Tabel 6.

37 Kalibrasi Mock Tahun1999

Meteorologi Limited Evapotranspiration (mm/month) Water Surplus (mm) Run Off & Groundwater Storage Discharge
Bulan Curah Hari PET
Exposed DE/Ep = DE Ea = P-Ea SMC ISMS SMS SS WS Koef Infiltrasi Konst. Pf 0.5*(1+K)*In Ground Water Storage DGs Base Flow Direct Run Storm Total Run Total Observ X-Y (X-Y)2 (X-Xrata) (X-Xrata)2
Hujan Hujan Surface (m/20)(18- Ep - DE Infiltrasi Resesi Off Run Off Off Dischar asi
(m) n); (%) ge (X)
Bulan Hari mm Hari (mm/hri) (mm/bl) % % (mm/bl) (mm/bl) (mm/bl) (mm/bl) (mm/bl) (mm/bl) (mm/bl) mm If Ws x If K % Gsom K*Gsom GS BF DRO SRO TRO (m(Y/d)eti (m3/deti (m3/detik) (m3/detik)
3
(m3/detik) (m3/detik)
k) k)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Jan 31 411.74 16 3.20 99.1 26.27 2.19% 2.17 96.88 314.9 200 200 514.86 0.00 314.86 0.393 123.67 0.607 0.20 99.38 190.16 115.47 214.85 24.69 98.98 191.19 0 290.16 3.78 12.0 8.2 67.5 7.8 61.2
Feb 28 381.61 16 3.66 102.5 26.27 3.06% 3.14 99.33 282.3 200 200 482.27 0.00 282.27 0.393 110.87 0.607 0.20 89.10 214.85 130.46 219.56 4.71 106.16 171.40 0 277.56 4.01 10.0 6.0 35.9 5.8 33.9
Mar 31 323.18 17 3.52 109.2 26.27 0.88% 0.96 108.26 214.9 200 200 414.92 0.00 214.92 0.393 84.41 0.607 0.20 67.84 219.56 133.32 201.16 -18.40 102.81 130.50 0 233.32 3.04 0.2 -2.8 8.1 -4.0 15.8
Apr 30 268.39 14 3.90 116.9 26.27 4.82% 5.63 111.31 157.1 200 200 357.08 0.00 157.08 0.393 61.70 0.607 0.20 49.58 201.16 122.15 171.73 -29.43 91.13 95.38 0 186.51 2.51 5.0 2.5 6.2 0.8 0.7
May 31 236.04 14 3.58 111.0 26.27 5.69% 6.32 104.72 131.3 200 200 331.32 0.00 131.32 0.393 51.58 0.607 0.09 41.45 171.73 104.28 145.73 -26.00 77.58 79.74 0 157.32 2.05 6.2 4.1 17.2 2.0 4.1
Jun 30 125.14 10 3.49 104.7 28.90 11.56% 12.10 92.56 32.6 200 200 232.58 0.00 32.58 0.607 19.79 0.393 0.09 13.78 145.73 57.24 71.02 -74.71 94.50 12.80 12 118.80 1.60 0.2 -1.4 2.0 -4.0 15.8
Jul 31 97.94 8 3.71 115.1 28.90 13.97% 16.07 99.00 -1.1 199 200 198.93 -1.07 0.00 0.607 0.00 0.393 0.09 0.00 71.02 27.89 27.89 -43.12 43.12 0.00 9.00 52.12 0.68 4.8 4.1 17.0 0.6 0.4
Aug 31 69.52 7 4.57 141.8 28.90 15.89% 22.54 119.27 -49.7 149 199 149.19 -49.75 0.00 0.607 0.00 0.393 0.09 0.00 27.89 10.96 10.96 -16.94 16.94 0.00 6.39 23.33 0.30 0.2 -0.1 0.0 -4.0 15.8
Sep 30 202.81 14 3.78 113.5 28.90 5.30% 6.01 107.48 95.3 200 149 244.51 0.00 95.33 0.607 57.88 0.393 0.09 40.31 10.96 4.30 44.61 33.66 24.23 37.44 0 61.67 0.83 2.0 1.2 1.4 -2.2 4.7
Oct 31 267.62 18 3.37 104.5 28.90 -0.48% -0.50 104.96 162.7 200 200 362.66 0.00 162.66 0.607 98.77 0.393 0.09 68.78 44.61 17.52 86.31 41.69 57.08 63.89 0 120.97 1.58 0.5 -1.1 1.2 -3.7 13.5
Nov 30 333.34 18 3.28 98.5 28.90 -0.48% -0.47 98.98 234.4 200 200 434.37 0.00 234.37 0.607 142.31 0.393 0.20 99.11 86.31 33.90 133.00 46.70 95.62 92.05 0 187.67 2.53 3.0 0.5 0.2 -1.2 1
Dec 31 441.99 20 2.99 92.6 26.27 -3.06% -2.84 95.41 346.6 200 200 546.58 0.00 346.58 0.393 136.13 0.607 0.20 109.39 133.00 80.76 190.16 57.15 78.97 210.45 0 289.43 3.77 6.0 2.2 5.0 1.8 3
2
Rata = 4.18 Jumlah= 161.6 Jumlah= 170.7

196
197
198
Tabel 6.38 Mock dengan Kalibrasi Tahun1998
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi

1 Hujan Bulanan Rat a-Rat a (P); (mm) Dat a 396,06 300,54 261,79 243,78 201,24 174,77 145,67 120,43 199,39 281,08 348,26 417,93 257,58

2 Hari Hujan Rat a-Rat a (N); (hari) Dat a 22 17 15 16 12 11 11 8 13 18 19 25 15,52

3 Jumlah hari dalam sat u bulan (Hr); (hari) Dat a 31 28 31 30 31 30 31 31 30 31 30 31 365

4 Evapot ranspirasi (Ep); (mm/hari) Dat a 3,081 3,816 3,638 3,774 3,642 3,319 3,444 4,117 3,779 3,463 3,275 3,120 3,54

Evapot ranspirasi (Ep); (mm/bulan) Perhit ungan 95,52 106,85 112,77 113,23 112,89 99,57 106,76 127,62 113,38 107,35 98,24 96,71 107,57

II Limited Evapotranspiration (mm/month)

5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28

6 DE/Ep = (m/20)(18-n); (%) Perhit ungan -4,9% 1,6% 3,6% 3,3% 9,0% 10,1% 10,1% 14,1% 7,6% 0,0% -1,6% -9,2% 3,6%

7 DE (mm/mont h) = Ep *(m/20)*(18-n) Perhit ungan -4,70 1,75 4,07 3,72 10,19 10,07 10,80 17,98 8,60 0,00 -1,61 -8,89 4,33

8 Ea = Ep - DE Perhit ungan 100,22 105,10 108,70 109,51 102,70 89,50 95,96 109,64 104,78 107,35 99,85 105,60 103,24

III Water Surplus

9 P-Ea (Hujan Rat a-rat a -Ea) Perhit ungan 295,83 195,44 153,09 134,27 98,54 85,26 49,71 10,79 94,60 173,73 248,40 312,33 154,33

10 Soil Moist ure Capacit y (SMC); (mm/mont h) Asumsi 200 200 200 200 200 200 200 200 200 200 200 200 200

11 I SMS Asumsi 200 200 200 200 200 200 200 200 200 200 200 200 200

12 SMS = I SMS + (P-E a ); (mm) Perhit ungan 495,83 395,44 353,09 334,27 298,54 285,26 249,71 210,79 294,60 373,73 448,40 512,33 354,33

13 Soil St orage (SS); (mm) Asumsi 0 0 0 0 0 0 0 0 0 0 0 0 0,00

14 Wat er Surplus (WS) = (P-E a )+SS; (mm) Perhit ungan 295,83 195,44 153,09 134,27 98,54 85,26 49,71 10,79 94,60 173,73 248,40 312,33 154,33

IV Run Off & Groundwater Storage

15 Koef. I nfilt rasi (I f) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50

16 I nfilt rat ion (I n) = WS * I f Perhit ungan 116,196 76,764 60,130 52,739 59,835 51,775 30,186 6,551 57,446 105,493 97,566 122,673 69,78

17 Konst ant a Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50

18 Percent age Fact or (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15

19 0.5*(1+K)*I n Perhit ungan 93,38 61,69 48,32 42,38 41,67 36,06 21,02 4,56 40,00 73,46 78,41 98,58 53,29

GSom Asumsi 180,45 202,95 184,93 160,61 139,91 96,62 74,01 50,09 24,24 49,52 92,92 134,83 115,92

20 K* G Som Perhit ungan 109,58 123,24 112,29 97,53 54,95 37,95 29,07 19,67 9,52 19,45 56,42 81,87 62,63

21 Ground Wat er St orage (GS)= (0.5*(1+K)*I n)+(K*G som) Perhit ungan 202,95 184,93 160,61 139,91 96,62 74,01 50,09 24,24 49,52 92,92 134,83 180,45 115,92

22 DGS = Gs-Gsom (mm/mont h) Perhit ungan 22,50 -18,03 -24,31 -20,70 -43,29 -22,62 -23,92 -25,85 25,29 43,39 41,91 45,63 0,00

23 Base Flow (BF) = I n- DGS Perhit ungan 93,70 94,79 84,44 73,44 103,12 74,39 54,10 32,40 32,16 62,10 55,66 77,05 69,78

24 Direct Run Off (DRO)= WS - I n Perhit ungan 179,64 118,68 92,96 81,53 38,70 33,49 19,53 4,24 37,16 68,24 150,84 189,65 84,55

25 St orm Run Off (SRO); if P>=200, SRO =0. I f P < 200, SRO = PxPF Perhit ungan 0,00 0,00 0,00 0,00 0,00 16,06 13,39 11,07 18,32 0,00 0,00 0,00 4,90

26 Tot al run Off (TRO) = BF+DRO+SRO Perhit ungan 273,33 213,47 177,40 154,98 141,83 123,94 87,02 47,71 87,64 130,34 206,49 266,70 159,24

V Debit

2
27 Luas Cat chment Area (m ) Perhit ungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916

3
28 St ream Flow; Calculat ed Discharge (m /det ) Perhit ungan 3,56 3,08 2,31 2,09 1,85 1,67 1,13 0,62 1,18 1,70 2,78 3,48 2,12

199
Tabel 6.39 Mock dengan Kalibrasi Tahun 2000
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi

1 Hujan Bulanan Rat a-Rat a (P); (mm) Dat a 395,30 324,27 268,77 252,35 184,98 160,17 129,70 97,96 175,29 275,17 316,43 412,03 249,37

2 Hari Hujan Rat a-Rat a (N); (hari) Dat a 18 15 13 13 10 12 8 7 9 16 15 18 12,73

3 Jumlah hari dalam sat u bulan (Hr); (hari) Dat a 31 29 31 30 31 30 31 31 30 31 30 31 366

4 Evapot ranspirasi (Ep); (mm/hari) Dat a 2,960 3,568 3,767 3,811 3,747 3,278 3,636 4,286 3,859 3,352 3,281 3,123 3,56

Evapot ranspirasi (Ep); (mm/bulan) Perhit ungan 91,77 103,48 116,79 114,32 116,17 98,34 112,70 132,86 115,77 103,92 98,44 96,82 108,45

II Limited Evapotranspiration (mm/month)

5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28

6 DE/Ep = (m/20)(18-n); (%) Perhit ungan 0,0% 4,6% 7,2% 6,9% 11,6% 8,3% 14,1% 15,5% 13,4% 2,9% 4,3% 0,3% 7,4%

7 DE (mm/mont h) = Ep *(m/20)*(18-n) Perhit ungan 0,00 4,76 8,44 7,88 13,43 8,17 15,88 20,64 15,47 3,00 4,20 0,32 8,52

8 Ea = Ep - DE Perhit ungan 91,77 98,72 108,35 106,44 102,74 90,17 96,83 112,22 100,30 100,92 94,24 96,50 99,93

III Water Surplus

9 P-Ea (Hujan Rat a-rat a -Ea) Perhit ungan 303,53 225,55 160,42 145,91 82,24 70,01 32,88 -14,26 74,99 174,26 222,19 315,53 149,44

10 Soil Moist ure Capacit y (SMC); (mm/mont h) Asumsi 200 200 200 200 200 200 200 186 200 200 200 200 199

11 I SMS Asumsi 200 200 200 200 200 200 200 200 186 200 200 200 200

12 SMS = I SMS + (P-E a ); (mm) Perhit ungan 503,53 425,55 360,42 345,91 282,24 270,01 232,88 185,74 260,72 374,26 422,19 515,53 349,44

13 Soil St orage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -14,26 0 0 0 0 0,00

14 Wat er Surplus (WS) = (P-E a )+SS; (mm) Perhit ungan 303,53 225,55 160,42 145,91 82,24 70,01 32,88 0 74,99 174,26 222,19 315,53 164,32

IV Run Off & Groundwater Storage

15 Koef. I nfilt rasi (I f) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50

16 I nfilt rat ion (I n) = WS * I f Perhit ungan 119,219 88,591 63,010 57,310 49,941 42,511 19,965 0,000 45,535 105,813 87,271 123,932 66,92

17 Konst ant a Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50

18 Percent age Fact or (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15

19 0.5*(1+K)*I n Perhit ungan 95,81 71,19 50,64 46,06 34,78 29,60 13,90 0,00 31,71 73,69 70,13 99,59 51,42

GSom Asumsi 174,83 201,97 193,83 168,34 148,27 93,02 66,14 39,88 15,66 37,86 88,56 123,91 112,69

20 K* G Som Perhit ungan 106,16 122,64 117,70 102,22 58,24 36,53 25,98 15,66 6,15 14,87 53,78 75,24 61,26

21 Ground Wat er St orage (GS)= (0.5*(1+K)*I n)+(K*G som) Perhit ungan 201,97 193,83 168,34 148,27 93,02 66,14 39,88 15,66 37,86 88,56 123,91 174,83 112,69

22 DGS = Gs-Gsom (mm/mont h) Perhit ungan 27,14 -8,13 -25,50 -20,06 -55,26 -26,88 -26,26 -24,22 22,20 50,70 35,35 50,93 0,00

23 Base Flow (BF) = I n- DGS Perhit ungan 92,08 96,73 88,51 77,37 105,20 69,39 46,22 24,22 23,34 55,12 51,92 73,01 66,92

24 Direct Run Off (DRO)= WS - I n Perhit ungan 184,31 136,96 97,41 88,60 32,30 27,50 12,91 0,00 29,45 68,44 134,92 191,60 83,70

25 St orm Run Off (SRO); if P>=200, SRO =0. I f P < 200, SRO = PxPF Perhit ungan 0,00 0,00 0,00 0,00 17,00 14,72 11,92 9,00 16,11 0,00 0,00 0,00 5,73

26 Tot al run Off (TRO) = BF+DRO+SRO Perhit ungan 276,40 233,69 185,92 165,98 154,50 111,61 71,06 33,22 68,90 123,56 186,84 264,61 156,36

V Debit

2
27 Luas Cat chment Area (m ) Perhit ungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916

3
28 St ream Flow; Calculat ed Discharge (m /det ) Perhit ungan 3,60 3,26 2,42 2,24 2,01 1,50 0,93 0,43 0,93 1,61 2,52 3,45 2,07

200
Tabel 6.40 Mock dengan Kalibrasi Tahun 2001
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi

1 Hujan Bulanan Rat a-Rat a (P); (mm) Dat a 370,08 322,59 288,68 266,72 218,12 161,29 133,38 80,33 232,64 262,95 323,28 386,83 253,91

2 Hari Hujan Rat a-Rat a (N); (hari) Dat a 16 14 12 14 10 9 6 5 12 13 15 16 11,83

3 Jumlah hari dalam sat u bulan (Hr); (hari) Dat a 31 28 31 30 31 30 31 31 30 31 30 31 365

4 Evapot ranspirasi (Ep); (mm/hari) Dat a 3,096 3,690 3,676 3,773 3,638 3,323 3,629 4,520 3,607 3,465 3,201 3,138 3,56

Evapot ranspirasi (Ep); (mm/bulan) Perhit ungan 95,98 103,31 113,94 113,19 112,78 99,70 112,48 140,12 108,20 107,42 96,02 97,29 108,37

II Limited Evapotranspiration (mm/month)

5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 27,58

6 DE/Ep = (m/20)(18-n); (%) Perhit ungan 2,6% 4,8% 7,4% 5,7% 10,1% 13,5% 16,9% 19,3% 9,2% 7,7% 3,9% 2,6% 8,6%

7 DE (mm/mont h) = Ep *(m/20)*(18-n) Perhit ungan 2,52 4,98 8,48 6,44 11,36 13,44 18,96 26,99 9,90 8,28 3,70 2,56 9,80

8 Ea = Ep - DE Perhit ungan 93,46 98,34 105,46 106,75 101,42 86,25 93,52 113,12 98,30 99,14 92,32 94,74 98,57

III Water Surplus

9 P-Ea (Hujan Rat a-rat a -Ea) Perhit ungan 276,62 224,25 183,22 159,97 116,70 75,03 39,86 -32,80 134,34 163,80 230,96 292,09 155,34

10 Soil Moist ure Capacit y (SMC); (mm/mont h) Asumsi 200 200 200 200 200 200 200 167 200 200 200 200 197

11 I SMS Asumsi 200 200 200 200 200 200 200 200 167 200 200 200 200

12 SMS = I SMS + (P-E a ); (mm) Perhit ungan 476,62 424,25 383,22 359,97 316,70 275,03 239,86 167,20 301,54 363,80 430,96 492,09 355,34

13 Soil St orage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -32,80 0 0 0 0 0,00

14 Wat er Surplus (WS) = (P-E a )+SS; (mm) Perhit ungan 276,62 224,25 183,22 159,97 116,70 75,03 39,86 0 134,34 163,80 230,96 292,09 172,44

IV Run Off & Groundwater Storage

15 Koef. I nfilt rasi (I f) Kalibrasi 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,50

16 I nfilt rat ion (I n) = WS * I f Perhit ungan 108,649 88,081 71,962 62,833 45,837 45,562 24,201 0,000 81,575 99,466 140,247 114,726 73,59

17 Konst ant a Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,50

18 Percent age Fact or (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,15

19 0.5*(1+K)*I n Perhit ungan 87,31 70,78 57,83 50,49 36,84 31,73 16,85 0,00 56,81 69,27 97,67 92,20 55,65

GSom Asumsi 174,06 193,00 187,98 171,98 154,92 130,91 83,15 49,51 19,45 64,45 94,58 134,81 121,57

20 K* G Som Perhit ungan 105,69 117,20 114,15 104,43 94,07 51,42 32,66 19,45 7,64 25,31 37,15 81,86 65,92

21 Ground Wat er St orage (GS)= (0.5*(1+K)*I n)+(K*G som) Perhit ungan 193,00 187,98 171,98 154,92 130,91 83,15 49,51 19,45 64,45 94,58 134,81 174,06 121,57

22 DGS = Gs-Gsom (mm/mont h) Perhit ungan 18,95 -5,02 -16,00 -17,05 -24,01 -47,76 -33,64 -30,06 45,00 30,13 40,23 39,24 0,00

23 Base Flow (BF) = I n- DGS Perhit ungan 89,70 93,10 87,97 79,89 69,85 93,32 57,84 30,06 36,58 69,33 100,01 75,48 73,59

24 Direct Run Off (DRO)= WS - I n Perhit ungan 167,97 136,17 111,25 97,14 70,86 29,47 15,65 0,00 52,76 64,34 90,72 177,37 84,48

25 St orm Run Off (SRO); if P>=200, SRO =0. I f P < 200, SRO = PxPF Perhit ungan 0,00 0,00 0,00 0,00 0,00 14,82 12,26 7,38 0,00 0,00 0,00 0,00 2,87

26 Tot al run Off (TRO) = BF+DRO+SRO Perhit ungan 257,67 229,28 199,22 177,03 140,72 137,62 85,75 37,45 89,34 133,67 190,73 252,85 160,94

V Debit

27 Luas Cat chment Area (m2) Perhit ungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916

3
28 St ream Flow; Calculat ed Discharge (m /det ) Perhit ungan 3,36 3,31 2,60 2,38 1,83 1,85 1,12 0,49 1,20 1,74 2,57 3,30 2,15

201
Tabel 6.41 Mock dengan Kalibrasi Tahun 2002
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 389,47 344,03 311,38 277,15 220,12 182,86 138,35 96,67 176,42 258,64 314,19 419,34 260,72
2 Hari Hujan Rata-Rata (N); (hari) Data 17 15 13 12 11 8 8 6 10 15 16 18 12,25
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,073 3,687 3,468 3,727 3,701 3,343 3,727 4,479 3,846 3,426 3,305 3,070 3,57
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 95,25 103,23 107,50 111,81 114,74 100,28 115,53 138,86 115,38 106,22 99,15 95,18 108,59
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 27,58
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 1,3% 3,9% 6,9% 8,2% 9,9% 14,4% 14,8% 18,1% 11,9% 4,7% 2,9% -0,3% 8,1%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 1,25 4,07 7,41 9,18 11,30 14,49 17,11 25,08 13,75 4,99 2,87 -0,31 9,27
8 Ea = Ep - DE Perhitungan 94,00 99,16 100,08 102,63 103,43 85,79 98,42 113,78 101,63 101,23 96,29 95,49 99,33
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 295,47 244,87 211,30 174,52 116,68 97,07 39,93 -17,11 74,80 157,41 217,91 323,85 161,39
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 183 200 200 200 200 199
11 ISMS Asumsi 200 200 200 200 200 200 200 200 183 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 495,47 444,87 411,30 374,52 316,68 297,07 239,93 182,89 257,69 357,41 417,91 523,85 361,39
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -17,11 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 295,47 244,87 211,30 174,52 116,68 97,07 39,93 0 74,80 157,41 217,91 323,85 177,62
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 116,053 96,179 82,992 68,546 45,831 58,944 24,248 0,000 45,419 95,581 132,319 127,199 74,44
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 93,26 77,29 66,69 55,08 36,83 41,05 16,89 0,00 31,63 66,56 92,15 102,22 56,64
GSom Asumsi 177,80 201,23 199,48 187,82 169,14 139,53 95,85 54,53 21,42 40,04 82,29 124,47 124,47
20 K* G Som Perhitungan 107,96 122,19 121,13 114,05 102,70 54,81 37,65 21,42 8,41 15,73 32,32 75,58 67,83
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 201,23 199,48 187,82 169,14 139,53 95,85 54,53 21,42 40,04 82,29 124,47 177,80 124,47
22 DGS = Gs-Gsom (mm/month) Perhitungan 23,43 -1,75 -11,66 -18,69 -29,60 -43,68 -41,32 -33,11 18,62 42,25 42,18 53,33 0,00
23 Base Flow (BF) = In- DGS Perhitungan 92,63 97,92 94,65 87,23 75,43 102,63 65,57 33,11 26,80 53,33 90,14 73,87 74,44
24 Direct Run Off (DRO)= WS - In Perhitungan 179,42 148,69 128,31 105,97 70,85 38,13 15,68 0,00 29,38 61,82 85,59 196,65 88,37
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 16,81 12,72 8,88 16,21 0,00 0,00 0,00 4,55
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 272,04 246,62 222,95 193,21 146,29 157,56 93,97 42,00 72,39 115,16 175,73 270,52 167,37
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,55 3,56 2,91 2,60 1,91 2,12 1,22 0,55 0,97 1,50 2,37 3,53 2,23

202
Tabel 6.42 Mock dengan Kalibrasi Tahun 2003
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 448,70 401,62 344,43 308,60 267,71 238,17 146,92 95,70 208,21 280,18 374,38 460,82 297,95
2 Hari Hujan Rata-Rata (N); (hari) Data 19 17 15 14 12 11 9 7 12 14 17 18 13,67
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 2,971 3,498 3,440 3,624 3,490 3,119 3,468 4,378 3,792 3,438 3,168 2,979 3,45
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 92,10 97,94 106,65 108,73 108,19 93,58 107,50 135,71 113,76 106,59 95,04 92,34 104,84
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 27,58
6 DE/Ep = (m/20)(18-n); (%) Perhitungan -1,3% 2,0% 3,6% 5,6% 7,9% 9,8% 13,0% 15,9% 8,7% 6,5% 2,2% -0,3% 6,1%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan -1,21 1,93 3,85 6,07 8,53 9,13 13,98 21,57 9,86 6,93 2,06 -0,30 6,87
8 Ea = Ep - DE Perhitungan 93,31 96,01 102,80 102,66 99,66 84,46 93,52 114,14 103,90 99,66 92,98 92,64 97,98
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 355,39 305,62 241,63 205,94 168,05 153,72 53,40 -18,44 104,31 180,52 281,40 368,18 199,98
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 182 200 200 200 200 198
11 ISMS Asumsi 200 200 200 200 200 200 200 200 182 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 555,39 505,62 441,63 405,94 368,05 353,72 253,40 181,56 285,88 380,52 481,40 568,18 399,98
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -18,44 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 355,39 305,62 241,63 205,94 168,05 153,72 53,40 0 104,31 180,52 281,40 368,18 219,83
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 139,588 120,037 94,906 80,886 66,004 93,341 32,425 0,000 63,342 109,618 170,874 144,613 92,97
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 112,17 96,46 76,27 65,00 53,04 65,00 22,58 0,00 44,11 76,34 118,99 116,21 70,52
GSom Asumsi 211,89 240,84 242,71 223,65 200,81 174,98 133,73 75,11 29,50 55,70 98,21 157,57 153,72
20 K* G Som Perhitungan 128,67 146,25 147,38 135,81 121,94 68,73 52,52 29,50 11,59 21,88 38,58 95,68 83,21
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 240,84 242,71 223,65 200,81 174,98 133,73 75,11 29,50 55,70 98,21 157,57 211,89 153,72
22 DGS = Gs-Gsom (mm/month) Perhitungan 28,95 1,87 -19,06 -22,84 -25,83 -41,25 -58,62 -45,61 26,20 42,52 59,36 54,32 0,00
23 Base Flow (BF) = In- DGS Perhitungan 110,64 118,17 113,97 103,73 91,83 134,59 91,05 45,61 37,14 67,10 111,52 90,29 92,97
24 Direct Run Off (DRO)= WS - In Perhitungan 215,80 185,58 146,72 125,05 102,04 60,38 20,97 0,00 40,97 70,90 110,53 223,57 108,54
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 0,00 13,50 8,80 0,00 0,00 0,00 0,00 1,86
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 326,44 303,75 260,69 228,78 193,88 194,97 125,52 54,40 78,12 138,01 222,04 313,86 203,37
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 4,25 4,38 3,40 3,08 2,53 2,63 1,64 0,71 1,05 1,80 2,99 4,09 2,71

203
Tabel 6.43 Mock dengan Kalibrasi Tahun 2004
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 371,57 334,91 287,53 240,40 214,27 166,87 129,74 70,61 175,50 245,95 331,44 390,75 246,63
2 Hari Hujan Rata-Rata (N); (hari) Data 16 14 13 12 11 9 8 4 9 11 14 17 11,19
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 29 31 30 31 30 31 31 30 31 30 31 366
4 Evapotranspirasi (Ep); (mm/hari) Data 3,229 3,644 3,641 3,913 3,788 3,386 3,640 4,574 3,965 3,602 3,351 3,218 3,66
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 100,08 105,68 112,88 117,39 117,43 101,57 112,84 141,79 118,95 111,66 100,53 99,74 111,71
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,0% 5,9% 7,2% 8,5% 10,8% 13,7% 14,4% 20,2% 13,0% 10,8% 5,3% 2,0% 9,6%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 2,96 6,25 8,15 10,02 12,73 13,94 16,30 28,68 15,47 12,10 5,28 1,97 11,15
8 Ea = Ep - DE Perhitungan 97,13 99,44 104,72 107,37 104,71 87,63 96,54 113,11 103,48 99,56 95,25 97,78 100,56
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 274,44 235,47 182,81 133,03 109,56 79,24 33,21 -42,50 72,02 146,39 236,19 292,97 146,07
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 158 200 200 200 200 196
11 ISMS Asumsi 200 200 200 200 200 200 200 200 158 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 474,44 435,47 382,81 333,03 309,56 279,24 233,21 157,50 229,52 346,39 436,19 492,97 346,07
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -42,50 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 274,44 235,47 182,81 133,03 109,56 79,24 33,21 0 72,02 146,39 236,19 292,97 163,21
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 107,793 92,488 71,802 52,249 66,528 48,119 20,163 0,000 43,730 88,891 92,769 115,070 66,63
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 86,62 74,32 57,70 41,99 46,33 33,51 14,04 0,00 30,45 61,90 74,55 92,47 51,16
GSom Asumsi 165,94 187,39 188,11 171,93 146,39 103,83 74,29 43,22 16,98 37,12 76,48 120,99 111,06
20 K* G Som Perhitungan 100,76 113,79 114,23 104,40 57,50 40,78 29,18 16,98 6,67 14,58 46,44 73,47 59,90
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 187,39 188,11 171,93 146,39 103,83 74,29 43,22 16,98 37,12 76,48 120,99 165,94 111,06
22 DGS = Gs-Gsom (mm/month) Perhitungan 21,45 0,72 -16,18 -25,54 -42,56 -29,54 -31,07 -26,24 20,14 39,36 44,51 44,95 0,00
23 Base Flow (BF) = In- DGS Perhitungan 86,35 91,76 87,99 77,79 109,09 77,66 51,23 26,24 23,58 49,53 48,26 70,12 66,63
24 Direct Run Off (DRO)= WS - In Perhitungan 166,65 142,99 111,01 80,78 43,03 31,12 13,04 0,00 28,29 57,50 143,42 177,90 82,98
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 15,34 11,92 6,49 16,13 0,00 0,00 0,00 4,16
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 253,00 234,75 198,99 158,57 152,12 124,12 76,20 32,73 68,00 107,03 191,68 248,02 153,77
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,30 3,27 2,59 2,14 1,98 1,67 0,99 0,43 0,92 1,39 2,58 3,23 2,04

204
Tabel 6.44 Mock dengan Kalibrasi Tahun 2005
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 376,95 332,68 309,65 282,77 253,92 230,08 165,55 84,19 220,47 305,74 340,45 394,86 274,77
2 Hari Hujan Rata-Rata (N); (hari) Data 14 13 12 10 9 8 9 6 9 13 14 17 10,98
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,162 3,754 3,872 3,802 3,591 3,160 3,571 4,593 3,860 3,405 3,260 3,142 3,60
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 98,02 105,10 120,03 114,05 111,33 94,81 110,70 142,39 115,79 105,54 97,81 97,40 109,42
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 5,6% 6,6% 8,5% 10,2% 13,7% 14,1% 13,7% 18,1% 12,6% 7,9% 4,9% 2,0% 9,8%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 5,47 6,90 10,25 11,61 15,28 13,36 15,19 25,72 14,64 8,39 4,82 1,92 11,13
8 Ea = Ep - DE Perhitungan 92,55 98,20 109,78 102,44 96,05 81,46 95,51 116,68 101,16 97,16 93,00 95,48 98,29
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 284,41 234,48 199,87 180,33 157,87 148,62 70,04 -32,49 119,31 208,59 247,45 299,38 176,49
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 168 200 200 200 200 197
11 ISMS Asumsi 200 200 200 200 200 200 200 200 168 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 484,41 434,48 399,87 380,33 357,87 348,62 270,04 167,51 286,82 408,59 447,45 499,38 376,49
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -32,49 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 284,41 234,48 199,87 180,33 157,87 148,62 70,04 0 119,31 208,59 247,45 299,38 195,49
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 111,708 92,099 78,503 70,829 95,862 90,245 42,530 0,000 72,448 126,659 97,192 117,586 82,97
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 89,77 74,01 63,09 56,92 66,76 62,85 29,62 0,00 50,45 88,20 78,10 94,49 62,86
GSom Asumsi 183,42 201,15 196,15 182,20 167,55 132,57 114,91 74,75 29,36 61,98 112,55 146,45 133,59
20 K* G Som Perhitungan 111,38 122,14 119,11 110,64 65,81 52,07 45,14 29,36 11,53 24,35 68,34 88,93 70,73
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 201,15 196,15 182,20 167,55 132,57 114,91 74,75 29,36 61,98 112,55 146,45 183,42 133,59
22 DGS = Gs-Gsom (mm/month) Perhitungan 17,73 -4,99 -13,96 -14,64 -34,99 -17,65 -40,16 -45,39 32,62 50,57 33,90 36,97 0,00
23 Base Flow (BF) = In- DGS Perhitungan 93,98 97,09 92,46 85,47 130,85 107,90 82,69 45,39 39,82 76,09 63,29 80,61 82,97
24 Direct Run Off (DRO)= WS - In Perhitungan 172,70 142,39 121,37 109,50 62,01 58,37 27,51 0,00 46,86 81,93 150,26 181,79 96,22
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 0,00 15,21 7,74 0,00 0,00 0,00 0,00 1,91
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 266,68 239,48 213,83 194,97 192,86 166,27 125,42 53,13 86,69 158,02 213,55 262,40 181,11
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,48 3,46 2,79 2,63 2,51 2,24 1,63 0,69 1,17 2,06 2,88 3,42 2,41

205
Tabel 6.45 Mock dengan Kalibrasi Tahun 2006
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 340,98 313,94 280,22 244,16 215,55 189,82 136,98 93,87 221,12 246,43 279,24 356,30 243,22
2 Hari Hujan Rata-Rata (N); (hari) Data 15 12 11 10 9 8 6 6 9 13 14 18 10,81
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,280 3,846 3,692 3,943 3,695 3,334 3,622 4,433 3,803 3,516 3,463 3,230 3,65
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 101,69 107,69 114,46 118,28 114,54 100,01 112,30 137,41 114,10 109,01 103,90 100,12 111,13
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,9% 7,6% 9,5% 10,8% 13,0% 14,4% 17,0% 18,1% 13,0% 7,9% 4,9% 0,7% 10,1%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 4,01 8,13 10,90 12,82 14,89 14,45 19,06 24,82 14,84 8,66 5,12 0,66 11,53
8 Ea = Ep - DE Perhitungan 97,69 99,56 103,56 105,46 99,64 85,56 93,23 112,60 99,26 100,34 98,78 99,46 99,60
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 243,29 214,38 176,65 138,70 115,91 104,26 43,75 -18,73 121,86 146,08 180,46 256,84 143,62
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 181 200 200 200 200 198
11 ISMS Asumsi 200 200 200 200 200 200 200 200 181 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 443,29 414,38 376,65 338,70 315,91 304,26 243,75 181,27 303,13 346,08 380,46 456,84 343,62
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -18,73 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 243,29 214,38 176,65 138,70 115,91 104,26 43,75 0 121,86 146,08 180,46 256,84 158,38
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 95,559 84,202 69,385 54,477 70,382 63,307 26,568 0,000 73,994 88,706 70,878 100,880 66,53
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 76,79 67,67 55,76 43,78 49,01 44,09 18,50 0,00 51,53 61,77 56,96 81,07 50,58
GSom Asumsi 147,05 166,09 168,52 158,09 139,77 103,91 84,90 51,85 20,36 59,53 85,15 108,67 107,82
20 K* G Som Perhitungan 89,30 100,85 102,33 96,00 54,90 40,81 33,35 20,36 8,00 23,38 51,71 65,99 57,25
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 166,09 168,52 158,09 139,77 103,91 84,90 51,85 20,36 59,53 85,15 108,67 147,05 107,82
22 DGS = Gs-Gsom (mm/month) Perhitungan 19,03 2,43 -10,43 -18,31 -35,86 -19,01 -33,05 -31,48 39,16 25,63 23,51 38,39 0,00
23 Base Flow (BF) = In- DGS Perhitungan 76,53 81,77 79,82 72,79 106,24 82,32 59,62 31,48 34,83 63,08 47,37 62,49 66,53
24 Direct Run Off (DRO)= WS - In Perhitungan 147,73 130,18 107,27 84,22 45,53 40,95 17,18 0,00 47,86 57,38 109,58 155,96 78,65
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 17,45 12,59 8,63 0,00 0,00 0,00 0,00 3,22
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 224,26 211,95 187,09 157,01 151,77 140,71 89,39 40,11 82,69 120,46 156,94 218,45 148,40
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 2,92 3,06 2,44 2,11 1,98 1,90 1,17 0,52 1,11 1,57 2,11 2,85 1,98

206
Tabel 6.46 Mock dengan Kalibrasi Tahun 2007
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 379,04 314,83 253,75 228,24 207,36 189,71 149,85 120,42 210,51 266,82 322,69 410,15 254,45
2 Hari Hujan Rata-Rata (N); (hari) Data 14 12 11 9 8 8 6 6 9 9 13 17 10,17
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,058 3,772 4,082 3,951 3,712 3,166 3,490 4,217 3,691 3,384 3,230 3,035 3,57
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 94,81 105,61 126,55 118,52 115,08 94,99 108,20 130,72 110,73 104,90 96,90 94,07 108,42
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 4,9% 7,9% 9,2% 11,5% 14,4% 15,2% 17,0% 17,7% 13,4% 12,6% 6,2% 1,6% 11,0%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 4,67 8,32 11,64 13,62 16,63 14,41 18,37 23,14 14,80 13,26 6,05 1,54 12,20
8 Ea = Ep - DE Perhitungan 90,14 97,28 114,91 104,90 98,45 80,58 89,83 107,58 95,93 91,64 90,85 92,53 96,22
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 288,90 217,55 138,84 123,34 108,91 109,13 60,02 12,83 114,57 175,18 231,84 317,62 158,23
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 200 200 200 200 200 200
11 ISMS Asumsi 200 200 200 200 200 200 200 200 200 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 488,90 417,55 338,84 323,34 308,91 309,13 260,02 212,83 314,57 375,18 431,84 517,62 358,23
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 0 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 288,90 217,55 138,84 123,34 108,91 109,13 60,02 12,83 114,57 175,18 231,84 317,62 158,23
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 113,472 85,446 54,531 48,446 66,133 66,268 36,444 7,793 69,572 106,376 91,059 124,754 72,52
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 91,19 68,67 43,82 38,93 46,05 46,15 25,38 5,43 48,45 74,08 73,18 100,25 55,13
GSom Asumsi 180,64 200,88 190,65 159,59 135,84 99,41 85,19 58,84 28,54 59,66 97,51 132,39 119,09
20 K* G Som Perhitungan 109,69 121,98 115,77 96,91 53,35 39,04 33,46 23,11 11,21 23,43 59,21 80,39 63,96
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 200,88 190,65 159,59 135,84 99,41 85,19 58,84 28,54 59,66 97,51 132,39 180,64 119,09
22 DGS = Gs-Gsom (mm/month) Perhitungan 20,24 -10,23 -31,06 -23,75 -36,43 -14,22 -26,35 -30,30 31,12 37,85 34,88 48,26 0,00
23 Base Flow (BF) = In- DGS Perhitungan 93,24 95,68 85,59 72,20 102,56 80,48 62,80 38,10 38,45 68,52 56,18 76,50 72,52
24 Direct Run Off (DRO)= WS - In Perhitungan 175,43 132,10 84,31 74,90 42,78 42,86 23,57 5,04 45,00 68,81 140,78 192,87 85,70
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 17,44 13,77 11,07 0,00 0,00 0,00 0,00 3,52
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 268,66 227,78 169,89 147,09 145,34 140,78 100,14 54,20 83,45 137,33 196,96 269,37 161,75
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,50 3,29 2,21 1,98 1,89 1,90 1,31 0,71 1,12 1,79 2,65 3,51 2,16

207
Tabel 6.47 Mock dengan Kalibrasi Tahun 2008
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 367,93 348,81 328,22 273,51 228,43 170,16 137,95 82,46 179,48 235,84 326,51 395,80 256,26
2 Hari Hujan Rata-Rata (N); (hari) Data 14 13 11 10 9 8 7 5 8 11 12 14 10,08
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 29 31 30 31 30 31 31 30 31 30 31 366
4 Evapotranspirasi (Ep); (mm/hari) Data 3,129 3,512 3,485 3,729 3,559 3,257 3,581 4,582 3,813 3,602 3,200 3,155 3,55
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 97,01 101,84 108,02 111,87 110,34 97,72 111,02 142,03 114,39 111,67 96,00 97,81 108,31
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 27,58
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 4,9% 6,9% 8,9% 10,5% 11,8% 14,8% 16,6% 19,5% 14,4% 10,8% 8,3% 4,9% 11,0%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 4,78 7,02 9,58 11,76 13,04 14,47 18,45 27,70 16,53 12,10 7,98 4,82 12,35
8 Ea = Ep - DE Perhitungan 92,23 94,81 98,45 100,12 97,30 83,25 92,57 114,33 97,86 99,56 88,02 92,99 95,96
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 275,70 253,99 229,77 173,40 131,13 86,91 45,37 -31,87 81,62 136,27 238,49 302,81 160,30
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 168 200 200 200 200 197
11 ISMS Asumsi 200 200 200 200 200 200 200 200 168 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 475,70 453,99 429,77 373,40 331,13 286,91 245,37 168,13 249,75 336,27 438,49 502,81 360,30
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -31,87 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 275,70 253,99 229,77 173,40 131,13 86,91 45,37 0 81,62 136,27 238,49 302,81 177,77
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 108,289 99,761 90,248 68,105 51,504 52,775 27,551 0,000 49,561 82,749 144,818 118,934 74,52
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 87,02 80,17 72,52 54,73 41,39 36,75 19,19 0,00 34,51 57,63 100,85 95,58 56,69
GSom Asumsi 174,60 193,05 197,39 192,39 171,55 145,56 93,92 56,08 22,03 43,16 74,58 130,14 124,54
20 K* G Som Perhitungan 106,02 117,22 119,86 116,82 104,17 57,17 36,89 22,03 8,65 16,95 29,29 79,03 67,84
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 193,05 197,39 192,39 171,55 145,56 93,92 56,08 22,03 43,16 74,58 130,14 174,60 124,54
22 DGS = Gs-Gsom (mm/month) Perhitungan 18,44 4,35 -5,01 -20,83 -25,99 -51,64 -37,85 -34,05 21,14 31,41 55,56 44,46 0,00
23 Base Flow (BF) = In- DGS Perhitungan 89,85 95,41 95,25 88,94 77,50 104,41 65,40 34,05 28,42 51,33 89,26 74,47 74,52
24 Direct Run Off (DRO)= WS - In Perhitungan 167,41 154,23 139,52 105,29 79,62 34,14 17,82 0,00 32,06 53,52 93,67 183,87 88,43
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 15,64 12,68 7,58 16,50 0,00 0,00 0,00 4,37
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 257,26 249,64 234,78 194,23 157,12 154,19 95,90 41,63 76,97 104,86 182,93 258,34 167,32
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,35 3,48 3,06 2,62 2,05 2,08 1,25 0,54 1,04 1,37 2,46 3,37 2,22

208
Tabel 6.48 Mock dengan Kalibrasi Tahun 2009
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 380,17 337,95 282,61 250,21 204,15 150,49 118,80 48,89 217,13 269,23 337,23 380,61 248,12
2 Hari Hujan Rata-Rata (N); (hari) Data 12 11 10 9 8 6 5 3 8 11 12 14 8,90
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,087 3,754 3,591 3,882 3,748 3,378 3,864 4,887 3,823 3,466 3,302 3,231 3,67
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 95,68 105,11 111,32 116,46 116,20 101,35 119,78 151,49 114,70 107,44 99,07 100,15 111,56
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 7,6% 9,2% 10,8% 12,1% 15,2% 18,1% 19,5% 21,7% 14,1% 10,8% 7,6% 5,9% 12,7%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 7,23 9,66 12,06 14,15 17,63 18,30 23,36 32,83 16,16 11,64 7,48 5,92 14,70
8 Ea = Ep - DE Perhitungan 88,46 95,44 99,26 102,31 98,57 83,04 96,42 118,66 98,55 95,79 91,59 94,23 96,86
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 291,72 242,51 183,35 147,90 105,59 67,44 22,38 -69,77 118,58 173,44 245,64 286,38 151,26
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 130 200 200 200 200 194
11 ISMS Asumsi 200 200 200 200 200 200 200 200 130 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 491,72 442,51 383,35 347,90 305,59 267,44 222,38 130,23 248,81 373,44 445,64 486,38 351,26
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -69,77 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 291,72 242,51 183,35 147,90 105,59 67,44 22,38 0 118,58 173,44 245,64 286,38 171,36
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 114,578 95,252 72,016 58,090 64,116 40,954 13,589 0,000 72,007 105,317 96,480 112,482 70,41
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 92,08 76,55 57,87 46,68 44,65 28,52 9,46 0,00 50,14 73,34 77,53 90,39 53,93
GSom Asumsi 172,60 196,88 196,10 176,95 154,13 105,19 69,83 36,89 14,49 55,84 95,27 135,38 117,46
20 K* G Som Perhitungan 104,81 119,55 119,08 107,45 60,54 41,31 27,43 14,49 5,69 21,93 57,85 82,21 63,53
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 196,88 196,10 176,95 154,13 105,19 69,83 36,89 14,49 55,84 95,27 135,38 172,60 117,46
22 DGS = Gs-Gsom (mm/month) Perhitungan 24,28 -0,79 -19,15 -22,82 -48,94 -35,35 -32,94 -22,40 41,35 39,44 40,11 37,22 0,00
23 Base Flow (BF) = In- DGS Perhitungan 90,29 96,04 91,17 80,91 113,06 76,31 46,53 22,40 30,66 65,88 56,37 75,27 70,41
24 Direct Run Off (DRO)= WS - In Perhitungan 177,14 147,26 111,34 89,81 41,47 26,49 8,79 0,00 46,58 68,12 149,16 173,90 86,67
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 13,83 10,92 4,49 0,00 0,00 0,00 0,00 2,44
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 267,43 243,30 202,50 170,72 154,53 116,63 66,24 26,90 77,24 134,00 205,53 249,16 159,51
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,49 3,51 2,64 2,30 2,01 1,57 0,86 0,35 1,04 1,75 2,77 3,25 2,13

209
Tabel 6.49 Mock dengan Kalibrasi Tahun 2010
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 383,33 339,30 268,58 231,38 205,54 162,47 110,96 72,47 180,70 293,88 344,63 401,59 249,57
2 Hari Hujan Rata-Rata (N); (hari) Data 14 12 11 10 9 7 6 5 10 12 14 17 10,42
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,010 3,659 3,678 3,829 3,631 3,272 3,629 4,503 3,832 3,412 3,240 3,117 3,57
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 93,32 102,45 114,02 114,87 112,56 98,17 112,49 139,61 114,97 105,78 97,19 96,61 108,50
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 4,9% 8,5% 9,9% 10,8% 13,4% 16,6% 17,3% 19,1% 11,9% 8,3% 5,6% 1,0% 10,6%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 4,60 8,75 11,23 12,45 15,04 16,31 19,50 26,73 13,70 8,79 5,43 0,95 11,96
8 Ea = Ep - DE Perhitungan 88,73 93,70 102,79 102,42 97,51 81,86 92,98 112,88 101,26 96,99 91,77 95,66 96,55
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 294,61 245,60 165,79 128,96 108,03 80,61 17,98 -40,41 79,43 196,89 252,86 305,93 153,02
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 160 200 200 200 200 197
11 ISMS Asumsi 200 200 200 200 200 200 200 200 160 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 494,61 445,60 365,79 328,96 308,03 280,61 217,98 159,59 239,02 396,89 452,86 505,93 353,02
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -40,41 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 294,61 245,60 165,79 128,96 108,03 80,61 17,98 0 79,43 196,89 252,86 305,93 170,61
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 115,713 96,463 65,119 50,650 65,596 48,949 10,918 0,000 48,235 119,557 99,318 120,162 70,06
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 92,99 77,52 52,33 40,70 45,68 34,09 7,60 0,00 33,59 83,26 79,81 96,56 53,68
GSom Asumsi 181,42 203,15 200,88 174,31 146,55 103,24 74,64 36,92 14,50 39,29 98,69 139,74 117,78
20 K* G Som Perhitungan 110,16 123,36 121,98 105,85 57,56 40,55 29,32 14,50 5,70 15,43 59,93 84,85 64,10
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 203,15 200,88 174,31 146,55 103,24 74,64 36,92 14,50 39,29 98,69 139,74 181,42 117,78
22 DGS = Gs-Gsom (mm/month) Perhitungan 21,73 -2,27 -26,57 -27,76 -43,31 -28,60 -37,72 -22,42 24,78 59,40 41,05 41,68 0,00
23 Base Flow (BF) = In- DGS Perhitungan 93,98 98,74 91,69 78,41 108,90 77,55 48,64 22,42 23,45 60,15 58,27 78,48 70,06
24 Direct Run Off (DRO)= WS - In Perhitungan 178,89 149,13 100,67 78,31 42,43 31,66 7,06 0,00 31,20 77,33 153,55 185,77 86,33
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 14,93 10,20 6,66 16,61 0,00 0,00 0,00 4,03
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 272,87 247,87 192,36 156,72 151,33 124,15 65,90 29,08 71,26 137,49 211,81 264,25 160,42
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,56 3,58 2,51 2,11 1,97 1,67 0,86 0,38 0,96 1,79 2,85 3,44 2,14

210
Tabel 6.50 Mock dengan Kalibrasi Tahun 2011
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 318,43 297,46 260,83 210,65 181,46 122,35 83,33 56,90 174,47 252,06 301,80 350,60 217,53
2 Hari Hujan Rata-Rata (N); (hari) Data 12 11 9 7 6 5 4 4 8 10 12 16 8,54
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,269 3,805 3,734 3,983 3,862 3,615 3,807 4,674 4,087 3,552 3,356 3,265 3,75
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 101,33 106,53 115,74 119,49 119,72 108,46 118,02 144,91 122,61 110,12 100,69 101,23 114,07
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 7,6% 9,9% 11,5% 14,4% 18,1% 19,1% 21,0% 20,6% 14,1% 11,6% 7,6% 3,3% 13,2%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 7,65 10,49 13,30 17,26 21,62 20,76 24,73 29,84 17,27 12,73 7,60 3,32 15,55
8 Ea = Ep - DE Perhitungan 93,68 96,04 102,44 102,23 98,10 87,69 93,30 115,07 105,33 97,39 93,09 97,90 98,52
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 224,75 201,42 158,39 108,43 83,36 34,66 -9,96 -58,17 69,14 154,67 208,71 252,70 119,01
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 190 132 200 200 200 200 193
11 ISMS Asumsi 200 200 200 200 200 200 200 190 132 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 424,75 401,42 358,39 308,43 283,36 234,66 190,04 131,87 201,01 354,67 408,71 452,70 319,01
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -9,96 -58,17 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 224,75 201,42 158,39 108,43 83,36 34,66 0 0 69,14 154,67 208,71 252,70 149,62
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 88,274 79,113 62,210 42,587 50,620 21,047 0,000 0,000 41,982 93,919 81,977 99,252 55,08
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 70,94 63,58 49,99 34,22 35,25 14,66 0,00 0,00 29,24 65,40 65,88 79,76 42,41
GSom Asumsi 148,53 161,13 161,42 148,01 124,10 83,99 47,65 18,71 7,35 32,12 78,02 113,25 93,69
20 K* G Som Perhitungan 90,19 97,84 98,02 89,88 48,74 32,99 18,71 7,35 2,89 12,62 47,38 68,77 51,28
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 161,13 161,42 148,01 124,10 83,99 47,65 18,71 7,35 32,12 78,02 113,25 148,53 93,69
22 DGS = Gs-Gsom (mm/month) Perhitungan 12,60 0,29 -13,41 -23,91 -40,11 -36,35 -28,93 -11,36 24,77 45,90 35,23 35,28 0,00
23 Base Flow (BF) = In- DGS Perhitungan 75,67 78,82 75,62 66,50 90,73 57,39 28,93 11,36 17,21 48,02 46,74 63,97 55,08
24 Direct Run Off (DRO)= WS - In Perhitungan 136,47 122,31 96,18 65,84 32,74 13,61 0,00 0,00 27,16 60,75 126,74 153,44 69,60
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 16,68 11,24 7,66 5,23 16,03 0,00 0,00 0,00 4,74
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 212,15 201,13 171,79 132,34 140,15 82,25 36,59 16,59 60,40 108,77 173,48 217,42 129,42
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 2,76 2,90 2,24 1,78 1,83 1,11 0,48 0,22 0,81 1,42 2,34 2,83 1,73

211
Tabel 6.51 Mock dengan Kalibrasi Tahun 2012
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 340,66 308,29 269,43 198,75 151,43 119,13 93,66 45,05 150,27 224,72 311,67 380,55 216,13
2 Hari Hujan Rata-Rata (N); (hari) Data 15 13 11 10 8 6 5 4 8 11 13 18 10,04
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 29 31 30 31 30 31 31 30 31 30 31 366
4 Evapotranspirasi (Ep); (mm/hari) Data 3,144 3,668 3,718 3,988 3,939 3,536 3,705 4,630 3,903 3,487 3,255 3,218 3,68
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 97,48 106,37 115,27 119,63 122,10 106,07 114,87 143,52 117,10 108,10 97,66 99,77 112,33
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 4,6% 6,9% 9,2% 10,8% 14,4% 17,0% 18,4% 21,0% 14,8% 10,1% 6,2% 0,7% 11,2%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 4,48 7,33 10,60 12,96 17,64 18,01 21,16 30,07 17,34 10,93 6,09 0,66 13,11
8 Ea = Ep - DE Perhitungan 93,00 99,03 104,67 106,67 104,46 88,07 93,71 113,46 99,76 97,17 91,56 99,11 99,22
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 247,66 209,25 164,76 92,08 46,97 31,06 -0,05 -68,41 50,51 127,55 220,11 281,44 116,91
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 132 200 200 200 200 194
11 ISMS Asumsi 200 200 200 200 200 200 200 200 132 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 447,66 409,25 364,76 292,08 246,97 231,06 199,95 131,54 182,06 327,55 420,11 481,44 316,91
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -0,05 -68,41 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 247,66 209,25 164,76 92,08 46,97 31,06 0 0 50,51 127,55 220,11 281,44 147,14
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 97,275 82,189 64,712 36,165 28,520 18,863 0,000 0,000 30,674 77,454 86,453 110,543 52,74
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 78,17 66,05 52,00 29,06 19,86 13,14 0,00 0,00 21,36 53,94 69,47 88,83 40,99
GSom Asumsi 154,35 171,90 170,43 155,49 123,48 68,36 39,99 15,71 6,17 23,78 63,28 107,90 91,74
20 K* G Som Perhitungan 93,73 104,38 103,49 94,42 48,50 26,85 15,71 6,17 2,42 9,34 38,42 65,52 50,75
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 171,90 170,43 155,49 123,48 68,36 39,99 15,71 6,17 23,78 63,28 107,90 154,35 91,74
22 DGS = Gs-Gsom (mm/month) Perhitungan 17,55 -1,47 -14,94 -32,01 -55,12 -28,38 -24,28 -9,54 17,62 39,50 44,62 46,45 0,00
23 Base Flow (BF) = In- DGS Perhitungan 79,73 83,66 79,65 68,18 83,64 47,24 24,28 9,54 13,06 37,96 41,83 64,09 52,74
24 Direct Run Off (DRO)= WS - In Perhitungan 150,39 127,06 100,05 55,91 18,45 12,20 0,00 0,00 19,84 50,10 133,66 170,90 69,88
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 18,27 13,92 10,95 8,61 4,14 13,81 0,00 0,00 0,00 5,81
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 230,12 210,72 179,69 142,35 116,01 70,39 32,89 13,68 46,71 88,06 175,49 234,99 128,42
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,00 2,94 2,34 1,92 1,51 0,95 0,43 0,18 0,63 1,15 2,36 3,06 1,71

212
Tabel 6.52 Mock dengan Kalibrasi Tahun 2013
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 343,03 318,44 276,44 257,37 221,09 190,47 147,01 44,85 139,66 251,51 305,20 352,89 237,33
2 Hari Hujan Rata-Rata (N); (hari) Data 14 12 11 9 8 7 6 3 7 12 15 18 10,31
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,139 3,748 3,696 3,857 3,679 3,518 3,486 4,770 3,988 3,536 3,311 3,146 3,66
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 97,32 104,95 114,58 115,71 114,06 105,53 108,05 147,88 119,63 109,62 99,33 97,53 111,18
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 27,58
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 4,8% 7,4% 9,6% 11,4% 12,7% 15,9% 16,9% 21,2% 15,4% 8,2% 4,8% 0,4% 10,7%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 4,69 7,81 11,04 13,17 14,48 16,77 18,21 31,34 18,44 8,98 4,78 0,43 12,51
8 Ea = Ep - DE Perhitungan 92,64 97,14 103,54 102,54 99,57 88,75 89,84 116,54 101,19 100,65 94,54 97,10 98,67
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 250,40 221,30 172,90 154,83 121,51 101,71 57,17 -71,70 38,47 150,86 210,66 255,79 138,66
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 128 200 200 200 200 194
11 ISMS Asumsi 200 200 200 200 200 200 200 200 128 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 450,40 421,30 372,90 354,83 321,51 301,71 257,17 128,30 166,77 350,86 410,66 455,79 338,66
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -71,70 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 250,40 221,30 172,90 154,83 121,51 101,71 57,17 0 38,47 150,86 210,66 255,79 157,78
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 98,349 86,921 67,909 60,814 47,727 61,763 34,716 0,000 23,360 91,605 127,917 100,467 66,80
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 79,03 69,85 54,57 48,87 38,35 43,01 24,18 0,00 16,27 63,79 89,08 80,74 50,65
GSom Asumsi 152,44 171,60 174,05 160,26 146,19 127,12 92,94 60,68 23,83 25,63 73,86 118,09 110,56
20 K* G Som Perhitungan 92,57 104,20 105,69 97,32 88,77 49,93 36,50 23,83 9,36 10,07 29,01 71,71 59,91
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 171,60 174,05 160,26 146,19 127,12 92,94 60,68 23,83 25,63 73,86 118,09 152,44 110,56
22 DGS = Gs-Gsom (mm/month) Perhitungan 19,16 2,45 -13,79 -14,08 -19,06 -34,18 -32,26 -36,85 1,80 48,23 44,23 34,35 0,00
23 Base Flow (BF) = In- DGS Perhitungan 79,19 84,47 81,70 74,89 66,79 95,94 66,98 36,85 21,56 43,37 83,69 66,11 66,80
24 Direct Run Off (DRO)= WS - In Perhitungan 152,05 134,38 104,99 94,02 73,79 39,95 22,46 0,00 15,11 59,25 82,74 155,32 77,84
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 17,50 13,51 4,12 12,84 0,00 0,00 0,00 4,00
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 231,24 218,85 186,69 168,91 140,58 153,40 102,94 40,97 49,51 102,63 166,43 221,44 148,63
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,01 3,16 2,43 2,27 1,83 2,07 1,34 0,53 0,67 1,34 2,24 2,89 1,98

213
Tabel 6.53 Mock dengan Kalibrasi Tahun 2014
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 353,65 312,16 279,42 232,75 225,40 152,75 100,77 65,72 154,67 259,89 316,59 381,55 236,28
2 Hari Hujan Rata-Rata (N); (hari) Data 16 14 11 10 8 8 5 4 7 11 13 17 10,47
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,210 3,768 3,720 3,937 3,662 3,418 3,790 4,599 3,996 3,410 3,302 3,216 3,67
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 99,52 105,51 115,33 118,11 113,53 102,55 117,50 142,58 119,88 105,71 99,05 99,71 111,58
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,1% 4,8% 8,8% 10,1% 14,0% 14,9% 18,3% 19,7% 16,4% 9,6% 6,6% 0,9% 10,6%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 3,05 5,08 10,10 11,89 15,86 15,31 21,50 28,15 19,63 10,18 6,51 0,87 12,35
8 Ea = Ep - DE Perhitungan 96,47 100,42 105,23 106,21 97,67 87,24 96,00 114,42 100,25 95,53 92,55 98,83 99,24
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 257,17 211,74 174,19 126,54 127,73 65,51 4,77 -48,70 54,42 164,36 224,04 282,71 137,04
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 151 200 200 200 200 196
11 ISMS Asumsi 200 200 200 200 200 200 200 200 151 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 457,17 411,74 374,19 326,54 327,73 265,51 204,77 151,30 205,72 364,36 424,04 482,71 337,04
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -48,70 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 257,17 211,74 174,19 126,54 127,73 65,51 4,77 0 54,42 164,36 224,04 282,71 153,93
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 101,011 83,165 68,416 49,702 77,559 39,779 2,895 0,000 33,047 99,804 87,999 111,042 62,87
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 81,17 66,83 54,98 39,94 54,01 27,70 2,02 0,00 23,01 69,50 70,72 89,23 48,26
GSom Asumsi 161,80 179,42 175,78 161,72 138,14 108,27 70,23 29,60 11,63 27,58 80,33 119,50 105,33
20 K* G Som Perhitungan 98,25 108,95 106,74 98,20 54,26 42,53 27,58 11,63 4,57 10,83 48,78 72,56 57,07
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 179,42 175,78 161,72 138,14 108,27 70,23 29,60 11,63 27,58 80,33 119,50 161,80 105,33
22 DGS = Gs-Gsom (mm/month) Perhitungan 17,62 -3,64 -14,06 -23,58 -29,87 -38,04 -40,63 -17,97 15,95 52,76 39,16 42,30 0,00
23 Base Flow (BF) = In- DGS Perhitungan 83,39 86,80 82,48 73,28 107,43 77,82 43,52 17,97 17,09 47,05 48,83 68,74 62,87
24 Direct Run Off (DRO)= WS - In Perhitungan 156,16 128,57 105,77 76,84 50,17 25,73 1,87 0,00 21,38 64,56 136,05 171,67 78,23
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 14,04 9,26 6,04 14,21 0,00 0,00 0,00 3,63
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 239,55 215,38 188,25 150,12 157,60 117,59 54,66 24,01 52,68 111,61 184,88 240,41 144,73
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,12 3,11 2,45 2,02 2,05 1,58 0,71 0,31 0,71 1,45 2,49 3,13 1,93

214
Tabel 6.54 Mock dengan Kalibrasi Tahun 2015
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 358,62 324,79 262,46 192,31 147,06 106,66 81,53 48,44 166,14 237,93 337,46 387,86 220,94
2 Hari Hujan Rata-Rata (N); (hari) Data 15 13 12 10 8 6 5 4 8 11 15 18 10,44
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,276 3,859 3,755 3,966 3,832 3,502 3,797 4,637 3,894 3,617 3,279 3,254 3,72
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 101,55 108,04 116,40 118,97 118,79 105,06 117,72 143,76 116,83 112,11 98,38 100,88 113,21
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,6% 6,2% 8,2% 10,2% 14,4% 17,0% 19,5% 19,9% 14,8% 9,8% 3,9% 0,3% 10,7%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 3,67 6,74 9,56 12,11 17,16 17,84 22,96 28,56 17,30 10,93 3,88 0,33 12,59
8 Ea = Ep - DE Perhitungan 97,88 101,30 106,84 106,86 101,63 87,22 94,76 115,20 99,53 101,18 94,50 100,55 100,62
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 260,73 223,50 155,61 85,45 45,43 19,43 -13,23 -66,76 66,61 136,75 242,96 287,30 120,32
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 187 120 200 200 200 200 192
11 ISMS Asumsi 200 200 200 200 200 200 200 187 120 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 460,73 423,50 355,61 285,45 245,43 219,43 186,77 120,01 186,62 336,75 442,96 487,30 320,32
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -13,23 -66,76 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 260,73 223,50 155,61 85,45 45,43 19,43 0 0 66,61 136,75 242,96 287,30 152,38
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 102,408 87,783 61,121 33,563 27,586 11,799 0,000 0,000 40,447 83,040 95,426 112,845 54,67
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 82,30 70,54 49,12 26,97 19,21 8,22 0,00 0,00 28,17 57,83 76,69 90,68 42,48
GSom Asumsi 162,96 181,25 180,60 158,78 123,39 67,67 34,80 13,67 5,37 30,28 69,72 119,02 95,63
20 K* G Som Perhitungan 98,95 110,06 109,67 96,42 48,46 26,58 13,67 5,37 2,11 11,89 42,34 72,27 53,15
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 181,25 180,60 158,78 123,39 67,67 34,80 13,67 5,37 30,28 69,72 119,02 162,96 95,63
22 DGS = Gs-Gsom (mm/month) Perhitungan 18,29 -0,65 -21,82 -35,39 -55,72 -32,88 -21,13 -8,30 24,91 39,44 49,30 43,94 0,00
23 Base Flow (BF) = In- DGS Perhitungan 84,12 88,43 82,94 68,96 83,30 44,68 21,13 8,30 15,54 43,60 46,12 68,91 54,67
24 Direct Run Off (DRO)= WS - In Perhitungan 158,32 135,71 94,49 51,89 17,84 7,63 0,00 0,00 26,16 53,71 147,53 174,46 72,31
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 17,67 13,52 9,80 7,49 4,45 15,27 0,00 0,00 0,00 5,68
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 242,44 224,14 177,43 138,52 114,66 62,11 28,62 12,75 56,97 97,31 193,65 243,37 132,67
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,16 3,23 2,31 1,87 1,49 0,84 0,37 0,17 0,77 1,27 2,61 3,17 1,77

215
Tabel 6.55 Mock dengan Kalibrasi Tahun 2016
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 391,72 301,42 268,85 229,12 201,84 146,71 88,94 58,02 189,08 251,64 333,85 403,22 238,70
2 Hari Hujan Rata-Rata (N); (hari) Data 14 12 10 9 7 6 4 3 7 9 11 14 8,67
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 29 31 30 31 30 31 31 30 31 30 31 366
4 Evapotranspirasi (Ep); (mm/hari) Data 3,089 3,635 3,671 3,856 3,700 3,361 3,697 4,593 3,859 3,539 3,236 3,102 3,61
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 95,77 105,42 113,79 115,69 114,71 100,84 114,62 142,40 115,76 109,72 97,07 96,16 110,16
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 5,9% 8,2% 11,2% 12,5% 15,9% 17,7% 19,9% 21,3% 15,9% 13,0% 9,5% 5,6% 13,0%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 5,66 8,65 12,70 14,44 18,23 17,85 22,77 30,35 18,40 14,27 9,24 5,37 14,83
8 Ea = Ep - DE Perhitungan 90,11 96,77 101,09 101,25 96,48 82,99 91,85 112,05 97,37 95,46 87,83 90,79 95,34
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 301,61 204,65 167,76 127,87 105,36 63,73 -2,90 -54,03 91,71 156,19 246,02 312,43 143,37
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 197 143 200 200 200 200 195
11 ISMS Asumsi 200 200 200 200 200 200 200 197 143 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 501,61 404,65 367,76 327,87 305,36 263,73 197,10 143,06 234,78 356,19 446,02 512,43 343,37
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -2,90 -54,03 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 301,61 204,65 167,76 127,87 105,36 63,73 0 0 91,71 156,19 246,02 312,43 177,73
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 118,465 80,381 65,893 50,224 63,977 38,696 0,000 0,000 55,691 94,842 96,629 122,715 65,63
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 95,20 64,60 52,95 40,36 44,55 26,95 0,00 0,00 38,78 66,05 77,65 98,62 50,48
GSom Asumsi 176,32 202,27 187,42 166,76 141,62 100,18 66,29 26,04 10,23 42,80 82,86 127,97 110,89
20 K* G Som Perhitungan 107,07 122,82 113,80 101,26 55,62 39,35 26,04 10,23 4,02 16,81 50,31 77,70 60,42
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 202,27 187,42 166,76 141,62 100,18 66,29 26,04 10,23 42,80 82,86 127,97 176,32 110,89
22 DGS = Gs-Gsom (mm/month) Perhitungan 25,95 -14,85 -20,66 -25,14 -41,44 -33,88 -40,26 -15,81 32,57 40,06 45,11 48,35 0,00
23 Base Flow (BF) = In- DGS Perhitungan 92,52 95,23 86,55 75,36 105,42 72,58 40,26 15,81 23,12 54,78 51,52 74,36 65,63
24 Direct Run Off (DRO)= WS - In Perhitungan 183,15 124,27 101,87 77,65 41,38 25,03 0,00 0,00 36,02 61,35 149,39 189,72 82,49
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 13,48 8,17 5,33 17,38 0,00 0,00 0,00 3,70
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 275,67 219,50 188,42 153,01 146,80 111,09 48,43 21,14 76,52 116,13 200,91 264,08 151,81
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,59 3,06 2,46 2,06 1,91 1,50 0,63 0,28 1,03 1,51 2,71 3,44 2,01

216
Tabel 6.56 Mock dengan Kalibrasi Tahun 2017
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 381,36 306,34 259,57 232,46 191,46 165,53 95,83 55,32 224,68 264,89 359,78 426,17 246,95
2 Hari Hujan Rata-Rata (N); (hari) Data 16 14 12 11 10 7 5 4 8 10 11 16 10,23
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,219 3,811 3,667 3,944 3,873 3,401 3,716 4,622 3,806 3,519 3,278 3,111 3,66
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 99,78 106,72 113,67 118,32 120,07 102,02 115,19 143,29 114,18 109,08 98,34 96,44 111,43
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,3% 5,9% 7,6% 8,9% 11,6% 15,5% 18,4% 21,0% 14,8% 11,9% 8,9% 3,3% 10,9%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 3,28 6,31 8,59 10,49 13,88 15,85 21,22 30,02 16,91 13,00 8,72 3,17 12,62
8 Ea = Ep - DE Perhitungan 96,50 100,41 105,09 107,83 106,19 86,17 93,97 113,27 97,27 96,08 89,63 93,28 98,81
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 284,85 205,93 154,48 124,64 85,27 79,35 1,87 -57,95 127,41 168,81 270,15 332,89 148,14
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 142 200 200 200 200 195
11 ISMS Asumsi 200 200 200 200 200 200 200 200 142 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 484,85 405,93 354,48 324,64 285,27 279,35 201,87 142,05 269,46 368,81 470,15 532,89 348,14
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -57,95 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 284,85 205,93 154,48 124,64 85,27 79,35 1,87 0 127,41 168,81 270,15 332,89 166,88
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 111,882 80,882 60,675 48,954 51,776 48,185 1,133 0,000 77,368 102,509 106,108 130,752 68,35
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 89,91 65,00 48,76 39,34 36,06 33,56 0,79 0,00 53,88 71,39 85,27 105,07 52,42
GSom Asumsi 191,60 206,26 190,24 164,28 139,10 90,69 69,18 27,96 10,98 58,19 94,24 142,50 115,43
20 K* G Som Perhitungan 116,35 125,24 115,52 99,76 54,63 35,62 27,17 10,98 4,31 22,86 57,23 86,53 63,02
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 206,26 190,24 164,28 139,10 90,69 69,18 27,96 10,98 58,19 94,24 142,50 191,60 115,43
22 DGS = Gs-Gsom (mm/month) Perhitungan 14,65 -16,01 -25,96 -25,18 -48,41 -21,51 -41,22 -16,98 47,21 36,05 48,25 49,11 0,00
23 Base Flow (BF) = In- DGS Perhitungan 97,23 96,90 86,64 74,14 100,18 69,70 42,35 16,98 30,16 66,46 57,85 81,65 68,35
24 Direct Run Off (DRO)= WS - In Perhitungan 172,97 125,04 93,80 75,68 33,49 31,17 0,73 0,00 50,04 66,31 164,04 202,14 84,62
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 17,60 15,21 8,81 5,08 0,00 0,00 0,00 0,00 3,89
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 270,20 221,94 180,44 149,82 151,27 116,08 51,89 22,06 80,20 132,76 221,90 283,79 156,86
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,52 3,20 2,35 2,02 1,97 1,56 0,68 0,29 1,08 1,73 2,99 3,70 2,09

217
Tabel 6.57 Mock dengan Kalibrasi Tahun 2018
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 368,30 325,20 295,83 246,85 219,77 172,29 158,45 96,59 173,37 268,10 347,71 389,92 255,20
2 Hari Hujan Rata-Rata (N); (hari) Data 15 14 13 11 11 8 7 4 7 11 13 16 10,63
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,170 3,744 3,912 3,918 3,691 3,329 3,599 4,556 4,053 3,516 3,222 3,157 3,66
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 98,27 104,84 121,28 117,54 114,41 99,87 111,56 141,25 121,59 108,99 96,67 97,86 111,18
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,6% 5,6% 7,2% 8,9% 10,8% 15,2% 16,6% 20,2% 15,5% 10,5% 6,9% 3,3% 10,4%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 3,55 5,85 8,76 10,42 12,40 15,15 18,54 28,57 18,89 11,42 6,67 3,21 11,95
8 Ea = Ep - DE Perhitungan 94,72 98,99 112,52 107,12 102,01 84,72 93,02 112,68 102,70 97,58 90,00 94,65 99,23
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 273,58 226,22 183,31 139,73 117,75 87,57 65,43 -16,08 70,67 170,52 257,71 295,27 155,97
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 200 184 200 200 200 200 199
11 ISMS Asumsi 200 200 200 200 200 200 200 200 184 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 473,58 426,22 383,31 339,73 317,75 287,57 265,43 183,92 254,59 370,52 457,71 495,27 355,97
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 0 -16,08 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 273,58 226,22 183,31 139,73 117,75 87,57 65,43 0 70,67 170,52 257,71 295,27 171,61
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 107,453 88,852 71,998 54,883 71,504 53,172 39,730 0,000 42,914 103,547 101,220 115,972 70,94
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 86,35 71,40 57,86 44,10 49,79 37,03 27,67 0,00 29,88 72,11 81,34 93,20 54,23
GSom Asumsi 174,82 192,51 188,30 172,20 148,67 108,19 79,52 58,90 23,13 38,97 87,42 134,42 117,25
20 K* G Som Perhitungan 106,16 116,90 114,34 104,56 58,39 42,49 31,23 23,13 9,09 15,31 53,08 81,63 63,03
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 192,51 188,30 172,20 148,67 108,19 79,52 58,90 23,13 38,97 87,42 134,42 174,82 117,25
22 DGS = Gs-Gsom (mm/month) Perhitungan 17,69 -4,21 -16,10 -23,53 -40,48 -28,67 -20,62 -35,77 15,84 48,44 47,01 40,40 0,00
23 Base Flow (BF) = In- DGS Perhitungan 89,77 93,06 88,10 78,41 111,99 81,84 60,35 35,77 27,08 55,10 54,21 75,57 70,94
24 Direct Run Off (DRO)= WS - In Perhitungan 166,12 137,37 111,31 84,85 46,25 34,39 25,70 0,00 27,76 66,98 156,49 179,29 86,38
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 0,00 15,83 14,56 8,88 15,93 0,00 0,00 0,00 4,60
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 255,89 230,43 199,41 163,26 158,24 132,07 100,61 44,64 70,77 122,08 210,70 254,87 161,91
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,34 3,32 2,60 2,20 2,06 1,78 1,31 0,58 0,95 1,59 2,84 3,32 2,16

218
Tabel 6.58 Mock dengan Kalibrasi Tahun 2019
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 395,26 347,30 297,75 237,75 197,19 142,85 76,30 59,17 170,77 275,74 360,98 415,07 248,01
2 Hari Hujan Rata-Rata (N); (hari) Data 15 14 12 11 10 7 5 4 7 10 14 16 10,35
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,122 3,757 3,606 3,926 3,768 3,430 3,726 4,691 3,890 3,658 3,222 3,114 3,66
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 96,78 105,19 111,79 117,78 116,81 102,91 115,52 145,42 116,70 113,41 96,65 96,52 111,29
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,9% 5,9% 8,2% 9,5% 11,6% 15,9% 18,4% 20,6% 15,9% 11,6% 5,3% 2,3% 10,8%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 3,81 6,22 9,18 11,22 13,50 16,36 21,28 29,94 18,55 13,11 5,08 2,22 12,54
8 Ea = Ep - DE Perhitungan 92,96 98,97 102,62 106,56 103,31 86,55 94,24 115,48 98,15 100,30 91,57 94,30 98,75
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 302,30 248,33 195,14 131,19 93,88 56,30 -17,94 -56,31 72,62 175,44 269,41 320,77 149,26
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 182 126 200 200 200 200 192
11 ISMS Asumsi 200 200 200 200 200 200 200 182 126 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 502,30 448,33 395,14 331,19 293,88 256,30 182,06 125,74 198,36 375,44 469,41 520,77 349,26
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -17,94 -56,31 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 302,30 248,33 195,14 131,19 93,88 56,30 0 0 72,62 175,44 269,41 320,77 186,54
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 118,736 97,537 76,644 51,527 57,009 34,187 0,000 0,000 44,094 106,533 105,815 125,988 68,17
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 95,42 78,38 61,59 41,41 39,70 23,81 0,00 0,00 30,71 74,19 85,03 101,25 52,62
GSom Asumsi 185,24 207,90 204,62 185,85 154,26 100,29 63,20 24,82 9,75 34,54 87,75 138,32 116,38
20 K* G Som Perhitungan 112,48 126,24 124,25 112,85 60,59 39,39 24,82 9,75 3,83 13,56 53,29 83,99 63,75
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 207,90 204,62 185,85 154,26 100,29 63,20 24,82 9,75 34,54 87,75 138,32 185,24 116,38
22 DGS = Gs-Gsom (mm/month) Perhitungan 22,66 -3,28 -18,78 -31,59 -53,97 -37,09 -38,38 -15,07 24,79 53,22 50,57 46,92 0,00
23 Base Flow (BF) = In- DGS Perhitungan 96,07 100,81 95,42 83,11 110,98 71,28 38,38 15,07 19,31 53,32 55,25 79,07 68,17
24 Direct Run Off (DRO)= WS - In Perhitungan 183,57 150,79 118,49 79,66 36,87 22,11 0,00 0,00 28,52 68,91 163,59 194,78 87,28
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 18,12 13,13 7,01 5,44 15,69 0,00 0,00 0,00 4,95
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 279,64 251,60 213,91 162,78 165,98 106,52 45,39 20,51 63,52 122,23 218,84 273,85 160,40
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,64 3,63 2,79 2,19 2,16 1,43 0,59 0,27 0,86 1,59 2,95 3,57 2,14

219
Tabel 6.59 Mock dengan Kalibrasi Tahun 2020
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 342,55 294,26 260,21 219,20 187,54 104,84 73,57 32,17 142,19 257,97 328,62 379,57 218,56
2 Hari Hujan Rata-Rata (N); (hari) Data 14 11 9 8 7 6 4 3 7 9 12 17 8,77
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 29 31 30 31 30 31 31 30 31 30 31 366
4 Evapotranspirasi (Ep); (mm/hari) Data 3,210 3,841 3,780 4,077 3,851 3,624 4,003 4,980 4,224 3,608 3,464 3,299 3,83
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 99,50 111,39 117,19 122,30 119,39 108,72 124,09 154,38 126,71 111,84 103,93 102,27 116,81
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 5,9% 9,5% 11,8% 13,1% 16,3% 17,7% 19,9% 21,7% 15,5% 13,4% 8,2% 2,0% 12,9%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 5,88 10,61 13,85 16,06 19,41 19,24 24,65 33,46 19,68 14,95 8,53 2,02 15,70
8 Ea = Ep - DE Perhitungan 93,61 100,78 103,34 106,23 99,98 89,48 99,43 120,93 107,03 96,89 95,39 100,26 101,11
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 248,94 193,48 156,87 112,97 87,56 15,36 -25,87 -88,75 35,16 161,08 233,22 279,31 117,44
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 174 85 200 200 200 200 188
11 ISMS Asumsi 200 200 200 200 200 200 200 174 85 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 448,94 393,48 356,87 312,97 287,56 215,36 174,13 85,38 120,54 361,08 433,22 479,31 317,44
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -25,87 -88,75 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 248,94 193,48 156,87 112,97 87,56 15,36 0 0 35,16 161,08 233,22 279,31 152,40
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 97,776 75,994 61,616 44,372 53,168 9,328 0,000 0,000 21,351 97,811 91,604 109,705 55,23
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 78,57 61,07 49,52 35,66 37,03 6,50 0,00 0,00 14,87 68,11 73,61 88,16 42,76
GSom Asumsi 160,49 176,03 167,96 151,50 127,65 87,16 40,73 16,00 6,28 17,34 74,92 119,11 95,43
20 K* G Som Perhitungan 97,45 106,89 101,99 92,00 50,14 34,24 16,00 6,28 2,47 6,81 45,50 72,33 52,67
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 176,03 167,96 151,50 127,65 87,16 40,73 16,00 6,28 17,34 74,92 119,11 160,49 95,43
22 DGS = Gs-Gsom (mm/month) Perhitungan 15,54 -8,07 -16,45 -23,85 -40,49 -46,43 -24,73 -9,71 11,05 57,59 44,19 41,38 0,00
23 Base Flow (BF) = In- DGS Perhitungan 82,24 84,06 78,07 68,22 93,66 55,76 24,73 9,71 10,30 40,22 47,42 68,33 55,23
24 Direct Run Off (DRO)= WS - In Perhitungan 151,16 117,49 95,26 68,60 34,39 6,03 0,00 0,00 13,81 63,27 141,62 169,61 71,77
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 17,24 9,64 6,76 2,96 13,07 0,00 0,00 0,00 4,14
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 233,40 201,55 173,33 136,82 145,28 71,43 31,50 12,67 37,18 103,49 189,04 237,93 131,13
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,04 2,81 2,26 1,84 1,89 0,96 0,41 0,17 0,50 1,35 2,55 3,10 1,74

220
Tabel 6.60 Mock dengan Kalibrasi Tahun 2021
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 368,55 325,79 282,72 232,64 174,53 132,89 79,05 34,09 178,45 258,26 328,21 381,07 231,35
2 Hari Hujan Rata-Rata (N); (hari) Data 14 13 12 11 9 8 5 4 10 14 15 17 10,94
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,416 3,813 3,628 3,970 4,009 3,680 3,899 4,915 4,074 3,541 3,327 3,198 3,79
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 105,89 106,76 112,46 119,09 124,27 110,39 120,86 152,35 122,21 109,77 99,81 99,13 115,25
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 4,9% 6,6% 7,9% 9,5% 12,6% 15,2% 18,4% 21,0% 11,6% 6,1% 3,9% 1,3% 9,9%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 5,22 7,01 8,86 11,34 15,71 16,75 22,26 31,92 14,13 6,74 3,93 1,30 12,10
8 Ea = Ep - DE Perhitungan 100,68 99,75 103,60 107,75 108,56 93,65 98,59 120,43 108,08 103,03 95,87 97,83 103,15
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 267,87 226,04 179,11 124,89 65,97 39,25 -19,54 -86,34 70,37 155,23 232,34 283,24 128,20
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 180 94 200 200 200 200 190
11 ISMS Asumsi 200 200 200 200 200 200 200 180 94 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 467,87 426,04 379,11 324,89 265,97 239,25 180,46 94,12 164,49 355,23 432,34 483,24 328,20
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -19,54 -86,34 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 267,87 226,04 179,11 124,89 65,97 39,25 0 0 70,37 155,23 232,34 283,24 164,43
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 105,213 88,784 70,351 49,054 40,056 23,832 0,000 0,000 42,730 94,260 91,257 111,250 59,73
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 84,55 71,35 56,54 39,42 27,89 16,60 0,00 0,00 29,76 65,64 73,34 89,40 46,21
GSom Asumsi 162,88 183,46 182,75 167,50 141,13 83,33 49,32 19,37 7,61 32,75 78,50 121,00 102,47
20 K* G Som Perhitungan 98,90 111,40 110,97 101,71 55,43 32,73 19,37 7,61 2,99 12,86 47,67 73,48 56,26
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 183,46 182,75 167,50 141,13 83,33 49,32 19,37 7,61 32,75 78,50 121,00 162,88 102,47
22 DGS = Gs-Gsom (mm/month) Perhitungan 20,58 -0,71 -15,24 -26,37 -57,81 -34,00 -29,95 -11,76 25,14 45,76 42,50 41,87 0,00
23 Base Flow (BF) = In- DGS Perhitungan 84,64 89,49 85,59 75,42 97,86 57,83 29,95 11,76 17,59 48,50 48,76 69,37 59,73
24 Direct Run Off (DRO)= WS - In Perhitungan 162,66 137,26 108,76 75,84 25,91 15,41 0,00 0,00 27,64 60,97 141,08 171,99 77,29
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 16,04 12,21 7,27 3,13 16,40 0,00 0,00 0,00 4,59
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 247,30 226,75 194,36 151,26 139,81 85,46 37,22 14,90 61,63 109,47 189,84 241,37 141,61
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 3,22 3,27 2,53 2,04 1,82 1,15 0,49 0,19 0,83 1,43 2,56 3,15 1,89

221
Tabel 6.61 Mock dengan Kalibrasi Tahun 2022
No URAIAN KET JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC YEAR

I Data Meteorologi
1 Hujan Bulanan Rata-Rata (P); (mm) Data 345,62 303,29 270,60 234,00 185,31 132,33 98,66 40,02 248,01 278,16 307,60 372,21 234,65
2 Hari Hujan Rata-Rata (N); (hari) Data 16 13 11 10 9 8 6 4 11 13 15 17 11,00
3 Jumlah hari dalam satu bulan (Hr); (hari) Data 31 28 31 30 31 30 31 31 30 31 30 31 365
4 Evapotranspirasi (Ep); (mm/hari) Data 3,327 3,731 3,743 3,926 3,754 4,107 4,163 4,937 4,077 3,826 3,785 3,584 3,91
Evapotranspirasi (Ep); (mm/bulan) Perhitungan 103,14 104,48 116,05 117,79 116,37 123,21 129,05 153,03 122,30 118,62 113,55 111,11 119,06
II Limited Evapotranspiration (mm/month)
5 Exposed Surface (m); (%) Kalibrasi 26,27 26,27 26,27 26,27 28,90 28,90 28,90 28,90 28,90 28,90 26,27 26,27 28
6 DE/Ep = (m/20)(18-n); (%) Perhitungan 3,3% 6,2% 9,2% 10,8% 12,6% 14,1% 17,7% 20,2% 10,8% 7,6% 3,9% 1,3% 9,8%
7 DE (mm/month) = Ep *(m/20)*(18-n) Perhitungan 3,39 6,52 10,67 12,76 14,71 17,36 22,84 30,96 13,25 9,00 4,47 1,46 12,28
8 Ea = Ep - DE Perhitungan 99,76 97,96 105,38 105,02 101,65 105,85 106,21 122,08 109,05 109,62 109,08 109,65 106,77
III Water Surplus
9 P-Ea (Hujan Rata-rata -Ea) Perhitungan 245,87 205,33 165,22 128,98 83,65 26,48 -7,55 -82,06 138,97 168,54 198,52 262,56 127,87
10 Soil Moisture Capacity (SMC); (mm/month) Asumsi 200 200 200 200 200 200 192 110 200 200 200 200 192
11 ISMS Asumsi 200 200 200 200 200 200 200 192 110 200 200 200 200
12 SMS = ISMS + (P-Ea); (mm) Perhitungan 445,87 405,33 365,22 328,98 283,65 226,48 192,45 110,39 249,36 368,54 398,52 462,56 327,87
13 Soil Storage (SS); (mm) Asumsi 0 0 0 0 0 0 -7,55 -82,06 0 0 0 0 0,00
14 Water Surplus (WS) = (P-Ea)+SS; (mm) Perhitungan 245,87 205,33 165,22 128,98 83,65 26,48 0 0 138,97 168,54 198,52 262,56 162,41
IV Run Off & Groundwater Storage
15 Koef. Infiltrasi (If) Kalibrasi 0,39 0,39 0,39 0,39 0,61 0,61 0,61 0,61 0,61 0,61 0,39 0,39 0,50
16 Infiltration (In) = WS * If Perhitungan 96,569 80,649 64,893 50,658 50,797 16,077 0,000 0,000 84,385 102,340 77,973 103,126 60,62
17 Konstanta Resesi (K) = max 1 Kalibrasi 0,61 0,61 0,61 0,61 0,39 0,39 0,39 0,39 0,39 0,39 0,61 0,61 0,50
18 Percentage Factor (PF) = 5%-10%, max 37.3 % Kalibrasi 0,20 0,20 0,20 0,09 0,09 0,09 0,09 0,09 0,09 0,20 0,20 0,20 0,15
19 0.5*(1+K)*In Perhitungan 77,60 64,81 52,15 40,71 35,37 11,20 0,00 0,00 58,76 71,27 62,66 82,87 46,45
GSom Asumsi 156,11 172,40 169,50 155,07 134,87 88,35 45,90 18,03 7,08 61,55 95,44 120,62 102,08
20 K* G Som Perhitungan 94,80 104,69 102,92 94,16 52,97 34,70 18,03 7,08 2,78 24,17 57,95 73,24 55,63
21 Ground Water Storage (GS)= (0.5*(1+K)*In)+(K*Gsom) Perhitungan 172,40 169,50 155,07 134,87 88,35 45,90 18,03 7,08 61,55 95,44 120,62 156,11 102,08
22 DGS = Gs-Gsom (mm/month) Perhitungan 16,29 -2,90 -14,42 -20,20 -46,52 -42,45 -27,87 -10,95 54,46 33,90 25,17 35,50 0,00
23 Base Flow (BF) = In- DGS Perhitungan 80,28 83,55 79,32 70,86 97,32 58,53 27,87 10,95 29,92 68,44 52,80 67,63 60,62
24 Direct Run Off (DRO)= WS - In Perhitungan 149,30 124,68 100,33 78,32 32,86 10,40 0,00 0,00 54,58 66,20 120,55 159,43 74,72
25 Storm Run Off (SRO); if P>=200, SRO =0. If P < 200, SRO = PxPF Perhitungan 0,00 0,00 0,00 0,00 17,03 12,16 9,07 3,68 0,00 0,00 0,00 0,00 3,49
26 Total run Off (TRO) = BF+DRO+SRO Perhitungan 229,58 208,24 179,64 149,17 147,21 81,09 36,94 14,62 84,50 134,64 173,35 227,06 138,84
V Debit
27 Luas Catchment Area (m2) Perhitungan 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916 34907916
3
28 Stream Flow; Calculated Discharge (m /det) Perhitungan 2,99 3,00 2,34 2,01 1,92 1,09 0,48 0,19 1,14 1,75 2,33 2,96 1,85

222