Production Planning & Control Undergraduate Project
Production Planning & Control Undergraduate Project
Project (CO4)
1. Build an MRP model in excel for twelve periods using this sizing technique:
a) Lot-for-Lot
b) EOQ
c) PDQ
Each model shall be put in separate tab. The ability of the model to also calculate
for the total cost is highly valuable. The model will be tested for its viability using
this data:
Period 1 2 3 4 5 6 7 8 9 10 11 12
Gross 30 40 30 70 20 10 80 50
requirements
and
Period 1 2 3 4 5 6 7 8 9 10 11 12
Gross 35 40 10 25 10 45
requirements
4. Submission will be done in groups (1 for each group). The Excel file shall be
submitted in Kalam before 23rd June 2023.