BTD3323/BMM4823 PRODUCTION PLANNING AND CONTROL

Project (CO4)

1. Build an MRP model in excel for twelve periods using this sizing technique:
a) Lot-for-Lot
b) EOQ
c) PDQ

Each model shall be put in separate tab. The ability of the model to also calculate
for the total cost is highly valuable. The model will be tested for its viability using
this data:
Period 1 2 3 4 5 6 7 8 9 10 11 12
Gross 30 40 30 70 20 10 80 50
requirements

and

Period 1 2 3 4 5 6 7 8 9 10 11 12
Gross 35 40 10 25 10 45
requirements

Holding cost = RM2.50/unit/week


Setup cost = RM150
Lead time = 1 week
Beginning inventory = 40
Stockout cost = rm10

2. Grouping can be made here:


https://docs.google.com/spreadsheets/d/1D4hFAKtFh3FyX3dfjzE-qoni-
cNnreNc14guGnqw8SQ/edit?usp=sharing

3. Save the excel file name as: <Program><Group No>


Example: BTD G1

4. Submission will be done in groups (1 for each group). The Excel file shall be
submitted in Kalam before 23rd June 2023.