You are on page 1of 21

POWER SYSTEM

ANALYSIS - I (EE-521)
Week 10
Presenter: Dr. Beenish Sultana
Day Ahead Market
Illustration of Price Matching and Market Splitting
REQUIREMENT OF CORRIDOR FROM DESPACTCH CENTER

Demand and Supply gap in two regions get balanced by unconstrained flow between
the two regions hence a common MCP (market clearing price) is derived.
Constraint Solution (Market Splitting)

Congestion was reported by NLDC from ER to SR corridor and


flow is constrained to 100MW. Due to flow constraint, system
will “Split” the market in to two regions i.e. Deficit (SR
Region) and Surplus region (ER Region),and will again run the
calculation chronology for both the regions separately
considering the flow constraint and will derive the ACP
(Area Clearing Price ) and ACV

Area Clearing Price (ACP) means the price of a time block electricity
contract established on the Power Exchange after considering all
valid purchase and sale bids in particular area(s) after market
splitting, i.e. dividing the market across constrained transmission
corridor(s)
Results after Market Splitting

You might also like