OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

STANDARD OPERATING PROCEDURES

(SOP)

RISK ASSESMENT

EMPLOYER : NAGPUR METRO RAIL CORPORATION LTD (NMRCL)

CONSULTANT : GENERAL CONSULTANT

CONTRACTOR : M/S ITD CEMENTATION LIMITED.

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 1


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

ISSUE CONTROL OHS&E

Rev Date Reason for Prepared by Checked by Approved


issue by

00 06.06.2017 Issued for Amit Ninawe Amit Bindeshwar


review & (Chief SHE Ninawe Prasad
comments Manager) (Chief SHE Chief Project
Manager) Manager

Signed/
Initials

Note:

This page is a record of all issues of this document. All previous issues are hereby
superseded and are to be destroyed.

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 2


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

REVISION NOTE

The following items/paragraphs are revised in this issue

Item Description in brief/Para. No. Item Description in brief/Para. No.

CONTROL COPY DISTRIBUTION NOTE

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 3


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

Copy Name of Control Department Organizatio Remarks


No. Copy Holder n

1. Mr.Bindeshwar Chief Project Manager ITDCL


Prasad
2. Mr. A. K Chauhan Construction Manager ITDCL
3. Mr.Amit Ninawe Chief SHE Manager ITDCL
4. Mr. Bharat Rawat Store Manager ITDCL
5. Mr. Suman Roy Plant Incharge ITDCL
6. Mr. Pravan Pandey Planning Engineer ITDCL
7. Mr. Mallikarjun Raju Admin In-Charge ITDCL
8. Mr. Tapas Roy Site In charge ITDCL
9. Mr. M. Mukharji Site In charge ITDCL
10. Mr. Amit Datta Site In charge ITDCL
11. Mr. Abhinendu Site In charge ITDCL
12. Mr. Vinit Pathak Electrical In charge ITDCL
13. Employer G.C. G.C
Representative
14. Employer NMRCL NMRCL
Representative

NOTE:

1. Controlled copy holders will receive the latest issue of the document and the suc-
cessive issues. He shall be responsible for destroying the old revision or otherwise
marking the same as “SUPERSEDED”.

2. The distribution of document shall be controlled for final document and it’s subse-
quent issues only.

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 4


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

INTRODUCTION:

This project OHS&E SOP – RISK ASSESSMENT has been prepared to describe how M/S
ITD CEMENTATION LIMITED intends to manage, control and co-ordinate the works in
order to protect and improve the Health, Safety and Welfare of all personnel engaged on
the projects and others who may be affected by the operations.

M/S ITD CEMENTATION LIMITED will actively seek the support of all workers and
operatives engaged on the projects to contribute effectively towards loss preventions.

This OHS&E Operational Control Procedure will enable the control of Environment,
Health & Safety risks and help in the continual improvement of its OHS&E performance.
M/S ITD CEMENTATION LIMITED will strive towards achieving a good safety culture
throughout the Project to promote Safety as a “SHARED RESPONSIBILITY” among all
levels in the organization and with sub-contractors.

In addition to this OHS&E plan M/S ITD CEMENTATION LIMITED, shall comply with
all requirements stated in Employers requirements-Occupational, Safety, Health &
Environment document.

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 5


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

INDEX

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 6


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

1.0 Purpose
To Identify OH & S hazards, assess the risks and plan risk control measures and re-
view the risk control measures.

2.0 Scope
All routine and non-routine activities. Activities of all personnel having access to
the work place including suppliers and visitors. The facilities at the work place pro-
vided by the organization.

3.0 Definitions
ITDCL – ITD CEMENTATION LIMITED

BOCWR- Building Other Construction Workers Regulations


OH&S - Occupational Health and Safety

4.0 Legal Requirement.


MAHARSHTRA BOCWR 2007.

5.0 Responsibility
Chief Project Manager
Chief Safety Manager

6.0 Procedure
a. Significant risks will be identified and eliminated/ minimized at planning stage
by the Project OH&S Manager, Project Manager and Works Manager.
b. The Project Senior Representatives and Line Supervisors along with Project OH
& S Manager will review, High and Medium Risk activities, in order to reduce

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 7


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

the level of the risk. Corporate Occupational Health & Safety Department will
be informed about actions taken to contain the risks.
c. The risk assessment at Project level will be carried out for every new activity
undertaken, when the project is ongoing and the measures identified for risk
control will be recorded in risk control document by the project site. New
measures may be required in the form of addition of new work methods/
procedures /improved safety equipment/ additional OH & S training /
safety signs / posters etc.
d. The five step process for risk control are

Step 1 : Identification of hazards.


The first step in work place occupational health and safety risk management
process is to identify the work place hazards. A hazard is defined as a situation
with the potential to cause harm.
If any of the risks are relatively minor and/ or the hazard can be easily controlled,
the activity will be attended automatically straight away. That is, it may not be nec-
essary to work through the assessment method shown in step 2 and before control-
ling the risk (step 3). All other risks must be assessed using a method such as the
one presented in step 2.

Step 2: Assessing the risks that may result because of the hazards.
The second step in work place occupational health and safety risk management
process is to work out which hazards need attention first. The risk associated with
each hazard must be assessed. The method of assessing risk is as follows.
Risk Assessment Method:
For each of the risks:
a) Estimate the likelihood of an incident occurring at the workplace, bearing in
mind existing control measures. Using the descriptive scale in the risk priority

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 8


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

chart (below), nominate the likelihood of an incident occurring at the work-


place.
b) Estimate the consequences of an incident occurring at the workplace, bearing in
mind existing control measures. Using the descriptive scale in the risk priority
chart, nominate the consequences of an incident occurring at the workplace.
c) Determine the “risk score” by plotting consequences and likelihood estimates
on the risk priority chart.
Using the scores obtained for the risks, develop a prioritized list of workplace
risks requiring action.
Risk Priority Chart
Risk Assessment Mathematical Model: - For quantifications of the risk the
following mathematical models is used.
Severity Factor: - (S)
UPON PERSONS, ENVIRONMENT OR PROPERTY
0 NO IMPACT

1 MINIMAL IMPACT FIRST AID, MINOR EQUIPMENT DAMAGE


MODERATE NON LOST TIME ACCIDENTS (LTA), DAMAGE
2
IMPACT REQUIRING OUTSIDE HELP OR MINOR DELAY
LTA OR SERIOUS INJURIES POSSIBLE,
3 SERIOUS IMPACT
DAMAGE /SUPSPENSION OF OPERATIONS
LIFE THRETENING, MAJOR EQUIPMENT OR
4 MAJOR IMPACT
OPERATIONAL DAMAGE
CATASTROPHIC LOSS OF PERSON (S), SEVERE STRUCTURAL OR
5
IMPACT ENVIRONMENTAL DAMAGE

Probability Factor: - (P)


0 ZERO POSSIBILITY
1 EVERY 10 YEARS
1 < 1 EVERY 10,000 OPERATIONS
OPERATING
1 EVERY OPERATING
2 < 1 EVERY 10,00 OPERATIONS
YEARS
3 < 10 EVERY 10,00 OPERATIONS 1 EVERY MONTH
ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 9
OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

OPERATING
1 EVERY WEEK
4 < 10 EVERY 100 OPERATIONS
OPERATING
5 INCIDENT MOST LIKELY WILL HAPPEN 1 EVERY DAY OPERATING

Risk = S x P (Severity X Probability)

Risk Score

5 0 5 10 15 20 25

4 0 4 8 12 16 20

3 0 3 6 9 12 15
SEVERITY

2 0 2 4 6 8 10

1 0 1 2 3 4 5

0 0 0 0 0 0 0

0 1 2 3 4 5

PROBABILITY

Risk Level

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 10


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

RISK LEVEL CONSEQUENCES


 POTENTIAL HAZARDOUS DAILY OR ROU-
TINE TASK
LOW RISK (< 6)
 REGARDED AS ACCEPTABLE WITH CUR-
(L)
RENT CONTROL MEASURES
 USE TOOL BOX TALK
 HAZARDOUS NON ROUTINE TASKS
 HIGH LOSS OF POTENTIAL
MODERATE RISK (8-12)  CONTROL MEASURES ARE RQUIRED TO RE-
(M) DUCE THE RISK
 PERMIT TO WORK & OPERATING PROCE-
DURE
 POTENTIAL DISASTEROUS OR CATA-
SIGNIFICANT RISK (> 15) STROPHIC OPERATIONS
(H)  OPERATIONS MUST BE ALTERED/
 SIGNIFICANT SAFETY CONTROL

Step 3: Deciding on control measures

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 11


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

In the workplace Occupational Health and Safety risk management process in-
volves deciding on control measures to manage exposure to identified risks.
Control Priorities
Start at the top of the list and work down.
Firstly, try to eliminate the hazard.
If this is not possible, prevent or minimize exposure to the risk by one or a combi-
nation of:
 Substituting a less hazardous material, process or equipment.
 Redesigning equipment or work process
 Isolating the hazard.
(Note: These measures may include engineering methods).
As a last resort, when exposures to the risk is not (or cannot be) minimized by
other means:
 Introduce administrative controls.
 Use appropriate personal protective equipment.
In many cases, it will be necessary to use more than one control measure to
satisfactorily manage a risk. Some control measures, which are lower control
priorities, may need to be put in place until a permanent measure can be im-
plemented. The control measures selected should:
 Adequately control exposure to the risk;
 Not create another hazard; and
 Allow workers to do their work without undue discomfort or distress.
Eliminating the hazard
The ideal solution is to get rid of a hazard completely. This is the most effective
control and should always be attempted in the first instance. If a hazard is removed
from the workplace, the associated risk is completely eliminated. For example,
eliminating the need to work in a confined space.
Prevent or minimize exposure to the risk

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 12


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

If a hazard cannot be eliminated, there are a number of control options that can be
used alone, or in combination, to prevent or minimize exposure to the risk.
Substitution
Involves replacing the hazard with one that presents a lower (and more manage-
able) risk. That is, replacing the plant, product or processes that represent the haz-
ard with something that does the same job but has less potential to cause harm. For
example, using a hydraulic machine instead of electrical power because of water on
the site.
Redesign
Involves changing the design of the workplace, equipment or work process. It in-
volves thinking about ways the work could be done differently to make the work-
place safer. For example, using damping or baffles to reduce exposure to noise and
vibration; or using a track to hold a portable saw to prevent back strains or sprains.
Isolation
Involves isolating or separating the hazard from the person, or the person from the
hazard. For example, installing guarding on equipment or operating machinery re-
motely.
When exposure to the risk is not (or cannot be) minimized by other means
When exposure to the risk is not (or cannot be) minimized by other means, admin-
istrative controls and personal protective equipment can be used. These controls
are lowest on the list of control priorities. In general, these measures should only be
used:
 When there are no other practical control measures available (that is, as a last
resort); as temporary measures while a more permanent solution is found;
and/ or
 To supplement other controls (that is, as back-up controls).
Administrative controls

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 13


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

Involve minimizing exposure to a risk through the use of procedures or instruc-


tions. It is often necessary to use these controls in conjunction with other measures.
For example, posting warning signs or providing safety training.
Personal Protective Equipment (PPE)
Is worn by people as a final barrier between themselves and the hazard. This mea-
sure does not control the hazard at the source. For example, using respiratory pro-
tection to minimize exposure to inhalation of silica dust.
STEP 4: IMPLEMENTING CONTROL MEASURES
Involves implementing selected control measures at the workplace. This means un-
dertaking those activities necessary to allow the measures to function or operate ef-
fectively.
Implementing control measures involves:
 Developing work procedures
Develop work methods and procedures in relation to the new control mea-
sures to make sure that the control measures are effective. Management, su-
pervisor and worker responsibilities need to be clearly defined in the work
procedures.
 Communication
Inform workers and others about the control measures to be implemented. If
is important to clearly communicate the reasons for changes.
 Providing training and instruction
Provide training and instruction for the workers, supervisors and others in re-
lation to the new control measures.
 Supervision
Provide adequate supervision to ensure that the new control measures are be-
ing used correctly.
 Maintenance

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 14


OHS&E SOP – RISK ASSESSMENT

Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)

Issuing Entity Doc. No Revision Date


ITDCL ITDCL / SHE/ SOP/02 00 06.06.2017

Maintenance relating to control measures is an important part of the imple-


mentation process. Work procedures will spell out maintenance requirements
to ensure the ongoing effectiveness of the new control measures. Records of
maintenance will be kept.
Step 5: Monitor and Review
The final step in the risk management process is to monitor and review the effec-
tiveness of measures. For this step, it can be useful to ask questions to determine
whether:
 Chosen control measures have been implemented, as planned;
 Chosen control measures are working; and
 There are any new problems.
This involve:
 Consulting with workers, supervisors and occupational health and safety repre-
sentatives;
 Measuring peoples exposure (e.g. taking noise measurement in the case of isola-
tion of a noise source); and
 Monitoring incident reports.
Review of risk assessment:
The Hazard identification and Risk assessment register should be regularly re-
viewed for incorporating hazards due to any changes/additions in the processes/
activities and after any accident / incident / near misses.

7.0 Review
This procedure will be reviewed every six months.

8.0 Records: Retention period


This SOP will be retained till the end of the project.

ITDCL / SHE/ SOP/02– RISK ASSESSMENT Page 15