Professional Documents
Culture Documents
The test is of 20 Marks and each questions has different marks. All the questions are
mandatory. Time is 1 Hour. The test will start sharp at 10:45 am and will end at 11:45 am.
If you will not submit within time, the test will end by itself and you will not get marks.
So, submit whatever you did in 1 hour time.
All MCQs holds different marks and marks are assigned on each question. Total marks- 20
marks - 5 question
You also need to submit the Excel File in support of your answer. Without Excel File your
answer will not be considered. (Solve 1 question in 1 sheet of same Excel File). Name your
Excel File as Your Name_Section_Rollnumber
Draft saved
The name and photo associated with your Google account will be recorded when you upload
files and submit this form. Only the email you enter is part of your response.
* Required
Email *
akjha.jgd@gmail.com
Name *
Roll Number *
21416
https://docs.google.com/forms/d/e/1FAIpQLSdGqZbVn-XbCVSNntfj64272e8Jg2wzxRLpobt_7fIO0rxSOg/viewform 1/7
11/10/22, 11:27 AM TQM-2022- Unit 2- 10/11/22
Section *
OPR A
OPR B
https://docs.google.com/forms/d/e/1FAIpQLSdGqZbVn-XbCVSNntfj64272e8Jg2wzxRLpobt_7fIO0rxSOg/viewform 2/7
11/10/22, 11:27 AM TQM-2022- Unit 2- 10/11/22
Process is not in control but process is not does not have special causes of
variations
https://docs.google.com/forms/d/e/1FAIpQLSdGqZbVn-XbCVSNntfj64272e8Jg2wzxRLpobt_7fIO0rxSOg/viewform 3/7
11/10/22, 11:27 AM TQM-2022- Unit 2- 10/11/22
Process is not in control but process is not does not have special causes of
variations
https://docs.google.com/forms/d/e/1FAIpQLSdGqZbVn-XbCVSNntfj64272e8Jg2wzxRLpobt_7fIO0rxSOg/viewform 4/7
11/10/22, 11:27 AM TQM-2022- Unit 2- 10/11/22
3. A
process that produces mobile phones is investigated. Ten samples of size *
100
are selected and the non-conforming units are given below in each sample.
Prepare an appropriate chart on Excel and answer:
https://docs.google.com/forms/d/e/1FAIpQLSdGqZbVn-XbCVSNntfj64272e8Jg2wzxRLpobt_7fIO0rxSOg/viewform 5/7
11/10/22, 11:27 AM TQM-2022- Unit 2- 10/11/22
4.
In
order to monitor flow rate, a new mechanism was investigated. The first ten *
lots produced as below. Prepare appropriate control charts on excel to
answer:
Process is in control
Process is unstable
Cannot be determined
0.1
0.3
0.5
0.8
https://docs.google.com/forms/d/e/1FAIpQLSdGqZbVn-XbCVSNntfj64272e8Jg2wzxRLpobt_7fIO0rxSOg/viewform 6/7
11/10/22, 11:27 AM TQM-2022- Unit 2- 10/11/22
Add file
This form was created inside of NDIM - New Delhi Institute of Management. Report Abuse
Forms
https://docs.google.com/forms/d/e/1FAIpQLSdGqZbVn-XbCVSNntfj64272e8Jg2wzxRLpobt_7fIO0rxSOg/viewform 7/7