wpd_quiz7
Section A 10 of 12 points
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 1/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 2/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
The time required for a product to move all the way through a process or a value 1/1
stream from start to finish is called:
Takt time
Cycle time
Lead time
Up time
Number of products made in a unit time (e.g. an hour or a day) is called: 1/1
Utilization
Flow rate
Productivity
Inventory turnover
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 3/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
Which of the following statements are true about the utilization of a resource 2/2
(labor or machine)? (2 best answers)
Section B 15 of 15 points
There are three tasks performed in a line with the following cycle times (processing times):
Task 1: 2 minutes;
Task 2: 4 minutes;
Task 3: 5 minutes.
The tasks are labor-intensive with one worker at each task.
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 4/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
How long does it take the process (in minutes) to produce 50 units starting with 3/3
an empty system?
550 minutes
256 minutes
261 minutes
211 minutes
200 minutes
If the wage rate is 100 rupees / hr for each worker, what is the cost of direct 3/3
labor in rupees / unit?
Rs. 30 / unit
Rs. 15 / unit
Rs. 25 / unit
Rs. 20 / unit
Rs. 35 / unit
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 5/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
If another (4th) worker is to be added to the line, to which task should he be 2/2
added?
Task 3
Task 1
Task 2
What will be the minimum manufacturing lead time (flow time) of the part in the 1/1
system?
2 minutes
4 minutes
5 minutes
11 minutes
What can we expect if each task produces at the pace of the bottleneck task i.e. 3/3
we want to avoid inventory between tasks? (3 best answers)
Section C 8 of 8 points
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 6/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
The Speedy Pizza Palace is revamping its order-processing and pizza-making procedures.
In order to deliver fresh pizza fast, six elements must be completed.
If the demand for pizzas is 120 per night (5:00 p.m. to 1:00 a.m.) during week 2/2
nights, what should be the cycle time, in minutes, to meet the demand?
3.75
3.5
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 7/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
What is the minimum number of workstations required to meet the demand? 2/2
If the demand increases to 200 pizzas on weekends, what will be the new 2/2
desired cycle time, in minutes, to meet the demand?
2.4
2.6
3.2
3.5
What is the minimum number of workstations required to meet the new 2/2
demand?
This content is neither created nor endorsed by Google. - Terms of Service - Privacy Policy
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 8/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
Forms
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&views… 9/10
10/09/2023, 18:30 WPD Quiz 7 on 09-Nov-2021
https://docs.google.com/forms/d/e/1FAIpQLScohPqBX803wTj-TaLpj3HHfS9MPbY4mSxrEARVtgMhyXyvbQ/viewscore?vc=0&c=0&w=1&flr=0&view… 10/10