Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
(SOP)
RISK ASSESMENT
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
Signed/
Initials
Note:
This page is a record of all issues of this document. All previous issues are hereby
superseded and are to be destroyed.
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
REVISION NOTE
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
NOTE:
1. Controlled copy holders will receive the latest issue of the document and the suc-
cessive issues. He shall be responsible for destroying the old revision or otherwise
marking the same as “SUPERSEDED”.
2. The distribution of document shall be controlled for final document and it’s subse-
quent issues only.
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
INTRODUCTION:
This project OHS&E SOP – RISK ASSESSMENT has been prepared to describe how M/S
ITD CEMENTATION LIMITED intends to manage, control and co-ordinate the works in
order to protect and improve the Health, Safety and Welfare of all personnel engaged on
the projects and others who may be affected by the operations.
M/S ITD CEMENTATION LIMITED will actively seek the support of all workers and
operatives engaged on the projects to contribute effectively towards loss preventions.
This OHS&E Operational Control Procedure will enable the control of Environment,
Health & Safety risks and help in the continual improvement of its OHS&E performance.
M/S ITD CEMENTATION LIMITED will strive towards achieving a good safety culture
throughout the Project to promote Safety as a “SHARED RESPONSIBILITY” among all
levels in the organization and with sub-contractors.
In addition to this OHS&E plan M/S ITD CEMENTATION LIMITED, shall comply with
all requirements stated in Employers requirements-Occupational, Safety, Health &
Environment document.
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
INDEX
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
1.0 Purpose
To Identify OH & S hazards, assess the risks and plan risk control measures and re-
view the risk control measures.
2.0 Scope
All routine and non-routine activities. Activities of all personnel having access to
the work place including suppliers and visitors. The facilities at the work place pro-
vided by the organization.
3.0 Definitions
ITDCL – ITD CEMENTATION LIMITED
5.0 Responsibility
Chief Project Manager
Chief Safety Manager
6.0 Procedure
a. Significant risks will be identified and eliminated/ minimized at planning stage
by the Project OH&S Manager, Project Manager and Works Manager.
b. The Project Senior Representatives and Line Supervisors along with Project OH
& S Manager will review, High and Medium Risk activities, in order to reduce
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
the level of the risk. Corporate Occupational Health & Safety Department will
be informed about actions taken to contain the risks.
c. The risk assessment at Project level will be carried out for every new activity
undertaken, when the project is ongoing and the measures identified for risk
control will be recorded in risk control document by the project site. New
measures may be required in the form of addition of new work methods/
procedures /improved safety equipment/ additional OH & S training /
safety signs / posters etc.
d. The five step process for risk control are
Step 2: Assessing the risks that may result because of the hazards.
The second step in work place occupational health and safety risk management
process is to work out which hazards need attention first. The risk associated with
each hazard must be assessed. The method of assessing risk is as follows.
Risk Assessment Method:
For each of the risks:
a) Estimate the likelihood of an incident occurring at the workplace, bearing in
mind existing control measures. Using the descriptive scale in the risk priority
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
OPERATING
1 EVERY WEEK
4 < 10 EVERY 100 OPERATIONS
OPERATING
5 INCIDENT MOST LIKELY WILL HAPPEN 1 EVERY DAY OPERATING
Risk Score
5 0 5 10 15 20 25
4 0 4 8 12 16 20
3 0 3 6 9 12 15
SEVERITY
2 0 2 4 6 8 10
1 0 1 2 3 4 5
0 0 0 0 0 0 0
0 1 2 3 4 5
PROBABILITY
Risk Level
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
In the workplace Occupational Health and Safety risk management process in-
volves deciding on control measures to manage exposure to identified risks.
Control Priorities
Start at the top of the list and work down.
Firstly, try to eliminate the hazard.
If this is not possible, prevent or minimize exposure to the risk by one or a combi-
nation of:
Substituting a less hazardous material, process or equipment.
Redesigning equipment or work process
Isolating the hazard.
(Note: These measures may include engineering methods).
As a last resort, when exposures to the risk is not (or cannot be) minimized by
other means:
Introduce administrative controls.
Use appropriate personal protective equipment.
In many cases, it will be necessary to use more than one control measure to
satisfactorily manage a risk. Some control measures, which are lower control
priorities, may need to be put in place until a permanent measure can be im-
plemented. The control measures selected should:
Adequately control exposure to the risk;
Not create another hazard; and
Allow workers to do their work without undue discomfort or distress.
Eliminating the hazard
The ideal solution is to get rid of a hazard completely. This is the most effective
control and should always be attempted in the first instance. If a hazard is removed
from the workplace, the associated risk is completely eliminated. For example,
eliminating the need to work in a confined space.
Prevent or minimize exposure to the risk
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
If a hazard cannot be eliminated, there are a number of control options that can be
used alone, or in combination, to prevent or minimize exposure to the risk.
Substitution
Involves replacing the hazard with one that presents a lower (and more manage-
able) risk. That is, replacing the plant, product or processes that represent the haz-
ard with something that does the same job but has less potential to cause harm. For
example, using a hydraulic machine instead of electrical power because of water on
the site.
Redesign
Involves changing the design of the workplace, equipment or work process. It in-
volves thinking about ways the work could be done differently to make the work-
place safer. For example, using damping or baffles to reduce exposure to noise and
vibration; or using a track to hold a portable saw to prevent back strains or sprains.
Isolation
Involves isolating or separating the hazard from the person, or the person from the
hazard. For example, installing guarding on equipment or operating machinery re-
motely.
When exposure to the risk is not (or cannot be) minimized by other means
When exposure to the risk is not (or cannot be) minimized by other means, admin-
istrative controls and personal protective equipment can be used. These controls
are lowest on the list of control priorities. In general, these measures should only be
used:
When there are no other practical control measures available (that is, as a last
resort); as temporary measures while a more permanent solution is found;
and/ or
To supplement other controls (that is, as back-up controls).
Administrative controls
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
Name of Work : Design & construction of elevated viaduct of length 6.836kms from Ch: 5890 to CH: 6000 to
CH: 7100 and CH: 7183 to Ch : 7700 between prajapati nagar to sitaburdi & ROR near Anand Talkies, viaduct &
ramp near ramjhula, ROR Near Prajapati nagar & viaduct of length 1.050kms from CH: (-)496 to CH: 90.962 and
CH:590 on BOQ basis. (Reach-04)
7.0 Review
This procedure will be reviewed every six months.