You are on page 1of 3

8/29/22, 4:31 PM WaterCAD

WaterCAD

1. For Water towers, Describe the difference between Base, Minimum, Initial, and Maximum
elevations.

2. What is the easiest way to create peak demand out of an average demand?

Mark only one oval.

input new demand for all meters

Copy and global Edit the average demand

Input demand for all nodes

Add new meters

https://docs.google.com/forms/d/1DGjS8Fl83mLNqIDP8G5uemgsrQhFSYuTCI9WODgP-Kc/edit 1/3
8/29/22, 4:31 PM WaterCAD

3. How can you avoid adding pipe lengths for all new pipes?

4. Describe the difference between Scenarios and Alternatives?

5. How can  Fire flow be limited to specific nodes?

Mark only one oval.

Select each one

Use a selection set

It can not be limited to specific nodes

https://docs.google.com/forms/d/1DGjS8Fl83mLNqIDP8G5uemgsrQhFSYuTCI9WODgP-Kc/edit 2/3
8/29/22, 4:31 PM WaterCAD

6.
Mark only one oval.

Option 1

This content is neither created nor endorsed by Google.

 Forms

https://docs.google.com/forms/d/1DGjS8Fl83mLNqIDP8G5uemgsrQhFSYuTCI9WODgP-Kc/edit 3/3

You might also like