERJAAN SALURAN AIR HUJAN & LANDSCAPE
- Pekerjaan canstin
- Pekerjaan pipa air hujan/air kotor Horisontal
- Bak kontrol Tertutup uk. 50x50x66 cm
- Bak kontrol Terbuka uk. 50x50 x70cm
- Pekerjaan Talang tegak air hujan /air kotor area selasar teras aula dan main lobby aula
- Pekerjaan Talang datar air hujan /air kotor area selasar teras aula
- Pekerjaan Talang datar air hujan /air kotor area dak ac
- Pekerjaan Area Parkir
V

- 0%
RENCANA PROGRESS MINGGUAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
RENCANA KOMULATIF PROGRESS MINGGUAN - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Jakarta, 01 Juli 2022


Dibuat oleh,
Pelaksana / Kontraktor
PT. ADIPRANA SENTOSA INDOVESCO

Hermandianto
Project Manager
TIME SCHEDULE / S CURVE

PEKERJAAN : PENGADAAN PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT JASA RAHARJA


LOKASI : Jl. HR.Rasuna Said Kav.C-2 Kuningan 12920 Jakarta Selatan DKI Jakarta

1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180

A SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA

B AULA DENGAN MEP AULA


1 PEKERJAAN FINISHING ARSITEKTUR/INTERIOR AULA
1.A Pekerjaan Dinding Lt Drop off
Pek. Bekisting Sloof 15x20 (menggunakan pas 1/2 bata)
-Area parkir motor
Pek. Pemasangan Dinding Ruang tunggu Homogenous Tile 30x60
- Area toilet Aula
- Roman Keramik type dLorenzo Dark
Pek. Cover Allumunium Composite Panel (Kolom)
area lt Drop off dan lt.2
Pek. Cover Allumunium Composite Panel
- ACP tbl.0.4mm
Pek. Kisi kisi Hollow 5x100 tbl.1,4 mm finish duco
- area lt Drop off dan lt.2
- Ex. Jof metal

1.B Pekerjaan Langit - Langit lantai Drop Off


Pek. Plafond Lantai dasar
- Pas. Rangka Plafond
- Pas. Penutup Plafond Gypsum water resistant(9mm)
Pek. List Plafond / sidowline

1.C Pekerjaan Pas. Lantai Drop Off


Pekerjaan Pasangan lantai
Pek. Pemasangan lantai Homogenous Tile 60x60
-Area Ruang tungg belakang, R. Parkir motor
- Roman type Metropolitan grigio

1.D Pekerjaan Dinding Lantai 2


Pek. Pemasangan Dinding Glassblock uk. 20x20 cm
area toilet
Pek. Pasang Dinding Bata ringan, tebal 7,5 cm
area operator
Pek. Plester
area operator
Pek. Acian
area operator
Pek. Kolom Praktis 11x11 cm
area operator
Pek. Balok Praktis 12x20 cm
area operator
Pek. Pemasangan Dinding Toilet Homogenous Tile 30x60
- Area toilet Aula
- Roman Keramik type dLorenzo Dark

1E Pekerjaan Pasangan lantai 2


Pek. Pemasangan lantai Homogenous Tile 60x120 R. Administrasi dan Bordes Tangga
- ex. Roman Granit color d'Travertine Crema
Pek. Pemasangan lantai Homogenous Tile 60x60 R. Audio & Lighting
ex. Roman Granit color metropolitan grey
Pek. Pemasangan lantai Homogenous Tile 30x60
- Teras aula kanan kiri
- ex. Roman keramik type dPizzara Nero
Pek. Pemasangan lantai Homogenous Tile 60x120 Tangga Akses Ke aula
- ex. Roman Granit color d'Travertine Crema
Pek. Pemasangan lantai Homogenous Tile 60x60 Tangga Akses ke R. audio
ex. Roman Granit color metropolitan grey
Pek. Pemasangan lantai Homogenous Tile 60x60 R.Back stage
ex. Roman Granit color metropolitan grey
Pek. Pemasangan lantai Homogenous Tile 60x120 ( Border)
- Area Main Lobby /Prefunction
- ex. Dark Emperador
Pek. Pemasangan Lantai Tegel Soeryo 20x20 Custom
- Area Main Lobby /Prefunction
- Lihat gambar kerja
Pek. Pemasangan lantai Homogenous Tile 60x120
- Area Main Lobby /Prefunction
- ex. Roman Granit color d'Travertine Crema
Pek. Pemasangan lantai Homogenous Tile 30x60
- Area Toilet Aula
- ex. Roman Granit color d'Travertine Crema
Pek. Pemasangan Lantai vinyl
- ex. Forbo motif serat kayu
- tangga R. operator
- Pek. Pemasangan Plester + acian self leveling Permukaan Lantai Aula
Pek. Waterproofing coating area toilet

1.F Pekerjaan Atap lt.2


Pek. Pemasangan rangka baja ringan + atap plat spandek ex. Light sight
area atas ruang Prefunction ujung kiri dan kanan

1.G Pekerjaan Langit - Langit/ plafond Lantai 2


- Area back stage + operator
Pas. Penutup Plafond Gypsum
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
- Rangka hollow galvanis 40x40 tbl.0,6mm
- Gypsum 12mm

Pek. List Plafond


- List Shadow Line

Pek.Pemasangan Plafond Fin wallpaper


- Area Ballroom
- Rangka hollow galvanis 40x40 tbl.0,6mm/ UFC frame
- Pas. Penutup Plafond Gypsum (9mm)
- Wallpaper

Pek.Pemasangan Plafond Fin hpl


Lobby (Prefunction)
- Rangka hollow galvanis 40x40 tbl.0,6mm/ UFC frame
- plywood finish hpl

Pek. Pemasangan plafond Reduksi Suara


- standarshield /gypsum 12mm ex. Knauf
- UFC frame alumunium

Pek.Pemasangan Atap Kaca laminate


area selasar aula
- kaca laminate tempered 6+6mm
- Besi pipa dia.20cm
- Besi rangka 50x100
- lihat gambar kerja

Pek. Kisi-kisi Lamberceilling (C1)


Pek Pemasangan Plafond Spandrell Allumunium Overstack selasar aula

Pek.Pemasangan Plafond metal (C2)


area atap lengkung kiri dan kanan

1.H Pekerjaan Kusen Pintu dan Jendela + Aksesoris Lt 2 Aula

Pas. Pintu P1 Uk.166x243 (2 Unit )


Area main back stage
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson

Pas. Pintu P2 Uk.200x243 (6 Unit )


Area aula
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson
- Pull handle custom kayu solid +kuningan

Pas. Pintu PD2 Uk.200x303 (2 Unit )


Area main lobby
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson
- Pull handle custom kayu solid +kuningan

Pas. Pintu PD03 Uk.176x243 (2 Unit )


Area mainlobby
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson
- Pull handle custom kayu solid +kuningan

Pas. Pintu PS1Uk.90x240 (2 Unit )


Area aula
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson

Pas. Pintu Uk.80x240 (4 Unit )


Area operator dan toilet
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson

Pas. Jendela J1 Uk. 80 x 200 cm ( 4 Unit )


Area back stage
- Kusen uPVC
- Finish Hotstamp
- Kaca Polos 5 mm

Handrail Kayu Merbau finish melamic

1.I Pekerjaan Pengecatan lantai 2


Pengecatan Dinding Eksterior
Pengecatan Dinding Interior
Pengecatan Plafond

1.J Pekerjaan Sanitary Lantai 2 - AULA


Floor Drain ex. Tototype ECO E2FD
Closet ex. Toto type CW637J/SW637JP
ECO Washer ex. Toto type TCW075
Wastafel ex. Toto type LW647CJT1
Kran Washtafel ex. Toto type TEN40ANV900/TN78-9V900
Jet Washer ex.Toto type 403SBW
Urinoir ex. Toto type UW58HJ
Partisi Urinoir ex. Toto type AW115J
Partisi Toilet / Cubicle Toilet Phenolic Grade a
Kaca Cermin toilet
Paper towel dispenser Roll
Sink Janitor ex. Tototype SK322E + T3QARQ13N
Meja beton wastafel finish granit hitam UK. 2400X600MM
- Lihat gambar kerja
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
Backing Kaca Cermin toilet uk. 2400x1200mm
- plywood 18mm finish hpl
- Edging mach to HPL
Backing Kaca Cermin wastafel kantin uk. 2000x900mm
- plywood 18mm finish hpl
- Edging mach to HPL
- lihat gambar kerja

1.K Pekerjaan Besi


- Railling R.Audio dan Manajemen
Pemasangan Railing Besi Tangga R. Audio & Manajemen + Handrail Kayu Merbau
- Pek Pengecatan Besi Handrail tahap pertama dan ke dua
- Pek. Plitur Melamik Handrail
- Tangga Darurat / tangga monyet H. 300cm

2 PEKERJAAN PANEL INTERIOR LT. 2


2.A Pekerjaan Panel Dinding Detail WT1 dan WT2 Jumlah= 1 unit
Pekerjaan Panel Dinding fin.cat eksterior
- Pek. Rangka Panel metal U Chanel 75
- Pek. Pemasangan Soundshield 12mm
- Plint : backing plywood 12mm + stainless steel gold tbl 1mm

Pekerjaan Panel Dinding Detail 3 (WT4) Jumlah= 1 unit


Pekerjaan Panel Dinding HPL
- Pek. Rangka Panel metal U Chanel 75
- Pek. Pemasangan Soundshield 12mm
- Pek. Pemasangan HPL Ex Taco interior
- Plint : backing plywood 12mm + stainless steel gold tbl 1mm

Pekerjaan Panel Dinding Detail 4 (WT1 + WT2 + WT2A) Jumlah = 1unit


Pekerjaan Panel Dinding HPL Inlay alumunium
- Pek. Pemasangan Multiplek 12mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pemasangan Allumunium T 6mm
- Pek. Pemasangan Allumunium 1cm
- Pek. Rangka Panel hollow Galvanis 40x40x0,6mm
- Pek. Pemasangan Akrilik satin
- Pek. Pemasangan melaminto
- Pek. Laser Cutting MDF
- Pek. Pengecatan duco CNC
- Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

Pekerjaan Panel Dinding Detail 5 (WT3) Jumlah= 2 unit


Pekerjaan Panel Dinding HPL cover plat laser cutting
- Pek. Pemasangan Multiplek 12mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pemasangan Allumunium T 6mm
- Pek. Pemasangan dan perakitan plat laser
- Pek. Rangka Panel hollow Galvanis 100x50x2m
- Pek. Pengecatan Hollow dan Laser Cutting
- Pek. Pengecatan ( Cat Meni )
-Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

Pekerjaan Panel Dinding Detail 6 (WT5A+ WT6A+WT9 + WT6 +WT5) = 1 unit


Pekerjaan Panel Dinding HPL
- Pek. Pemasangan Multiplek 12mm
- Pek. Pemasangan HMR Board 3 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Rangka Panel metal U Chanel 75
- Pek. Pemasangan Allumunium 1cm
- Pek. Pemasangan Allumunium T 6mm
- Pek. Pemasangan Akrilik satin
- Pek. Rockwool 40kg/m3 tbl. 10 cm
-Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

Pekerjaan Panel Dinding Detail 7 (WT8+WT7+WT8A) = 2unit


Pekerjaan Panel Dinding HPL
- Pek. Pemasangan Soundshield 12mm
- Pek. Pemasangan HMR Board 3 mm
-Pek. Pemasangan HPL Ex Taco
- Pek. Rangka Panel metal U Chanel 75
- Pek. Pemasangan Allumunium 1cm
- Pek. Pemasangan Allumunium T 6mm
- Pek. Pemasangan Akrilik satin 5mm
- Pek. Rockwool 40kg/m3 tbl. 10 cm
-Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

Pekerjaan Panel Dinding Detail 8(WT10) = 2 Unit


Pekerjaan Panel Dinding HPL 2 muka
- Pek. Rangka Panel metal U Chanel 75
- Pek. Pemasangan HPL Ex Taco
- Pek. Pemasangan Allumunium T 6mm
- Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

Pekerjaan Panel Dinding Detail 9 (WT11) = 1 Unit


Pekerjaan Panel Dinding HPL
- Pek. Pemasangan Multiplek 12mm
- Pek. Pemasangan HMR Board 9 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Rangka Panel hollow Galvanis 40x40x2m
- Pek. Rockwool 40kg/m3 tbl. 10 cm
- Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

Pekerjaan Panel Dinding Detail 10 (dinding samping panggung) = 2 Unit


Pekerjaan Panel Dinding HPL dan pintu kamuflase
- Pek. Pemasangan Multiplek 12mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Rangka Panel hollow Galvanis 40x40x2m
- Pek. Rockwool 40kg/m3 tbl. 10 cm
- Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

Pekerjaan Panel Dinding Detail 11 (P01, dinding teras samping aula) = 2unit
Pekerjaan Panel Dinding Homogenous Tile
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
- Pek. Pemasangan Aqua panel ex. Knauf 12mm
- Pek. Pemasangan Dinding Roman granitUk.60x120cm
- Pek. Rangka Panel metal stud C75

2B Pekerjaan Cover Kolom Bulat Façade Aula (area tangga lebar)


- Pek. Pemasangan Hollow
- Pek. Pemasangan melaminto
- Pek. Pemasangan acrylic
- Pek. Laser Cutting Plat
- Pek. Pengecatan duco Plat cutting laser
- Plint : backing plywood 12mm + stainless steel gold tbl 1mm backing plywood 12mm

2C Signage /Logo JR
- MDF cutting laser
- Finish Duco metalic

2D Pekerjaan Pasang Panel Acoustic


- Panel Acoustic tbl. 12mm
- Tepi Panel dibevel

III PEKERJAAN PERKUATAN STRUKTUR BAJA PLAFOND AULA


IV PEKERJAAN ARSITEKTUR LT. ATAS

4A Pekerjaan Exterior Fasade


Pekerjaan Panel kerawangan
- Pek. Pemasangan dan perakitan GRC 9mm cutting laser
- Pek. Rangka Panel hollow Galvanis 100x50x2m
- Pek. Pengecatan Hollow dan Laser Cutting
- Pek. Pengecatan duco

V PEKERJAAN RAILING EXPANDA/PAGAR WIREMESH


5A Pengerjaan Railing/pagar wiremesh
- Kawat wiremesh 50x50 tbl.4mm
- Woodplank warna serat kayu tbl 9mm Finish couting natural

5B Pengerjaan Railing/pagar expanda Lt.2


- Kawat wiremesh 50x50 tbl.4mm
- Woodplank warna serat kayu tbl 9mm Finish couting natural

7 PEKERJAAN LAIN LAIN


Tutup manhole metal cast iron
- uk. 600x600mm

2 PEKERJAAN ELEKTRIKAL - AULA


1 Lantai 1
- Stop kontak 120W 16A
- Instalasi stop kontak NYM 3 x 2,5mm2 + conduit 20mm

2 Lantai 2
- Stop kontak 120W 16A
- Instalasi stop kontak NYM 3 x 2,5mm2 + conduit 20mm

3 Exhaust fan
Type ceiling fan
Flow rate : 1400 cmh / 825 cfm
Power : 100 w
Voltage : 220V/1P/50Hz
Rpm : 1300
Kabel power 3x2,5mm2 + conduit 20mm2
4 Saklar ganda untuk switch ON/OFF exhaust fan
5 Instalasi saklar NYM 3x1,5mm2 + conduit 20mm2
5 Bongkar panel AC eksisting + Kabel power
6 Panel SDP

B PEKERJAAN ACCESS POINT DAN DATA


1 Ceiling Access Point maximum 200 client per WI FI radio dan total 400 client per access point
2 Data outlet
3 Instalasi data UTP cat 6 + conduit 20mm2
4 Rack 8U inc. PDU
5 Patch panel 24 port
6 Switch hub 24 port
7 cable management
8 Patch cord @ 3 meter
9 Backbone FO 4 core MM incl. konduit 20mm2
10 OTB, adapter, connector, blank, aksesoris
11 Patch cord FO MM, 3m SC-SC
12 Kabel tray data 300x100 lengkap Tee, elbow, jointing, aksesoris

C PEKERJAAN FIRE FIGHTING


1 Lantai 1
- Smoke detector
- Lampu indicator
- Alarm bell
- Manual call point
- End of line
- Instalasi smoke detector NYM 2 x 1,5mm2 + conduit 20mm
- Instalasi Alarm bell NYM 2 x 1,5mm2 + conduit 20mm
- Instalasi lampu indicator NYM 2 x 1,5mm2 + conduit 20mm
- Instalasi manual call point NYM 2 x 1,5mm2 + conduit 20mm
- Fire Extinguisher kap. 3,5kg inc. braket

2 Lantai 2
- MCFA 5 zone konvensional
- Smoke detector
- Instalasi smoke detector NYM 2 x 1,5mm2 + conduit 20mm
- Fire Extinguisher kap. 3,5kg inc. braket
- Programing
- Fire Extinguisher kap. 3,5kg inc. braket
- test comm

C PEKERJAAN PLUMBING - AULA


1 Pekerjaan Air Kotor
Pipa PVC AW 10 kg/cm2
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
Lantai 1
- Dia.40mm
- Dia.50mm
- Dia.65mm
- Dia.100mm
- Fitting-fitting dan material bantu

2 Unit Pengolahan Limbah


2. Bio Septic Tank kapasitas 6 m3/hari
Instalasi Pemipaan
Pipa Air Kotor PVC kelas 10 kg/cm2
1. Pemipaan Lantai 1
- PVC dia. 100 mm
- PVC dia. 65 mm
b. Sumur resapan

D PEKERJAAN AIR BERSIH


1 Instalasi pemipaan Air Bersih
Pemipaan air bersih menggunakan Polypropeline PN-10
lengkap fitting dan alat bantunya.

Pipa PPR-PN10
- Dia.15mm
- Dia.32mm
- Dia.50mm
- Fitting-fitting dan material bantu

E PEKERJAAN POMPA BOOSTER


- ( PAB.1/PAB.2 ) flow rate:30m3/jam, H 13M, Suct. 2", disch. 2"
- Kabel power NYY 3 x 2,5mm2
- Panel control D.O.L starter untuk pompa booster c/w ON-OFF push button, ON-OFF status lamp, selector switch A-O-M, RST indicator lamp
- Kabel feeder panel control NYY 4 x 4mm2
- Pipa Header dia.150mm2 lengkap aksesoris, valve-valve dan support
- Pemipaan Pompa

D PEKERJAAN SPRINKLER
1 Pekerjaan Relokasi Head Sprinkler
-Relokasi Head sprinkler
-Instalasi sprinkler untuk relokasi dengan BSP SCH 40 dia. 1"
termasuk fitting-fitting, support, zincromate dan pengecatan
-Pasang Head sprinkler
-Instalasi sprinkler inc. fitting-fitting, finishing dan support
Pipa BSP SCH 40 dia. 1"
Pipa BSP SCH 40 dia. 3"

C LOBBY BELAKANG DENGAN MEP LOBBY BELAKANG


1 PEKERJAAN RENOVASI LOBBY BELAKANG

1.A PEKERJAAN PERSIAPAN


Pek. Pembuatan Papan nama Pekerjaan
Pengukuran dan Pemasangan Bouwplank
Pembuatan Kantor Sementara / Direksi keet
Pembuatan Gudang Semen dan Peralatan
Pengadaan /sewa scafolding
Pek. Bongkaran Beton Bertulang
Pek. Bongkaran lantai Granit
Pek. Bongkaran Plafond
Pek. Bongkaran Dinding 1/2 Bata
Pek Perapihan instalasi listrik Ruangan yg Terbongkar
Pek. Pembersihan Setelah Selesai Pekerjaan
Mobilisasi dan demobilisasi
Shop Drawing, As Built Drawing & dokumentasi
Air & listrik tersedia

2 PEKERJAAN FINISHING ARSITEKTUR


2.A Pekerjaan Lt Drop off
Pasangan batu kali
Pek. Pasang batu belah 1PC :4PP
- area drop parkir
Pek. Plester batu kali
- area drop parkir
Pek. Pengurugan tanah material dari luar proyek
- area drop parkir
Pek.pasir urug bawah pondasi
- area drop parkir
Pek. Pengurugan tanah material dari luar proyek

2.B Pekerjaan Dinding Lt Drop off


Pekerjaan Dinding Panel 2 sisi
area Drop off
- Pek. Pemasangan Soundshield 12mm ex. Knauf
- Pek. Rangka Panel metal U Chanel 75
- Pek. Pemasangan Allumunium 1cm
- Pek. Cat dinding
- skirting

Pek. Dinding panel hpl


area tangga

Pekerjaan Dinding Panel 2 sisi


area lobby lift
- Pek. Pemasangan Soundshield 12mm ex. Knauf
- Pek. Rangka Panel metal U Chanel 75
- Pek. Pemasangan Allumunium 1cm
- Pek. Cat dinding
- skirting

Pek. Pasang Dinding Bata ringan, tebal 7,5 cm


area home lift
Pek. Plester
Pek. Acian
Pek. Pemasangan Dinding HT 60X120 cm
- Roman type dRomano 120x60cm
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
- area home lift
Pek. Cat dinding kolom eksisting
Pek. Cat dinding Ruang MEP + canopi

Pek. Dinding panel kisi kisi


area entrance dropoff, lounge
- partisi dua muka rangka hollow
- 1 muka wallpanel wpc premium zora wood tbl. 24mm
- 1 muka finish cat

2.C Pekerjaan Beton Lt Drop off


Pek. Kolom Praktis 11x11 cm
Pek. Balok Praktis 12x20 cm
Pek. Struktur Lantai home lift t = 30 cm,
area : drop off
- Pek. Beton K -225
- Pek. Pembesian
- Pek. Bekisting, Multi 12 mm

Pekerjaan plat Beton penutup atap pit lift


- Pek. Beton K -225
- Pek. Pembesian
detail pembesian lihat gambar
- Pek. Bekisting, Multi 12 mm

2.D Pekerjaan Pas. Lantai Drop Off


Pek. Pemasangan lantai Homogenous Tile 60x60
- Roman type Metropolitan bruno
- General area drop off
Pek. Pemasangan lantai Homogenous Tile 60x60
- Roman type Metropolitan bruno
- Area klinik dan koperasi
Pek. Pemasangan lantai Homogenous Tile 60x60 ( Border)
- Roman type Metropolitan grey
- General area drop off
Pek. Pemasangan lantai Homogenous Tile 60x60
- Roman type Metropolitan bruno
- Area tangga
Pek. Pemasangan Lantai Tegel Soeryo 20x20 Custom

2.F Pekerjaan Plafond


- AreaDrop off
Pek. Pemasangan plafond
- Rangka hollow 4x4 tbl. 0.5mm
- Pas. Penutup Plafond Gypsum (9mm)
Pek. Penutup Plafond GRC (6mm)
- Pas. Penutup Plafond Gypsum water resistant(9mm)
Pek. List Plafond /shadow line uk. 20x20mm
Pengecatan Plafond
Pek. Lamber ceilling ex. Zora wood

2.G Pekerjaan Kusen Pintu dan Jendela + Aksesoris Lt Drop off & Lantai 2

Pas. Pintu Uk. 225x350 (2 Unit )


Area tangga drop off
- Pintu Kaca Frameless + Kaca Tempered 12mm
- Floor Hinges
- Over Panel
- Top Patch Fitting
- Bottom Patch Fitting
- Bottom Patch Lock + Cylinder
- Pull Handle ex. Geze

Pas. Pintu Uk. 130x240 (1Unit )


Area coridor lounge
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson/Geze

Pintu frameless 1 daun Uk. 90s220 cm ( 2 Unit )


Area Kantin dan Ruang tunggu VVIP
- Kaca polos tempered 12mm
- pull handle h 1200 mm
- accessories floor hinge, patch fitting, kunci tanam ex. Dorma
- cutting sticker

Pas. Pintu Uk 90x220. (3Unit )


Area Ruang ganti dan dapur
- Kusen dan Daun pintu uPVC
- Finish Hotstamp
- Aksesories ex. Dekkson/Geze

Pas. Jendela J1 Uk. 2750 x 450 cm ( 2Unit )


Area lounge
- Kusen
- Kaca Polos Tempered 8 mm

Pas. Jendela J2' Uk. 675 x697 cm ( 1 Unit )


Area drop off
- Kaca Polos polos 8 mm
- Frame uPVC finish Hotstamp

Pas. Jendela J3 Uk. 113 x430 cm ( 2 Unit )


area tangga main lobby
- Kusen
- Kaca Polos Tempered 8 mm

Pas. Pintu Jendela Uk.210 x270 cm ( 3 Unit )


Area R. koperasi dan R. klinik
- Pintu kaca swing - Frame
- Jendela kaca mati
- Frame uPVC finish Hotstamp
- Kaca Polos polos 8 mm
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
- Aksesories ex. Dekkson

Pas. Pintu Jendela Uk.456 x270 cm ( 1 Unit )


Area drop off
- Pintu kaca swing - Frame
- Jendela kaca mati
- Frame uPVC finish Hotstamp
- Kaca Polos polos 8 mm
- Kisi kisi
- Aksesories ex. Dekkson

III PEKERJAAN ARSITEKTUR LT. 2


PEKERJAAN PANEL DINDING INTERIOR

Pekerjaan Panel Dinding 1 muka


Pekerjaan Panel HPL
Area kantin
- Pek. Pemasangan Multiplek 12mm
- Pek. Pemasangan HMR Board 3 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pengecatan Profil (duco)
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Pek. Skirting solid wood finish duco warna gold
- Lihat gambar kerja

Pekerjaan Panel Dinding Panel 1 muka


Pekerjaan Panel HPL + mirror
Area Ruang kantin
- Pek. Pemasangan Multiplek 9mm
- Pek. Pemasangan HMR Board 3 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pemasangan Profil from solid kayu
- Pek. Pengecatan Profil (duco)
- Pek. Skirting solid wood finish duco warna gold
- Pek. Pemasangan bronze mirror
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel Dinding 1 muka


Pekerjaan Panel HPL
Area Lounge
- Pek. Pemasangan Multiplek 12mm
- Pek. Pemasangan HMR Board 3 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pengecatan Profil HMR Board (duco)
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Pek. Skirting solid wood finish duco warna gold
- Lihat gambar kerja

Pekerjaan Panel Dinding Panel 1 muka


Pekerjaan Panel HPL + profil
Area Ruang VVIP
- Pek. Pemasangan Multiplek 9mm
- Pek. Pemasangan HMR Board 3 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pemasangan Profil from solid kayu
- Pek. Pengecatan Profil (duco)
- Pek. Skirting solid wood finish duco warna gold
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel Dinding Panel 1 muka


Pekerjaan Panel HPL + profil+ mirror
Area Ruang VVIP
- Pek. Pemasangan Multiplek 9mm
- Pek. Pemasangan HMR Board 3 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pemasangan Profil from solid kayu
- Pek. Pengecatan Profil (duco)
- Pek. Skirting solid wood finish duco warna gold
- Pek. Pemasangan bronze mirror
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel Dinding


Pekerjaan Panel HPL + profil
Area Ruang coridor Lounge
- Pek. Pemasangan Multiplek 9mm
- Pek. Pemasangan HMR Board 3 mm
- Pek. Pemasangan HPL Ex Taco
- Pek. Pemasangan Profil from solid kayu
- Pek. Pengecatan Profil (duco)
- Pek. Skirting solid wood finish duco warna gold
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel kisi kisi Dinding


Pekerjaan Panel kisi kisi
Area Ruang coridor Lounge
- Pek. Pemasangan Multiplek 12 mm
- Pek. Pemasangan panel kisi kisi ex. Zora wood
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel Dinding Panel 1 muka


Pekerjaan Panel finish HT
Area Ruang VVIP dan kantin
- Pek. Pemasangan Multiplek 18mm
- Pek. Pemasangan HT Roman type dtravetine crema 60x120 cm
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel Dinding Panel 2 muka finis wallpaper


1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
Pekerjaan Panel finish wallpaper
Area Ruang ganti VVIP
- Pek. Gypsum 9mm
- Pek. Pemasangan wallpaper
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel Dinding Panel 1 muka finis wallpaper


Pekerjaan Panel finish HT
Area Ruang ganti VVIP
- Pek. Gypsum 9mm
- Pek. Pemasangan wallpaper
- Pek. Rangka Panel hollow Galvanis 40x40x0.6mm
- Lihat gambar kerja

Pekerjaan Panel kisi kisi Dinding


Pekerjaan Panel kisi kisi
Area lobby
- Pek. Pemasangan panel kisi kisi ex. Zora wood
- Lihat gambar kerja

Hand rail kayu merbau

3.B Pekerjaan Pas. Lantai 2


Pek. Pemasangan lantai Homogenous Tile 60x120
- area kantin
- ex. Roman Granit color dTraventine
Pek. Pemasangan lantai Homogenous Tile 60x120
- area Lobby antara kantin dan VVIP
- ex. Roman Granit color dTraventine
Pek. Pemasangan lantai marmer dark emperador
- area tangga / step anak tangga baru
- ex. Marmer Dark emperador
Pek. Pemasangan lantai marmer 60x120 ( Border)
- type dark emperador
- Pek. Pemasangan Lantai Tegel Soeryo 20x20 Custom
Lihat gambar kerja
Pek. Pemasangan lantai Homogenous Tile 60x120 Selasar Lobby
- Area Lounge
- ex. Roman Granit color d'Travertine Crema
Pek. Pemasangan Dinding HT 60X120 cm
- Area coridor lounge
- Roman type dRomano 120x60cm
Pek Pemasangan Dinding keramik 30x30
Area Dinding pantry kantin

3.C Pekerjaan Langit - Langit / Plafond


Pekerjaan plafond
- Area Drop off
- Pas. Rangka Plafond
- Pas. Penutup Plafond Gypsum jayaboard (9mm)
- Pek. List Plafond

3.D Pekerjaan Pengecatan


- Pengecatan Plafond

IV PEKERJAAN STRUKTUR TANGGA LOBBY (BETON)


V PEKERJAAN HOME LIFT

5.A Pengadaan Home Lift


- Kabin Stainless steel Hairlines
- Kapasitas 400/kg ( 3 orang )
- Panel Elektrikal & Kabel Power
- Tes Commisioning

V PEKERJAAN SANITAIR
Wastafel ex. Toto type LW5871 area kantin
Kran Washtafel ex. Toto type TEN40ANV900/TN78-9V900
Kaca Cermin wastafel kantin
Meja beton wastafel finish granit hitam area kantin uk. 2000x600mm
Backing Kaca Cermin wastafel kantin uk. 2000x900mm
- plywood 18mm finish hpl
-Edging mach to HPL
Kaca Cermin Ruang ganti

VI TOILET RUANG MEP


Pek. Cat plafond
Pas. Lantai keramik
Pas. Dinding keramik toilet
Pas. Pasang pintu alumunium toilet frame alumunium uk. 220x70cm
Floor Drain ex. Tototype ECO E2FD
Closet ex. Toto type CW637
Wastafel ex. Toto type LW897
Kran Washtafel ex. Toto type TX109LD
Jet Washer ex.Toto type 403SBW
Kaca Cermin
Paper towel dispenser Roll

2 MEP LOBBY BELAKANG

A PEKERJAAN ELEKTRIKAL - LOBBY BELAKANG


STOP KONTAK
1 Lantai Drop Off
- Stop kontakk 200 W 16A
- Kabel NYM 3 x 2,5 mm² di dalam HI PVC conduit dia. 20 mm² untuk stop kontak
2 Lantai Dasar
Area Kantin
- Stop kontakk 120 W 16A
- Kabel NYM 3 x 2,5 mm² di dalam HI PVC conduit dia. 20 mm² untuk stop kontak

Area R tunggu VVIP


- Stop kontak 120 W 16A
- Kabel NYM 3 x 2,5 mm² di dalam HI PVC conduit dia. 20 mm² untuk stop kontak
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180

Area lobby
- Stop kontak 120 W 16A
- Kabel NYM 3 x 2,5 mm² di dalam HI PVC conduit dia. 20 mm² untuk stop kontak
B PEKERJAAN ACCESS POINT
1 Ceiling Access Point maximum 200 client per WI FI radio dan total 400 client per access point
2 Instalasi dat UTP cat 6 + conduit 20mm2

D PEKERJAAN SALURAN AIR HUJAN & LANDSCAPE


1 Pekerjaan canstin
- canstin uk. 10x20x40cm
- pasir urug

2 Pekerjaan pipa air hujan/air kotor Horisontal


area parkir dan drop off
- Pipa PVC AW/setara dia. 30cm
- galian
- pasir urug 10 cm
- Pekerjaan memotong plat beton 2 lapis

- Pipa PVC AW/setara dia. 10cm


- pasir urug 10 cm
dibawah bak tanaman

3 Bak kontrol Tertutup uk. 50x50x66 cm


- tutup plat beton 8cm

4 Bak kontrol Terbuka uk. 50x50 x70cm


- tutup grill galvanis

5 Pekerjaan Talang tegak air hujan /air kotor


area selasar teras aula dan main lobby aula
- Pipa galvanis AW/ setara dia. 10cm

6 Pekerjaan Talang datar air hujan /air kotor


area selasar teras aula
- Ukuran lihat gambar detail

7 Pekerjaan Talang datar air hujan /air kotor


area dak ac
- Ukuran lihat gambar detail

2 Pekerjaan area parkir


1 Pekerjaan paving block berwarna
area parkir
- paving block uk. 23x23 & 11.5x11.5 cm
- pasir urug
- termasuk bongkar paving lama

2 Pekerjaan batu andesit bakar uk.15x15cm di area ex. Lapangan Tenis


- terpasang

Pekerjaan batu andesit honed uk.15x15cm di area ex. Lapangan Tenis


- terpasang

3 Pekerjaan lantai Rabat beton tebal 50 cm


- Beton rabat 1:2:3
- Tulangan rangkap wiremesh M6

E PEKERJAAN AUDIO-VIDEO & CONTROL SYSTEM


1 AUDIO SYSTEM
1 Ultra-Compact Passive Line Array
2 Ultra-Compact Reflex Subwoofer
3 Monitor Speaker
4 4-Channel Power Rack
5 Line Array Bracket
6 Power Conditioner
7 Digital Signal Processor
8 Digital Mixer
9 Dante expansion card
10 Stage Box
11 Handheld Wireless Microphone
12 Headworn Wireless Microphone
13 Mic Wireless Receiver
14 Power Distribution System
15 Antenna Spliter
16 Antenna
17 Battery Charger
18 Audio Floorbox Inlet
19 Audio Wallbox Inlet Outlet
20 Profesional Speaker Cable

2 VIDEO SYSTEM
1 Side Display LED P2.5 - Right (Dimensions 3.84 X 2.16 m)
2 Side Display LED P2.5 - Left (Dimensions 3.84 X 2.16 m)
3 AV Over IP Extender Transmitter
4 AV Over IP Extender Receiver
5 AV Over IP Extender Wallplate Transmitter
6 Audio over IP Receiver
7 IP System Controller & Configurator
8 HDMI Transmitter
9 HDMI Receiver
10 HDMI Splitter
11 Mini PC
12 Premium HDMI Cable 1m
13 Premium HDMI Cable 7 meter
14 Smart Sinaged Display 13 Inch
15 PTZ Optical Camera Auto Tracking
16 PTZ Optical Camera
17 MEDIA STATION
18 MOTORIZE BRACKET CAMERA
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180

3 CONTROL SYSTEM
1 4-Series Control System
2 Mobile include Touchsreen Panel
3 Keypad Control
4 Wireless Access Point
5 Ethernet Switch
ACCESSORIES
1 Equipment Rack 42U
2 Standing Microphone
3 Installation Material
4 Programming, Setting, Configuration
5 Testing & Commisioning

F PEKERJAAN SPECIAL LIGHTING


1 PEKERJAAN SUPPLY SPECIAL LIGHTING LANTAI DASAR +0.00

1.A Lobby Belakang +0.00


CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V
DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
HL.INT2 - Custom Decorative Pendant Light 30x2W Led Bulb 2700K E14
RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree
RDL32D - Downlight Spot Dimmable 9W Cob Led 3000K 220V 1-10Vdc 15 degree
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree

1.B Ruang Koperasi, Ruang Penerimaan Dokumen, Ruang Ganti dan Ruang Rias +2.20

RDL23 - Downlight General - 15W Cob Led 3000K 220V 60 degree


LSE - Saklar Lokal Engkel Panasonic E Series Silver

1.C Ruang Tamu VVIP dan Ruang Ganti +2.20

CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V


DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

1.D Kantin dan Dapur +2.20

CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V


DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
RDL7.3B - Downlight Adjustable Wide Beam 15W Cob Led 3000K 220V 40 degree
LSE - Saklar Lokal Engkel Panasonic E Series Silver
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

1.E Area Mezzanine +2.20

CL1AD - Continuous Led Striplight Dimmable 6W/M COB Led 2850K 24V
DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V
DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

1.F Area Koridor & Tangga +2.20

RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree


EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

2 PEKERJAAN SUPPLY SPECIAL LIGHTING LANTAI Ballroom +3.90

2.A Area Ballroom


CL1AD - Continuous Led Striplight Dimmable 6W/M COB Led 2850K 24V
DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
CL3D - Continuous Led Striplight Dimmable 10W/M COB Led 2850K 24V
DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
STG1 - Stage Lighting Moviang Head DMX 100W Led 13 Colour 16 Channel Mode
MX1 - Mixer Controller Lighting DMX 512 16 Channel
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

2.B Area Main Lobby Aula +3.90

CL1AD - Continuous Led Striplight Dimmable 6W/M COB Led 2850K 24V
DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V
DK2 - Dimmable Driver 1-10Vdc Euchips EUP150A-1W24V-1
HL.INT3 - Custom Decorative Pendant Light Dimmable 120W Nichia Led chip 2700K 220V
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

2.C Ruang Manajemen +3.90

RDL7.3B - Downlight Adjustable Wide Beam 15W Cob Led 3000K 220V 40 degree
RDL24A - Downlight General - 15W SMD Led 3000K 220V
LSS - Saklar Lokal Seri Panasonic E Series Silver

2.D Koridor Aula, Toilet Pria dan Toilet Wanita +3.90

CL1A - Continuous Led Striplight 6W/M COB Led 2850K 24V


CL3 - Continuous Led Striplight 10W/M COB Led 2850K 24V
RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad
LSE - Saklar Lokal Engkel Panasonic E Series Silver
LSS - Saklar Lokal Seri Panasonic E Series Silver

3 PEKERJAAN SUPPLY SPECIAL LIGHTING LANTAI DROP OFF DAN OUTDOOR


1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
3.A Area Drop Off -1.50
CL2 - Continuous Led Striplight 15W/M SMD3014 2850K 24V
RDL23 - Downlight General - 15W Cob Led 3000K 220V 60 degree

3.A Ruang Audio & Lighting

RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree


RDL7.3B - Downlight Adjustable Wide Beam 15W Cob Led 3000K 220V 40 degree
LSS - Saklar Lokal Seri Panasonic E Series Silver

4 PEKERJAAN SUPPLY LIGHTING CONTROL

4.A Lighting Control Lantai Dasar

CTRL-CS - Core Bus Module, ModBus RTU/TCP for third party devices
CTRL-PS - Din Rail Meanwell power source 24VDC 100W
CTRL-RY - DIN Rail High-Voltage Switch 12 Outputs
CTRL-DM - DIN Rail Dimmer, 1 feed, 4 channels
CTRL-DL - DIN Rail Module tailored for LED strips dimming
CTRL-PL - Lighting Panel include MCB

4.B Lighting Control Lantai 1

CTRL-CS - Core Bus Module, ModBus RTU/TCP for third party devices
CTRL-PS - Din Rail Meanwell power source 24VDC 100W
CTRL-RY - DIN Rail High-Voltage Switch 12 Outputs
CTRL-DM - DIN Rail Dimmer, 1 feed, 4 channels
CTRL-DL - DIN Rail Module tailored for LED strips dimming
CTRL-PL - Lighting Panel include MCB

G PEKERJAAN INSTALASI SPECIAL LIGHTING

1 PEKERJAAN SUPPLY SPECIAL LIGHTING LANTAI DASAR +0.00

1.A Lobby Belakang +0.00


CL2 - Continuous Led Striplight 15W/M SMD3014 2850K 24V
HL.INT2 - Custom Decorative Pendant Light 30x2W Led Bulb 2700K E14
RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree
RDL32D - Downlight Spot Dimmable 9W Cob Led 3000K 220V 1-10Vdc 15 degree
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree

1.B Ruang Koperasi, Ruang Penerimaan Dokumen, Ruang Ganti dan Ruang Rias +2.20

RDL23 - Downlight General - 15W Cob Led 3000K 220V 60 degree


LSE - Saklar Lokal Engkel Panasonic E Series Silver

1.C Ruang Tamu VVIP dan Ruang Ganti +2.20

CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V


CL3D - Continuous Led Striplight Dimmable 10W/M COB Led 2850K 24V
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

1.D Kantin dan Dapur +2.20

CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V


CL3D - Continuous Led Striplight Dimmable 10W/M COB Led 2850K 24V
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
RDL7.3B - Downlight Adjustable Wide Beam 15W Cob Led 3000K 220V 40 degree
LSE - Saklar Lokal Engkel Panasonic E Series Silver
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

1.E Area Mezzanine +2.20

CL1AD - Continuous Led Striplight Dimmable 6W/M COB Led 2850K 24V
CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

1.F Area Koridor & Tangga +2.20

RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree


EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

2 PEKERJAAN SUPPLY SPECIAL LIGHTING LANTAI Ballroom +3.90

2.A Area Ballroom

CL1AD - Continuous Led Striplight Dimmable 6W/M COB Led 2850K 24V
CL3D - Continuous Led Striplight Dimmable 10W/M COB Led 2850K 24V
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
STG1 - Stage Lighting Moviang Head DMX 100W Led 13 Colour 16 Channel Mode
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

2.B Area Main Lobby Aula +3.90

CL1AD - Continuous Led Striplight Dimmable 6W/M COB Led 2850K 24V
CL2D - Continuous Led Striplight Dimmable 15W/M SMD3014 2850K 24V
HL.INT3 - Custom Decorative Pendant Light Dimmable 120W Nichia Led chip 2700K 220V
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad

2.C Ruang Manajemen +3.90

RDL7.3B - Downlight Adjustable Wide Beam 15W Cob Led 3000K 220V 40 degree
RDL24A - Downlight General - 15W SMD Led 3000K 220V
LSS - Saklar Lokal Seri Panasonic E Series Silver

2.D Koridor Aula, Toilet Pria dan Toilet Wanita +3.90

CL1A - Continuous Led Striplight 6W/M COB Led 2850K 24V


CL3 - Continuous Led Striplight 10W/M COB Led 2850K 24V
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree
RDL35D - Downlight Spot Dimmable 20W Cob Led 3000K 24 degree
EX1 - Exit lamp 3W Led 6000K 220V with Battery Nicad
LSE - Saklar Lokal Engkel Panasonic E Series Silver
LSS - Saklar Lokal Seri Panasonic E Series Silver

3 PEKERJAAN SUPPLY SPECIAL LIGHTING LANTAI DROP OFF DAN OUTDOOR

3.A Area Drop Off -1.50

CL2 - Continuous Led Striplight 15W/M SMD3014 2850K 24V


RDL23 - Downlight General - 15W Cob Led 3000K 220V 60 degree

3.B Parking Lot & Facade

WL8 - Outdoor Wall Lighting 1x6,5W MR16 Led 2700K 12V 36 degree
WL8A - Outdoor Wall Lighting 2x6,5W MR16 Led 2700K 12V 36 degree
WW24 - Outdoor RGBW Wall Washer with DMX 24W 24V 10x60 degree

3.A Ruang Audio & Lighting

RDL7.2A - Downlight Spot 10W Cob Led 3000K 220V 24 degree


RDL7.3B - Downlight Adjustable Wide Beam 15W Cob Led 3000K 220V 40 degree
LSS - Saklar Lokal Seri Panasonic E Series Silver

H INSTALASI STOP KONTAK AUDIO VIDEO & CONTROL SYSTEM


1 Instalasi stop kontak NYM 3 x 2,5mm2 + conduit 20mm
2 Outlet stop kontak
3 Panel Stop kontak / PP-Power Aula
4 Kabel Feeder NYY 4x16mm² + BC1 6mm²

I PEKERJAAN CCTV AULA


A PEKERJAAN CCTV - AULA
1 IP Cam CCTV PoE 8MP( outdoor )
2 IP Cam CCTV PoE 8MP ( indoor )
2 Instalasi CCTV UTP cat6 + conduit 20mm2
3 NVR 16 ch + HDD 2 TB
4 LED Monitor 42"
5 Switch PoE CCTV 16 port
6 Setting & konfigurasi

J STRUKTUR AULA
1 PEKERJAAN FINISHING ARSITEKTUR/INTERIOR AULA
Perkuatan Dinding Partisi
- Besi C kanal CNP uk. 150.65.20 tbl 2,3mm

2 PEKERJAAN PERKUATAN STRUKTUR BAJA PLAFOND AULA


- Pek. Kolom tambahan WF 250x125x6x9
- box plat uk. 350x550x25mm
- Base plat uk. 296x350x25mm
- Pek. Plat Stiffener Kolom, t = 8mm
- Trekstang M20
- Pek. Perakitan dan Erection perkuatan rangka cremona
- Pek. Stiffener Pedestal, t = 8 mm
- Pek. Besi C125.50.20 , t=3.2mm
- Pek. Baja ringan C100.35.1
- Pek. Pengelasan
- Pek. Pengecatan ( Cat Meni )
- Pek. Mur-Baut M20, Type HTB A-325
- Pek. Dynabolt M12.160
- Pek. Besi kanal 100.50.5 penggantung plafond
Perkuatan Balok Lantai dan Kolom Lantai 2
-Pek. WF 250x125x6x9
-Pek. 2L50x50x5
-Pek. 2L80x80x8
- Pek. Plat Stiffener dan Joint Plate Balok WF, t = 10mm
- Pek. Pekerjaan Mur-Baut M16 Sambungan HTB A325
- Pek. Pengelasan
- Pek. Pengecatan anti karat balok WF
PERKUATAN KOLOM WF 600X300 LANTAI SATU
-Pek. Galian untuk Kolom Komposite
-Pek. Uugan Tanah Kembali dan Pemadatan
-Pek. Beton Kolom Komposite 600 x 800 mm (8 buah, tinggi 5,8 m)
-Pek. Bekisting Kolom Komposite
-Pek. Pembesian D22 Kolom Komposite 14D22
-Pek. Pembesian Sengkang D13-150 & D13-200
-Pek. Chemical Anchoring Besi D22 ( 8x14 bar) ke PC
PERKUATAN BALOK BAJA GIRDER UTAMA WF600X200
- Pek. WF 400x200x8x13
- Pek. Plat Stiffener dan Joint Plate Balok WF, t = 12mm dan 10 mm
- Pek. Pekerjaan Mur-Baut M16 Sambungan HTB A325
- Pek. Steiger dan Dongkrak/up lifting balok WF
- Pek. Pengelasan balok WF
- Pek. Pengecatan anti karat balok WF

K STRUKTUR LOBBY BELAKANG


1 PEKERJAAN RENOVASI LOBBY BELAKANG
1.A Pekerjaan Struktur Baja dan Pembesian Kolom home lift
- Pek. Kolom home lift H 250x250x9x14, E.7.00
- Pek. Baja koneksi kolom area home life WF 200x100x5.5x8
- Pek. Pengelasan
- Pek. Pengecatan ( Cat Meni )
- Pek. Mur-Baut M16, Type 3x2
- Pek. Angkur struktur ke balok beton M19 2
- Pek. Perakitan dan Erection perkuatan rangka cremona
- Pek. Stiffener Plat, t = 8 mm

1.B Pekerjaan Struktur Baja Perkuatan tangga


- Pek. Perkuatan tangga beton WF 150x75x5x7
- Pek. Stiffener Plat, t = 8 mm
- Pek. Angkur M19 2
- Pek. Perakitan dan Erection perkuatan rangka cremona
1 2 3 4 5 6 7
BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN NILAI
% 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120 127 134 141 148 155 162 169 176
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168 175 180
- Pek. Pengelasan
- Pek. Pengecatan ( Cat Meni )
- Pek. Perkuatan railing tangga besi hollow 40x40 tbl.1,5 finish cat
- Pek. railing besi pipa finish cat + hand railing

1.C Pekerjaan Pondasi strauss dia.300mm


- Kedalaman pondasi strauss 6000mm
- Besi SGK Spiral dia.8-200
- Besi polos dia.13

II PEKERJAAN STRUKTUR LT. 2


II.A PEKERJAAN STRUKTUR TANGGA LOBBY (BETON)
Pek. Struktur Lantai Tangga, t = 15 cm,
area : Lobby
- Pek. Beton K - 350 ( fc'=30 Mpa)
- Pek. Pembesian
- Pek. Bekisting, Multi 12 mm

Pek. Struktur Lantai Tangga, t = 15 cm,


area :drop off
- Pek. Beton K - 350 (fc'=30 Mpa)
- Pek. Pembesian
- Pek. Bekisting, Multi 12 mm

II.B Kolom Tipe K - 1, (400 cm x 400 cm )


- Pek. Beton K - 350 (fc'=30 Mpa)
Pek. Pembesian
Pek. Bekisting, Multi 12 mm
Pek. Struktur Balok,

II.C Balok Tipe B-1 (35cm x 60 cm)


- Pek. Beton K - 350 (fc'=30 Mpa)
Pek. Pembesian
Pek. Bekisting, Multi 12 mm

II.D Balok Tipe B-2 (40cm x 60 cm)


- Pek. Beton K - 350 (fc'=30 Mpa)
Pek. Pembesian
Pek. Bekisting, Multi 12 mm

II.E Balok Tipe B-3 (25cm x 40 cm)


- Pek. Beton K - 350 (fc'=30 Mpa)
Pek. Pembesian
Pek. Bekisting, Multi 12 mm

II.F Balok Tipe B-4 (20cm x 30 cm)


- Pek. Beton K - 350 (fc'=30 Mpa)
Pek. Pembesian
Pek. Bekisting, Multi 12 mm

II.G Pek. Struktur Dak Lantai, t = 15 cm,


area main Lobby
- Pek. Beton K - 350 (fc'=30 Mpa)
- Pek. Pembesian
- Pek. Bekisting, Multi 12 mm
- Pek. Pemasangan Bondek

- 0%
RENCANA PROGRESS MINGGUAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
RENCANA KOMULATIF PROGRESS MINGGUAN - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Jakarta, 01 Juli 2022


Dibuat oleh,
Pelaksana / Kontraktor
PT. ADIPRANA SENTOSA INDOVESCO

Hermandianto
Project Manager
TIME SCHEDULE / S CURVE
PEKERJAAN : PENGADAAN KONTRAKTOR PELAKSANA PEMBANGUNAN KANTOR OJK SAMARINDA
LOKASI : SAMARINDA

8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NO URAIAN PEKERJAAN NILAI BOBOT
1 8 15 22 1 8 15 22 1 8 15 22 1 8 15 22 1 8
7 14 21 28 7 14 21 28 7 14 21 28 7 14 21 28 7 14

PEKERJAAN PERSIAPAN DAN PENDAHULUAN


BANGUNAN KANTOR
I. Pekerjaan Bangunan Kantor
II. Pekerjaan Kanopi Parkiran
III. Pekerjaan Toilet Disabilitas
IV. Pekerjaan Ruang Tunggu Supir
BANGUNAN MUSHOLA
Pekerjaan Bangunan Musholla
LAPANGAN TENIS
Pekerjaan Lapangan Tenis
-
RENCANA PROGRESS MINGGUAN - - - - - - - - - - - - - - - - - - -
RENCANA KOMULATIF PROGRESS MINGGUAN - - - - - - - - - - - - - - - - - - - -

Jakarta, 30 Maret 2023


Dibuat oleh,
PT. ADIPRANA SENTOSA INDOVESCO

Rahendra Yustiawan
Direktur
SCHEDULE MATERIAL
PEKERJAAN : PENGADAAN KONTRAKTOR PELAKSANA PEMBANGUNAN KANTOR OJK PALU
LOKASI : PALU - SULAWESI TENGAH

1 2 3 4 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NO URAIAN PEKERJAAN
1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 0

A PEKERJAAN PENDAHULUAN
I PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)

B PEKERJAAN PERSIAPAN DAN PENGUKURAN


I KAYU DAN PAPAN

C PEKERJAAN LANTAI 1, 2 DAN 3


1 MATERIAL SEMEN

2 MATERIAL BESI BETON

3 MATERIAL SPLITE DAN PASIR

4 MATERIAL READYMIX

6 MATERIAL BATA MERAH

7 MATERIAL PASIR

8 MATERIAL KERAMIK

9 MATERIAL CAT

10 MATERIAL PIPA PVC

11 MATERIAL SANITAIR

Jakarta, 30 Maret 2023


KETERANGAN : PENGADAAN PELAKSANAAN Dibuat oleh,
PT. ADIPRANA SENTOSA INDOVESCO

Rahendra Yustiawan
Direktur
TIME SCHEDULE / S CURVE
PEKERJAAN : PENGADAAN PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT JASA RAHARJA
LOKASI : Jl. HR.Rasuna Said Kav.C-2 Kuningan 12920 Jakarta Selatan DKI Jakarta

Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22


BOBOT 1 2 3 4 5 6
MASA PEMELIHARAAN 90 Hari
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Kalender
NO URAIAN PEKERJAAN 1 11 18 25 32 39 46 53 60 67 74 81 88 94 101 108 115 122 129 136 143 150 153 160 167 174
10 17 24 31 38 45 52 59 66 73 80 87 93 100 107 114 121 128 135 142 149 152 159 166 173 180
(%) 1-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 1-Dec 8-Dec 11-Dec 18-Dec BLN KE
10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 30-Nov 7-Dec 10-Dec 17-Dec 24-Dec 1 2 3

1 PEKERJAAN ARSITEKTUR
PEKERJAAN PERSIAPAN 410,328,732 2.6190 6.17% 0.28% 0.28% 0.28% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%
PEKERJAAN SIPIL ARSITEKTUR 694,827,798 4.1483 10.45% 0.50% 0.50% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45%
-
2 PONDASI DAN STRUKTUR -
PEKERJAAN TANAH 22,452,020 0.2956 0.34% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
PEKERJAAN PONDASI 293,341,997 3.9536 4.41% 0.74% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46%
PEKERJAAN LOWER STRUKTUR 307,440,295 3.0836 4.63% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51%
PEKERJAAN UPPER STRUKTUR 3,529,216,882 14.1591 53.10% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 2.79% 0.75%
PEKERJAAN ATAP 464,023,262 - 6.98% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78%
-
3 ELEKTRIKAL -
PEMASANGAN PANEL 51,376,798 - 0.77% 0.26% 0.26% 0.26%
PEMASANGAN KABEL FEEDER 38,193,305 - 0.57% 0.11% 0.11% 0.11% 0.11% 0.11%
PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH 24,679,152 0.0825 0.37% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur 94,188,626 0.2024 1.42% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%
INSTALASI TOILET 13,567,917 - 0.20% 0.07% 0.07% 0.07%
PEMASANGAN INSTALASI CCTV LANTAI DASAR 17,654,130 - 0.27% 0.05% 0.05% 0.05% 0.05% 0.05%
PEMASANGAN INSTALASI CCTV LANTAI 1 44,494,814 - 0.67% 0.13% 0.13% 0.13% 0.13% 0.13%
PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2 58,681,182 - 0.88% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 5,333,123 - 0.08% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 7,704,620 - 0.12% 0.03% 0.03% 0.03% 0.03%
TEST COMUISONING 7,500,000 - 0.11% 0.11%
-
4 PLUMBING, SPRINKLER / HYDRANT DAN TATA UDARA -
PEKERJAAN PLUMBING 13,001,635 - 0.20% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
SPRINKLER DAN HYDRANT 110,007,146 - 1.66% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18%
PEKERJAAN TATA UDARA 438,748,240 - 6.60% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73%

6,646,761,674 28.54 100%


RENCANA PROGRESS MINGGUAN 0.28% 0.78% 1.51% 1.21% 1.72% 1.72% 5.26% 5.26% 5.40% 5.40% 5.42% 5.04% 5.82% 6.41% 6.41% 6.41% 6.41% 6.40% 6.19% 6.25% 5.50% 2.00% 2.02% 1.19% 0.00% 0.00%
RENCANA KOMULATIF PROGRESS MINGGUAN - 0.28% 1.06% 2.57% 3.78% 5.50% 7.22% 12.48% 17.74% 23.14% 28.54% 33.97% 39.01% 44.83% 51.24% 57.65% 64.06% 70.46% 76.86% 83.05% 89.30% 94.79% 96.79% 98.81% 100.00% 100.00% 100.00%

Jakarta, 01 Juli 2022


Di setujui Oleh, Diperiksa oleh, Dibuat oleh,
Owner Konsultan Pengawas Pelaksana / Kontraktor
PT. JASA RAHARJA PT. SARMAG KONSULTAN NUSANTARA PT. ADIPRANA SENTOSA INDOVESCO

(…..............................................) Kesanover Hermandianto


Team Leader Project Manager
KURVA S
PROGRESS MINGGUAN
PEKERJAAN : PENGADAAN PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT JASA RAHARJA
LOKASI : Jl. HR.Rasuna Said Kav.C-2 Kuningan 12920 Jakarta Selatan DKI Jakarta
OWNER : PT. JASA RAHARJA
KONSULTAN PENGAWAS : PT. SARMAG KONSULTAN NUSANTARA
PELAKSANA/KONTRAKTOR : PT. ADIPRANA SENTOSA INDOVESCO

Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22


BOBOT
1 2 3 4 5 6 MASA PEMELIHARAAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 90 Hari Kalender
NO URAIAN PEKERJAAN 1 11 18 25 32 39 46 53 60 67 74 81 88 94 101 108 115 122 129 136 143 150 153 160 167 174
10 17 24 31 38 45 52 59 66 73 80 87 93 100 107 114 121 128 135 142 149 152 159 166 173 180
(%) 1-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 1-Dec 8-Dec 11-Dec 18-Dec BLN KE
10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 30-Nov 7-Dec 10-Dec 17-Dec 24-Dec 1 2 3

1 PEKERJAAN ARSITEKTUR

PEKERJAAN PERSIAPAN 6.17% 0.28% 0.28% 0.28% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%

PEKERJAAN SIPIL ARSITEKTUR 10.45% 0.50% 0.50% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45%

2 PONDASI DAN STRUKTUR

PEKERJAAN TANAH 0.34% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%

PEKERJAAN PONDASI 4.41% 0.74% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46%

PEKERJAAN LOWER STRUKTUR 4.63% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51% 0.51%

PEKERJAAN UPPER STRUKTUR 53.10% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 3.54% 2.79% 0.75%

PEKERJAAN ATAP 6.98% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78%

3 ELEKTRIKAL

PEMASANGAN PANEL 0.77% 0.26% 0.26% 0.26%

PEMASANGAN KABEL FEEDER 0.57% 0.11% 0.11% 0.11% 0.11% 0.11%

PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH 0.37% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%

PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur 1.42% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%

INSTALASI TOILET 0.20% 0.07% 0.07% 0.07%

PEMASANGAN INSTALASI CCTV LANTAI DASAR 0.27% 0.05% 0.05% 0.05% 0.05% 0.05%

PEMASANGAN INSTALASI CCTV LANTAI 1 0.67% 0.13% 0.13% 0.13% 0.13% 0.13%

PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2 0.88% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%

PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 0.08% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%

PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 0.12% 0.03% 0.03% 0.03% 0.03%

TEST COMUISONING 0.11% 0.11%

4 PLUMBING, SPRINKLER / HYDRANT DAN TATA UDARA

PEKERJAAN PLUMBING 0.20% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%

SPRINKLER DAN HYDRANT 1.66% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18%

PEKERJAAN TATA UDARA 6.60% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73% 0.73%

100%
RENCANA PROGRESS MINGGUAN 0.28% 0.78% 1.51% 1.21% 1.72% 1.72% 5.26% 5.26% 5.40% 5.40% 5.42% 5.04% 5.82% 6.41% 6.41% 6.41% 6.41% 6.40% 6.19% 6.25% 5.50% 2.00% 2.02% 1.19% 0.00% 0.00%
RENCANA KOMULATIF PROGRESS MINGGUAN - 0.28% 1.06% 2.57% 3.78% 5.50% 7.22% 12.48% 17.74% 23.14% 28.54% 33.97% 39.01% 44.83% 51.24% 57.65% 64.06% 70.46% 76.86% 83.05% 89.30% 94.79% 97% 99% 100% 100% 100%
REALISASI PROGRESS MINGGUAN 1.07% 0.59% 0.96% 6.08% 6.89% 5.57%
REALISASI KOMULATIF PROGRESS MINGGUAN - 1.07% 1.66% 2.62% 8.70% 15.59%
DIVIASI 0.79% 0.60% 0.05% 4.93% 10.09% -7.22%

Jakarta, 07 Agustus 2022


Di setujui Oleh, Diperiksa oleh, Dibuat oleh,
Owner Konsultan Pengawas Pelaksana / Kontraktor
PT. JASA RAHARJA PT. SARMAG KONSULTAN NUSANTARA PT. ADIPRANA SENTOSA INDOVESCO

Kesanover Hermandianto
Margaret V. S Panjaitan Team Leader Project Manager
Ketua Tim
TIME SCHEDULE / S CURVE
PEKERJAAN : PENGADAAN PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT JASA RAHARJA
LOKASI : Jl. HR.Rasuna Said Kav.C-2 Kuningan 12920 Jakarta Selatan DKI Jakarta
OWNER : PT. JASA RAHARJA
KONSULTAN PENGAWAS : PT. SARMAG KONSULTAN NUSANTARA

DEFECT LIST
PELAKSANA/KONTRAKTOR : PT. ADIPRANA SENTOSA INDOVESCO

JULI Aug-22 AGUSTUS Sep-22 Oct-22 OKTOBER Nov-22 Dec-22


BOBOT 1 2
MASA PEMELIHARAAN 90 Hari
1 5 6 7 8 2 9 10 11 12 13 3 14 15 16 17 4 18 19 20 21 22 23 24 25 26
Kalender
NO URAIAN PEKERJAAN 1 32 39 46 53 32 60 67 74 81 88 94 101 108 115 94 122 129 136 143 150 153 160 167 174
31 38 45 52 59 59 66 73 80 87 93 100 107 114 121 121 128 135 142 149 152 159 166 173 180
(%) 1 Juli 1-Aug 8-Aug 15-Aug 22-Aug 1 Agustus 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 3 OKTOBER 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 1-Dec 8-Dec 11-Dec 18-Dec BLN KE
31 Juli 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 30 OKTOBER 6-Nov 13-Nov 20-Nov 27-Nov 30-Nov 7-Dec 10-Dec 17-Dec 24-Dec 1 2 3

1 PEKERJAAN ARSITEKTUR
PEKERJAAN PERSIAPAN 6.17% 1.10% 0.25% 0.25% 0.25% 0.25% 1.02% 0.25% 0.25% 0.25% 0.25% 0.25% 1.27% 0.25% 0.25% 0.25% 0.25% 1.02% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%
PEKERJAAN SIPIL ARSITEKTUR 10.45% 1.45% 0.45% 0.45% 0.45% 0.45% 1.80% 0.45% 0.45% 0.45% 0.45% 0.45% 2.25% 0.45% 0.45% 0.45% 0.45% 1.80% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45%

2 PONDASI DAN STRUKTUR


PEKERJAAN TANAH 0.34% 0.04% 0.04% 0.04% 0.04% 0.04% 0.17% 0.04% 0.04% 0.04% 0.13%
PEKERJAAN PONDASI 4.41% 1.20% 0.46% 0.46% 0.46% 0.46% 1.84% 0.46% 0.46% 0.46% 1.38%
PEKERJAAN LOWER STRUKTUR 4.63% 0.51% 0.51% 0.51% 0.51% 2.06% 0.51% 0.51% 0.51% 0.51% 0.51% 2.57%
PEKERJAAN UPPER STRUKTUR 53.10% 3.54% 3.54% 7.08% 3.54% 3.54% 3.54% 3.54% 3.54% 17.70% 3.54% 3.54% 3.54% 3.54% 14.16% 3.54% 3.54% 3.54% 2.79% 0.75%
PEKERJAAN ATAP 6.98% 0.78% 0.78% 0.78% 0.78% 0.78% 0.78% 3.10% 0.78% 0.78% 0.78% 0.78%

3 ELEKTRIKAL
PEMASANGAN PANEL 0.77% 0.26% 0.26% 0.26%
PEMASANGAN KABEL FEEDER 0.57% 0.11% 0.11% 0.11% 0.11% 0.11%
PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH 0.37% 0.04% 0.04% 0.04% 0.04% 0.04% 0.21% 0.04% 0.04% 0.04% 0.04% 0.17%
PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur 1.42% 0.10% 0.10% 0.10% 0.10% 0.10% 0.51% 0.10% 0.10% 0.10% 0.10% 0.40% 0.10% 0.10% 0.10% 0.10% 0.10%
INSTALASI TOILET 0.20% 0.07% 0.07% 0.07%
PEMASANGAN INSTALASI CCTV LANTAI DASAR 0.27% 0.05% 0.05% 0.05% 0.05% 0.21% 0.05%
PEMASANGAN INSTALASI CCTV LANTAI 1 0.67% 0.13% 0.13% 0.13% 0.13% 0.54% 0.13%
PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2 0.88% 0.11% 0.11% 0.22% 0.11% 0.11% 0.11% 0.11% 0.44% 0.11% 0.11%
PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2 0.08% 0.01% 0.01% 0.02% 0.01% 0.01% 0.01% 0.01% 0.04% 0.01% 0.01%
PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2 0.12% 0.03% 0.03% 0.03% 0.03%
TEST COMUISONING 0.11% 0.11%

4 PLUMBING, SPRINKLER / HYDRANT DAN TATA UDARA


PEKERJAAN PLUMBING 0.20% 0.02% 0.02% 0.02% 0.07% 0.02% 0.02% 0.02% 0.02% 0.09% 0.02% 0.02%
SPRINKLER DAN HYDRANT 1.66% 0.18% 0.18% 0.18% 0.18% 0.74% 0.18% 0.18% 0.18% 0.18% 0.18%
PEKERJAAN TATA UDARA 6.60% 0.73% 0.73% 0.73% 0.73% 2.93% 0.73% 0.73% 0.73% 0.73% 0.73%

100%
RENCANA PROGRESS MINGGUAN 3.78% 5.40% 5.40% 5.42% 5.04% 5.82% 6.41% 6.41% 6.41% 6.41% 6.40% 6.19% 6.25% 5.50% 2.00% 2.02% 1.19% 0.00% 0.00%
RENCANA KOMULATIF PROGRESS MINGGUAN - 3.78% 5.40% 10.80% 16.23% 21.27% 27.09% 33.50% 39.91% 46.32% 52.72% 59.12% 65.31% 71.56% 77.06% 79.06% 81.07% 82.26% 82.26% 82.26%

Jakarta, 01 Juli 2022


Di setujui Oleh, Diperiksa oleh, Dibuat oleh,
Owner Konsultan Pengawas Pelaksana / Kontraktor
PT. JASA RAHARJA PT. SARMAG KONSULTAN NUSANTARA PT. ADIPRANA SENTOSA INDOVESCO

2,644,680

494,680

41,223 Margaret V. S Panjaitan Kesanover Hermandianto


Ketua Tim Team Leader Project Manager
BART CHART
PEKERJAAN : PENGADAAN PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT JASA RAHARJA
LOKASI : Jl. HR.Rasuna Said Kav.C-2 Kuningan 12920 Jakarta Selatan DKI Jakarta

Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22


1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN 1 8 15 22 29 36 43 50 57 64 71 78 85 91 98 105 112 119 126 133 140 147 153 160 167 174
7 14 21 28 35 42 49 56 63 70 77 84 90 97 104 111 118 125 132 139 146 152 159 166 173 180
1-Jul 8-Jul 15-Jul 22-Jul 29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec
7-Jul 14-Jul 21-Jul 28-Jul 4-Aug 11-Aug 18-Aug 25-Aug 1-Sep 8-Sep 15-Sep 22-Sep 29-Sep 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov 10-Nov 17-Nov 24-Nov 1-Dec 8-Dec 15-Dec 22-Dec 29-Dec

1 PEKERJAAN ARSITEKTUR
PEKERJAAN PERSIAPAN
PEKERJAAN SIPIL ARSITEKTUR

2 PONDASI DAN STRUKTUR


PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN LOWER STRUKTUR
PEKERJAAN UPPER STRUKTUR
PEKERJAAN ATAP

3 ELEKTRIKAL
PEMASANGAN PANEL
PEMASANGAN KABEL FEEDER
PEMASANGAN KABEL TRAY ARUS KUAT & ARUS LEMAH
PEMASANGAN INSTALASI PENERANGAN & STOPKONTAK LANTAI 1 Berikut Armatur
INSTALASI TOILET
PEMASANGAN INSTALASI CCTV LANTAI DASAR
PEMASANGAN INSTALASI CCTV LANTAI 1
PEMASANGAN INSTALASI FIRE ALARM LANTAI 1 , TAMAN PARKING & LANTAI 2
PEMASANGAN INSTALASI TATA SUARA LANTAI 1 & LANTAI 2
PEMASANGAN INSTALASI Kabel Utp Data LANTAI 1 & LANTAI 2
TEST COMUISONING

4 PLUMBING, SPRINKLER / HYDRANT DAN TATA UDARA


PEKERJAAN PLUMBING
SPRINKLER DAN HYDRANT
PEKERJAAN TATA UDARA
SCHEDULE PERALATAN
PEKERJAAN : PENGADAAN PEMBANGUNAN GEDUNG AULA KANTOR PUSAT PT JASA RAHARJA
LOKASI : Jl. HR.Rasuna Said Kav.C-2 Kuningan 12920 Jakarta Selatan DKI Jakarta

Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22


1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN 1 8 15 22 29 36 43 50 57 64 71 78 85 91 98 105 112 119 126 133 140 147 153 160 167 174
7 14 21 28 35 42 49 56 63 70 77 84 90 97 104 111 118 125 132 139 146 152 159 166 173 180
1-Jul 8-Jul 15-Jul 22-Jul 29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec
7-Jul 14-Jul 21-Jul 28-Jul 4-Aug 11-Aug 18-Aug 25-Aug 1-Sep 8-Sep 15-Sep 22-Sep 29-Sep 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov 10-Nov 17-Nov 24-Nov 1-Dec 8-Dec 15-Dec 22-Dec 29-Dec

1 THEODOLITE
2 EXCAVATOR
3 ALAT PANCANG HIDROLIK
4 MOBILE CRANE
5 CUTTING WELL
6 SCAFOLDING
7 VIBRATOR
8 CONCRETE PUMP
9 STAMPER KUDA
10 GERINDA TANGAN
11 BOR TANGAN
12 MESIN LAS
13 GENSET
14 PERALATAN TUKANG SIPIL
15 PERALATAN TUKANG ARSITEKTUR
16 PERALATAN TUKANG BAJA
17 PERALATAN TUKANG MEKANIKAL ELEKTRIKAL
18 PERALATAN TUKANG PLUMBING
19 PERALATAN TUKANG TATA UDARA

PENDATANGAN PELAKSANAAN
DAFTAR MATERIAL INDENT
PEKERJAAN : PENGADAAN KONTRAKTOR PELAKSANA PEMBANGUNAN KANTOR OJK PALU
LOKASI : PALU - SULAWESI TENGAH

No Item Pekerjaan Kode Gambar Spesifikasi Supplier/Vendor Asal Negara Keterangan

PEKERJAAN ATAP
1 RANGKA BAJA RINGAN Bahan Mutu Tinggi G 550 Bluescope Indonesia Pabrikasi 2-4 Minggu

2 ATAP SPANDEK MOTIF GELOMBANG Spandek Optima AZ100 tebal 0,4 mm BMT Kirana Bluescope Indonesia Pabrikasi 2-4 Minggu

Apabila stok Coil Kosong, Indent


8 - 10 Minggu

3 NOK/ RABUNG SPANDEK Kirana AZ100 tebal 0,4 mm BMT Bluescope Indonesia Pabrikasi 2-4 Minggu
Apabila stok Coil Kosong, Indent
8 - 10 Minggu
MAN POWER
PEKERJAAN : PENGADAAN KONTRAKTOR PELAKSANA PEMBANGUNAN KANTOR OJK PALU
LOKASI : PALU - SULAWESI TENGAH

1 2 3 4 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NO URAIAN PEKERJAAN 1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126

PEKERJAAN PERSIAPAN DAN PENDAHULUAN 4 4 4 4 4 4 4 4 4 4 4 4 4 4


BANGUNAN KANTOR

I. Pekerjaan Bangunan Kantor 10 10 10 10 10 10 10 10


II. Pekerjaan Kanopi Parkiran 5 5 5 5
III. Pekerjaan Toilet Disabilitas 5 5 5 5
IV. Pekerjaan Ruang Tunggu Supir 5 5 5 5
BANGUNAN MUSHOLA

Pekerjaan Bangunan Musholla - 10 10 10 10 10


LAPANGAN TENIS

Pekerjaan Lapangan Tenis 8 8 8 8 10

TOTAL 14 14 14 14 14 14 14 14 29 29 29 29 14 12 8 8 8 10

1 2 3 4 5
NO URAIAN PEKERJAAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 8 15 22 29 36 43 50 57 64 71 78 85 92 99 106 113 120
7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126

1 STAFF & TENAGA AHLI


MANAGER PROYEK 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SITE MANAGER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
AHLI K3 KONSTRUKSI 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
AHLI ARSITEKTUR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
AHLI MEKANIKAL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
AHLI ELEKTRIKAL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
QUALITY CONTROL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
QUANTITIY SURVEYOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PELAKSANA ARSITEKTUR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PELAKSANA SIPIL / STRUKTUR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PELAKSANA ELEKTRIKAL DAN MEKANIKAL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SURVEYOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
DRAFTER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ADMINISTRASI PROYEK 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 PEKERJA
MANDOR 1 1 1 2 2 2 2 2 2 2 2 3 3 2 3 3 2 2
TUKANG 5 5 5 5 5 5 5 5 10 10 10 10 5 4 3 3 3 4
PEKERJA 9 9 9 9 9 9 9 9 19 19 19 19 9 8 5 5 5 6

TOTAL 29 29 29 30 30 30 30 30 45 45 45 46 31 28 25 25 24 26