CLASS PROGRAMME

Approval of service suppliers
DNV-CP-0484 Edition October 2021

Approval of service supplier scheme

The content of this service document is the subject of intellectual property rights reserved by DNV AS (“DNV”). The user
accepts that it is prohibited by anyone else but DNV and/or its licensees to offer and/or perform classification, certification
and/or verification services, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the
basis of and/or pursuant to this document whether free of charge or chargeable, without DNV’s prior written consent. DNV
is not responsible for the consequences arising from any use of this document by others.

The PDF electronic version of this document available at the DNV website dnv.com is the official version. If there
are any inconsistencies between the PDF version and any other available version, the PDF version shall prevail.

DNV AS
FOREWORD

DNV class programmes contain procedural and technical requirements including acceptance
criteria for obtaining and retaining certificates for objects and organisations related to
classification.

© DNV AS October 2021

Any comments may be sent by e-mail to rules@dnv.com

This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this
document. The use of this document by other parties than DNV is at the user's sole risk. DNV does not accept any liability or responsibility
for loss or damages resulting from any use of this document.
CHANGES – CURRENT

 Changes - current
This document supersedes the November 2020 edition of DNVGL-CP-0484.
The numbering and/or title of items containing changes is highlighted in red.

Changes October 2021

Topic Reference Description

Mandatory upload of UTM App.A [1.4.8] Added requirement to upload UTM reports to Veracity.


reports to Veracity

Deletion of list of operators on App.A [1.5] Deleted subsection 'Information on the certificate' to eliminate


AoSS certificate (UTM) the need to issue new certificate in case of changes in the list of
operators.

Implementation of IACS UR App.A [17] Added new subsection for firms engaged in watertight cable


Z17 rev. 15 transit seal systems inspection on ships and mobile offshore
units.

Implementation of IACS UR App.A [18] Added new subsection for firms engaged in commissioning


Z17 rev. 16 testing of ballast water management systems (BWMS).

App.B [19] Previous App.B [19] Service suppliers engaged in testing of
ballast water management systems (validation of biological
efficacy at commissioning) is replaced by App.A [18].

Alignment with IACS UR W35 App.B [4] Aligned with respect to IACS UR W35 to ensure that NTD


suppliers approved to this class programme also comply with
IACS UR W35.

Examination of mooring App.B [12] Rewritten the programme for examination of mooring systems


system components for mobile offshore units. The programme is transparent
in terms of types of inspections the applicable company
is qualified to perform and provides clear and consistent
requirements.

Service suppliers engaged in App.B [17] The content of this programme has been superseded by App.B


renewal survey examination of [12].
offshore fibre ropes intended
for mooring of mobile offshore
units

Rebranding to DNV All This document has been revised due to the rebranding of DNV


GL to DNV. The following have been updated: the company
name, material and certificate designations, and references to
other documents in the DNV portfolio. Some of the documents
referred to may not yet have been rebranded. If so, please see
the relevant DNV GL document.

Editorial corrections
In addition to the above stated changes, editorial corrections may have been made.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 3
Approval  of  service  supplier  scheme

DNV AS
CONTENTS

 Contents
Changes  –  current.................................................................................................. 3

Section  1  General.................................................................................................... 7
1  Introduction.........................................................................................7
2  Objective..............................................................................................7
3  Scope................................................................................................... 7
4  Definitions........................................................................................... 7
5  Requirements.......................................................................................7
6  Validity  of  the  certificate..................................................................... 8

Appendix A Special requirements for categories of service suppliers listed in
IACS  UR  Z17...........................................................................................................9
1  Thickness measurements on ships and mobile offshore units............. 9
2  Tightness testing of closing appliances such as hatches, doors etc.
with  ultrasonic  equipment.................................................................... 12
3  In-water survey on ships and mobile offshore units by diver or
Remotely Operated Vehicle (ROV)........................................................13
4  Inspection and maintenance of fire extinguishing equipment and
systems.................................................................................................14
5  Service of inflatable liferafts, inflatable lifejackets, hydrostatic
release units, inflatable rescue boats, marine evacuation systems....... 14
6  Inspection and testing of radio communication equipment and
automatic identification systems (AIS)................................................ 14
7  Inspections and maintenance of self-contained breathing
apparatus..............................................................................................16
8  Examination of Ro-Ro ships bow, stern, side and inner doors........... 16
9  Annual performance testing of Voyage Data Recorders (VDR) and
simplified Voyage Data Recorders (S-VDR).......................................... 16
10  Inspection of low location lighting systems using photo
luminescent materials and evacuation guidance systems used as an
alternative to low-location lighting systems......................................... 17
11  Sound pressure level measurements of public address and
general alarm systems on board ships................................................. 17
12  Testing of coating systems in accordance with IMO Resolution
MSC.215(82) and/or MSC.288(87)....................................................... 18
13  Maintenance, thorough examination, operational testing,
overhaul and repair of lifeboats and rescue boats, launching
appliances and release gear................................................................. 20
14  Measurements of noise level on board ships.................................. 20
15  Tightness testing of primary and secondary barriers of gas
carriers with membrane cargo containment systems for vessels in
service.................................................................................................. 20

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 4
Approval  of  service  supplier  scheme

DNV AS
16  Firms engaged in survey using remote inspection techniques

 Contents
(RIT) as an alternative means for close-up survey of the structure of
ships and mobile offshore units........................................................... 20
17 Firms engaged in watertight cable transit seal systems inspection
on ships and mobile offshore units...................................................... 21
18 Firms engaged in commissioning testing of ballast water
management systems (BWMS)............................................................. 21

Appendix B Special requirements for categories of service suppliers not listed
in  IACS  UR  Z17.....................................................................................................22
1 Service suppliers engaged in testing of navigational equipment
and  systems......................................................................................... 22
2  Service suppliers engaged in preparation of inventory of
hazardous  materials  (IHM)...................................................................24
3  Service suppliers engaged in inspection and testing of centralised
gas welding and cutting equipment......................................................25
4  Service suppliers engaged in non-destructive testing (NDT) on
classification  projects........................................................................... 26
5  Service suppliers engaged in condition monitoring and condition
based  maintenance...............................................................................33
6  Service suppliers engaged in resin casting of chock foundations,
stern  tubes,  etc.................................................................................... 47
7    Intentionally  left  blank.................................................................... 49
8 Service suppliers engaged in testing of ballast water management
systems (environmental testing)..........................................................49
9  Service suppliers engaged in testing of ballast water management
systems (land-based and shipboard testing)........................................51
10  Laboratories engaged in mechanical and analytical testing............ 56
11  Laboratories engaged in corrosion testing of corrosion resistant
steels.................................................................................................... 61
12  Examination of mobile and long term mooring systems..................64
13  Service suppliers engaged in noise and vibration measurements
according to DNV's comfort class - COMF(V-crn)..................................73
14  Service suppliers engaged in alignment of propulsion shafting
and installation of rotating machinery..................................................76
15 Service suppliers engaged in marine riser management.................. 80
16 Approval of service suppliers supporting automated boiler water
maintenance  system............................................................................. 88
17 Service suppliers engaged in renewal survey examination of
offshore fibre ropes intended for mooring of mobile offshore units...... 91
18 Service suppliers engaged in indoor climate measurements
according to DNV's comfort class - COMF(C-crn).................................. 91

Appendix C Guidelines for the technical inspection of radio installations
onboard ships fitted for compliance with GMDSS................................................. 94
1  .......................................................................................................... 94

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 5
Approval  of  service  supplier  scheme

DNV AS
2  Introduction.......................................................................................94

 Contents
3  Documentation...................................................................................95
4  Antennae............................................................................................95
5 Inspection of the reserve source of energy and automatic battery
charger(s).............................................................................................96
6 Inspection of maritime VHF...............................................................97
7 MF or MF/HF radiotelephone equipment including DSC and NBDP..... 97
8 INMARSAT ship earth station............................................................ 99
9  Float-free  satellite  EPIRB.................................................................. 99
10 Enhanced group call (EGC) receiver................................................ 99
11 HF MSI with direct-printing (NBDP) receiver................................. 100
12  NAVTEX  receiver............................................................................ 100
13 Two-way VHF radiotelephone apparatus........................................100
14  Radar  transponders....................................................................... 100
15 Methods of maintenance................................................................100
16 Handbooks and documentation......................................................101
17  Signs  and  labels.............................................................................101
18 Special requirements for passenger vessels.................................. 102

Appendix D Guidelines for the technical inspection of Automatic Identification
System onboard ships fitted for compliance with SOLAS V................................. 103
1    General...........................................................................................103
2  Introduction..................................................................................... 103
3  Documentation.................................................................................103
4  Antennae..........................................................................................103

Changes  –  historic.............................................................................................. 105

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 6
Approval  of  service  supplier  scheme

DNV AS
SECTION 1 GENERAL

Section 1
1 Introduction
The approval of service supplier scheme is a procedure by which the Society approves suppliers providing
services to the customer, such as measurements, tests or maintenance of safety systems and equipment, the
result of which may form the basis for the Society's decisions.

2 Objective
The objective of this procedure is to provide minimum requirements for approval and certification of service
suppliers and is applicable to both initial and renewal audits.

3 Scope
The scope of the Society's approval of service supplier will normally include the following activities:
— review of documentation
— verification of competence and control needed to perform the service
— verification of equipment and facilities for the service
— assessment of the supplier and any servicing stations and subcontractors
— evaluation of how the service will be reported
— witnessing of a practical demonstration of the performance of the service including satisfactory reporting
— issuance of approval of service supplier certificate.

4 Definitions
Term Definition

IACS International Association of Classification Societies

IACS UR IACS Unified Requirements

5 Requirements

5.1 Services listed in IACS UR Z17
For services listed in IACS UR Z17 the requirements of IACS UR17 apply with any additions and clarifications
as given in App.A.

5.2 Services not listed in IACS UR Z17
For services not listed in IACS UR Z17, the general provisions of IACS UR Z17 apply. Amendments/deviations
are defined in App.B below. If requirements in App.B below are in conflict with IACS UR Z17 then the
requirements in App.B will prevail.

5.3 Applicable revision of IACS UR Z17
The in force date for revisions shall follow IACS UR Z17 revision notes.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 7
Approval  of  service  supplier  scheme

DNV AS
Section 1
6 Validity of the certificate

6.1 Renewal
Renewal of the certificate shall be made at intervals not exceeding three (3) years by verification through
audits that approved conditions are maintained or, where applicable, on expiry of the supplier’s approval
received from an equipment manufacturer, whichever comes first. In the latter case, the Society shall be
informed in due course by the service supplier.

6.2 Periodical audits
The Society may, at its own discretion, require periodical audits in the validity period of the certificate.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 8
Approval  of  service  supplier  scheme

DNV AS
APPENDIX A SPECIAL REQUIREMENTS FOR CATEGORIES OF

Appendix A
SERVICE SUPPLIERS LISTED IN IACS UR Z17

1  Thickness measurements on ships and mobile offshore units
IACS UR Z17 Annex 1 [1] applies with the following additions.

1.1 Application
Firms carrying out thickness measurements on board ships and offshore units, the results of which are used
by the Society's surveyors in making decisions affecting classification, are subject to approval by the Society
in accordance with the mandatory procedures given in this class programme.
All firms shall be certified as one of the following two categories:
— Category I: authorised to do measurements onboard all types and sizes of ships.
1)
— Category II: authorised to do measurements onboard fishing vessels of all sizes, and non-ESP  ships of
2)
less than 500 GT .
ESP ships of all sizes and general cargo ships of more than 500 GT can only be measured by category I
companies.
Category I companies shall be certified according to Sec.1 [1] to Sec.1 [5] of this document. Category II
shall be certified according to Sec.1 [6].
1)
 ESP ships: ships subject to enhanced survey programme, i.e. oil tankers, tankers for chemicals and bulk
carriers, with the mandatory class notation ESP.
2)
 As per the international convention on tonnage measurement of ships, 1969.

1.2 Objective
The objective of this programme is to ensure that measurements and reporting of structural scantlings are
correct. This is done by ensuring that firms engaged in thickness measurements have qualified personnel
that are able to recognise corroded or pitted areas and understand ship’s drawings, implemented written
systems for training, control, verification and reporting, in addition to the necessary technical equipment and
facilities to render professional assistance.

1.3 Limitation to the size of the company
Where several servicing stations are owned by a given company, each station shall be assessed and approved
separately, according to the same requirements as for the main company.

1.4 General requirements
1.4.1 Training and qualification
The operators carrying out the measurements shall be certified in ultrasonic testing at level 1 and relevant
industry sector, according to a recognised international standard for qualification and certification of NDT
personnel (i.e. EN ISO 9712 or equivalent). Personnel qualification to an employer based qualification scheme
as SNT-TC-1A may be accepted if the employer's written practice is reviewed and found acceptable by the
Society. Operators shall have had a minimum of one (1) year tutored on-the-job training.
The operator shall have adequate knowledge of the relevant rules and ship’s structures, sufficient to select a
representative position for each measurement.
Operators and supervisors shall be able to communicate in English.
The responsible supervisor shall be certified in ultrasonic testing at level 2 and relevant industry sector,
according to a recognized international standard for qualification and certification of NDT personnel (i.e. EN

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 9
Approval  of  service  supplier  scheme

DNV AS
ISO 9712 or equivalent). Personnel qualification to an employed based qualification scheme as SNT-TC-1A

Appendix A
may be accepted if the employer's written practice is reviewed and found acceptable to the Society.

1.4.2 Equipment and facilities
Instruments using pulsed echo technique, either with oscilloscope or digital instruments using multiple echo
are required Single echo instruments are not accepted. A record of the equipment used shall be kept. The
record shall contain information on maintenance and calibration. Confirmation from the manufacturer that
the instruments satisfy the requirement above shall be enclosed in the instrument record.

1.4.3 Work procedures
The firm shall have documented work procedures covering planning, execution and reporting including items
listed in [1.4.4], [1.4.5], [1.4.6] and [1.4.7].

1.4.4 Preparation
— practise of verification of readings by attending surveyor to be agreed
— the supplier is responsible for using the latest version of the report form that can be found on
www.dnv.com under Maritime, Publications & downloads
— the surveyor’s presence shall be recorded in the report
— all data given in the minimum thickness list shall be entered into the template before the job is started, as
part of the preliminary preparation
— operators and supervisor shall carry ID cards with photo
— an up-dated list of approved operators and supervisor shall be kept at the approving office so that
identification can be verified by the attending surveyor. Readings taken by non-listed operators will be
rejected
— the operators shall attend the planning meeting which is held before each job is started. Owner's
representative and the attending surveyor will also participate in the meeting
— equipment shall be calibrated with the Society's surveyor present.

1.4.5 Execution
— Measurements that are not carried out in cooperation with the Society will not be accepted. The firm shall
inform the owner accordingly.
— When onboard the operator/supervisor shall have his/her certificate and identification papers readily
available. The operator shall notify the Society's surveyor of any structural deficiencies or abnormal
measurements detected. That includes areas with substantial corrosion, which shall be mapped with an
increased number of measurements, taken in co-operation with the Society's surveyor.
— Unless otherwise specified, the measurements shall be taken in line with the Society's guideline for
thickness measurements, available at www.dnv.com.

1.4.6 Sub-contractors shall not be used
To hire certified operators from another approved service supplier is not considered sub-contracting. This is,
however, to be included in the report. Subcontractors providing anything other than subcontracted personnel
or equipment shall also meet the requirements given in this document.

1.4.7 Verification
The firm shall have the Society's surveyor verification of each separate job.

1.4.8 Reporting
The UTM report shall be made in the Society's electronic reporting format, Pegasus, available at
www.dnv.com, and uploaded as hcz-file to DNV online tool Veracity.
Prior to commencing measurements onboard, in addition to the measured values, the original scantlings, the
minimum thickness and the substantial corrosion limits shall be stored in the electronic report.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 10
Approval  of  service  supplier  scheme

DNV AS
When on board, measured thicknesses shall be continuously recorded in the Society’s electronic report form,

Appendix A
based on the operator’s working notes, photos and sketches and are regularly to be made available for the
attending surveyor's review and verification.
Upon completion of the measurements onboard the operator shall provide the surveyor with a temporary
electronic draft of the results presented in the Society's electronic report form, and supplied with the
operator’s notes, as found necessary. The location of the measurements shall be illustrated by sketches or
drawings.
The preliminary report shall include a longitudinal strength evaluation when required, (IMO Res.A.744(18)
Annex 12) valid for oil tanker with length above 130 meters and over 10 years of age, e.g. at the third
renewal survey and subsequent renewal surveys.
Final reporting in original electronic form and in a non-editable electronic form (e.g. PDF-format) shall be
presented to the surveyor within two (2) weeks after the job is terminated. The firm shall have the surveyor’s
verification of each separate job, documented in the report by his signature and the text 'Verified and
Evaluated'.
The report shall include a copy of the certificate of approval of the firm.

1.5 Certification
1.5.1 Alterations
In case any alteration to the certified service operation system of the firm is made, including changes related
to UTM operators, such alteration shall immediately be reported to the Society.

1.6 Category II companies - limited approval of firms locally engaged in
ultrasonic thickness measurements of ship’s structure
1.6.1 Application
1)
Firms carrying out thickness measurements on fishing vessels of all sizes and non-ESP  ships below 500
2)
GT , may be qualified according to the requirements in this section.
If the company in addition complies with IACS Unified Requirements Z17, it may carry out thickness
measurements onboard fishing vessels of all sizes and non-ESP ships with length less than 100 meters,
except General dry cargo ship subject to Extended hull survey requirements (EHSR) above 500 GT, as per the
definition set in DNV-RU-SHIP Pt.7 Ch.1 Sec.1 or IACS Unified requirements Z7.1.
1)
 ESP ships: ships subject to enhanced survey programme, i.e. oil tankers, tankers for chemicals and bulk
carriers, with the mandatory class notation ESP.
2)
 As per the International convention on tonnage measurement of ships, 1969.
Guidance note:
IACS UR Z17 is available on the Internet at http://www.iacs.org.uk/ under Publications, Unified requirements.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

1.6.2 Objective
The objective of this limited approval programme is to ensure that firms engaged in thickness measurements
have qualified personnel that are able to measure thicknesses, recognise corroded or pitted areas and
understand ship’s drawings in addition to having the necessary technical equipment to render professional
assistance.

1.6.3 Procedure for approval

1.6.3.1 The following documents shall be submitted to the Society for review
— description of company’s management structure and manning
— name of operators and supervisor, documenting training, experience and qualifications

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 11
Approval  of  service  supplier  scheme

DNV AS
— description of equipment used including routines for maintenance and calibration

Appendix A
— a guide for operators of such equipment.

1.6.3.2 Operator
The operators carrying out the measurements shall be certified in ultrasonic testing at level 1 and relevant
industry sector, according to a recognised international standard for qualification and certification of NDT
personnel (i.e. EN ISO 9712 or equivalent). Personnel qualification to an employer based qualification scheme
as SNT-TC-1A may be accepted if the employer's written practice is reviewed and found acceptable by
Society. Operators shall have had a minimum of one (1) year on-the-job training. The operator shall have
adequate knowledge of ship’s structure sufficient to select a representative position for each measurement.
Guidance note:
For more information please see DNV-CG-0285, available on DNV internet homepage www.dnv.com.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

1.6.3.3 Equipment
Instruments using pulsed echo technique, either with oscilloscope or digital instruments using multiple echo,
single crystal technique are required. Single echo instruments are not accepted. Confirmation from the
manufacturer that the instrument satisfies the requirement above shall be enclosed in the instrument record.

1.6.3.4 Work execution
— the firm shall attend the planning meeting that is held before each job is started
— measurements that are not carried out in cooperation with the Society, unless otherwise agreed, will not
be accepted. The firm shall inform the owner accordingly
— the operator shall notify the surveyor of any structural deficiencies detected.

1.6.4 Reporting
Measured thicknesses shall be continuously recorded and to be made available for the attending Society's
surveyor.
The operator shall report in a recognised system and may illustrate the result by sketches or on the
drawings.
In addition to the measured values, the original scantlings, the minimum thickness and the substantial
corrosion limits, shall be included in the report.
Final reporting shall be presented to the surveyor within two (2) weeks after the job is terminated. The firm
shall have the surveyor’s verification of each separate job, documented in the report by his signature.
The report shall include a copy of the certificate of approval, containing the names of all approved operators.

1.6.5 Certification
Any alteration to the certified service operation system shall immediately be reported to the Society.

2  Tightness testing of closing appliances such as hatches, doors
etc. with ultrasonic equipment
IACS UR Z17, including Annex 1 [2], applies with the following additions.

2.1  Equipment and acceptance criteria
2.1.1  The following minimum criteria for the equipment is normally applicable:
— The transmitter shall provide a uniform open hatch value (OHV) over the tested area.
— The OHV shall be adjustable to a stable value allowing maximum sensitivity without false side effects.
— The receiver shall be provided with an audible signal and a visual readout, calibrated in decibel.
— The visual readout shall be able to hold peak values encountered during the measurements.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 12
Approval  of  service  supplier  scheme

DNV AS
— The equipment shall be demonstrated to achieve the fail/pass criterion set by the Society, (see [2.1.4]).

Appendix A
2.1.2  The following minimum criteria for calibration is normally applicable:
— Biannual re-calibration tests shall be carried out by laboratories authorised by the manufacturer, in
accordance with procedures accepted by the Society.
— Procedures for on-site testing of functionality of transmitters/receivers and of accuracy of the equipment
shall be established. This procedure shall guarantee continuing accuracy during the measurements.

2.1.3  Record of equipment shall be kept and shall contain a log of calibration and maintenance.

2.1.4  The fail/pass criterion to be applied in tightness testing shall normally be taken as follows:
— 0 dB shall mean that the hatch cover is leak tight.
— From 1dB to 10% of OHV shall mean that the hatch cover is considered weather tight, subject to verifying
the design and the condition of the hatch cover, the coaming and the drainage arrangements.
— Above 10% of the OHV shall mean that the hatch cover is considered not to be weather tight and that
corrective action to gaskets and drains is required.

3  In-water survey on ships and mobile offshore units by diver or
Remotely Operated Vehicle (ROV)
IACS UR Z17, including Annex 1 [3], applies with the following additions.

3.1 Reporting
The report shall give a complete summation in writing, including still photos, as applicable.
The report shall as a minimum contain information on the condition, including any damages of:
— propeller
— rudder
— sea suction
— underwater discharges
— bilge keels
— side and bottom plating
— thrusters (if fitted)
— marine fouling
— painting
— structure
— cathodic protection (depletion by visual inspection and measurement of potential)
— diving/ROV conditions (visibility, swell and current).
Damages found shall be documented by sketches and/or photos showing location and size.
The report shall include a copy of the certificate of approval.

3.2 Remote survey
Upon a case-by-case evaluation, in-water survey on ships and mobile offshore units may be carried out as
remote survey provided that the quality of data stream (video, photos, etc.) and communication provides a
level of assurance equivalent to the one obtained during a survey on board.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 13
Approval  of  service  supplier  scheme

DNV AS
Appendix A
4  Inspection and maintenance of fire extinguishing equipment and
systems
IACS UR Z17 Annex 1 [4] applies with the following additions:
— [4.3] Procedures:
CO2 systems - IMO MSC.1/Circ.1318:
— Section valves of fixed gas fire-fighting systems shall be internally inspected every five (5) years (see
IMO MSC.1/Circ.1432 and DNV-SI-0364).
— CO2 pipes shall be blown through annually to ensure that they are free from debris and not clogged.
Test or record of the test shall be presented to the attending surveyor (see DNV-SI-0364).

5  Service of inflatable liferafts, inflatable lifejackets, hydrostatic
release units, inflatable rescue boats, marine evacuation systems
IACS UR Z17 Annex 1 [5] applies.

6  Inspection and testing of radio communication equipment and
automatic identification systems (AIS)
IACS UR Z17 Annex 1 [6] applies with the additions given below in [6.1] to [6.9]. Guidelines for the
technical inspection of radio installations and automatic identification systems are given in App.C and App.D
respectively.

6.1 Extent of engagement
Approval of inspection and testing of radio communication equipment and AIS are independent processes and
the applicant may apply for each approval separately or combined. The applicant may apply for inspection
and testing of:
1) radio communication equipment, or
2) AIS, or
3) both radio communication equipment and AIS.
The application shall clearly state the type of inspection 1), 2) or 3) applied for.

6.2 Reference documents
The service supplier shall additionally have access to the following documents:
— DNV Statutory Interpretations of SOLAS, as amended
— MODU Code
— HSC Code
— IMO Res. A.1053(27) as amended
— IMO Res. A.789(19)
— MSC.1/Circ.1039
— DNV survey report forms: CRC 521 , CRC 401, MOD CRC 411 and AIS 001a.

6.3 Supervisors
— Certificate recognized by the ITU shall be understood as first- and second-class radio electronic certificate,
as per ITU Radio regulations, volume 1, chapter IX, article 47.
— The supervisor for AIS shall document AIS training at the AIS manufacturer(s).

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 14
Approval  of  service  supplier  scheme

DNV AS
Appendix A
6.4 Radio inspector
The inspector shall be different than the installation/commissioning/repair/service technician.

6.5 Equipment and facilities
No additions.

6.6 Minimum required instruments
Certificates for calibration of the testing equipment shall be submitted.

6.7 Procedures and instructions
— If survey of radio installations based on MODU Ch. 11 as amended is included in the application, then
the procedures shall also cover this area. Descriptions showing understanding of the GMDSS radio
requirements in the MODU code shall be submitted.
— The procedures shall conform to the requirements in the applicable IMO Resolutions listed in App.C for
radio and App.D for AIS, and shall include:
— details about what to check, how to check, and testing instrument used for each check item
— instructions on how to correctly complete the survey reports as listed in [6.8].
In addition, procedures and instructions for operating each item of the testing/inspection equipment shall
also be kept and be available at all times.
— If App.C and App.D are adopted as the service supplier's inspection procedures, then additional
information describing the testing instrument/"how to check" and reason for acceptance in some cases
shall be provided.

6.8 Reporting
The report form used shall be one of the following report forms:
1) For radio equipment:
— CRC 629a (for ships and HSLC)
— MOD CRC 304a (for MODU)
— the form CRC 630a (annual testing of 406 MHz EPIRB) or equivalent to be used for reporting of
annual testing of the EPIRB for all vessels.
2) For AIS:
— AIS 001a or appendix to IMO MSC.1/Circ.1252 (2007).
The name of the inspector shall be clearly indicated (preferably with upper-case letters) on the reports,
stamped and signed by the inspector.

6.9  Communication with DNV station
When approached directly by owners or managers of a ship for conducting a radio or AIS survey, before
conducting the survey the service supplier shall always notify the appropriate DNV station for further
instructions.
In addition, a DNV surveyor should normally be present during the radio and AIS surveys. Deviation from this
shall be clarified with appropriate DNV station before conducting the survey.
Failure in complying with the above requirements may result in cancellation of the certificate.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 15
Approval  of  service  supplier  scheme

DNV AS
Before attending the vessel, the service supplier shall clarify with the owner/manager whether the radio

Appendix A
survey is handled as remote survey by DNV. In case DNV will conduct the radio survey as remote survey, the
service supplier shall obtain contact information of the DNV remote surveyor from the owner/manager and
establish contact with Technical Support/remote surveyor instead of local DNV station before attending the
vessel.

7  Inspections and maintenance of self-contained breathing
apparatus
IACS UR Z17 Annex 1 [7] applies.

8  Examination of Ro-Ro ships bow, stern, side and inner doors
IACS UR Z17 Annex 1 [8] applies.

9  Annual performance testing of Voyage Data Recorders (VDR) and
simplified Voyage Data Recorders (S-VDR)
IACS UR Z17 Annex 1 [9] applies with the following additions:
— [9.3] Procedures:
The service supplier shall have documented procedures, instructions and checklists stating how to carry
out annual performance testing and examination of the:
— condition of all protective enclosures, including labelling
— condition of interfaces and converters
— condition of the UPS
— condition of the acoustic beacon
— condition of the release mechanism
— condition of microphones
— condition of the alarm/operating panel
— availability of all data recorded on the final recording medium
— any special items according to the applicable manufacturer’s maintenance scheme
st
— for installations on or after July 1  2014:
— functions for performance test
— data recorded on the final recording medium shall also include ECDIS display, AIS, rolling motion,
configuration data and electronic logbook (if fitted).
The instructions or checklists shall include pass criteria where relevant. Procedures and instructions for
operation of each item of the test equipment shall also be kept and be available during the annual survey.
The person carrying out annual performance testing shall additionally have access to IMO resolution
A.861(20), MCS.333(90) and IEC 61996 as well as particular documentation from the VDR manufacturer
during the annual survey on board.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 16
Approval  of  service  supplier  scheme

DNV AS
— [9.6] Reporting - Test Report:

Appendix A
Successfully passed annual performance test shall be documented in form of a Certificate of compliance
(COC) and shall be prepared in a standard form acceptable to the Society. The COC shall as a minimum
contain:
— the heading Certificate of compliance for voyage data recorder
— name and IMO number of the ship
— date and place of successfully passed testing
— make, model and serial number of the VDR
— list the reference standards in IACS UR Z17 [9.4.1]
— name and address of service supplier
— name of the technician carrying out the annual performance test
— DNV service supplier approval certificate number and the date of expire of the service supplier
certificate.
One copy of the COC shall be retained onboard the vessel, and one copy filed at the supplier. The COC
shall be traceable to the order reference system.
— Practical demonstration:
Certification is conditional on a practical demonstration of an annual VDR performance test (APT) as well
as satisfactory reporting being completed. Practical demonstration is required for both initial certification
and renewal.

10  Inspection of low location lighting systems using photo
luminescent materials and evacuation guidance systems used as an
alternative to low-location lighting systems
IACS UR Z17 Annex 1 [10] applies.

11  Sound pressure level measurements of public address and
general alarm systems on board ships
IACS UR Z17 Annex 1 [11] applies with the additions given below.
The service supplier may apply for a combined approval for sound pressure measurements of GA/PA
and measurements of noise levels (see [14] below). Both the requirements in [11] and [14] will then be
applicable.
— [11.5] Reporting:
The sound pressure level of the General alarm system, the ambient noise level and the arithmetic
difference of them shall be stated in the report. Whereas the ambient noise level is in general the noise
level measured in the specified space with machinery and equipment under normal operating condition.
The sound level of the public address system, the speech interference level (SIL) and the arithmetic
difference of them shall be stated in the report. Whereas the SIL shall be determined by measuring the
octave band levels 500 Hz, 1000 Hz, 2000 Hz and 4000 Hz in the specified space with machinery and
equipment under normal operating condition.
The operating condition and the environmental condition shall be reported accordingly.
— [11.7] Reference documents:
The supplier shall in addition have access to the following document:
— IEC 60942 - Electroacoustics - Sound calibrators (2003-01).

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 17
Approval  of  service  supplier  scheme

DNV AS
Appendix A
12  Testing of coating systems in accordance with IMO Resolution
MSC.215(82) and/or MSC.288(87)
IACS UR Z17 Annex 1 [12] applies with the following additions.

12.1 Application
The test laboratories shall be recognized by the Society and approved in accordance with this class
programme. The approval may be given to both a recognized test laboratory independent of the coating
manufacturer, and to the coating manufacturer's own laboratory.
In the following, such laboratories are also referred to as the supplier.

12.2 Auditing of the supplier
When actual testing, forming basis for test reports used to seek type approval from the Society, is carried
out, the Society's local office’s surveyor shall be called in for witnessing milestones as given in DNV-CP-0108
Protective coating systems for seawater ballast tanks and double-side skin spaces or DNV-CP-0139 Protective
coating systems for cargo oil tanks - Non-metallic materials. This is mainly related to testing performed at
the coating manufacturer's own laboratory and may typically be:
— witnessing of selection of paint material in the stock if appropriate
— witnessing of sample surface preparation
— witnessing of primer application and weathering
— examination of surface and preparation prior to application of top coat
— witnessing of top coat application
— witnessing during testing
— witnessing evaluation of test.

12.3 Reference documents
The supplier shall have access to:
— IMO Resolution MSC.215(82), Performance standard for protective coatings for dedicated seawater ballast
tanks in all types of ships and double-side skin spaces of bulk carriers (IMO PSPC-WBT).
— The relevant standards listed in the IMO Resolution MSC.215(82), and which are made mandatory via
IACS UI SC 223.
— IACS UI SC 223, For application of SOLAS Regulation II-1/3-2 Performance standard for protective
coatings (PSPC) for dedicated seawater ballast tanks in all types of ships and double-side skin spaces of
bulk carriers, adopted by Resolution MSC.215(82).
— IMO MSC.1/Circ.1465 Unified interpretations of the performance standard for protective coatings for
dedicated seawater ballast tanks in all types of ships and double-side skin spaces of bulk carriers
(Resolution MSC.215(82))IMO Resolution MSC.288(87), IMO Performance standard for protective coatings
for cargo oil tanks of crude oil tankers (IMO PSPC-COT).
— IACS UI SC 259, For application of SOLAS Regulation II-1/3-11 Performance standard for protective
coatings for cargo oil tanks of crude oil tankers (PSPC-COT), adopted by Resolution MSC.288(87)
— IMO MSC.1/Circ. 1479: Unified Interpretation on the application of the performance standard for
protective coatings for cargo oil tanks of crude oil tankers (Resolution MSC.288(87)).
— The relevant standards listed in the IMO Resolution MSC.288(87), and which are made mandatory via
IACS UI SC 259.
— IACS Recommendation no. 101, IACS Model report for IMO Resolution MSC.215(82) Annex 1 "Test
procedures for coating qualification".
— IACS Recommendations no. 102, IACS Model report for IMO Resolution MSC.215(82) Annex 1 "Test
procedures for coating qualification", Section 1.7 - Crossover test.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 18
Approval  of  service  supplier  scheme

DNV AS
Appendix A
12.4 Administrative procedures
The supplier shall have an order reference system where each engagement is traceable to when, who and
where testing was carried out, including location of test records and reports. A training and qualification
scheme for personnel involved in testing shall be available.

12.5 Work procedures and instructions
The supplier shall have documented procedures, instructions and checklists for how to carry out testing and
reporting. Procedures and instructions for operating of each item of the testing equipment shall also be kept
and be available at all time. As a minimum, the following procedures shall be available:
— procedures for measuring of salt contamination
— procedures recording the weather condition
— procedures for inspection of surface cleanliness, surface profile, oil, grease, dust and other contamination
— procedures for measuring of dry film thickness and inspection of curing of the shop primer
— procedures for measuring of adhesion/cohesion power
— procedures for inspection of undercutting from scribe.

12.6 Verification
The supplier shall have a system for verifying that the services provided are carried out in accordance with
approved procedures. Performed verification shall be documented.

12.7 Reporting
All test records shall be properly documented and retained in such a way that the performed testing can
easily be re-traced later. The report shall identify extent and location of testing performed and a conclusive
statement as to whether the test results satisfy the acceptance criteria or not.
The test report shall include references to relevant documents, as a minimum as referred to in [12.4].
In addition, and as a minimum, the following information shall be given:
— name, address and other contact information of the supplier
— contract requirements, e.g. order no., reference documents, specifications, special agreements etc.
— place and date of sample preparation and testing
— test equipment used
— name and signature of the person preparing the test samples
— name and signature of the person performing the tests
— name and signature of the person issuing the test report
— name and signature of the supervisor verifying the report.
The supplier shall file one copy of the test report, and the test report shall be traceable to the order reference
system. Also reports for testing of coating systems that have failed shall be reported and filed in accordance
with above.
IACS’ model reports shall be used as basis for the coating test laboratory’s own test report format.

12.8 References
— DNV-RU-SHIP Pt.6 Ch.1 Sec.9.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 19
Approval  of  service  supplier  scheme

DNV AS
Appendix A
13  Maintenance, thorough examination, operational testing,
overhaul and repair of lifeboats and rescue boats, launching
appliances and release gear.
IACS UR Z17 Annex 1 [13] applies.

14  Measurements of noise level on board ships
IACS UR Z17 Annex 1 [14] applies.
The service supplier may apply for a combined approval for measurements of noise levels and sound
pressure measurements of GA/PA (see [11] above). Both the requirements in [11] and [14] will then be
applicable.

15  Tightness testing of primary and secondary barriers of gas
carriers with membrane cargo containment systems for vessels in
service
IACS UR Z17 Annex 1 [15] applies.

16  Firms engaged in survey using remote inspection techniques
(RIT) as an alternative means for close-up survey of the structure
of ships and mobile offshore units
IACS UR Z17 Annex 1 [16] applies with the additions and clarifications given below in [16.1] to [16.3].
[16.1] is applicable for all types of RIT, [16.2] is applicable for remotely operated vehicles (ROV), and [16.3]
is applicable for other inspection techniques than those explicitly mentioned in IACS UR Z17.

16.1 General
16.1.1 Thickness measurements
Service suppliers undertaking thickness measurements are to hold separate approval as a 'Firm engaged in
thickness measurements on ships and mobile offshore units' (see [1]).

16.1.2 Language
Operators and supervisors shall be able to communicate in English.

16.1.3 Equipment
The equipment used for the survey must be suitable for the intended purpose. The equipment shall be non-
hazardous to the involved personnel and to the structure being inspected both during normal operations and
in the event of a malfunction or failure.
Guidance note:
The following specifications are considered acceptable:

— high definition live video monitoring for DNV Surveyor during survey. Minimum screen size 10”
— 4K definition video recording device
— 4096x2160 still image capture device.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 20
Approval  of  service  supplier  scheme

DNV AS
16.1.4 Reporting and data storage

Appendix A
Upon completion of survey, the service supplier shall provide DNV with photographs and/or video footage
from the survey, for the purpose of documenting the observed findings. The photographs and videos shall
have acceptable quality. The naming of the files should reflect the structural element surveyed, or otherwise
be easily identifiable. The data shall be stored by the service supplier, and shall be available at request from
DNV for 5 years.
Within two week of the survey completion date, DNV shall receive a written report in PDF format. The
following shall as a minimum be included in the report:
— particulars of the ship
— information about the service supplier and pilot
— date, place and type of survey
— descriptions, photos and other information relevant for the class-related activities.

16.1.5 Safety
It is the responsibility of the supplier to ensure safe operation for services for which approval is sought. The
supplier shall document a process ensuring sufficient safety level for all inspection techniques which they
have chosen to qualify. The process shall include a case by case evaluation related to each inspection (Ship/
MOU).

16.1.6 Practical demonstration
A practical demonstration (inspection) is required for the initial approval. It shall be demonstrated that
the test objectives can be achieved in a realistic test environment, within agreed acceptance criteria. The
demonstration shall be performed according to applicable work procedure(s).

16.2 Remotely operated vehicle (ROV)
16.2.1 General
For in-water close-up survey of the internal compartments by remotely operated vehicle (ROV), suppliers are
also to hold separate approval as a "Firm carrying out an in-water survey on ships and mobile offshore units
by diver or remotely operated vehicle (ROV)", (see [3]).

16.3 Other inspection techniques
16.3.1 General
Other inspection techniques than those explicitly mentioned in IACS UR Z17, for instance crawlers,
borescopes, laser scanning, hyperspectral imaging, etc., may be included in the service for which approval is
sought.

17 Firms engaged in watertight cable transit seal systems
inspection on ships and mobile offshore units
IACS UR Z17 Annex 1 [17] applies.

18 Firms engaged in commissioning testing of ballast water
management systems (BWMS)
IACS UR Z17 Annex 1 [18] applies.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 21
Approval  of  service  supplier  scheme

DNV AS
APPENDIX B SPECIAL REQUIREMENTS FOR CATEGORIES OF

Appendix B
SERVICE SUPPLIERS NOT LISTED IN IACS UR Z17

1 Service suppliers engaged in testing of navigational equipment
and systems

1.1 Application
1.1.1  This programme is applicable to service suppliers engaged in performing inspection and testing of
navigational equipment and systems on board ships for compliance with SOLAS requirements. board ships for
compliance with SOLAS requirements.

1.1.2  Service suppliers should be approved for the functional level and not for the manufacturer level.
Approval of service suppliers by classification societies does not include the ability to service the equipment
down to the manufacturer level.
If a service suppliers is not able to cover all groups of navigational equipment the groups of equipment for
which the firm is approved should be listed on any certificate issued.

1.1.3  The service supplier engagements are divided into five (5) groups of services:
Group 1:
1) Heading information systems, including bearing devices:
1) magnetic compass
2) gyro compass
3) transmitting heading device (THD).
2) Rate-of-turn indicator.
3) Rudder, propeller, thrust, pitch and operational mode indicators.

Group 2:
1) speed and distance measuring equipment (SDME)
2) echo-sounding equipment.

Group 3:
1) Position-fixing systems:
1) Loran C/Chayka
2) GPS
3) GLONASS
4) GPS/GLONASS
5) DGPS 7 DGLONASS.

Group 4:
1) bridge navigational watch alarm system (BNWAS)
2) radar system, including plotting aids
3) electronic chart display and information system (ECDIS).

Group 5:
1) heading control system (HCS)
2) track control system (TCS)

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 22
Approval  of  service  supplier  scheme

DNV AS
3) integrated navigational system (INS).

Appendix B
1.2 Requirements for supplier
1.2.1 Reference documents
The service supplier should have access to the following documents:
— SOLAS 1974 as amended.
— IMO Res. A.789(19): Specification on the survey and certification functions of recognized organizations
acting on behalf of the administration.
— All IMO Performance standards relevant for each group of services listed in [1.1.3] as well as all IEC cross
product standards (IEC 60945 and IEC 61162 series).
— Flag state administration requirements.
— Relevant parts, if any, of the Society's rules and guidelines.

1.2.2 Personnel

1.2.2.1  The service supplier should provide evidence that the person carrying out the inspection has
education from a technical school (a minimum two years' programme of engineering or physical science) or
from a nautical institution with relevant seagoing experience as a certified ship's officer.

1.2.2.2  Personnel should be trained in testing navigational equipment and systems, preferably by the
manufacturer of the equipment. Personnel should also have passed training concerning initial, annual,
periodical and renewal surveys and have proficiency in the English language commensurate with the work.

1.2.2.3  Personnel testing colour calibration on ECDIS should, in addition, have a documented Ishihara colour
vision deficiency test or equivalent and have colour vision not worse than would be required for seagoing
service as an officer.

1.2.3 Procedures and instructions
The supplier should have documented procedures and instructions for carrying out the testing and
examination of navigational equipment and systems. Such procedures and instructions should ensure that
the level of performance tests is in compliance with the relevant technical standards.

1.2.4 Equipment and facilities

1.2.4.1  The supplier should have the major and auxiliary equipment (e.g. multimeter, earth fault finder,
NMEA logger, etc.) required for correctly performing the testing.

1.2.4.2  A record of the test equipment used should be kept. The record should contain information on
manufacturer and type of equipment, and a log of maintenance and calibrations.

1.2.4.3  A standard which is relevant to the navigational equipment and systems to be tested is available for
the equipment and is cited in the inspection report.

1.2.4.4  For equipment employing software in conjunction with the testing/examination, this software shall
be fully described and verified.

1.2.5 Reporting
The service supplier should confirm by means of a documented report that the equipment has been tested
satisfactorily, using relevant DNV forms.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 23
Approval  of  service  supplier  scheme

DNV AS
1.2.6 Review and verification

Appendix B
1.2.6.1  The surveyor should be on board to the extent necessary to control the process. board to the extent
necessary to control the process.

1.2.6.2  The surveyor should confirm that no further testing is needed or specify additional testing.

1.2.6.3  The surveyor should verify the report of the service supplier.

2  Service suppliers engaged in preparation of inventory of
hazardous materials (IHM)

2.1 Application
This programme is applicable to service suppliers engaged in the following services:
— preparation of inventory of hazardous materials (IHM)
— IHM laboratory and testing services.

2.2 Specific requirements for hazmat expert companies
2.2.1  The active hazmat experts need to demonstrate practice experience for at least one (1) project per
year.

2.2.2  At least one employee of the audited company possesses a valid DNV fully approved hazmat expert
qualification certificate. The training includes a participation in the 3-4 days seminar Approved HazMat Expert
as a theoretical and practical introduction to the business and mandatory to pass the exam. Moreover a
witnessing of the hazmat expert during his/her first assignment is required.

2.2.3  An operational manual is provided, which describes the project execution according to the IMO IHM
guidelines.

2.2.4  The reports may be compiled in the following main structure:
— executive summary
— scope and method
— visual and sampling check plan
— pictorial report
— lab report
— findings and conclusions
— references and qualification.

2.3 Specific requirements for laboratories (lab)
2.3.1  Only ISO/IEC 17025 accredited laboratories should be used.

2.3.2  The lab is accredited for the respective test items and test methods stated in the IMO IHM guidelines.

2.3.3  At least one employee of the audited company possesses a valid DNV HazMat Expert qualification
certificate or an equal qualification issued by a recognized organization.

2.3.4  For asbestos the supplier should demonstrate his quality performance through so called proficiency
test events organized by independent institutes at least two (2) times a year.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 24
Approval  of  service  supplier  scheme

DNV AS
2.3.5  The reports should content in particular scope, method, detection level and signature.

Appendix B
2.4 Relevant documents
1) The HKC: The 'Hong Kong international convention for the safe and environmentally sound recycling of
ships, 2009' SR/CONF/45.
2) IHM guidelines: Guidelines for the development of the inventory of hazardous materials Resolution IMO
MEPC.269(68).
3) Survey and certification guidelines: 2012 Guidelines for the survey and certification of ships under the
Hong Kong convention Resolution IMO MEPC.222(64).
4) EU SRR: Regulation (EU) No 1257/2013 of the European Parliament and of the council of 20 November
2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/EC.
5) IACS Recommendation 113 Expert parties engaged in visual and/or sampling checks for preparation of
inventory of hazardous materials.
6) DNV-RU-SHIP Pt.6 Ch.7 Sec.4 Recycling/Recyclable.
7) ISO/IEC 17025 General requirements for the competence of testing and calibration laboratories.

3  Service suppliers engaged in inspection and testing of centralised
gas welding and cutting equipment

3.1 Procedures
3.1.1 Service suppliers shall have documented procedures and instructions on how to carry out the servicing
of the equipment and/or system. These shall either contain or make reference to the manufacturer’s
servicing manuals, servicing bulletins, instructions and training manuals, as appropriate, and to international
requirements.

3.1.2 Additionally they shall make reference to any requirements (e.g. which markings should be appended
to the equipment/system).

3.2 Administrative procedures
The supplier should have an order reference system where each engagement is traceable to the inspection
and testing report.

3.3 Training of personnel
The supplier is responsible for the qualification and training of its supervisors and inspectors/operators to
a recognised national, international or industry standard as applicable. A plan for training of personnel is
included.

3.4 Reporting
Every assignment shall be accompanied by a written report. One copy shall be handed to the vessel, and
filed at the supplier premises. The report shall be traceable to the order reference systems. The report shall
in addition to specify the works carried out give information of any deficiencies found on components, non-
conformance detected and any replacements done of components. NMA forms shall be used as applicable.
The report shall include a copy of the certificate of approval.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 25
Approval  of  service  supplier  scheme

DNV AS
Appendix B
3.5 Reference documents
The service supplier shall have access to the following documents:
— Manufacturer’s servicing manuals, servicing bulletins, instructions and training manuals, as appropriate.
— Approval certificates showing any conditions that may be appropriate during the servicing and/or
maintenance of gas welding and cutting equipment.

4  Service suppliers engaged in non-destructive testing (NDT) on
classification projects

4.1 General
4.1.1 Scope
This appendix is applicable to service suppliers engaged in performing NDT (Non-destructive testing) on ship
and/or offshore components/structures which have or will have DNV classification. The general requirements
are given in Sec.1. Relevant service suppliers shall be approved by the Society if required by relevant part
of the Society's rules and standards. In this programme such NDT service suppliers are referred to as the
supplier.
Guidance note:
NDT suppliers approved to this document comply with the requirements of IACS UR W35. The requirements of this document
exceed the requirements of IACS UR W35 and service suppliers approved to a scheme based on IACS UR W35 may not necessarily
meet the requirements of this document.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

4.1.2 Objective
The objective of this approval programme is to ensure that the supplier is using appropriate procedures, has
qualified and certified personnel and has implemented written procedures for training, experience, education,
examination, certification, performance, application, control, verification and reporting of NDT. In addition,
the supplier shall ensure that appropriate equipment and facilities is utilized in order to provide a professional
service.

4.1.3 Extent of programme
The approval programme defines the procedures required in obtaining the Society's approval for carrying out
NDT of ship and offshore units (components and structures) classed by the Society.

4.1.4 Terms and definitions
The following terms and definitions apply for this document and approval programme.

ACFM = alternating current field measurements
client = firm purchasing the services of a supplier (i.e. NDT services provider)
ET = electromagnetic testing (i.e. Eddy Current testing and/or alternating current field
measurements (ACFM))
industrial = section of industry or technology where specialised NDT practices are used, requiring specific
sector product-related knowledge, skill, equipment and/or training
MT = magnetic particle testing
NDT = non-destructive testing. The development and application of technical methods to examine
materials or components in ways that do not impair their future usefulness and serviceability,
in order to measure geometrical characteristics and to detect, locate, measure and evaluate
flaws. NDT is also known as non-destructive examination/evaluation (NDE) and non-

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 26
Approval  of  service  supplier  scheme

DNV AS
destructive inspection (NDI). Comprising, but not limited to, the methods and techniques MT,

Appendix B
PT, RT, VT, UT, PAUT, TOFD, ET (including ACFM)
PAUT = phased array ultrasonic testing (technique within the method UT)
PT = penetrant testing
RT = radiographic testing
RT‐D = digital radiography (several techniques within the method RT, e.g. computed radiography or
direct radiography)
significant = absence or change of activity which prevents the certified individual from practising the duties
interruption corresponding to the level in the method and the industrial sector(s) within the certified
scope, for either a continuous period in excess of one year or two or more periods for a total
time exceeding two years
Guidance note:
Legal holidays or periods of sickness or courses less than 30 days are not taken into account when calculating
the interruption.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

society = the classification society conducting the approval. For this programme the society is DNV
supplier = independent NDT company or NDT department/section that forms a part of a company
providing NDT services on ship and/or offshore components/structures
TOFD = time of flight diffraction (technique within the method UT)
UT = ultrasonic testing
VT = visual testing.

4.1.5 References
Applicable reference documents are given in Table 1.

Table 1 Reference documents

Document code Title

Nondestructive Examination and Quality Control Central Qualification and Certification
ASME ANDE-1
Program

ANSI/ASNT CP-105 Nondestructive Testing – Qualification and Certification of Personnel

ANSI/ASNT CP-106 Standard for Qualification and Certification of Nondestructive Testing Personnel

ANSI/ASNT CP-189:2016 or
Standard for qualification and certification of non-destructive testing personnel
later

ASME V Nondestructive Examination: Article 14 - Examination System Qualification

ASNT SNT-TC-1A:2016 or
Personnel Qualification and Certification in Nondestructive Testing
later

CAN/CGSB-48.9712/ISO
Non-destructive testing – Qualification and certification of NDT personnel
9712

EN 4179 Aerospace series. Qualification and approval of personnel for non-destructive testing

NAS 410 Standard for qualification and certification of nondestructive testing personnel

ISO 9001:2015 or later Quality management systems - Requirements

ISO 9712:2012 or later Non-destructive testing - Qualification and certification of NDT personnel

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 27
Approval  of  service  supplier  scheme

DNV AS
Document code Title

Appendix B
Employer’s qualification system for non-destructive testing (NDT) personnel (For steel
ISO 11484 products: tubes, pipes (seamless or welded), flat products, long products, rails, bars,
sections, rod, and wire)

Conformity assessment – General requirements for accreditation bodies accrediting
ISO/IEC 17011
conformity

Conformity assessment - Requirements for the operation of various types of bodies
ISO/IEC 17020:2012 or later
performing inspection

Conformity assessment - General requirements for bodies operating certification of
ISO/IEC 17024:2012 or later
persons

ISO/TS 11774 Non-destructive testing – Performance-based qualification

ISO 18490 Non-destructive testing – Evaluation of vision acuity of NDT personnel

Non-destructive testing - Discontinuities in specimens for use in qualification
ISO/TS 22809
examinations

ISO/TR 25108 Non-destructive testing - Guidelines for NDT personnel training organizations

ISO/TR 25107 Non-destructive testing – Guidelines for NDT training syllabuses

4.2  Requirements for supplier
4.2.1 Extent of approval
A certificate of approval will be awarded and maintained on the basis of compliance with the following.

4.2.2  Submission of documents
The following documents shall be submitted to the Society for review before the audit is scheduled:
— an outline of supplier's organisation and management structure, including any subsidiaries to be included
in the approval
— information on the structure of the supplier's quality management system
— quality manual and master list of the quality manual and documented procedures covering the
requirements given in [4.2.3]
— for companies with in-house personnel certification scheme; a written practice developed in accordance
with a recognized standard or recommended practice (i.e. ASNT's SNT-TC-1A, ANSI/ASNT CP-189 or
similar)
— operational work procedures for each NDT method including procedure for selection of NDT technique
— training- and follow-up programmes for NDT operators including practical training on various ship and
offshore products
— procedure for supervisor's authorisation of NDT operators
— experience of the supplier in the specific service area
— a list of NDT operators' documented training and experience within the relevant service area, including
qualifications and third party certification according to EN ISO 9712 based certification schemes
— description of equipment(s) used for the particular service for which approval is sought
— a guide for NDT operators to use relevant equipment
— record formats for recording results of the services referred to in [4.2.14]
— information on other activities which may present a conflict of interest
— record of customer claims and corrective actions
— any legal proceedings against the company in the past/currently in the courts of law.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 28
Approval  of  service  supplier  scheme

DNV AS
4.2.3 Quality management system

Appendix B
The supplier shall have a documented quality management system, covering at least:
— work procedures for all tasks and operations, including the various NDT methods and NDT techniques for
which the supplier is involved
— preparation, issuance, maintenance and control of documents
— maintenance and calibration of the equipment
— training programs for the NDT operators and the supervisors
— maintenance of records for NDT operators' and the supervisors' training, qualification and certification
— certification of NDT operators' including re-validation and re-certification
— procedure for test of operators visual acuity
— supervision and verification of operation to ensure compliance with the operational procedures
— quality management of subsidiaries
— job preparation
— recording and reporting of information, including retention time of records
— code of conduct for the supplier's activities; especially the NDT activities
— periodic review of work process procedures
— corrective and preventive action
— feedback and continuous improvement
— internal audits
— the provision of an engineering library with required codes, standards and procedures to assist NDT
operators.
A documented quality system complying with ISO/IEC 17020:2012 or later version, or similar and including
the above would be considered acceptable. The supplier should satisfy the requirements of type A or type B
inspection body, as described in ISO/IEC 17020.

4.2.4 Extent of approval
The supplier shall demonstrate, as required in [4.2.5] to [4.2.14], that it has the competence and control
needed to perform the specified services.
The extent of the approval shall include and be limited to the NDT methods, NDT techniques and personnel
upon which approval will be granted.

4.2.5  Qualification and certification of NDT personnel
The supplier is responsible for the training and third party certification of its supervisors and operators to a
recognized certification scheme based on ISO 9712.
Personnel qualification to an employer based qualification scheme as e.g. SNT-TC-1A or ANSI/ASNT CP-189
may be accepted if the supplier's written practice is reviewed and found acceptable by the Society. The
supplier's written practice shall as a minimum, except for the impartiality requirements of a certification body
and/or authorised body, comply with ISO 9712.
The supervisors' and operators' certificates and competence shall comprise all industrial sectors and
techniques being applied by the supplier.
Level 3 personnel shall be certified by an accredited certification body.

4.2.6 Supervisor
The supplier shall have a supervisor or supervisors, responsible for the appropriate execution of NDT
operation and for the professional standard of the operators and their equipment, including the professional
administration of the working procedures.
The supervisor shall be directly involved in review and approval of NDT procedures, NDT reports, calibration
of NDT equipment and tools. The supervisor shall on behalf of the supplier re-evaluate the training,
qualification and experience of the operators annually.
The supplier shall employ, on a full-time basis, at least one supervisor for the NDT method(s) concerned and
as described in [4.2.5]. The supervisor shall be certified to level 3 by an accredited certification body.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 29
Approval  of  service  supplier  scheme

DNV AS
It is recognized that small suppliers may not directly employ a level 3 in all the applicable methods. In

Appendix B
such cases, limited to suppliers with no more than 10 NDT operators, it may be accepted that the supplier
employ an external, independently certified, level 3 in those methods not held by the full-time level 3(s) of
the supplier. Such employment/agreement shall be documented in writing, and the service supplier shall
document continuously that the level 3 in question is sufficiently available and fulfilling all assigned tasks.
Note:
The Society may at its own discretion request any supplier to have full-time employed level 3 in certain NDT methods. Example:
Suppliers mainly doing UT may be requested to have full-time employed level 3 in UT. This is particularly relevant for suppliers
qualified for advanced NDT.

---e-n-d---o-f---n-o-t-e---
The supervisor's training, qualification, experience and certification shall be re-evaluated at regular intervals
for re-certification set by the accredited body that originally certified the supervisor (normally every five (5)
years).

4.2.7  Operators
The operator carrying out the NDT shall, as a minimum, be qualified and certified to level 2 in the NDT
method(s) concerned and as described in [4.2.5]. Operators only undertaking the gathering of data using
any NDT method and not performing data interpretation or data analysis may be qualified and certified as
appropriate, at level 1.
The operator shall have adequate knowledge of materials, structures or components, NDT equipment and
limitations that are sufficient to apply the relevant NDT method for each application appropriately.

4.2.8  Personnel records
The supplier is required to keep and maintain records of the qualified NDT operators. The supplier shall
submit an updated list of qualified operators to the Society on request.
The records shall contain information on age, formal qualification, training, certification, authorisation/re-
validation, recertification and experience in the NDT method(s) concerned.

4.2.9  Equipment
The supplier shall maintain records of the NDT equipment used and detail information related to
maintenance, calibration and verification activities. If the supplier hires equipment, such equipment shall
have updated calibration records, and the operators shall be familiar with the specific equipment type prior
to using it. Under any circumstance, the supplier shall possess sufficient equipment to carry out the services
being a part of the NDT scope required by the Society.
Where the equipment is of unique nature, the NDT operators shall be trained in the operation and use of the
equipment before carrying out NDT using this equipment.

4.2.10  Work procedures and instructions
The supplier shall establish written procedures for the NDT being applied. These procedures shall be verified/
approved by the supplier’s level 3. The procedures shall define all relevant information relating to the
inspection and shall at least contain information on:
— NDT methods
— calibration checks
— inspection procedure
— defect evaluation against acceptance criteria
in accordance with the Society's rules and standards.
All NDT procedures and instructions shall be properly documented in such a way that the performed testing
may be easily retraced and/or repeated at a later stage.
Guidance note:
The service supplier shall observe that the Society's rules and standards may give further specific requirements for NDT
procedures, e.g. that project specific procedures shall be prepared and submitted for formal approval by the Society, etc.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 30
Approval  of  service  supplier  scheme

DNV AS
4.2.11 Administrative procedures

Appendix B
The supplier shall have an order reference system where each engagement is traceable to when, who and
where the test was carried out including the location of test record and reports.

4.2.12 Verification
The supplier shall have a system to verify that the service provided is carried out in accordance with
approved or agreed procedures. Executed verification shall be documented. Verification shall be performed by
personnel possessing similar qualifications as the personnel performing the service.

4.2.13 Sub-contractors
The supplier shall give information of agreements and arrangements if any part(s) of the services provided
are subcontracted. The supplier, in the following-up of subcontracts shall give particular emphasis to the
quality management system of the subcontractor.
Subcontractors shall meet the same requirements placed on suppliers for any NDT performed.

4.2.14 Reporting
All NDT shall be properly documented in such a way that the performed examination may be easily retraced
and/or repeated at a later stage. The reports shall identify the defects present in the tested area, and
a conclusive statement as to whether or not the material, weld, component or structure satisfies the
acceptance criteria or not.
The report shall as a minimum have a content covering the same items as listed in DNV-CG-0051. Applicable
standard, NDT procedure and acceptance criteria shall comply with the Society's rules.

4.3 Approval procedure
4.3.1 Initial audit
The Society will carry out an audit of the supplier once all documentation and information received from the
supplier has been evaluated and accepted.
The audit will be carried out by reviewing records submitted by the supplier, a visit to the supplier's facility/
office and interview of personnel including certified level 3 supervisor.
Acceptance of the supplier's supervisor(s) and NDT operators shall be done according to [4.7] of this
programme.

4.3.2 Renewal audit
Renewal of the certificate of approval shall be made at intervals specified in Sec.1 [6.1]. The supplier should
submit an application for renewal to the Society at least three months before the expiry date.

4.3.3 Additional audits
The Society may require additional audits where deemed necessary, e.g. as part or condition of the approval
or as the result of findings during a project. The scope of the audit may be limited where relevant, e.g. a
review of documentation, a verification of personnel or a verification of processes. See also Sec.1 [6.2].
The supplier shall provide access to their records, people and facility upon request.

4.4 Certificate of approval
4.4.1 Approval of the supplier
If the submitted documentation, the audit and where relevant the practical examination is found satisfactory,
the supplier is qualified for a certificate of approval.

4.4.2 Scope of the approval
The approval will be specific and limited to supplier specified on the certificate, to the listed NDT methods
and techniques, and the list of qualified operators. The certificate do not cover the supplier's organization and
facilities not covered by the Society's audits as specified in [4.3.1] to [4.3.3].

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 31
Approval  of  service  supplier  scheme

DNV AS
The approval for NDT methods will depend on availability of supplier's certified supervisor and NDT operators

Appendix B
certified in the methods for which the approval is sought.
The approval of the supplier covers the NDT operators on the list of operators submitted to the Society.

4.5  Information on alteration to the approved service operation system
In cases where any alteration to the approved service operation system or alteration of supervisors covered
by the suppliers approval or NDT operators of the supplier are made, such alteration shall be reported
immediately to the Society. A re-audit and/or re-approval may be required when deemed necessary by the
Society.

4.6  Cancellation or suspension of the certificate of approval
4.6.1  Right to cancel or suspend
The Society reserves the right to cancel or suspend the certificate of approval in the following cases:
— where the service was improperly carried out or the results were improperly reported
— where a surveyor finds deficiencies in the approved service operation system of the supplier, and
appropriate corrective action is not taken
— if any NDT work is done without following procedures approved by the Society
— where the supplier fails to give information of any alteration, as given in [4.5]
— where an additional audit, if requested as described in [4.3.3], has not been carried out
— where wilful acts or omissions are ascertained
— violation of code of ethics and conduct.

4.6.2 Information
The Society reserves the right to inform interested parties on cancellation or suspension of the certificate of
approval.

4.6.3 Re-approval
A supplier that has had a certificate of approval cancelled may apply for re-approval after a period of one (1)
year.
This possibility is not open if the cancellation was based on a serious fault, such as a violation of code of
conduct.
A supplier that has had its certificate of approval suspended may have the certificate reinstated as soon as
issues listed in [4.6.1] are rectified.

4.7 Requirements for qualification of NDT personnel
4.7.1 General
The following approach shall be used in order to qualify NDT operators employed or hired by suppliers
approved according to this programme or seeking approval according to this programme.
The Society reserves the right to require practical examination including reporting (e.g. using test samples),
witnessed or arranged by the Society accordingly for NDT operators and supervisors. The scope and grading
of practical examination of NDT operators will typically be as specified in ISO 9712 latest revision.

4.7.2  Acceptance of supervisors for service suppliers
The supplier's supervisor or supervisors, responsible for the appropriate execution of NDT operation and for
the professional standard of the operators and their equipment, including the professional administration of
the working procedures, (see [4.2.6]), shall be certified as outlined in this appendix.
In particular, the supplier shall ascertain that the supervisor:
— has satisfactory vision and colour perception

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 32
Approval  of  service  supplier  scheme

DNV AS
— is familiar with and able to satisfactorily interpret standards codes and draft NDT procedures and/or NDT

Appendix B
instructions for the testing in the relevant industrial sector(s)
— is familiar with applicable rules, standards and requirements for NDT, for the method(s) and sector(s) for
which approval as service supplier is sought
— has acquired suitable industrial experience at typical level corresponding with the certification level in the
applicable NDT method and relevant sector(s)
— has been successful in job-specific practical third party certification examinations that are relevant to the
industrial sector in which approval is sought
— continues to be qualified, without significant interruption, in the industrial sector which approval is sought.

4.7.3 Route A for acceptance of NDT operators' qualifications
An individual holds at least an ISO 9712 level 2 certificate in a method and relevant sector issued by a
certification body which is accredited for certification of persons according to ISO/IEC 17024 confirming
compliance with ISO 9712. Furthermore, the supplier has active working procedures for follow-up and yearly
authorisation of the certified individual.

4.7.4 Route B for acceptance of NDT operators' qualifications
An individual qualified and certified to at least level 2 in a method and relevant sector against criteria of a
standard that is equivalent to ISO 9712, may be accepted as being qualified provided it is satisfied that all
criteria are equivalent to those of ISO 9712.
In this case the individual may be accepted as being qualified upon receipt of satisfactory documented
evidence of qualification and certification provided by the certification body concerned and that the supplier
has active working procedures for follow-up and yearly authorization of the certified individual.

4.7.5 Route C for acceptance of NDT operators' qualifications
An individual qualified and certified to at least level 2 in a method and relevant sector against criteria of
a standard or recommended practice that is based on so called in-house certification (e.g. according to
ASNT's SNT-TC-1A or ANSI/ASNT CP-189 or similar), may be accepted provided it is satisfied that all criteria
regarding training, theoretical and practical competence are equivalent to those of ISO 9712.
In particular, the supplier shall ascertain and provide evidence that the operators have:
— satisfactory vision and colour perception
— completed general and job-specific training prior to examination
— acquired suitable industrial experience in the applicable NDT method and relevant sector(s)
— been successful in general and relevant specific written qualification examinations
— been successful in job-specific practical examinations that are relevant to the industrial sector which
approval is sought
— continues to be qualified, without significant interruption, in the industrial sector which approval is sought,
and
— is familiar with and able to satisfactorily implement defined NDT procedures and/or NDT instructions for
the testing in the relevant industrial sector.

5  Service suppliers engaged in condition monitoring and condition
based maintenance

5.1 General
5.1.1 Scope
Companies providing condition monitoring (CM) and/or condition based maintenance (CBM) services for
machinery and equipment, in order to offer an alternative to calendar based maintenance, shall be approved
by the Society. The companies shall be approved in accordance with this programme and applicable DNV
rules. In the following, such companies are referred to as the supplier.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 33
Approval  of  service  supplier  scheme

DNV AS
5.1.2 Objective

Appendix B
The objective of this approval programme is to ensure that the supplier is using appropriate procedures, has
qualified personnel and has implemented written procedures for training, performance, application, control,
verification and reporting.

5.1.3 Extent of the approval programme
The approval programme defines the requirements for obtaining the Society's approval for carrying out
CM and/or CBM on machinery and equipment, normally subject to renewal/complete and annual survey on
vessels classed by the Society.

5.1.4 Use of standards
The requirements for this approval programme is mainly based on international standards.

5.1.5 Terms, definitions and abbreviations
The following terms and definitions apply for this document and approval programme.

alarm = operational signal or message designed to notify personnel when a selected anomaly or a
logical combination of anomalies, requiring corrective actions is encountered (ISO 13372)
alert = operational signal or warning message designed to notify personnel when a selected
anomaly, or a logical combination of anomalies, requiring heightened awareness is
encountered (ISO 13372)
competence = proven ability to use knowledge, skills and personal, social and/or methodological abilities,
in work or study situations and in professional and personal development
access control = means to ensure that access to assets is authorized and restricted based on business and
security requirements
account = method associated with establishing, granting and revoking access accounts and
management maintaining the permissions and privileges provided under these accounts to access
specific resources and functions in the physical premises, network and systems
accuracy = composite of trueness and precision (ISO 5725-1)
binary = statistical measure of how well a binary classification test correctly identifies or excludes
accuracy (BA) a condition. The binary accuracy is the proportion of true results (both true positives and
true negatives) among the total number of cases examined i.e. BA= (TP+TN)/(TP+TN+FP
+FN)
anomaly = irregularity or abnormality in a system (ISO 13372)
abnormality = deviation from a standard condition (ISO 13372)
audit = systematic, independent and documented process for obtaining objective evidence and
evaluating its objectively to determine the extent to witch the audit criteria are fulfilled
baseline = descriptor or group of descriptors which provides a criterion of the normal behaviour of a
machine under various process states (ISO 13372)
condition = activity, performed either manually or automatically, intended to measure at
monitoring predetermined intervals the characteristics and parameters of the actual state of the item
(CM) (EN 13306)
condition = activity, performed either manually or automatically, including a single or a composition of
monitoring several descriptors combined in a method of analysis to measure and determine the state
method and condition of a machine or equipment. The activity may cover a functional failure or be
limited to a specific failure mechanism or degradation
corrective = maintenance carried out after fault recognition and intended to restore an item into a state
maintenance in which it can perform a required function (EN 13306)
condition based= preventive maintenance which includes assessment of physical conditions, analysis and
maintenance the possible ensuing maintenance actions (EN 13306)
(CBM)

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 34
Approval  of  service  supplier  scheme

DNV AS
continuous = recurring activity to enhance performance (ISO 9000)

Appendix B
improvement
continuous = service provided by the supplier as per the terms and conditions agreed shall not under
operation normal circumstances be discontinued
confidence level= figure of merit (e.g. percentage) that indicates the degree of certainty that the diagnosis/
prognosis is correct (ISO 13381-1)
data‐driven = simple trending, neural network, pattern recognition/correlations, statistical data analysis,
model etc.
data = frequency of data sampling relative to a time unit
acquisition rate
data flow = graphical representation of the system and any connections to it illustrating the flow
diagram of data from sensor system through any node (component) before made available for
analysis
descriptor = data item derived from raw or processed parameters or external observation
diagnostics = examination of symptoms and syndromes to determine the nature of faults or failures
(kind, situation, extent) (ISO 13372)
estimated = estimation of the period from the current point in time to the point in time where the
time to failure monitored machine is deemed to be in the failed condition (ISO 13381-1)
(ETTF)
failure mode = manner in which the inability of an item to perform a required function occurs EN 13306
failure = physical, chemical or other processes which may lead or have led to failure (EN 13306)
mechanism
failure modes = structured procedure to determine equipment functions and functional failures, with each
effects analysis failure being assessed as to the cause of the failure and the effects of the failure on the
(FMEA) system (ISO 13372)
failure modes = FMEA with a classification process based on the severity of the faults (ISO 13372)
effects and
criticality
analysis
(FMECA)
failure modes = process based on FMECA that documents the symptoms produced by each mode and the
symptoms most effective detection and monitoring techniques in order to develop and optimize a
analysis monitoring programme (ISO 13379-1)
(FMSA)
fault tree = deductive (top-down) method of analysis aimed at identifying the causes or combination of
analysis (FTA) causes that may lead to the defined top event (IEC 61025)
inspection = examination for conformity by measuring, observing, or testing the relevant characteristics
of an item (EN 13306)
influence = parameters that affect the deterioration rate of a failure mode (ISO 13381-1)
factors
knowledge‐ = fault/symptom diagnostic, causal tree diagnostics
based model
maintenance = a guided logic approach to select most appropriate maintenance task based on a
task analysis maintenance strategy
malware = software intentionally designed to cause damage to a computer, server or network
malware = method to ensure that information and information processing facilities are at any time
management protected against current malware threats
minimum = minimum manning level indicates that the supplier shall be able to continue performing
manning level all relevant services and verification of work according to approved procedures and

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 35
Approval  of  service  supplier  scheme

DNV AS
requirements even if relevant personnel for some reason is unavailable in a period to

Appendix B
perform their intended function
operating = physical loads and environmental conditions experienced by the item during a given period
conditions (EN 13306)
preventive = combination predetermined and condition based maintenance carried out intended to
maintenance assess and/or to mitigate degradation and reduce the probability of failure of an item
predetermined = preventive maintenance carried out in accordance with established intervals of time or
maintenance number of units of use but without previous condition investigation (EN 13306)
patch = area of systems management that involves acquiring, testing and installing multiple
management patches (code changes) to an administered computer system (IEC 62443-2-1)
parameter = variable representing some significant measurable system characteristic (ISO 13372)
precision = the closeness of agreement between independent test results obtained under stipulated
conditions (ISO 5725-1)
primary = a principal condition monitoring method that requires a qualified supervisor
condition
monitoring
method
prognostics = analysis of the symptoms of faults to predict future condition and residual life within
design parameters (ISO 13372)
physics‐based = first principle equations, finite element methods etc.
model
remote access = communication with, or use of, assets or systems within a defined perimeter from any
location outside that perimeter (IEC 62443-2-1)
reliability = method to identify and select failure management policies to efficiently and effectively
centred achieve the required safety, availability and economy of operation (IEC 60300-3-11)
maintenance
(RCM)
retention time = minimum duration of time for which the information and data shall be stored and
of records maintained (retained) irrespective of format (paper, electronic, or other)
RUL = remaining useful life, remaining time before system health falls below a defined failure
threshold (ISO 13381-1)
root cause = set of conditions of a sequence of events that result in the initiation of a failure mode (ISO
13372)
supplier = firm providing services on behalf of a client on ship and/or offshore unit
security system = specification of components and software
specification
security system = diagram illustrating architecture (network) with relevant integrations/interconnections in
diagram the system
supplementary = condition monitoring method usually used to support a primary condition monitoring
monitoring method or used in combination with other supplementary monitoring methods to achieve
method required confidence level
symptom = perception, made by means of human observations and measurements, which may
indicate the presence of one or more faults (ISO 13372)
syndrome = group of signs or symptoms that collectively indicate or characterize an abnormal condition
(ISO 13372)
trueness = the closeness of agreement between the average value obtained from a large series of test
results and an accepted reference value (ISO 5725-1)

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 36
Approval  of  service  supplier  scheme

DNV AS
5.1.6 References

Appendix B
5.1.6.1 Normative references

Table 2 Normative references

Document code Title

DNV-RU-OU-0300 Fleet in service

DNV-RU-SHIP Pt.7 Ch.1 Survey requirements for fleet in service

Condition monitoring and diagnostics of machines - Prognostics - Part 1: General
ISO 13381-1
guidelines

ISO 17359 Condition monitoring and diagnostics of machines - General guidelines

ISO 5725-1 Accuracy of measurement methods and results

Condition monitoring and diagnostics of machines- Data interpretations and diagnostics
ISO 13379-1
techniques - Part 1: General guidelines

ISO 13372 Condition monitoring and diagnostics of machines - Vocabulary

Condition monitoring and diagnostics of machines - Requirements for training and
ISO 18436-2 certification of personnel
Part 2: Vibration condition monitoring and diagnostics.

Condition monitoring and diagnostics of machines - Requirements for qualification and
ISO 18436-4
assessment of personnel - Part 4: Field lubricant analysis

Condition monitoring and diagnostics of machines - Requirements for qualification and
ISO 18436-6
assessment of personnel - Part 6:Acoustic emission

Condition monitoring and diagnostics of machines - Requirements for qualification and
ISO 18436-7
assessment of personnel - Part 7: Thermography

Condition monitoring and diagnostics of machines - Requirements for qualification and
ISO 18436-8
assessment of personnel - Part 8: Ultrasound

ISO 9001 Quality management

ISO 8000-2 Data quality - Part 2: Vocabulary

ISO 8000-8 Data quality - Part 8: Information and data quality: Concepts and measuring

IEC 62443-2-4 Security program requirements for IACS service providers

5.1.6.2 Informative references

Table 3 Informative references

Document code Title

Condition monitoring and diagnostics of machines -Electrical signature analysis of three-
ISO 20958
phase induction motors

Condition monitoring and diagnostics of machines - Ultrasound - Part 2: Procedures and
ISO 29821-2
validation

Condition monitoring and diagnostics of machines - Ultrasound - Part 1: General
ISO 29821-1
guidelines

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 37
Approval  of  service  supplier  scheme

DNV AS
Document code Title

Appendix B
ISO 22096 Condition monitoring and diagnostics of machines - Acoustic emission

Condition monitoring and diagnostics of machines - Data processing, communication and
ISO 13374
presentation (1-4)

Condition monitoring and diagnostics of machines - Vibration condition monitoring - Part
ISO 13373-3
3: Guidelines for vibration diagnosis

Condition monitoring and diagnostics of machines- Data interpretations and diagnostics
ISO 13379-2
techniques - Part 2: Data driven models

EN 62740 Root cause analysis (RCA)

ISO 19011 Guidelines for auditing management systems

ISO 14224 Collection and exchange of reliability and maintenance data for equipment

ISO 17025 General requirements for the competence of testing and calibration laboratories

Information technology - Security techniques - Information security management
ISO 27001
systems - Requirements

ISO 19847 Ships and marine technology — Shipboard data servers to share field data at sea

ISO 19848 Ships and marine technology — Standard data for shipboard machinery and equipment

EN 13306 Maintenance terminology

IEC 61025 Fault tree analysis

Dependability management Part 3-14: Application guide, Maintenance and maintenance
IEC 60300-3-14
support

IEC 60300-3-11 Dependability management Part 3-11: Application guide, Reliability centred maintenance

IEC 62443-2-1 Establishing an industrial automation and control system security

IEC 62443-3-3 Establishing an industrial automation and control system security

NEK EN 60812 Failure modes and effects analysis (FMEA and FMECA)

Condition monitoring and diagnostics of machines - Requirements for qualification and
ISO 18436-5
assessment of personnel - Part 5: Lubricant laboratory technician/analyst

IACS UR Z27 Condition Monitoring and Condition Based Maintenance

DNV-RP-0496 Cyber security resilience management for ships and mobile offshore units in operation

DNV-RP-0497 Data quality assessment framework

5.2 Requirements to supplier
The certificate of approval will be awarded and maintained on the basis of compliance with the requirements
in this chapter.

5.2.1 Extent of approval
The supplier shall be approved according to the rules of this programme and applicable monitoring methods
as part of their service. The approval shall cover minimum one primary condition monitoring method (CM
method) [5.2.3.2] and supplementary CM methods as applicable.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 38
Approval  of  service  supplier  scheme

DNV AS
The supplier shall select a service level according to alternatives in Table 4, appropriate to their service

Appendix B
extent (application) and elements (scope). The service level sought will define the type of service they are
approved for.

Table 4 Extent of approval

Service level

Data-driven
CM supplier CBM supplier
CM supplier

Service extent

Selected functional failure modes X X

All functional failure modes (CBM) X

Service elements
* ** *
CM measurement technique [5.2.3.2] X  X X 

Physics-based model [5.2.3.4] X X X

Data-driven model X X

Knowledge-based model X

Inspection and testing (Condition **
X X
assessment)

Maintenance task analysis X

Maintenance recommendations X

Note:
*Minimum one (1) CM measurement technique is a requirement
**Only applicable as supplementary CM method (descriptor) in combination with a primary CM method.

---e-n-d---o-f---n-o-t-e---

5.2.2 Submission of documents
In addition to the documents listed in the general requirements provided in this programme, see Sec.1, the
following documents shall be submitted for review:
— information on the implemented quality management system, quality manual and documented procedures
covering the requirements given in [5.2.5]
— documented process for establishing a maintenance programme covering essential elements given in
[5.2.3]
— documented information and data management covering the requirements given in [5.2.4].

5.2.3 Requirements for the maintenance programme
The supplier shall be able to select correct CM method(s), see [5.2.3.2] and establish a maintenance
programme according to the agreed service level in Table 4.
A supplier qualified as a CM supplier or data-driven CM supplier shall select monitoring methods for selected
functional failure modes. The selected monitoring methods shall provide capabilities (diagnostics and
prognostics) to ensure required function availability and allow for sufficient time to plan and perform
associated maintenance tasks.
A supplier qualified as a CBM supplier shall be able to set up maintenance tasks for a machine or equipment
covering all functional failure modes. The supplier shall have a documented process, see [5.2.3.1], to analyse
and select appropriate maintenance based on an agreed maintenance strategy. The process shall select

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 39
Approval  of  service  supplier  scheme

DNV AS
maintenance CM methods for failure modes and corresponding failure mechanisms that allow for CM and

Appendix B
ensure predetermined maintenance for failure modes that do not allow for CM. The maintenance programme
shall include the following essential elements:
**
— maintenance task analysis
— monitoring method (diagnostics)
— prognostics
— reporting.
Note:
**Maintenance task analysis is only applicable for a CBM supplier, see Table 4.

---e-n-d---o-f---n-o-t-e---

5.2.3.1 Maintenance task analysis
The supplier shall document a maintenance task analysis for selecting the most appropriate maintenance for
all relevant functional failure modes and corresponding failure mechanisms.
The selected maintenance should comply with an agreed maintenance strategy.
Guidance note:
It is recommended to apply a standard reliability centered maintenance (RCM) decision logics when selecting appropriate
maintenance tasks.
Maintenance tasks may be:

— preventive (predetermined or condition based)
— corrective (immediate corrective or deferred corrective) and;
— based on OEM recommendations.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Failure modes shall derive from a documented FMEA or FMECA, applicable for the function.
The maintenance task analysis shall include an evaluation and selection process to determine an appropriate
CM method(s), see [5.2.3.2] and prognostics, see [5.2.3.8].
Guidance note:
It is recommended to apply failure mode symptoms analysis (FMSA) as a supplement/modification to the FMEA/FMECA to assist
with the selection of appropriate CM method, CM measuring technique and failure modelling technique.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.3.2 Condition monitoring method
A CM method shall be able to determine the condition of a machine or equipment based on input from one or
a composition of several descriptors (ISO 17359) in a system:
— CM measuring technique (manipulated parameters), see [5.2.3.3]
— failure modelling technique, see [5.2.3.4]
— parameters (non-manipulated sensor data (parameters) reflecting the operating conditions of the machine
or equipment)
— information acquired from testing and inspection (condition assessment).
The supplier shall document any CM method part of the approval. This shall include a general description
about the machine or equipment and its function, type of CM method applied and details describing the
descriptors part of the CM method.
Guidance note:
When combining input from several descriptors in a system this may be done by using a fault tree analysis (FTA) with a typical
undesired state of a machine or equipment as the top event.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
For each applicable CM method the following shall be documented, as applicable (ISO 17359):
— descriptors used

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 40
Approval  of  service  supplier  scheme

DNV AS
— accuracy, see [5.2.3.6]

Appendix B
— confidence level, see [5.2.3.7]
— operating conditions during monitoring/measurements
— monitoring interval
— data acquisition rate(s)
— measurement locations or data source/sensors
— set points/alarm limits
— baseline data.
In addition any measurable parameter may be used solely or in combination with other parameters and/or
measurements.

5.2.3.3 CM measuring technique
Descriptors may be obtained from the following standard CM measurement techniques (ISO 18436):
— vibration
— oil analysis (field lubricant analysis)
— acoustic emission
— thermography
— ultrasound.

5.2.3.4 Failure modelling technique
A failure modelling technique (diagnostics) may be a single or a combination of techniques in a system
(hybrid model) based on the following type of models:
— knowledge-based model
— physics-based model, (not covered by a CM measurement technique)
— data-driven model.
The supplier shall document the model(s) part of a CM method. A model shall be based on input from
relevant parameter(s), and be able to determine the condition or level of degradation of a failure mode for a
machine or equipment with a satisfactory level of confidence, see [5.2.3.7].
A model shall be documented by:
— development process, see [5.2.3.7]
— list of parameters used
— model accuracy, see [5.2.3.6]
— model confidence level, see [5.2.3.7]
— limitations and operating conditions.

5.2.3.5 Development process
The development shall be documented according to the type of model.
Physics-based models:
A physics-based model encapsulates the physics of a machine or equipment and the deterioration process
using appropriate mathematical equations. The following shall be documented in addition for a physics-based
model:
— description of how the condition/state is estimated based on mathematical equation(s) and observed
deviations from normal behaviour
— mathematical equations representing the system with an adequate level of decomposition into sub models
— elaboration of mathematical equations in a logical sequence
— definition of alarm limits based on design calculations and/or other documented acceptance criteria.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 41
Approval  of  service  supplier  scheme

DNV AS
Knowledge-based models:

Appendix B
Knowledge-based models rely on input from subject matter experts (SME) with long time experience
(operation and design) with the applicable machine or equipment. The following shall be documented in
addition for a knowledge-based model:
— fault hypotheses with description of associations between failure modes, failure mechanisms, symptoms/
syndromes and descriptors
— definition of alarms or abnormal behaviour according to relevant fault hypotheses.
Guidance note:
It is recommended to apply a FMSA to document associations between failure modes, failure mechanisms, symptoms/syndromes
and descriptors.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Data-driven models:
Data-driven models provide a representation of observed behaviour without the need to have specific
understanding of the physics. The following shall be documented in addition for a data-driven model:
— description of method(s) used
— representative training data:
— independent from the test data
— covering all applicable operating conditions
— retraining to account for new operating conditions
— representative test data:
— test data shall represent the scenarios (limitations and operation conditions) under which the model
will be used
— test data shall be composed of independent samples to ensure a reliable indication of the expected
performance of the system in real conditions.
Guidance note:
Independent samples are samples from different experiments, rather than multiple samples from the same experiment.
Simulations may be considered on a case by-case basis as part of the documentation.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.3.6 Accuracy
Accuracy shall be determined based on the level of precision and trueness used to describe the closeness
of a measurement or diagnosis compared to a true value or baseline measurement (ISO 5725-1). The
precision level shall be determined based on a number of tests sufficient to calculate a standard deviation.
Repeatability of tests shall be considered when determining the precision level.
Trueness shall be documented by the deviation from an average of measured/calculated value and the real
value.
Likelihood of detection shall be evaluated if applicable to the method.
Accuracy may also be used as a statistical measure of how well a binary classification test correctly identifies
or excludes a condition (binary accuracy).
Guidance note:
High accuracy, see ISO 5725-1, requires both high precision and high trueness.
Binary accuracy (BA) is the proportion of true results (both true positives and true negatives) among the total number of cases
examined. The formula for quantifying binary accuracy is:

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 42
Approval  of  service  supplier  scheme

DNV AS
5.2.3.7 Confidence level

Appendix B
The confidence level shall be documented by the cumulative effect of error sources on the final certainty of
confidence in the accuracy of the CM method, CM model or prognosis. Confidence level should be calculated
by using a weighted assessment of the following error sources as a minimum:
— accuracy
— data quality level for descriptors used
— system or component design documentation
— failure data and characteristics.
The calculated confidence level shall be compared and evaluated according to the applicable safety level of
the failure mode to document and confirm satisfactory confidence level.
Guidance note:
Many common prediction tasks in the field of condition based maintenance involve imbalanced classes (in which instances of one
class greatly outnumber the other, e.g. OK instances outnumber FAIL). For such problems traditional performance metrics such
as Accuracy (defined as the count of test cases which are true positives and/or negatives expressed as a fraction of all test cases)
may be misleading (since a model which always predicts the majority class may attain a high accuracy score). Care is required in
such tasks to define meaningful performance metrics.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.3.8 Prognostics
The supplier shall document any prognostics applied to predict future fault progression and expected RUL or
ETTF. The prognostics shall be based on a updated diagnosis, see [5.2.3.2] and current operating condition.
The prognostics shall provide capabilities to estimate RUL or ETTF with a satisfactory level of confidence (ISO
13381-1).
Expected remaining useful life (RUL) or time to failure (ETTF):
The supplier shall have a documented process to estimate RUL or ETTF based on an evaluation of:
— descriptor(s) expected behaviour and/or rate of deterioration (failure mechanism)
— effect of other failure modes or other influence factors
— effect of future operating conditions as applicable
— operational history, failure data, previous maintenance and inspection results (condition).
Prognostics confidence:
The prognostics confidence level, see [5.2.3.7] shall be determined by evaluating the cumulative effect of
uncertainties related to the estimate and/or error sources on the final result (RUL or ETTF). The supplier shall
have a documented process to determine prognostic confidence level based on the following:
— diagnostics confidence level
— level of documentation, historical data and/or information supporting the RUL or ETTF estimate
— type of estimate made (extrapolation or projection).
Alarm limits and acceptance criteria should be set or updated based on the estimated prognostics.
Based on the result from the prognosis the supplier may make maintenance recommendations in line with
the maintenance task analysis.
Guidance note:
Prognostics applied (level of) should be based on function criticality, ensure required function availability and allow for sufficient
time to plan and perform associated maintenance tasks.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.3.9 Reporting
All condition monitoring (CM) results shall be properly documented and retained in such a way that all
conclusions may easily be traced later. The reporting shall identify extent and location of measurements
performed in terms of machine identifying numbers, trends, defects indicated, and a conclusive statement
including:

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 43
Approval  of  service  supplier  scheme

DNV AS
— current state (diagnostics) of the machine or equipment with an estimated level of confidence, see

Appendix B
[5.2.3.2]
— estimated RUL or ETTF with level of confidence, see [5.2.3.8]
— state conditions and assumptions to which the prognosis remains valid.
Any CM results shall be presented together with the following information:
— name of the vessel
— identification number (DNV ID or IMO number)
— place and date of measurement and analysis
— applicable monitoring method(s) and measurement technique(s)
— measurement equipment used (if applicable)
— name of personnel that has performed the measurement or analysis
— name of personnel that has verified the measurement or analysis.
If the service level [5.2.1] includes issuing maintenance recommendations this shall be documented.
Maintenance recommendations given shall include:
— detailed task description to the level of detail necessary for a skilled maintenance person
— due date or running hours for completing the task
— task preparation note describing any preparation necessary
— required materials (consumables, spare parts and special tools)
— list of applicable documentation (maintenance procedures and service manuals and drawings)
— information of checks and measurements to be recorded.
The reporting shall be electronically made available to the machinery or equipment owner and the Society.
The supplier is responsible for retention of condition monitoring data and reporting for a minimum of five (5)
years.

5.2.4 Data management
All parameters (sensor data) collected and applied as basis for decisions and input to CM methods, see
[5.2.3.2], and prognostics, see [5.2.3.8], shall be quality assured. The supplier shall have a sufficient level
of data management to ensure that the data is protected and that the data acquisition do not introduce data
security threats/breaches to the vessel network. The data management shall be a documented process of
coordinated activities ensuring sufficient:
— data quality, see [5.2.4.1]
— data security (cyber security), see [5.2.4.2]
— data infrastructure, see [5.2.4.3].
Guidance note:
For a limited data transfer and with secure tunnels, a limited data management will be considered on a case by case basis.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.4.1 Data quality
The supplier is responsible for using only quality assured information and data for diagnostics and/or
prognostics (ISO 8000-8).
The supplier shall have a documented information and data management covering the following elements:
— data flow diagram for sensor system(s)
— responsibilities and competence requirements
— work process that defines characteristics of information and data that determines its quality and provides
methods to manage, measure and improve the quality of information and data from sensor system
through applicable nodes before made available for analysis and other processing
— technologies and tools to support data quality processes.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 44
Approval  of  service  supplier  scheme

DNV AS
Guidance note:

Appendix B
As part of a process to evaluate sufficient level of data and information management, the supplier is recommended to apply DNV-
RP-0497 to perform a data quality assessment wrt. relevant data flow(s) and an organisational maturity assessment to evaluate
the suppliers ability to manage data quality according to the service sought.
Information and data quality assurance may be performed completely or partly by the machine or equipment owner.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.4.2 Data security
The supplier shall have sufficient level of information and data security for the service sought (IEC
62443-2-4).
The supplier shall have a documented information and data security management covering:
— security system specification and diagram
— work process to integrate applicable systems, analyse and identify security threats and provide methods
to manage, measure and improve the information and data security at a sufficient level.
— responsibilities and competence requirements
— malware and patch management
— remote access
— access control and account management.
Guidance note:
Information and data security management may be performed completely or partly by the machine or equipment owner.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.4.3 Data infrastructure
The supplier is responsible for ensuring that applicable infrastructure used for data acquisition is capable of
performing according to required availability level and providing the resources to ensure sufficient support.
Hardware installed onboard shall be able to perform according to applicable conditions where it is installed
and any applicable limitations shall be documented.
Guidance note:
Data infrastructure is used for data creation, consumption and sharing. Data infrastructure is the sum of functions, methods,
mechanisms and tools that ensure interoperability, transparency and trust in data value chains cross composite hardware,
software, network resources and services.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.5 Quality management system
The supplier shall have a documented quality management system (ISO 9001), covering at least:
1) internal audits, see [5.2.5.1]
2) competence requirements and training programmes for the condition monitoring personnel, see [5.2.5.2]
3) competence requirements and responsibilities for service responsible, see [5.2.5.3]
4) Continuous improvement, see [5.2.5.4]
5) personnel records, see [5.2.5.5]
6) verification of work, see [5.2.5.6].
Guidance note:
The service supplier shall have an active improvement process including evaluation of monitoring methods and any industry
development, self-evaluation of relevant services and customer feedback.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.5.1 Internal audits
The supplier shall have a documented internal audit programme to measure and evaluate compliance with
internal work procedures and processes. The auditor(s) performing internal audits shall be qualified and be

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 45
Approval  of  service  supplier  scheme

DNV AS
independent of the organisation that is being audited, (outside CM/CBM organisation). Audit findings shall be

Appendix B
reported, followed up and concluded in a systematic process.

5.2.5.2 Training, competence and certification of condition monitoring personnel
The supplier is responsible for ensuring sufficient level of training, competence and experience within the
services that are sought.
The supplier shall have a supervisor(s) responsible for the appropriate execution of each primary condition
monitoring method part of the service sought.
The supervisor(s) shall be responsible for the professional standard of the condition monitoring personnel,
monitoring method(s) and the professional administration of relevant working procedures.
Standard measurement techniques:
If the service includes a standard measurement technique, [5.2.3.2] this requires third party certification of
involved personnel according to relevant technical part of ISO 18436 Condition monitoring and diagnostics of
machines - Requirements for qualification and assessment of personnel .
Personnel performing standard measurement techniques and analysis on collected data shall be qualified to
the appropriate level for their scope of work in accordance with relevant technical parts of ISO 18436. The
personnel shall have adequate knowledge of the systems and components handled, sensors, equipment and
the limitations of the relevant condition monitoring methods applied.
If a primary monitoring method includes a standard measurement techniques, the supervisor shall as a
minimum be independently certified to the requirements of category III for a minimum of one measurement
techniques, according to relevant parts of ISO 18436.
Data-driven models:
For a service including data-driven models the supplier shall ensure that personnel involved in development
of, diagnostics and prognostics with data-driven models, are qualified to the appropriate level for their
scope of work. The supplier shall document personnel with sufficient combination of education, training
and experience to ensure that they understand the principles and process applicable to techniques and/or
theories used.
If a primary monitoring method is data-driven, the supervisor shall be a qualified professional with an
education in data engineering, data science, mathematics or statistics and with documented relevant
experience.
Guidance note:
Relevant experience typically includes maintenance management, CM measuring techniques and development and implementation
of data-driven models based on statistical methods, neural network analysis, classification trees, random forest, logistic regression
and support-vector machines.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Other models:
For services including knowledge-based models or other physics-based models (not a part of a standard
measurement technique), the supplier shall document personnel with sufficient combination of education,
training and experience to ensure that they understand the principles and procedures for carrying out
condition monitoring, diagnostics and prognostics according to applicable condition monitoring method(s) in
which the supplier have chosen to qualify.

5.2.5.3 Competence requirements and responsibilities for service responsible
The supplier shall in addition to the supervisor(s) have a service responsible role as part of the organisation.
The service responsible shall ensure the integrity of the programme and the professional standard of the
service sought. The responsibilities for the role shall be documented and include ensuring:
— sufficient resources to uphold an uninterrupted service [5.2.5]
— that the maintenance task analysis is performed according to approved process [5.2.3.1]
— that only quality assured data and information are used as part of the service [5.2.4]
— a sufficient level of information and data security [5.2.5]
— operation in accordance with the quality management system [5.2.5].

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 46
Approval  of  service  supplier  scheme

DNV AS
Guidance note:

Appendix B
The service responsible role may be executed exclusively or in a joint responsibility in a combination with the role as a supervisor.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.5.4 Continuous improvement
The supplier shall have a documented process for continuous improvement. The process shall be an ongoing
effort to improve the services and any internal process. The process shall as a minimum collect information
from:
— experience with work processes [5.2.5.1]
— feed back from clients and condition monitoring personnel
— information collected from OEM's (Bulletins)
— industry developments (equipment, monitoring methods and measurement techniques)
— internal audits [5.2.5.2]
— root cause analysis (RCA).
Guidance note:
It is recommended that the continuous improvement includes the design and maintainability of machinery and equipment.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

5.2.5.5 Personnel records
The supplier is required to keep records of its condition monitoring personnel part of the service(s) sought.
The records shall contain information on training, certification, re-validation and performing experience with
applicable monitoring methods or measurement techniques.
Records of qualifications and training shall be maintained on a continuous basis.

5.2.5.6 Verification of work
The supplier shall have a documented system for verifying that the services provided are carried out in
accordance with approved work procedures. Verification of work shall be executed by personnel with the
same or higher competence level as the person performing the work.

6  Service suppliers engaged in resin casting of chock foundations,
stern tubes, etc.

6.1 Objective
The objective of this programme is to set the specific requirements for approval of service suppliers (AoSS)
engaged in resin casting.
A service supplier will have to fulfill both the service specific requirements below and the general
requirements in Sec.1.
Service supplier is hereafter also referred to as supplier.

6.2 Application
This programme is applicable to suppliers engaged in resin casting for following applications:
— foundation chocking for machinery installations
— installation of propeller shaft bearings
— installation of rudder stock bearings.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 47
Approval  of  service  supplier  scheme

DNV AS
Appendix B
6.3 Reference documents
Type approval programme for resin:
— DNV-CP-0432  Pourable compounds for foundation chocking.
Classification guideline for installation of machinery components:
— DNV-CG-0372 Foundation and mounting of machinery.

6.4 Requirements for service supplier
6.4.1 General
The cast resin used for chocking or installation shall have a type approval certificate according to DNV-
CP-0432.

6.4.2 Servicing station
The supplier shall appoint supervisory staff responsible for installation. The names will be mentioned on the
certificate.
The supplier shall maintain an updated list of qualified personnel.
The evidence of qualification of staff performing the installation shall be available on site at the request of the
attending surveyor.

6.4.3 Documents
For each application the installation drawings and calculations shall be prepared by the supplier or an
authorized representative.

6.4.4 Reporting
Each application shall be reported with the relevant installation conditions and final acceptance statement by
the supplier's person responsible.
As a minimum the following information shall be reported:
— clear identification number of project
— responsible person, operators
— used type of resin with batch number
— environmental conditions (temperature(air, joining parts, resin/hardener), relative humidity) with date and
time
— start time and duration of casting process
— amount of resin casted/test samples
— heat treatment/tempering during curing process, if any
— environmental conditions during curing process
— final acceptance test with date and time
— final acceptance statement by the supplier's person responsible.

6.4.5 Verification
The supplier shall have the surveyor's verification of each separate job, documented in the report by the
attending surveyor's signature.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 48
Approval  of  service  supplier  scheme

DNV AS
Appendix B
7  Intentionally left blank

8 Service suppliers engaged in testing of ballast water management
systems (environmental testing)

8.1 Scope
8.1.1 Scope for class approval
Test facilities engaged in testing of ballast water management systems (BWMS) following DNV type approval
programme DNV-CP-0209, the results of which may form the basis for the surveyor’s decisions, shall be
approved by DNV following the criteria established in this programme.

8.1.2 Scope for statutory approval
Test facilities engaged in testing of BWMS following the Code for Approval of Ballast Water Management
Systems (BWMS Code) adopted by resolution MEPC.300(72), the results of which may form the basis for the
surveyor’s decisions, shall be approved by DNV following the criteria established in this programme, as well
as relevant criteria given in the BWMS Code, where DNV is so authorized by the relevant flag administration.
Additional national accreditation, as may be required by the different flag administrations to grant the type
approval for the BWMS, shall be complied with and verified by DNV. National accreditation or any other
accreditation is not considered to be equivalent to the requirements of this programme.

8.1.3 Scope for approval as independent lab for the United States coast guard
This section deals with test facilities engaged in testing of BWMS as sub-contractors to DNV acting as
independent lab (IL) for the United States coast guard (USCG). In order to be considered as a sub-contractor
to DNV acting as IL for the USCG, test facilities shall comply with the following:
— Tests shall be conducted following the USCG 46 CFR 162.060 and/or the US environmental protection
Agency’s environmental technology verification program document Generic protocol for the verification of
ballast water treatment technologies November 2010 – hereafter referred to as ETV protocol.
— Be approved by DNV following the criteria established in this programme.
— Be approved by the USCG as sub-contractors to DNV.
Approval according to this programme is a prerequisite for DNV to engage in a frame agreement with test
facilities when DNV is acting as an IL for the USCG.

8.2 Test facility requirements
8.2.1 General
A certificate of approval will be awarded and maintained on the basis of compliance with the requirements
given in [8.2.3] to [8.2.5]. The test facility shall demonstrate that it has the competence and control needed
to perform the tests required by:
— Code for Approval of Ballast Water Management Systems (BWMS Code), and
— DNV class guideline DNV-CG-0339, and/or
— USCG 46 CFR 162.060 and the ETV protocol.
The test facility is responsible for ensuring that the appropriate quality assurance and quality control
procedures outlined in the documentation listed in [8.2.2] are implemented.

8.2.2 Documentation
The following documents shall be submitted:
— Valid ISO 17025 certificate.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 49
Approval  of  service  supplier  scheme

DNV AS
8.2.3 Quality assurance system

Appendix B
The test facility shall be accredited to ISO 17025.
The accreditation body shall be a member of IAF/EA, and the scope of accreditation shall be relevant and
clearly defined.

8.2.4 Sub-contractors
The test facility shall give information of agreements and arrangement if any parts of the services provided
are sub-contracted. The information shall be included in the quality assurance project plan (QAPP) and the
quality management plan (QMP) shall incorporate all sub-contractors.
The information shall include name, address, function and certification of the sub-contractor. The QAPP shall
include in details what the sub-contractor will be responsible for and how proper transfer of authority will be
assured.
Particular emphasis shall be given to quality management by the test facility in following-up of such
subcontracts. Subcontractors providing anything other than subcontracted personnel or equipment shall also
meet the requirements of section [8.2.2] to [8.2.5].

8.2.5 Reporting
A report shall be written for each test. The report shall be based on standard forms and is in addition
to describing the work performed to give information of any deficiencies found on components, non-
conformance detected and any replacements done of components.
The report shall also include information regarding the test design, methods of analysis and the results of
these analyses.
The report shall be traceable to the order reference system.

8.3 Approval procedures
8.3.1 Application as sub-contractor to DNV acting as IL to the USCG
DNV may, based on request by the test facility, apply to the USCG to include the test facility in DNV’s list of
sub-contractors to DNV when acting as IL to the USCG.
Upon approval by the USCG, DNV and the test facility may sign a frame agreement allowing the test facility
to conduct tests as a sub-contractor to DNV.

8.4 References
The following references are used or referred to in this programme:
— DNV rules for classification of ships, DNV-RU-SHIP Pt.6 Ch.7 Sec.1
— DNV class guideline DNV-CG-0339
— DNV type approval programme DNV-CP-0209
— IMO Res. MEPC.300(72) Code for Approval of Ballast Water Management Systems (BWMS Code)
— IMO Res. MEPC.169(57) Guidelines G9 of the ballast water management convention
— USCG 46 CFR 162.060 – Ballast water management systems
— US environmental protection agency’s environmental technology verification (ETV) Program document
Generic protocol for the verification of ballast water treatment technologies November 2010.
— ISO 17025:2005 standard.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 50
Approval  of  service  supplier  scheme

DNV AS
Appendix B
9  Service suppliers engaged in testing of ballast water
management systems (land-based and shipboard testing)

9.1 Scope
9.1.1 Scope for class approval
Test facilities engaged in testing of ballast water management systems (BWMS) following DNV type approval
programme DNV-CP-0209, the results of which may form the basis for the surveyor’s decisions, shall be
approved by DNV following the criteria established in this programme.

9.1.2 Scope for statutory approval
Test facilities engaged in testing of BWMS following the Code for Approval of Ballast Water Management
Systems (BWMS Code) adopted by resolution MEPC.300(72), the results of which may form the basis for the
surveyor’s decisions, shall be approved by DNV following the criteria established in this programme, as well
as relevant criteria given in the BWMS Code, where DNV is so authorized by the relevant flag administration.
Additional national accreditation, as may be required by the different flag administrations to grant the type
approval for the BWMS, shall be complied with and verified by DNV. National accreditation or any other
accreditation is not considered to be equivalent to the requirements of this programme.

9.1.3 Scope for approval as independent lab for the United States coast guard
This section deals with test facilities engaged in testing of BWMS as sub-contractors to DNV acting as
independent lab (IL) for the United States coast guard (USCG). In order to be considered as a sub-contractor
to DNV acting as IL for the USCG, test facilities shall comply with the following:
— Tests shall be conducted following the USCG 46 CFR 162.060 and/or the US environmental protection
Agency’s environmental technology verification program document Generic protocol for the verification of
ballast water treatment technologies November 2010 – hereafter referred to as ETV protocol.
— Be approved by DNV following the criteria established in this programme.
— Be approved by the USCG as sub-contractors to DNV.
Approval according to this programme is a prerequisite for DNV to engage in a frame agreement with test
facilities when DNV is acting as an IL for the USCG.

9.2 Test facility requirements
9.2.1 General
A certificate of approval will be awarded and maintained on the basis of compliance with the requirements
given in [9.2.3] to [9.2.8]. The test facility shall demonstrate that it has the competence and control needed
to perform the tests required by:
— Code for Approval of Ballast Water Management Systems (BWMS Code), and
— DNV type approval programme DNV-CP-0209, and/or
— USCG 46 CFR 162.060 and the ETV protocol.
The test facility is responsible for ensuring that the appropriate quality assurance and quality control
procedures outlined in the documentation listed in [9.2.2] are implemented.

9.2.2 Documentation
The following documents shall be submitted:
— Quality assurance project plan (QAPP) including standard operating procedures (SOP)
— Quality management plan (QMP)
— Environmental safety and health plan (ESH)
— Piping and instrumentation diagram of the test facility set-up

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 51
Approval  of  service  supplier  scheme

DNV AS
— Detailed sampling facilities and port arrangement and location

Appendix B
— General arrangement plan of the test facility set-up
— Equipment list of pumps, sensors and valves
— Test facility validation plan (see [9.3.3]).

9.2.3 Quality assurance system

9.2.3.1 Accreditation
The test facility shall be accredited to ISO 17025. If not available, compliance with the requirements of ISO
17025 shall be documented and audited by DNV.

9.2.3.2 Quality assurance project plan
The test facility shall have an approved quality assurance project plan (QAPP) for BWMS testing that is
regularly reviewed and updated as defined in the facility’s quality management plan (QMP).
The QAPP is a written document that provides a comprehensive overview of the test facility management,
infrastructure, capabilities, test methodology, measurement and data collection systems, data management
systems, and includes all relevant facility standard operating procedures (SOPs, typically included as
appendices).
The QAPP shall be developed in accordance with ISO/IEC 17025.

9.2.3.3 Standard operating procedures
Standard operating procedures (SOPs) are work procedures following international standards where
applicable and individual procedures containing description for an activity to be performed in exactly the
same way independent of involved personnel.
The test facility shall have SOPs that include, as a minimum:
— challenge water preparation (biological parameters and physical/ chemical parameters)
— sampling volumes and sample handling
— analytical procedures
— handling of results.

9.2.3.4 Quality management plan
The test facility shall have an approved quality management plan (QMP) describing how it structures its
quality system, the quality policies and procedures, areas of application, and roles, responsibilities, and
authorities.
The QMP addresses the quality control management structure and policies of the test facility (including
subcontractors and outside laboratories).
The QMP shall be developed in accordance with ISO/IEC 17025.

9.2.3.5 Environmental safety and health plan
The test facility shall have an environmental safety and health plan (ESH) that is regularly reviewed and
updated.

9.2.4 Personnel
The test facility is responsible for ensuring that a sufficient number of qualified personnel are available to
perform the tests required by the regulations described in [9.2]. The personnel shall all be employed or
under contract to the test facility and shall meet, as a minimum the requirements listed in [9.2.4.1] to
[9.2.4.3].

9.2.4.1 Positions
The staff responsible for the operations under testing shall consist of the following positions, as a minimum:
— on-site test director
— operations staff
1)
— 1 QA/QC  person

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 52
Approval  of  service  supplier  scheme

DNV AS
— 2 analysts for organisms ≥ 50 µm size class

Appendix B
— 2 analysts for organisms ≥ 10 – 50 µm size class
— 1 analyst for the < 10 µm
— 1 sample handling person.
1) 
QA/QC: Quality assurance/quality control.
It is acceptable if one key analyst is identified for multiple size classes, provided the number of qualified
analysts during testing is consistent with the QAPP.

9.2.4.2 Qualifications
Personnel involved in testing shall have qualifications in the following disciplines, as a minimum:
— chemistry
— engineering
— biology/microbiology.

9.2.4.3 Training
The test facility is responsible for the qualification and training of its personnel to a recognized national,
international or industry standard as applicable.
Records of qualifications and training shall be maintained.

9.2.4.4 Personnel records
The test facility shall keep records of the approved personnel responsible for testing. The record shall contain
information on age, formal education, training and experience for the services for which they are approved.

9.2.5 Procedures, equipment and premises

9.2.5.1 Procedures
The test facility shall maintain a record of:
— Any issues associated in operation or maintenance of the equipment encountered during test operations,
including any recorded data or operator observations associated with performance deviations or
abnormal/unexpected operations.
— Consumables, spare parts etc. used for the BWMS during testing period.
— The commissioning process, indicating the equipment was correctly installed and safe to operate under its
intended operating conditions, and that the designated laboratory representative has received appropriate
instruction in operation and maintenance of the equipment.
The test facility shall have a procedure to monitor any potential chemical residuals that result from BWMS
operation during testing.
The test facility ensures that the BWMS successfully alerts/alarms if its discharge exceeds prescribed levels
as determined by vendor and/or environmental discharge standards and if any safety issues are encountered
during operations.

9.2.5.2 Equipment
The test facility shall have adequate instrumentation to:
— Log engineering parameters of the operation of the BWMS during testing in order to validate and ensure
that the data relevant for the tested BWMS are adequately reported.
— Log power consumption throughout test operations of the BWMS.
— Measure core parameters including temperature, salinity, TSS, POC, DOC, DO, pH and chlorophyll.
— Quantify and analyze samples of organisms in all of the required class sizes.
Calibration certificates and records of all equipment used for monitoring and measuring shall be available on
site for inspection.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 53
Approval  of  service  supplier  scheme

DNV AS
9.2.5.3 Premises

Appendix B
The test facility shall be outfitted with adequate piping, pumps, valves and calibrated gauges to be able to
test a BWMS according to the requirements stipulated by the regulations described in [9.2].
The test facility shall be equipped with at least:
— Three (3) holding tanks, one for feed-water (in case augmentation of the challenge water is necessary)
and the other two for holding untreated (control) ballast water and treated ballast water.
3
— Each of the holding tanks for untreated (control) and treated ballast water shall have a volume ≥ 200 m
and the possibility to hold water for a period of at least 24 hours.
— Sampling facilities and ports designed to be in compliance with guidelines G2 of the BWM convention and
the ETV protocol.

9.2.6 Challenge water requirements
The test facility shall be able to consistently achieve the water quality conditions (temperature, salinity,
organic and mineral matter) and biological conditions required by the regulations described in [9.2].
In the cases where injection of living organisms, sediments, and dissolved organics into challenge water is
necessary, appropriate methods and procedures shall be described in the QAPP and relevant SOPs.

9.2.7 Sub-contractors
The test facility shall give information of agreements and arrangement if any parts of the services provided
are sub-contracted. The information shall be included in the quality assurance project plan (QAPP) and the
quality management plan (QMP) shall incorporate all sub-contractors.
The information shall include name, address, function and certification of the sub-contractor. The QAPP shall
include in details what the sub-contractor will be responsible for and how proper transfer of authority will be
assured.
Particular emphasis shall be given to quality management by the test facility in following-up of such
subcontracts. Subcontractors providing anything other than subcontracted personnel or equipment shall also
meet the requirements of section [9.2.2] to [9.2.8].

9.2.8 Reporting
A report shall be written for each test. The report shall be based on standard forms and is in addition
to describing the work performed to give information of any deficiencies found on components, non-
conformance detected and any replacements done of components.
The report shall also include information regarding the test design, methods of analysis and the results of
these analyses.
The report shall be traceable to the order reference system and shall include a copy of the certificate of
approval.

9.3 Approval procedures
9.3.1 Application and approval
The test facility intending to receive a certificate of approval based on this programme shall submit an
application together with the documentation listed in [9.2.2].
Submitted documentation will be approved or reviewed, as applicable, for compliance with the requirements
listed in this programme, the BWMS Code and when applicable the USCG 46 CFR 162.060 and the ETV
protocol.
Test facility validation, as detailed in [9.3.3], shall be conducted as part of the initial and renewal audit, or as
otherwise required in [9.3.3].
An initial audit as detailed in [9.3.2] may only be conducted after the approval process is finalized.

9.3.2 Initial audit
The surveyor will carry out an audit of the test facility once all documentation and information received from
the test facility has been evaluated.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 54
Approval  of  service  supplier  scheme

DNV AS
Additionally, certification as detailed in [9.3.6] is conditional on a practical demonstration of at least one

Appendix B
BWMS test as well as satisfactory reporting being carried out.

9.3.3 Test facility validation
As part of the initial audit and the renewal audit, the test facility will conduct validation tests to confirm that
the methods, procedures, equipment and personnel conducting the tests can deliver consistent results and
that the methods used are fit for their intended purpose.

9.3.3.1 Validation of equipment and test set-up
The intention of this validation test is to document, through experimental data, that there are minimal or no
differences between the following measurements for control and treatment samples upon water uptake and
discharge, when no treatment system is used:
— temperature
— salinity
— total suspended solids
— particulate organic matter
— dissolved organic matter
— dissolved oxygen
— pH
— live and dead organisms for the three different sizes: ≥ 50 µm, ≥ 10 µm and < 50 µm, < 10 µm
— the < 10 µm is only applicable for test facilities intending to work as sub-contractor for DNV when acting
as IL for the USCG.
Where piping is shared between treatment and control lines, procedures for cleaning the pipes may be
demonstrated. Alternatively, test sequence showing that control water is pumped prior to treated water upon
uptake, and treated water is pumped prior to control water upon discharge may be accepted by DNV.

9.3.3.2 Validation of the sampling and analysis methods
The test facility shall verify that the chosen sampling design, geometry and installation result in
representative samples and that organism mortality as a result of sample acquisition is minimized.
If only a sub-sample of the sampling volumes required by the BWMS Code or ETV protocol are analysed, then
the test facility shall apply procedures for estimating uncertainty of measurement. Internal data or reference
to published data will be accepted as equivalent to the estimation of uncertainty of measurement.

9.3.4 Application as sub-contractor to DNV acting as IL to the USCG
After finalization of the process described in [9.3.1] to [9.3.3] and DNV has issued a certificate of approval,
DNV may, based on request by the test facility, apply to the USCG to include the test facility in DNV’s list of
sub-contractors to DNV when acting as IL to the USCG.
Upon approval by the USCG, DNV and the test facility may sign a frame agreement allowing the test facility
to conduct tests as a sub-contractor to DNV.

9.3.5 Renewal audit
Renewal or endorsement of the certificate of approval shall be made at intervals not exceeding three
(3) years. Verification shall be through audits confirming that approved condition is being maintained.
Intermediate audits may be required if found necessary by DNV. At least three months before the period of
validity expires, the test facility shall apply to DNV for renewal of the certificate of approval.

9.3.6 Certification
If the submitted documentation and the surveyor's audit and the practical demonstration are found
satisfactory then the test facility will receive a certificate of approval.

9.4 Cancellation of the certificate of approval
DNV reserves the right to cancel the certificate of approval in the following cases:

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 55
Approval  of  service  supplier  scheme

DNV AS
— where the service was improperly carried out or results were improperly reported

Appendix B
— where a surveyor finds deficiencies on site compared to approved documentation and appropriate
corrective action is not taken within the time limit specified by the surveyor
— where the test facility fails to inform of any alteration
— where intermediate audit, if requested and as described in [9.3.5], has not been carried out
— where willful acts or omissions are ascertained
— where the USCG has withdrawn their approval of the test facility as sub-contractor to DNV
— where a national authority has withdrawn their approval of the test facility.
A test facility who has had the certificate of approval cancelled may apply for re-approval after a period of six
(6) months. Re-approval is not allowed if the cancellation was based on a grave fault, such as a violation of
ethics.

9.5 References
The following references are used or referred to in this programme:
— DNV rules for classification of ships, DNV-RU-SHIP Pt.6 Ch.7 Sec.1
— DNV class guideline DNV-CG-0339
— IMO Res. MEPC.300(72) Code for Approval of Ballast Water Management Systems (BWMS Code)
— Guidelines G9 of the ballast water management convention
— USCG 46 CFR 162.060 – ballast water management systems
— US Environmental protection agency’s environmental technology verification (ETV) program document
“Generic protocol for the verification of ballast water treatment technologies” November 2010
— ISO/IEC 17025:2005 standard.

10  Laboratories engaged in mechanical and analytical testing

10.1 Introduction
10.1.1 Objective
The objective of this class programme (CP) is to give a description of the Society's approval scheme for
laboratories for mechanical and analytical testing.
A service supplier will have to fulfill both the service specific requirements below and the general
requirements in Section 1 of this document.
Aim of the assessment of testing laboratories is the verification of the personnel competency related to
the scope of the certification. Furthermore, it is intend to ensured that an effective and sufficient quality
management system exists.
DNV acceptance of test laboratories does not preclude witnessing, survey or inspections where this is
required by any rules or contract partner.
Guidance note:
This class programme is not applicable for obtaining EU marine equipment directive (MED) certificates. Visit www.dnv.com for
information on MED certification.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

10.1.2 Scope
This CP gives a description of the procedures and requirements related to documentation and inspection
applicable for approval of laboratories for mechanical and analytical testing.
DNV acceptance of a testing laboratory is an independent approval system based on assessment of
documentation and on-site inspection. Basis for this service is the international standard ISO 17025, the
application eform AoSS 6141 and all supplements provided by the Society.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 56
Approval  of  service  supplier  scheme

DNV AS
10.1.3 Application

Appendix B
The procedures and requirements described in this CP are applicable for obtaining approval in accordance
with DNV ship rules and/or offshore standards.
Note that this is a general program. Wherever specific programs are given for certain laboratories or
products, the special programs apply. Examples of other laboratory approval programs are:
— App.A [12] Laboratories engaged in testing of coating systems in accordance with IMO Resolution
MSC.215(82) and/or MSC.288(87).
— [11] Laboratories engaged in corrosion testing of corrosion resistant steels.

10.2 Acceptance procedure
10.2.1 Application for acceptance
The application form AoSS 6141 shall be filled in by the testing laboratory shall be submitted to the together
with all documents required in this form.

10.2.2 Inspection
The inspection of procedures, premises and equipment, the checking of documents, management and quality
systems shall be conducted by the Society's representative with sufficient competency and experience in the
field of testing related to the scope of certification.

10.2.3 Documentation
All the documents required and necessary for the assessment of documentation, (see eForm AoSS 6141)
should be submitted to the auditor before the on-site inspection. If any serious divergences are already
detected within the assessment of documentation, the laboratory will be informed in advance of appraisal.
An appointment for the on-site inspection will be arranged during initial audits, only if the assessment of
documentation revealed that no significant differences exist, which are not opposed the Society's acceptance.

10.2.4 Audit
The time frame of inspection is based on the extent applied for recognized testing methods and for scope
approved employees involved. The minimum duration of on-site inspection is 12 working hours. One-day
inspections are only possible in substantiated exceptional cases.

10.2.4.1 Steps of audit
— introductory discussion
— the introductory discussion involves the following points:
a) introduction of participants
b) introduction to the structure of the organization according to the currently valid organization chart
c) confirmation that the applied scope of acceptance is still up-to-date and has not to be adapted
d) confirmation of confidentiality. For this a declaration of independence has to be submitted to the
auditor.
— verification of the requirements to the organization and management as well as the technical
requirements
— final discussion
— during the inspection of the testing laboratory the comparison shall be made with the processes, activities
and responsibilities associated with the practical implementation, which are described in the submitted
documentation.

10.2.4.2 Audit participants
— head of laboratory
— quality management representative (QMR) of the testing laboratory
— responsible employees of the testing laboratory

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 57
Approval  of  service  supplier  scheme

DNV AS
— auditor (the Society's representative).

Appendix B
10.2.4.3 Audit results
A final discussion will be conducted with the head of laboratory at the end of the audit. The final discussion
includes:
— information about the overall impression of the testing laboratory
— information about the ascertained defects or deviations
— definition of the corrective actions. The actions have to be confirmed by the head of laboratory and the
auditor. Dates until the corrective actions are finished have to be agreed
— resolve open questions/issues.

10.2.4.4 Corrective actions
The testing laboratory shall send the documentation for implementation of corrective actions to the auditor
until the agreed due date. If required, a new on-site inspection shall be carried out.

10.2.4.5 Audit report
The auditor will issue an audit report about the area inspected by him, after on-site audit. One copy will be
filed by the Society, and the original will be submitted to the testing laboratory.

10.2.4.6 Acceptance as testing laboratory
The auditor makes a recommendation for acceptance or refusal by the in his audit report, and/or with
restriction. The acceptance usually applies for a period of three years. In case of acceptance by the ,
a certificate is issued in the name of the testing laboratory and will be sent to the testing laboratory.
Furthermore, part of the certificate is an appendix, containing all the accepted test methods. The certificate
will be published on DNV’s approval finder (https://approvalfinder.dnv.com/).

10.2.4.7 Maintenance
In order to maintain the acceptance as testing laboratory, a periodic review (hereafter called interim audit) is
required and will be carried out by the Society's surveyor. The cycle will be specified during the audit based
on the audit results and/or e.g. round robin tests etc. The cycle shall not exceed 18 month.

10.2.4.8 Renewal
A re-certification is possible after expiry of the period of validity. The extent of the renewal process
corresponds roughly to the first certification with the task of reviewing compliance with this approval
programme. Re-certification is based on the latest issue of the class programme. In the context of the re-
certification audit, the cycle of the interim audit is redefined and the testing laboratory will be informed. The
procedure for renewed acceptance begins with sending of a written request by the testing laboratory. The re-
audit should take place in time and before the validity end date, for ensuring a complete connection to the
expired approval.

10.2.4.9 Extension of scope of acceptance
In principle, it is possible to extend or restrict the scope of the certification. In principle, the same
requirements apply, which were already specified in the class programme.

10.2.4.10 Non-standardized test methods
The acceptance of testing methods is possible, which has been developed by the testing laboratory and
not described in the normative documents. It is also required to validating the procedure adequately
and describing in the testing instruction the procedure extensively stating the intended application, the
determining parameters and all required information in order to ensure the correct execution.

10.2.4.11 Sub-contractors
The testing laboratory shall give information of agreements and arrangements if any parts of the services
provided are subcontracted. Particular emphasis shall be given to quality management by the laboratory in
the follow-up of such subcontracts. Subcontractors providing anything other than subcontracted personnel or
test equipment shall also meet the requirements of this programme.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 58
Approval  of  service  supplier  scheme

DNV AS
Appendix B
10.3 Audit of the testing laboratory
10.3.1 Review of documentation
All relevant documents and records shall be presented by testing laboratory to the auditor for review.

10.3.2 Issues to be handled during the audit
— In general, deviations between actual state of the laboratory and the submitted documentation.
— The laboratory shall demonstrate and document that the head of the laboratory and its employees have
a sufficient qualifications. A systematic approach shall be in place. ensuring that training needs are
evaluated and that appropriate measures are taken.
— A matrix shall be submitted, indicating the responsibilities and reporting lines of all employees:
— Proper execution of the testing methods shall be demonstrated
— The suitability of the locations and the equipment for the testing methods. The conformity between
submitted documentation of locations and actual locations shall be demonstrated, e.g. with the documents
submitted regarding the floor plan and the location laid down therein. The laboratory shall in general be in
a clean, tidy and for testing methods appropriate state.
— Control of documents and records. The laboratory's approval process of the existing documents shall
be clearly regulated. All documents shall be labelled with an unique document number and the current
revision status. Systematic approach shall be in place to ensure that all employees in the laboratory is
duly and timely informed about changes in documents and procedures, i.e. where they are affected by
these changes. For the standards and specifications used a systematic approach shall be in place which
ensures that they are current and always up-to-date (latest revision), and that no invalid standards,
specifications, inspection/work instructions etc. are in circulation.
Note:
More and more frequently, the use of printed documents in testing laboratories is waived and instead
uses exclusively electronic documents. For the case where electronic documents are applied exclusively, it
should be noted that the electronic documents shall be protected against unauthorized modifications, and
all printed documents are labelled with an endorsement “uncontrolled copy”.
— Demonstration of representative testing methods. The auditor will make a selection of testing methods
based on the requested scope of certification, which shall be demonstrated during to the auditor during
the audit. The laboratory may request information in advance for which test methods to be demonstrated.
The laboratory shall demonstrate that the staff has the ability and competence to perform the test
methods professionally and standardised. The laboratory shall ensure that appropriate test specimens are
available.
— Calibration status of the testing equipment and devices shall be valid. Calibration with validity time
more than one year will normally not be accepted. The laboratory shall have a systematic approach in
place to ensure that calibration will not expire, and that no improperly calibrated testing equipment are
used. The laboratory shall have assigned the responsibility of keeping calibrations up to date to one or
more employees. The responsibility includes ensuring that all the testing equipment and devices have
a unique identification (inventory number) and are equipped with a calibration status tag, if possible.
Regular calibration of all the testing equipment and devices shall be recorded by the laboratory. If the
testing laboratory performs their own calibration, it shall be ensured that the measurement standards
used are connected directly to recognised standards. Furthermore, work instructions shall be available
for all calibration processes. All calibrations shall be documented. If testing equipment and devices are in
circulation, which are not calibrated, they shall be clearly identified as such and should be exclusively used
for subordinate measurements.
— The participation in proficiency testing as well as its evaluation and documentation: The testing laboratory
should develop a procedure for ensuring test results, which is suitable to monitor the quality of testing
methods at regular intervals. This may be achieved e.g. by regular participation in round robin tests. An
evaluation with identifying the consequences drawn shall be submitted to the auditor.
— Existence of clear sample labelling and identification systems: The testing laboratory shall have
and demonstrate a procedure, ensuring that each individual test specimen is tagged with an unique
identification number for excluding confusion between individual test specimens and ensuring a complete

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 59
Approval  of  service  supplier  scheme

DNV AS
traceability. In cases where the test specimens are too small or otherwise inappropriate for labelling

Appendix B
accordingly, an acceptable replacement procedure shall be specified.
— Internal quality assurance measures for the individual testing methods and all other processes, which are
necessary for ensuring a smooth processing: Internal audits should be carried out at regular intervals
to prove that all the processes still meet the requirements for quality management system. The audit
should also be used to ensure, the audit activities correspond with the latest state of standardization
and for identifying possibilities for improvement. The planning and conduct of the audits should be the
responsibility of QMB. Representative audit reports shall be documented and presented to the surveyor.
— Existence of test and work instructions: For all testing methods to be reconised by the, a work/job/
inspection instruction shall be available. The instruction shall describe an exact procedure, for example,
for calibrations, sample preparation, maintenance and care of testing machines. It shall be demonstrated
that inspection and work instructions are always up-to-date, contain an unique document number, are
subject to an approval process and are accessible to all relevant employees.
— Content and structure of test reports: A test report shall be prepared for all tests to be recognised by the
Society. Each test report should have a cover sheet, which contain the following information:
a) title
b) test report number for enabling a clear identification
c) name and address of testing laboratory
d) name and address of customer
e) an indication that the testing laboratory is recognised by DNV
Furthermore, a test report should contain the following information:
f) a pagination with indication of total number of pages
g) indication of the test report number on each page for allowing an allocation for each test report
h) indication of the procedures used. Possibly, the hints from the norm text regarding the test report
shall be observed
i) deviations from standardized test methods
j) a detailed description of the tested material or received test specimens. Where possible, a description
of the preparation process for test specimens shall be specified
k) testing conditions
l) the test results, where appropriate and possible, expressing the individual results, average values,
standard deviation, measurements of test specimens, number of test specimen verified, graphical
presentation of the test results
m) information required from the customer
n) date of the test
o) names and signatures of the persons which create a test report as well as the person which has
released the test report
p) whether additional requirements are fulfilled, for example, official regulations.

10.4 Alteration
In case where any alteration to the certified service operation system of the testing laboratory is made, then
such alteration shall be reported immediately to the Society.
In such cases re-audit may be required as and when deemed necessary by the Society.

10.5 Cancellation and re-approval
DNV reserves the right to cancel the approval of acceptance in the following cases:
— where the service was improperly carried out or results were improperly reported
— where a surveyor finds deficiencies in the approved service operative system of the supplier and
appropriate corrective action is not taken
— where the supplier fails to inform the of any alteration made, as given in [1]

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 60
Approval  of  service  supplier  scheme

DNV AS
— where it as has not been possible to carry out random audit, when requested as described in [3]

Appendix B
— where wilful acts or omissions are ascertained
— or when the Society otherwise finds it justified.
The Society reserves the right to inform interested parties on cancellation of the acceptance of approval.
A testing laboratory who has had the acceptance of approval cancelled may apply for re-approval after a
period of six (6) months. Application for re-approval may be refused if the cancellation was based on a grave
fault, such as a violation of ethics.

11  Laboratories engaged in corrosion testing of corrosion resistant
steels

11.1 Introduction
11.1.1 Objective
The objective of approval according to this approval programme is to ensure that the supplier is using
appropriate procedures and test facilities, has qualified and certified personnel and has implemented written
procedures for training, performance, testing, control, verification and reporting.

11.1.2 Scope
Corrosion resistant steels (CRS) to be applied in cargo oil tanks of crude oil tankers, in accordance with IMO
resolution MSC.289(87), shall be pre-qualified by a third party.
As per the following document:
— IACS UI SC 258, for application of SOLAS regulation 3-1, Part A1, Chapter II-1 of the SOLAS convention
(corrosion protection of cargo oil tanks of crude oil tankers), adopted by resolution MSC.289(87) The
performance standard for alternative means of corrosion protection for cargo oil tanks of crude oil tankers.
The test laboratories shall be recognized by the Society and approved in accordance with this class
programme.
Guidance note:

1) Approval is not needed for the testing laboratory where a surveyor from the Society is present at specified stages to witness
the approval tests.
2) approval is needed for the testing laboratory where a surveyor from the Society is not present at specified stages to witness
the approval tests.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
The approval may be given to both a recognized test laboratory, independent of the steel manufacturer and
the steel manufacturer's own laboratory.
In the following, such laboratories are also referred to as the supplier.

11.1.3 Extent of engagement
The approval programme defines the procedures required in obtaining the Society's approval carrying out the
laboratory tests in accordance with IMO resolution:
— MSC.289(87), Annex 3, Appendix – and further interpreted in IACS UI SC 258.
This approval programme is in agreement with requirements stated in IACS UR Z17, as amended. The
specific requirements to laboratories are given in Annex 1, Section 13 of IACS UR Z17.

11.2 Requirements to suppliers
The general requirements related to approval of service suppliers as outlined in class programme DNV-
CP-0484 apply to this programme.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 61
Approval  of  service  supplier  scheme

DNV AS
A certificate of approval will be awarded and maintained on the basis of compliance with [2] through [11].

Appendix B
11.2.1 Submission of documents
The following documents shall be submitted for review:
— an outline of the supplier's organization and management structure, including subsidiaries, if any
— list of operators/technicians/inspectors documenting training and experience within the relevant service
area, and qualifications according to recognized national, international or industry standards, as relevant
— list of nominated agents, if any
— quality manual and/or documented procedures covering requirements in the IMO resolution MSC.289(87)
— a detailed list, including description, of the laboratory test equipment for the IMO resolution MSC.289(87)
— a guide for operators of such equipment
— a detailed list of reference documents comprising a minimum those referred to in IMO resolution
MSC.289(87) that are available in the laboratory
— details of testing panel preparation, procedure of test panel identification, test procedures and sample test
report(s)
— details of exposure method and site for weathering primed test panels
— a sample daily or weekly log/form for recording test condition and observations including unforeseen
interruption of the exposure cycle with corrective actions
— experience of the supplier in the specific service area
— details of any sub-contracting agreements, e.g. related to preparation of test samples
— certificates of approval by other bodies, if any
— information on other activities which may present a conflict of interest
— list and documentation of licences granted by equipment’s manufacturer, if any
— comparison test report with an approved corrosion resistant steel, if available, or detailed template of test
report
— copy of any relevant certificates with their issue number and/or date, such as ISO 17025 and/or ISO 9001
certificates.

11.2.2 Reference documents
The supplier shall have access to:
— IMO resolution MSC.289(87), IMO performance standard for alternative means of corrosion protection for
cargo oil tanks of crude oil tankers (IMO PS-COT), adopted on 14th May 2010.
— IACS UI SC 258, for application of SOLAS Regulation 3-1, Part A1, Chapter II-1 of the SOLAS convention
(corrosion protection of cargo oil tanks of crude oil tankers), adopted by Resolution MSC.289(87) The
performance standard for alternative means of corrosion protection for cargo oil tanks of crude oil tankers.
— IACS UR W30, normal and higher strength corrosion resistant steels for cargo oil tanks, February 2013
and as later amended.

11.2.3 Extent of approval
The supplier shall demonstrate, as required in [11.2.4] to [11.2.10], that it has the competence and control
needed to perform the specified services. A practical demonstration may further be required, if deemed to be
necessary.

11.2.4 Equipment
The supplier shall have the test equipment and facilities required for correctly performing the tests as per the
IMO resolution;
— MSC.289(87), Annex 3, Appendix.
A record of the equipment and software used shall be kept. The record shall contain information on
manufacturer and type of equipment, and a log of maintenance and calibrations. Software used in
conjunction with the testing shall be fully described and verified.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 62
Approval  of  service  supplier  scheme

DNV AS
11.2.5 Administrative procedures

Appendix B
The supplier shall have an order reference system where each engagement is traceable to when, who and
where testing was carried out, including location of test records and reports.

11.2.6 Minimum required equipment and instruments
As given in, and/or necessary to carry out the testing specified in, the IMO resolution:
— MSC.289(87), Annex 3, Appendix.

11.2.7 Work procedures and instructions
The supplier shall have documented procedures, instructions and checklists for how to carry out testing and
reporting. Procedures and instructions for operating of each item of the testing equipment shall also be kept
and be available at all time.

11.2.8 Verification
The supplier shall have a system for verifying that the services provided are carried out in accordance with
approved procedures. Performed verification shall be documented.

11.2.9 Sub-contractors
The supplier shall give information of agreements and arrangements if any parts of the services provided are
subcontracted. Particular emphasis shall be given to quality management by the supplier in the following-
up of such subcontracts. Subcontractors providing anything other than subcontracted personnel or test
equipment shall also meet the requirements of [2] through [11] of this class programme.

11.2.10 Reporting
All test records shall be properly documented and retained in such a way that the performed testing easily
may be re-traced later. The report shall identify extent and location of testing performed and a conclusive
statement as to whether the test results satisfy the acceptance criteria or not.
The test report shall include references to relevant documents, as a minimum as referred to in [3].
In addition, and as a minimum, the following information shall be given:
— name, address and other contact information of the supplier
— contract requirements, e.g. order number, reference documents, specifications, special agreements etc.
— judgment and conclusion of test results
— place and date of sample preparation and testing
— environmental conditions
— test equipment used
— list of relevant standards
— name and signature of the person preparing the test samples
— name and signature of the person performing the tests
— name and signature of the person issuing the test report
— name and signature of the supervisor verifying the report.
The supplier shall file one copy of the test report, and the test report shall be traceable to the order reference
system. Also reports for testing that have failed shall be reported and filed in accordance with above.

11.3 Certificate of approval
11.3.1 Approval of the supplier
If the submitted documentation and the surveyor's audit and the practical demonstration are all found
satisfactory to the Society, the supplier will receive a certificate of approval. The certificate of approval will be
published on DNV’s approval finder (https://approvalfinder.dnv.com/).

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 63
Approval  of  service  supplier  scheme

DNV AS
11.3.2 Scope of the approval

Appendix B
The approval will be specific as to the types of testing for which approval is sought, i.e. in accordance with
IMO resolution:
— MSC.289(87), Annex 3, Appendix.
The approval may be given to both a recognized test laboratory, independent of the steel manufacturer and
the steel manufacturer's own laboratory.
When actual testing performed at the steel manufacturer's own laboratory, forming basis for test reports
used to seek class approval from DNV, is carried out, the DNV surveyor shall be called in for witnessing
milestones, which may typically be:
— witnessing of steel making process/steel cutting
— witnessing of welding
— witnessing during testing
— witnessing evaluation of test.

11.3.3 Change to scope of the approval
In case of changes to the scope of approval, e.g. additions to the applicable welding consumables, the effects
of these changes shall be subjected to corrosion resistance tests for the welded joints specified in:
— MSC.289(87), Annex 3, Appendix.

11.4 References
— IMO Resolution MSC.289(87), IMO performance standard for alternative means of corrosion protection for
cargo oil tanks of crude oil tankers (IMO PS-COT), adopted on 14th May 2010.
— IACS UI SC 258, for application of SOLAS regulation 3-1, Part A1, Chapter II-1 of the SOLAS convention
(corrosion protection of cargo oil tanks of crude oil tankers), adopted by resolution MSC.289(87) The
performance standard for alternative means of corrosion protection for cargo oil tanks of crude oil tankers.
— IACS UR W30, normal and higher strength corrosion resistant steels for cargo oil tanks, February 2013
and as later amended.
— Current version of ISO 9001 series – quality management systems – requirements.
— DNV rules for classification of ships, DNV-RU-SHIP Pt.2 Ch.2 (metallic materials).
— DNV rules for classification of ships, DNV-RU-SHIP Pt.6 Ch.1 Sec.9 (coating).

12  Examination of mobile and long term mooring systems

12.1 Introduction
12.1.1 General
Companies carrying out examination on mooring systems for vessels with a position mooring system or
equipment, shall be approved by the Society. The companies shall be approved in accordance with this
programme and applicable rules. In the following, such companies are referred to as the supplier.

12.1.2 Objective
The objective of this programme is to define the requirements for obtaining approval for a company carrying
out examination and minor repairs of a mooring system or components part of a mooring system, see Table
5.

12.1.3 Scope
The scope of this approval programme is to provide requirements for written work procedures, qualified
personnel and implemented processes at the supplier to ensure sufficient training, performance, application,
control, verification and reporting.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 64
Approval  of  service  supplier  scheme

DNV AS
This document covers both mobile and long term mooring for all vessels with a position mooring system or

Appendix B
equipment.

12.1.4 Application
The supplier shall be approved for examination of minimum one mooring system component listed in Table 5.

Table 5 Mooring system components

Mooring system
Rule reference Note
component

Mooring chain DNV-OS-E302 Includes chain and shackles

Fibre rope DNV-OS-E303 Offshore fibre ropes

Wire rope DNV-OS-E304 Including sheeted and un-sheeted wire rope

Anchor DNV-OS-E301 Only applicable for mobile mooring

Connectors DNV-OS-E301 Including any type of connecting and termination hardware

Floatation elements DNV-OS-E301 Including submersible buoys

The examination shall include close visual inspection (CVI) and measurements for selected components. The
supplier may in addition include non-destructive testing (NDT), see [12.4] as part of the examination.
For examination intended to be performed in-water, the supplier shall in addition qualify for using minimum
one of the following techniques:
— diver or remote operated vehicle (ROV), see [12.5]
— remote inspection technique (RIT), see [12.6].

12.1.5 Limitations
This programme does not cover major repairs. Minor repairs may be carried out by the supplier without
attendance from the Society. Major repairs shall be approved and performed under supervision of the
Society.
Guidance note:
For more information of minor repair for fibre rope, see DNV-RP-E304.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12.1.6 Terms, definitions and abbreviations
The terms defined in Table 6 apply for this document and approval programme.

Table 6 Definition of terms

Term Definition

anchor jewelry anchor shackles, swivels, open links, and connecting links

audit systematic, independent and documented process for obtaining objective evidence and
evaluating its objectively to determine the extent to witch the audit criteria are fulfilled

examination combination of those activities used to verify and evaluate the condition of a component or
assembly of components in order to determine its ability to perform as required

inspection process of examination, measurement and/or testing to determine a condition or state of an
item

long term mooring mooring system intended for permanent installed MOU

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 65
Approval  of  service  supplier  scheme

DNV AS
Term Definition

Appendix B
maintenance combination of all technical, administrative and managerial actions during the life cycle of
an item intended to retain it in, or restore it to, a state in which it can perform the required
function

minor repair work that is not involving machining, welding or any form of heat treatment

mooring system term used to describe the assembly of components intended to ensure the connection/
fixation between the winch or other fastening point on the vessel to the seafloor

proven technology level of experience through operation for a certain length of time demonstrating the
capabilities of the technology for a specific application

novel technology technology, products or systems for which complete performance or approval criteria does
not exist

vessel any object designed for transportation or special operations on water

The abbreviations described in Table 7 apply for this document and approval programme.

Table 7 Abbreviations

Abbreviation Description

CVI close visual inspection

IMCA International Marine Contractors Association

IMO International Maritime Organization

ISO International Organization for Standardization

MBS minimum breaking strength

NDT non-destructive testing - the development and application of technical methods to examine
materials or components in ways that do not impair their future usefulness and serviceability,
in order to measure geometrical characteristics and to detect, locate, measure and evaluate
flaws. NDT is also known as non-destructive examination/evaluation (NDE) and non-
destructive inspection (NDI). Comprising, but not limited to, the methods and techniques MT,
PT, RT, VT, UT, PAUT, TOFD, ET and/or ACFM, see [4]

POD probability of detection

RIT remote inspection technique

ROV remote operated vehicle

12.1.7 References
The references listed in Table 8 are used in this class programme.

Table 8 References

Document code Title

DNV-RU-OU-0300 Fleet in service

DNV-OS-E301 Position mooring

DNV-OS-E302 Offshore mooring chain

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 66
Approval  of  service  supplier  scheme

DNV AS
Document code Title

Appendix B
DNV-OS-E303 Offshore fibre ropes

DNV-OS-E304 Offshore mooring steel wire ropes

DNV-RP-A203 Technology qualification

DNV-RP-E304 Damage assessment of fibre ropes for offshore mooring

ISO 9712 Non-destructive testing - Qualification and certification of NDT personnel

Quality management - Quality of an organization - Guidance to achieve
ISO 9004
sustained success

ISO 19011 Guidelines for auditing management systems

ISO 9001 Quality management systems

API RP 2I In-service Inspection of Mooring Hardware for Floating Structures

Entry level requirements and introductory modular course outline for new
IMCA R 002
remotely operated vehicle (ROV) personnel

IMCA C 004 Guidance for the safe and efficient operation of remotely operated vehicles

Guidance on competence assurance and assessment: Remote Systems & ROV
IMCA C 005
Division

12.2  General requirements
12.2.1 General
The supplier shall demonstrate that the supplier has the competence and organisation needed to perform the
specified services.
A service supplier certificate will be awarded and maintained on the basis of compliance with the items
described in [12.2.2] to [12.2.6].

12.2.2 Submission of documents
In addition to the documents listed in the general requirements provided in this programme, see Sec.1, the
following documents shall be submitted for review:
— work procedures covering examination activities using CVI, see [12.2.3]
— quality management system, see [12.3]
— work procedures covering examination activities using NDT, see [12.4]
— work procedures covering examination activities using Diver or ROV, see [12.5]
— work procedures covering examination activities using RIT, see [12.6]
Guidance note:
Documentation related to NDT, Diver or ROV and RIT is only applicable if any of these methods and techniques are used as part of
an examination process.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12.2.3 Work procedures
The supplier shall have procedures covering dry or wet examination of mooring system components. This
includes:
— description of type of examination and applicable mooring system component(s), see [12.1.4]
— job preparation and cleaning, see [12.2.4]

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 67
Approval  of  service  supplier  scheme

DNV AS
— examination process, see [12.2.5]

Appendix B
— reporting, see [12.2.6].

12.2.4 Job preparation and cleaning
Job preparation shall include a description of those activities necessary to ensure a safe and effective
examination/inspection according to applicable examination scope. This includes:
— preparation meeting (kick-off)
— selection of tools and equipment
— maintenance and calibration (tools and equipment)
— work process planning, resources and time schedule
— operational criteria and limitations
— cleaning.
The examination and cleaning scope shall be determined according to applicable rules, see DNV-RU-OU-0300
Ch.3 Sec.4 [2], DNV-RU-OU-0300 Ch.3 Sec.4 [3] and/or DNV-RU-OU-0300 Ch.3 Sec.4 [4].
Cleaning of mooring system components before examination shall be performed according to predetermined
acceptance criteria.
The preparation meeting shall be performed by attendance from the Society. The meeting shall conclude the
scope for cleaning and examination and if/how the Society shall witness (parts of) the examination.
Guidance note:
It is recommended that the vessel owner is represented in the preparation meeting.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12.2.5 Examination process
The process describing the examination shall provide the necessary information enabling a qualified
individual using required tools and equipment to perform a safe and complete examination. The process shall
describe what to do presented as a step by step process and covering inspection activities that shall identify
all common problems related to specific mooring system components, see API RP 2I.
In addition, for examination processes that include use of:
— NDT, see [12.4]
— Diver/ROV and/or RIT, see [12.5]
— RIT, see [12.6].

12.2.6 Reporting
The reporting shall be based on a standard template issued by pdf or other electronic format accessed
through e.g. a web portal. For access by e.g. a web based interface the supplier shall document sufficient
system support and account management using password protected user names.
All examination reporting/records shall be documented and retained in such a way that the performed
examination may easily be re-traced later. The supplier shall as a minimum keep this information stored with
a secure back-up for six (6) years.
The report template shall include the following general information applicable for all mooring system
components:
— name and address of the supplier
— name of the vessel and DNV identification number or IMO number
— list of mooring system components or segments part of the examination, with certificate number
— place and date of examination
— name and signature of the person responsible for the reporting
— name and signature of the person that has performed NDT, if relevant
— name of operator for ROV or other RIT used, if relevant
— name and signature of the person verifying the reporting, see also [12.3.5]
— description of examination process used, including method, technique and test equipment/tool(s)

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 68
Approval  of  service  supplier  scheme

DNV AS
— requirements including reference to applicable rules and standards

Appendix B
— examination summary describing type, extent and location of examination(s) performed, any defects
or other unacceptable conditions found, and a conclusive statement as to whether the mooring system
component(s) satisfies the acceptance criteria or not
— damages found documented by sketches and still images (photos) showing location and size
— for mooring chain the reporting shall include extent and location of the examination performed in terms of
link identifying numbers.

12.3 Quality management system
12.3.1 General
The supplier shall have a documented quality management system covering requirements described in IACS
UR Z17, including the following:
— internal audits, see [12.3.2]
— competence requirements and training programmes for the personnel, see [12.3.3]
— continuous improvement, see [12.3.4]
— supervision and verification of work, see [12.3.5]
— personnel records, see [12.3.6].
Guidance note:
For additional information, see ISO 9001 and ISO 9004.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12.3.2 Internal audits
The supplier shall have a documented internal audit programme to measure and evaluate compliance with
internal work procedures and process. Audit findings shall be reported, followed up and concluded in a
systematic way as part of the continuous improvement, see [12.3.4].
Guidance note:
It is recommended that the auditor(s) performing internal audits are independent of the organization that is being audited, see
also ISO 19011..

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12.3.3 Competence requirements and training
The supplier is responsible for ensuring that all personnel has sufficient training and are qualified to the
appropriate level for their scope of work. The supplier shall document personnel competence with a sufficient
combination of education, training and experience to ensure that they understand the principles and process
applicable to techniques and examination method used.
The supplier shall have a person responsible for the appropriate execution and professional standard of the
service sought (service responsible). The responsibilities for the position shall be documented and include:
— sufficient resources to uphold an uninterrupted service
— examination methods are performed according to approved work process
— qualified operators are used to perform the examination
— operation in accordance with the quality management system.
The service responsible shall be a qualified professional with documented relevant experience.
Guidance note:
Relevant experience typically includes inspection and inspection management related to mooring systems, NDT, RIT, etc.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 69
Approval  of  service  supplier  scheme

DNV AS
12.3.4 Continuous improvement

Appendix B
The supplier shall have a documented process for continuous improvement. The process shall be an ongoing
effort to improve the services and any internal process. The process shall as a minimum collect information
from:
— experience with work processes, tools and equipment
— effectiveness of examination processes
— feedback from clients and operators
— information collected from original equipment manufacturer (OEM)
— industry developments (tools, equipment, inspection methods and techniques)
— internal audits, see [12.3.2].
The supplier shall have a system to ensure the tracking of issues and findings through a process of
registration, assigning responsibility, evaluation and implementation of improvements.

12.3.5 Supervision and verification of work
The supplier shall have a documented system for verifying that the services provided are carried out
in accordance with approved work procedures. Verification of work shall be executed by personnel with
documented competence and a technical capacity in order to verify that the work carried out to the required
technical standard and in compliance with applicable work process and procedures.

12.3.6 Personnel records
The supplier is required to keep personnel records containing information on certification, competence,
training and relevant experience.
Records shall be maintained on a continuous basis and kept up to date.

12.4 Additional requirements, non-destructive testing (NDT)
12.4.1 General
If an examination process involves use of non-destructive testing (NDT) the supplier shall, in addition to the
requirements described in [12.2] and [12.3], have a documented system covering:
— work procedures for the applicable NDT methods used, see [12.4.2]
— record of equipment used, including information on maintenance and calibration
— NDT supervisor, see [12.4.3]
— training and certification programmes for NDT operators, see [12.4.4].
Guidance note:
NDT inspection of thimbles related to examination of fibre rope is not required but may by used on a voluntary basis (visual
inspection is accepted).

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Requirements in this subsection may be omitted if the supplier have obtained a separate approval according
to requirements described in [4] with NDT methods qualified for examination of applicable mooring system
components.

12.4.2 Work procedure(s)
The supplier shall establish written procedures for the NDT being applied. These procedures shall be verified
and approved by the NDT supervisor, see [12.4.3]. The procedures shall define all relevant information
relating to the inspection and examination and shall as a minimum contain information on NDT methods,
calibration checks, inspection procedure and defect evaluation against acceptance criteria in accordance with
the Society's rules and standards.
All NDT procedures and instructions shall be properly documented in such a way that the performed testing
may easily be retraced and/or repeated at a later stage.
The supplier shall demonstrate sufficient capabilities and control according to applicable work procedures.
The Society may require a practical demonstration to verify the NDT method used.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 70
Approval  of  service  supplier  scheme

DNV AS
Guidance note:

Appendix B
Practical demonstration will normally be required for advanced NDT methods like phased array ultrasonic testing (PAUT), time of
flight diffraction (TOFD), etc.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12.4.3 NDT Supervisor
The supplier shall have a supervisor, responsible for the appropriate execution of NDT operation and for the
professional standard of the operators and their equipment, including the professional administration of
relevant working procedures.
The supervisor shall be directly involved in review and approval of NDT procedures, NDT reports, calibration
of NDT equipment and tools. The supervisor shall on behalf of the supplier re-evaluate the training,
qualification and experience of the operators annually.

12.4.4  Qualification and certification of NDT supervisor and operators
The supplier is responsible for the training and third party certification of its supervisor and operators to a
recognized certification scheme based on ISO 9712.
Personnel qualification to an employer based qualification scheme as e.g. SNT-TC-1A or ANSI/ASNT CP-189
may be accepted if the supplier's written practice is reviewed and found acceptable by the Society. The
supplier's written practice shall as a minimum, except for the impartiality requirements of a certification body
and/or authorised body, comply with ISO 9712.
The supervisor and operators carrying out the NDT shall, as a minimum, be qualified and certified to level 2
in the relevant NDT methods. Operators only undertaking the gathering of data using any NDT method and
not performing data interpretation or data analysis may be qualified and certified as appropriate, at level 1.
The operator shall have adequate knowledge of materials, structures or components, NDT equipment and
limitations that are sufficient to apply the relevant NDT method for each application appropriately.
The supervisors' and operators' certificates and competence shall comprise all relevant NDT techniques being
used as part of the examination processes, see [12.2.5].

12.5 Additional requirements, examination using diver or ROV
12.5.1 General
If a work process involve use of a diver or ROV for in-water examination the supplier shall, in addition to
the requirements described in [12.2] and [12.3], have a documented system comprising the requirements
described in IACS UR Z17 Annex 1 [3]. In addition the following shall be documented for examination of
mooring system components:
— work procedures describing the use of diver and/or ROV, including evaluation of conditions according to
operational criteria and limitations (visibility, swell and current)
— record of equipment used, including information on maintenance and calibration
— reporting of damages found by video recording and still images, showing location and size.
Video and still images shall have a quality that ensures a sufficient probability of detection (POD) according
to applicable failure mechanism and degradation.
Guidance note:
For ROV operators it is recommended to use guidance on competence assurance and assessment described in IMCA C 005, IMCA C
004 and IMCA R 002, or similar.
For video recording and still images the following specifications are considered acceptable:

— 4K definition video recording device
— 4096x2160 still image capture device.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Requirements in this chapter may be omitted if the supplier has obtained a separate approval according to
requirements described in App.A [3]. The supplier shall then have work procedures describing the use of
diver and/or ROV specific for examination of mooring systems, see [12.2.2].

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 71
Approval  of  service  supplier  scheme

DNV AS
If the ROV has capabilities for performing NDT as part of the examination process the requirements described

Appendix B
in [12.4] shall apply.

12.5.2 Diver and ROV supervisor
The supplier shall have a supervisor, responsible for the appropriate execution of diving and/or ROV operation
and for the professional standard of the operators and equipment, including the professional administration
of relevant working procedures.
The supervisor shall directly be involved in review and approval of any work process and re-evaluate the
training, qualification and experience of the operators annually, or on a case-by-case basis (job specific).
Guidance note:
For training, competence assurance and assessment of ROV operator(s) and supervisor it is recommended to use guidance
described in IMCA C 005, IMCA C 004 and IMCA R 002, or similar.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12.6 Additional requirements, examination using RIT
12.6.1 General
If an examination process involves use of a remote inspection technique (RIT) the supplier shall, in addition
to the requirements described in [12.2] and [12.3], have a documented system covering:
— RIT qualification, see [12.6.2]
— work procedures describing the use of RIT as part of an examination process, see [12.6.3]
— record of equipment used, including information on maintenance and calibration
— RIT supervisor, see [12.6.4]
— competence and training for RIT operators, see [12.6.5].

12.6.2 RIT qualification
If a work process involves use of a RIT considered not to be proven in use, the technology and equipment
shall be qualified. The qualification process includes:
— documentation review
— function and performance test.
Guidance note:
RIT comprises any type of technology used for remote inspection as part of an examination process. 'Not proven in use' typically
relates to novel technology and technology used in new ways and not commonly known to be applied in the industry and/or for the
purpose of RIT.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
A documentation review shall be performed as part of the qualification process. The supplier shall submit
documentation that describes:
— the technology, its intended use, its functions and performance requirements
— operational limitations for the technology
— failure modes for the technology that can lead to reduced or loss of function/performance
— competence and training requirements for using the technology (operator)
— maintenance and calibration, if relevant
— a test programme with the objective of verifying the technology functions and performance requirements
according to given acceptance criteria, see [12.6.3].
Guidance note:
Acceptance criteria should be established describing what the RIT shall be able to detect and/or measure, given specific operational
conditions criteria (visibility and lighting, movements, swell and current, etc.).
For more information regarding technology qualification, see DNV-RP-A203.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 72
Approval  of  service  supplier  scheme

DNV AS
Final part of the qualification process includes a function and performance test. The test shall be performed

Appendix B
according to an approved test programme in a realistic test environment and with attendance from the
Society. The test shall verify the RIT functionality and performance in terms of accuracy of measurements
and capability to detect defects and/or anomalies (probability of detection). Measurements shall be evaluated
according to a known baseline or other known (measured) defects.
If the RIT has capabilities for performing NDT as part of the examination process the requirements described
in [12.4] shall apply.

12.6.3 Work procedures
The supplier shall establish written work procedures describing how the RIT shall be used as part of an
examination process. The procedures shall include all relevant information need to ensure a reliable and
efficient examination process including:
— evaluation of conditions according to operational criteria and limitations
— communication between RIT operator and supervisor or other responsible person
— system for tracking the examination and recording findings (defects and/or anomalies) according to
applicable rules and standards and/or acceptance criteria.

12.6.4 RIT supervisor
The supplier shall have a supervisor, responsible for the appropriate execution of the RIT operation and
for the professional standard of the operators and equipment, including the professional administration of
relevant working procedures.
The supervisor shall be directly involved in review and approval of any work process involving use of RIT and
equipment and tools. The supervisor shall on behalf of the supplier re-evaluate the training, qualification and
experience of the operators annually.

12.6.5 Qualification of RIT personnel
The supplier is responsible for the qualification of its operators and supervisor and for their training in the use
of the equipment utilised when performing examination.
The supplier shall document that the operators and the supervisor are qualified and have relevant experience
working with RIT.
Relevant experience for operators should be minimum one year of experience working with RIT conducting
relevant examinations.
Relevant experience for the supervisor should be minimum two years working with RIT conducting relevant
examinations.

13  Service suppliers engaged in noise and vibration measurements
according to DNV's comfort class - COMF(V-crn)

13.1 Objective
The objective of this programme is to ensure that the service suppliers are using appropriate procedures
and test equipment, have qualified personnel and have implemented procedures for training, performance,
reporting and verification of noise and vibration measurements.

13.2 Scope
Noise and local vibration measurements related to the habitability of crew and passengers on board are
required for the additional class notation COMF(V-crn), which may be applied to all ship types. The approval
shall also include field measurements of sound insulation and impact sound insulation measurements
according to ISO 16283-1 and ISO 16283-2.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 73
Approval  of  service  supplier  scheme

DNV AS
Appendix B
13.3 Application
This programme is applicable to service suppliers engaged in performing noise and local vibration
measurements for compliance with DNV's comfort class notation COMF(V-crn). In the following, such a
company is referred to as the service supplier. The service supplier may apply for a combined approval
for measurements according to this programme and according to measurements of indoor climate
measurements according to DNV's comfort class - COMF(C-crn), see [18] for indoor climate measurements
according to DNV's comfort class - COMF(C-crn).

13.4 Reference documents
The service supplier shall have access and knowledge of the following documents:
— relevant parts of the Society’s rules and guidelines
— relevant international standards referred to in the Society's rules and guidelines
— IACS UR Z17
— SOLAS 1988, as amended (Reg.II-1/3-12)
— IMO resolution MSC.337(91) Code on noise levels on board ships
— IMO Resolution A.343(IX) Recommendation on methods of measuring noise levels at listening posts.

13.5 Procedure for approval and certification
The general procedure for approval and certification as given in IACS UR Z17 applies.
In addition, the requirements and clarifications as given in the following [13.6] to [13.8] apply.

13.6  Submission of documents
The following documents shall be submitted for review in addition to the documents listed in IACS UR Z17
[5.1.1]:
— typical measurement reports or protocols, e.g. a report template or reports from a previous measurement
— calibration certificates of the equipment to be used for the particular service for which the approval is
sought
— calibration procedures for the equipment to be used for the particular service for which the approval is
sought.

13.7  Requirements to suppliers
13.7.1 Supervisor
The supervisor shall have a minimum of two (2) years of experience and more than five (5) measurement
campaigns as an operator in noise and vibration measurements.

13.7.2 Operators
The operator shall have the following qualifications:
— Knowledge in the field of noise and vibration, sound and vibration measurements and handling of
measurement equipment. It is recommended that the vibration measurement operator holds minimum a
category I certificate in accordance with ISO 18436-2.
— Adequate knowledge of ship machinery and manoeuvring systems in order to verify that the vessel has
the required operational condition(s) during the measurements.
— Adequate knowledge of the applicable rules and international standards referred to in the Society's rules.
— At least one (1) years’ experience and shall have had minimum three (3) complete on-the-job training
jobs of noise and vibration measurements for comfort class COMF(V-crn). The same applies for sound

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 74
Approval  of  service  supplier  scheme

DNV AS
insulation and impact sound insulation if the approval shall include these. Where it is not possible to

Appendix B
perform internal training by competent personnel, external training shall be provided by competent DNV
personnel or a competent external party.
— Be able to document theoretical and practical training onboard in using a portable noise and vibration
instrument.
— Shall be able to identify possible errors in the measurement results related to e.g. malfunctioning
measurement equipment or non-ideal location of the sensor.

13.7.3 Equipment

13.7.3.1 Sound level meters
Measurement of sound pressure levels shall be carried out using precision integrating sound level meters.
Such meters shall be manufactured to IEC 61672-1 class 1 standard or to an equivalent standard acceptable
to the Society.

13.7.3.2 Octave filter set
When used alone, or in conjunction with a sound level meter, as appropriate, an octave filter set shall
conform to IEC 61260 standard, or an equivalent standard acceptable to the Society.

13.7.3.3 Microphone and wind screen
A microphone wind screen shall be used when taking recordings outside, e.g. on navigating bridge wings
or on deck, and below deck where there is a substantial air movement. The wind screen should not affect
the measurement level of similar sounds by more than 0.5 dB(A) in 'no wind' conditions. Permanently
usage of the wind screen is allowed in case the class 1 sound level meter has an internal correction function
implemented that is set active.

13.7.3.4 Portable sound calibrator
Sound calibrators that shall be used onboard to verify the set up and performance of the noise level meter
shall comply with the standard IEC 60942 and shall be approved by the manufacturer of the sound level
meter.

13.7.3.5 Noise generator and tapping machine
The equipment shall comply with the requirements in ISO 16283-1 and ISO 16283-2 or ASTM E989.

13.7.3.6 Vibration instrument
Measurements of mechanical vibrations on the deck shall be carried out with a digital portable vibration
instrument in accordance with the requirements given in ISO 20283-5 (i.e. ISO 8041) and DNV-RU-SHIP
Pt.6 Ch.8 Sec.1 [2.3.3.4]. The measurements shall be analysed using FFT (fast Fourier transform or more
correctly named discrete Fourier transform) and be possible to present in the frequency domain (frequency
spectra) in addition to the overall velocity level frequency weighted according to ISO 20283-5 (i.e. ISO 2631
or ISO 8041).

13.7.3.7 Vibration transducer
Vibration transducer with a minimum sensitivity of 100 mV/g or equivalent shall be used. A suitable tripod
mounting plate designed for measuring floor vibration on various floor types shall be used. The total weight
of plate and transducer should be about 1.5 kg.

13.7.3.8 Portable vibration calibrator
A portable or handheld vibration shaker/exciter with an accuracy of maximum 5% with respect to both
amplitudes and frequency shall be used onboard to verify the set up and performance of the vibration
measurement equipment.

13.7.3.9 Calibration
All noise and vibration instruments shall be verified at least every two (2) years by a national standard
laboratory or a competent laboratory accredited according to ISO 17025.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 75
Approval  of  service  supplier  scheme

DNV AS
All calibration reports shall include a statement of conformity with a relevant standard or manufacturer's

Appendix B
specification (e.g. IEC 61260-3 for sound level meter, ISO16283-2 and ISO 10140-5 for tapping machine,
ISO 8041 and ISO 16063-21 for vibration instrument).
A record with a complete description of the equipment used shall be kept, including an up to date calibration
log.
Where the supplier hires equipment from external resources such equipment shall have available calibration
records.

13.7.4  Procedure and instructions
The supplier shall have documented procedures and instructions to carry out service of the equipment.
Documented work procedures are at least to contain information on inspection preparation, selection and
identification of vibration measurement locations, calibration checks and report preparation.
Before the measurements are carried out, a measurement procedure shall be submitted to the Society for
approval. The measurements should be made according to this approved measurement procedure.

13.7.5  Reporting
A noise and vibration survey report in accordance with the approved measurement procedure, see [13.7.4]
shall be made for each individual ship. The report shall comprise information about the ship operating
condition(s), the noise and vibration levels and the corresponding acceptance criteria in the various spaces
on board. The report shall show the reading at each specified point marked on a general arrangement plan,
or on accommodation drawings attached to the report. A description of any deviations from the approved
measurement procedure shall be included. Further requirements to the content of the report are given in
DNV-RU-SHIP Pt.6 Ch.8 Sec.1 [2.2.6.1] and DNV-RU-SHIP Pt.6 Ch.8 Sec.1 [2.3.4.1].
The report shall include a copy of the supplier's certificate of approval.
All measurement records shall be properly documented and kept in such a way that all results may be
reviewed at a later stage.

13.7.6  Verification
The name of the attending surveyor of the Society that witnessed the measurements shall be included in the
report.

13.8 Validity
The approval will be valid for three (3) years. For cancellation of approval see IACS Z17 [8].

14  Service suppliers engaged in alignment of propulsion shafting
and installation of rotating machinery

14.1 Introduction
14.1.1 Objectives
The objective of this programme is to set the specific requirements for approval of service suppliers
(AoSS) engaged in shaft alignment measurements services. This include requirements to: appropriate
written procedures, qualification and certification of personnel, fit-for purpose tools and equipment and
implementation of written procedures for training, performance, application, control, verification and
reporting.
A service supplier will have to fulfill both the service specific requirements below and the general
requirements in Sec.1 of this document.
The objective of the approval of the firms is verification of the firm's processes and system related to the
scope of the certification. evaluation of the personnel with regard to assigned responsibilities, adequacy

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 76
Approval  of  service  supplier  scheme

DNV AS
of the tools and equipment furthermore, it is intend to ensured that an effective and sufficient quality

Appendix B
management system exists.
DNV approval of alignment firms does not preclude class witnessing, survey or inspections where this is
required by any rules or contract partner.
Guidance note:
The class programme is a volunteer assessment and approval scheme, it does not state or limit the firm's obligations toward the
Yard, ship owner or any other contracted party or statutory authorities.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

14.1.2 Scope
[14] provides procedures and requirements related to documentation and inspection applicable for approval
of firms engaged in rotating machinery alignment and installation.

14.1.3 Application
The procedures and requirements described in this subsection are applicable for obtaining approval in
accordance with DNV rules and standards.
This programme is complemented with 5 modules which the firms may apply for one or more modules
depending on the services provided by the firm.

14.2 Acceptance procedure
14.2.1 Approval request
The approval process starts with a written request from the firm. The request shall contain:
— the firm's location, postal address and contact details
— firm's official/legal name, identity or number
— the contact person's details
— summary of the company's services and the specified request for the approval modules.

14.2.2 Documentation:
The following documents shall be submitted for review:
— list of equipment and the calibration procedure, schedule and status
— qualification and recorded experience of operators and the process responsible persons
— process description for each module
— examples of measurement and calculation report.
— description and the records of technical personnel training.

14.2.3 Operators
Operators shall have sufficient training according to a defined training program providing knowledge about
utilization of the tools, equipments and basic knowledge about the concept of alignment process.

14.2.3.1 Process responsible person
There shall be at least one responsible person, present on board, in charge of the alignment and
measurement process with the following qualifications:
— proved proficiency about the concept of the machinery alignment
— sufficient recorded experience about the alignment and installation process
— sufficient experience about utilization of equipment and the calibration procedures
— preferably experienced with alignment calculations and drafting reports
— familiar with relevant DNV requirements.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 77
Approval  of  service  supplier  scheme

DNV AS
14.2.4 Inspection and audit

Appendix B
An initial assessment of the firm shall be carried out that may incorporate a physical inspection and audit in
the firms premises.
The followings shall be verified during the inspection and audit:
— interview with the responsible and the process key personnel relevant to the services subject to approval
— verification and spot check of quality management documentation, (in case the firm holds ISO 9001:2015
Quality Management certificate from DNV this part may be waived)
— spot check of reports, equipments and the process as defined in the firms procedure documents
— below documents may be reviewed:
— maintenance and calibration records of the equipment
— record of the training and experience of the key personnel.

14.3 Process requirements
14.3.1 General requirements
1) The scope of alignment procedure for new building (hereby termed NB) installation is approved by DNV
in advance, this shall form the basis of the alignment process.
2) The scope of alignment procedure for ships in service shall be pre-agreed with DNV on a case by case
basis.
3) All influencing factors including environmental factors that may change the results of the measurements
shall be identified and dealt with, e.g. turning gear is disengaged while performing jack load test or
crankshaft deflection.
4) All equipment shall be calibrated and documented according to the makers recommended intervals or on
a yearly basis whichever comes earlier.

14.3.2 Module 1: Laser aided sighting:
Laser aided sighting method shall be used to verify or measure the orientation of the shafting line including
the relevant position the bearings as detailed in the alignment calculations regulated by DNV.
In some cases (new building) the sighting is limited to the bearings in the stern tube or extended to the first
temporary support in case of single bearing installations. For vessels in service, a laser alignment process to
assess the tilt angle of the prime mover or the gear box may be required.

14.3.2.1 Reference line:
A reference line is defined in shaft alignment calculations to act as the baseline for the relative orientation of
the shafting components, in particular the shaft line bearings. The most commonly used reference line is the
centerline of the stern tube bore represented by the centerline of the aft and forward seal flanges. However
if the reference line was taken differently in the original shaft alignment documents the firm shall follow the
same reference.

14.3.2.2 Single slope/double sloped aft propeller shaft bearing:
The firm should have access to the original arrangement of the shafting and the bearing i.e. slope of the
stern tube aft bearing and shall choose sufficient points along the bearing length in order to determine the
slope of the bearing. (Ref DNV-RU-SHIP Pt.4 Ch.2 Sec.4 minimum 5 points in way of the aft bearing length,
minimum of 3 points for each segment in a double sloped bearing and 3 points on the forward stern tube
bearing). Measurement procedure shall observe the design features of design and production of the sloped
bearings (i.e. aft slope of double slope bearings is normally machined in the bottom half only).

14.3.2.3 Offset:
In most of designs the inner centerline of bearings in stern tube has an offset with respect to outer diameter
and will be evident in the laser readings. Offsets of other inboard bearings in the shaft line (2 measurement
points in each) as well as the prime mover flywheel/gear box flange centerline also need to be measured
where required by DNV.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 78
Approval  of  service  supplier  scheme

DNV AS
14.3.2.4 Calibration and sighting of stern tube housing

Appendix B
The stern tube housing calibration measurement and sighting is required by DNV in case a bush is removed
for repair. In case of class notation "Shaft Align 1 or 2", DNV-RU-SHIP Pt.6 Ch.2 Sec.10: Laser aided
sighting of vertical and horizontal offsets of the stern tube housing in way of the bearings shall be submitted
for review by the attending surveyor. A minimum of 5 reference points shall be used covering the aft most
bearing housing and 3 reference points for the forward bearing housing. The laser reference line shall be
made concentric with the stern tube and independent of the bearings. Spigots (recess) of aft and forward
seal flanges are normally concentric with the stern tube bore unless machined at an offset for adjustment of
seal tolerances.

14.3.2.5 Calibration of bearings and housings
— Inner diameter of the bearings and housing shall be measured in accordance with the scope defined in the
rules and design.
— In addition to the dimensions, the readings shall also reflect the relevant aspects involved i.e. ovality etc.

14.3.3 Module 2: Jack load test:
Jack load tests may be required in cold and hot static conditions (ref alignment calculations/procedure and
also when additionally deemed required by DNV). All probable and environmental influencing factors shall be
identified and addressed (e.g. turning gear disengagement).
The following factors shall be observed for the jack load test:
— the jack correction factors shall be included in the report
— the jack positions shall follow the pre-defined positions in the original shafting arrangement
documentation.
— for the ship's in service when there is a risk of bent shaft the jack load measurements shall be measured
in 4 shaft angles ( i.e. 0°, 90°, 180° & 270 °)
— sufficient points shall be recorded to achieve a clear curve with knuckle point clearly defined and an
accurate estimation of the actual load may be obtained.
— the attached example graph shall be used for reporting of the results of the jack load test.
— jacking up should be to the extent which the shaft reaches to the top bearing shell(i.e. lift the shaft to the
full extent of the bearing clearance.
— load cells shall be utilized in case accurate readings and interpretations are not achieved by normal jacks
hydraulic pressure readings.

14.3.4 Module 3: Gap and Sag measurements
Gap and sag measurements shall only be carried out by dial gauges or devices using equivalent principles
(feeler gauges are not allowed).
The measurements shall be carried out to satisfy alignment calculations regulated in accordance with
applicable DNV rules.
The following shall be observed and reflected in the report:
— the condition of the vessel (afloat, propeller immersion etc.)
— temporary supports are in place
— installation of engine, gearbox and intermediate bearing(s) are finalised or otherwise agreed with DNV
surveyor.

14.3.5 Module 4: Fastening arrangement
— The foundation for propulsion, power generation and steering shall be approved by class before
implementation.
— Resin casting compounds shall be type approved according to DNV-CP-0432 Pourable compounds for
foundation chocking.
— Resilient mounts shall be type approved according to DNV-CP-0144 Flexible mounts used for propulsion or
auxiliary machinery.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 79
Approval  of  service  supplier  scheme

DNV AS
— Detailed procedures of the chock fasting process shall be included.

Appendix B
14.3.6  Module 5: Strain gauge measurements
Strain gauges may be utilized for verification of shaft alignment in static (using turning gear) and running
condition, in both vertical and horizontal plane. In such cases the measurement programme shall be
submitted for approval. The strain gauge measurement is considered as a supplementary module for inboard
alignment verification in addition to Jack load and Gap and Sag measurements.

14.3.7 Reporting:
In addition to the requirements mentioned under each module for reporting, the followings shall be
observed:
— All machinery and environmental conditions e.g.
— The measurement conditions where applicable shall be stated in the report i.e. :
— vessel's temperature (hot, cold state)
— engine condition (hot/cold with crankcase temperature)
— on blocks (dry dock),
— loaded, light ship or on ballast condition,
— vessel's trim angle of listed,
— propeller fully immersed, partially immersed
— The draft report should be presented to the attending surveyor.

14.4 Validity
The approval certificate remains valid for 3 years unless if any evidence proves that the firm fails to comply
with class requirements.
The certificate may be renewed based on a renewal assessment.

15 Service suppliers engaged in marine riser management

15.1 General
Marine riser management (MRM) is a continuous process of knowledge and experience management applied
throughout the lifecycle to ensure that the riser system is managed safe and effectively.

15.1.1 Scope
Companies providing a MRM service as an alternative to calendar based inspection and maintenance shall be
approved by the Society. The companies shall be approved in accordance with this programme and applicable
DNV rules. In the following, such companies are referred to as the supplier.

15.1.2 Objective
The objective of this approval programme is to ensure that the supplier is using appropriate procedures, has
qualified personnel and has implemented written procedures for training, performance, application, control,
verification and reporting.

15.1.3 Extent of the approval programme
The approval programme defines the requirements for obtaining the Society's approval for carrying out
marine riser management applicable to elements part of the marine riser system on units with the optional
Drill, Well and Welltest notation, see DNV-RU-OU-0300.

15.1.4 Terms, definitions and abbreviations
The following terms and definitions apply for this document and approval programme.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 80
Approval  of  service  supplier  scheme

DNV AS
auxiliary line = rigid line attached to the outside of the riser main tube (exclusive of the choke and kill (C/

Appendix B
K) lines) e.g. hydraulic supply lines, mud boost line, air line (API 16Q)
choke and kill = high-pressure line that allows fluids to be pumped into or removed from the well with the
(C/K) lines BOPs closed (API 16Q)
fracture = fracture mechanics is the field of solid mechanics that deals with the behaviour of cracked
mechanics bodies subjected to stresses and strains
heat treatment = specified, timed sequence of controlled heating and cooling of materials for the purpose of
changing physical or mechanical properties (API 16AR)
inspection = process of examination, measurement and/or testing to determine a condition or state of
drill-through equipment.
maintenance = combination of all technical, administrative and managerial actions during the life cycle
of an item intended to retain it in, or restore it to, a state in which it can perform the
required function
manufacturing = composite of files or records associated with the original design and manufacturing
data book including product certification records
(MDB)
marine riser = continuous process of knowledge and experience management applied throughout the
management lifecycle to ensure that the riser system is managed safe and effectively
(MRM)
owner = equipment owner and/or manager responsible for the technical standard of the equipment.
The responsibility for the equipment may in some cases be subcontracted to OEM or other
rd
3  party
riser joint = one section of the riser string having the main tube fitted with a box and pin coupling,
choke, kill, and auxiliary lines (optional), and brackets, clamps, thrust collars, and
buoyancy modules, as applicable (API 16Q)
riser string = deployed assembly of riser joints (API 16Q)
riser = system designed to document, evaluate, and diagnose the design, fabrication, operation,
management and maintenance history of a riser component, assembly, or system through its lifecycle
system
slick joint = riser joint of standard length without attached buoyancy
S/N fatigue = stress range versus number of cycles to failure
curve
remanufacture = process of disassembly, reassembly, and testing of drill-through equipment, with or
without the replacement of parts, in which machining, welding, heat treatment, or other
manufacturing operation is employed (API 16AR)
repair = process of disassembly, reassembly, and testing of drill-through equipment with or without
the replacement of parts in order to correct failed or worn components (repair do not
include machining, welding, heat treatment, or other manufacturing operations) (API
16AR)

15.1.5 References

15.1.5.1  Normative references

Table 9 Normative references

Document code Title

DNV-RU-OU-0300 Fleet in service

DNV-OS-E101 Drilling facilities

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 81
Approval  of  service  supplier  scheme

DNV AS
Document code Title

Appendix B
API RP 16Q Design, Selection, Operation, and Maintenance of Marine Drilling Riser Systems

15.1.5.2  Informative references

Table 10 Informative references

Document code Title

Probabilistic methods for planning of inspection for fatigue
DNV-RP-C210
cracks in offshore structures

DNV-RP-E101 Re-certification of well control equipment

DNV-RP-F204 Riser fatigue

DNV-RP-F206 Riser integrity management

DNV-ST-F201 Riser systems

Standard for Repair and Re-manufacturer of Drill-through
API 16AR
Equipment

Condition monitoring and diagnostics of machines - General
ISO 17359
guidelines

15.2  Requirements to supplier
The certificate of approval will be awarded and maintained on the basis of compliance with the requirements
in this chapter.

15.2.1 Extent of approval
The supplier shall be approved according to the rules of this programme and applicable methodology and
systematics as part of their service.

15.2.2 Submission of documents
In addition to the documents listed in the general requirements provided in this programme, see Sec.1, the
following documents shall be submitted for review:
— information on the implemented quality management system, quality manual and documented procedures
covering the requirements given in [15.2.10]
— process for establishing a marine riser management covering the elements given in [15.2.3]
— data management covering the requirements given in [15.2.11].

15.2.3 Requirements for a marine riser management (MRM)
MRM is an alternative to a regular inspection, maintenance and repair approach following a fixed five (5)
years cycle. MRM shall be based on a continued approach to ensure that all failure modes and degradations
impacting the integrity of the riser(s) are identified, quantified and actions taken to ensure that acceptable
level of safety is achieved.
The MRM shall ensure that all maintenance, inspection and repair are documented, planned and that the
activities are continuously updated based on experience.
The MRM shall be established based on a structured process and approach. The selected approach will
determine applicable activities based on usage and recorded data. There are two approaches that may be
applied, see API RP 16Q :
— usage-only logging, see [15.2.3.1]

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 82
Approval  of  service  supplier  scheme

DNV AS
— usage and condition logging, see [15.2.3.2].

Appendix B
15.2.3.1 Usage-only logging
Usage-only logging is based on logging (tracking) total time in service of each riser joint, allowing the
inspection, maintenance and testing intervals to change with actual time in service.
Inspection, maintenance and testing activities shall be based on the time in service since last inspection and
a continued evaluation of the following parameters collected from each configuration (riser string):
— riser joint position
— water depth
— type of configuration (riser string)
— start and end date (service period).
The usage-only approach is limited to maximum 1825 days between typical repair scope, see DNV-RU-
OU-0300 Ch.3 Sec.4 [6.3].
Guidance note:
This method is also called 'wet days counting' as the actual days the riser is used in water (service) is logged.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

15.2.3.2 Usage and condition logging
The usage-and condition logging approach incorporates the requirements for usage-only logging, see
[15.2.3.1], and in addition enables the inspection, maintenance and testing to be based on the severity of
riser operating conditions.
Operating conditions severity shall be determined based on the impact from parameters like:
— riser tension
— riser angle
— mud weight
— drill string tension
— offset
— current
— wave loading
— other environmental conditions.
Guidance note:
Parameters may be recorded from a supervisory control and data acquisition system (SCADA), data loggers, GPS system,
accelerometers, radio frequence identification (RIFD) tags/readers, strain gauges and other sensors and automated feedback
devices.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Acquisition of data shall be collected at intervals and acquisition rates being able to capture any significant
change in parameter.
The level of wear and fatigue remaining useful life (RUL) shall be determined by a continued analysis of
collected parameters, see [15.2.4].
With a usage and condition logging approach the maintenance, inspection and testing programme, see
[15.2.6], shall be based on the results from the initial inspection, see [15.2.4], the continued analysis and on
the condition of the riser joint.

15.2.4  Process to qualify new riser joints for a programme
The supplier shall have a documented process to evaluate all risers joints applicable for a new or entering in
to an existing programme, including:
— type of riser
— dimensions
— type of riser coupling

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 83
Approval  of  service  supplier  scheme

DNV AS
— choke, kill and auxiliary lines.

Appendix B
The process shall evaluate and determine if the supplier has the necessary documentation, competence and
experience required to establish a program for the applicable type of riser. This includes:
— verification of product certificate (DNV)
— evaluation of deviations from the original design (if applicable)
— design documentation or other form of design basis information
— in service time and inspection history
— supplier experience with applicable riser type.
Any riser joint to be added to a programme shall be subject to an initial inspection to determine the condition
and establish a baseline for all applicable degradations.
Identified anomalies shall be evaluated and specially considered.

15.2.5 Fatigue life
Riser joint fatigue RUL shall be documented by using design documentation and documented operation and
inspection history. Alternatively fatigue RUL may be documented by other calculations and analysis based
on the actual design, components and materials used. If part of the required documentation is missing
conservative inputs or assumptions shall be used to replace the missing information to ensure that the worst
case scenario for the riser joint(s) is captured.
As part of a usage and condition logging approach, see [15.2.3.2], fatigue utilisation may be calculated
and used to determine optimal inspection intervals. Inspection history and results shall be considered when
determining optimal inspection intervals. Fatigue analysis shall be performed by using one of the following
two approaches, or in combination:
— S/N fatigue curves or
— fracture mechanics.
Guidance note:
For further guidance on fatigue analysis, see DNV-RP-F204 Riser fatigue and DNV-RP-C210  Probabilistic methods for planning of
inspection for fatigue cracks in offshore structures

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
The fatigue analysis shall consider expected sea states (sea spectrum) and evaluate the effects of both wave-
induced fatigue and vortex induced vibration (VIV) fatigue.

15.2.6 Inspection, maintenance and testing programme
The supplier shall establish a maintenance, inspection and testing programme specific to the applicable riser
type. The programme shall ensure that the riser is fit for service in its anticipated operating environment and
shall include planned activities that shall be executed and reported in a systematic manner.
The supplier shall document a systematic process for selecting a combination of inspection and preventive
maintenance performed prior to functional failure to achieve intended level of safety, reliability and service
life.
Guidance note:
Reliability centred maintenance (RCM) may be used to establish correct maintenance tasks with optimal intervals for riser system
and components. Risk based inspection (RBI) methodology may be used to determine inspection activities and intervals applicable
for the riser structure.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Maintenance, inspection and testing scope and intervals shall be established based on the results from the
baseline inspection, see [15.2.6] and predicted severity of riser operating conditions (usage). Scope and
intervals shall ensure a sufficient safety level and be updated and changed reflecting the service conditions to
which the riser is exposed and any effects from change in operation.
Maintenance tasks and repairs may be performed based on the condition of the riser joint where it is possible
to observe and detect degradation (diagnostics) prior to functional failure. Assessment of the condition may
be performed by periodic inspection or by condition monitoring.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 84
Approval  of  service  supplier  scheme

DNV AS
Failure mechanisms and degradations to be considered shall include, but not be limited to:

Appendix B
— mechanical damage
— accidental damage and loose attachments
— corrosion (internal and external)
— abrasion wear (erosion)
— coating deterioration
— fatigue/stress cracking (surface and through wall cracks)
— material degradation
— marine growth (affect on VIV suppression)
— VIV
— seal leak.
Guidance note:
Failure mechanism will normally derive from a documented FMEA or FMECA, applicable to the function.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
Failure mechanisms and degradations shall be evaluated for any type of operation.
The programme scope shall as a minimum include applicable activities as described and listed in DNV-RU-
OU-0300 Ch.3 Sec.4 [6.3].
The supplier shall document corrective maintenance tasks and additional inspections that will apply in the
event of abnormal conditions including, but not be limited to:
— under-tensioning
— over-tensioning
— extended periods of hang-off
— large vessel offset
— shock loads during running or retrieval.
Deepwater drilling and operations in cold weather shall also be specially considered.

15.2.7 Preservation
Preservation in periods of storage between use may be applied to stop or reduce applicable degradations and
failure mechanisms. The supplier shall have documented procedures describing preservation of all type of
riser joints and according to extent (time) of preservation, including:
— cleaning
— inspection prior to preservation
— preparations (dismantling etc.)
— storage and environmental conditions
— protection measures
— inspection during preservation
— inspection for re-activation.
If preservation periods exceeds ten (10) years a full inspection and fitness for use evaluation is required prior
to taking back into use. The inspection shall include maintenance tasks, repair and inspection activities as
described and listed in DNV-RU-OU-0300 Ch.3 Sec.4 [6.3].
If maintenance and inspection intervals shall be extended the riser joint shall be sufficiently preserved in idle
time between usage.

15.2.8 Re-manufacture process
The supplier shall document any re-manufacture process that involves machining, welding or any form
of heat treatment. Any change made to original assembled product or change to original design shall be
documented and it is the responsibility of the supplier to obtain any relevant design information to ensure the
continued safety and structural integrity of the riser joint or riser string when deployed. It is the responsibility
of the supplier to obtain sufficient information about the riser joint design to be able ensure a complete re-
manufacture process. The process and documentation shall be approved by the Society.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 85
Approval  of  service  supplier  scheme

DNV AS
Guidance note:

Appendix B
For technical requirements and guidance on design and fabrication, see DNV-OS-E101.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

15.2.9 Riser tracking and monitoring
The supplier shall have a computerised software system for collecting and storing essential information for
each riser joint and enabling real-time automatic tracking of the usage and condition. The software shall have
capabilities and functions covering (not limited to):
— tracking of riser joint registered to a specific unit or group of units being part of the same management.
Tracking shall distinguish between in use (in water), in preservation or in set-back (local storage)
— riser sequence (stack-ups) showing and tracking the position of each riser joint in the riser string each
time the riser joint is deployed
— monitoring of usage and conditions, see [15.2.3]
— access to inspection and maintenance programme, see [15.2.5]
— access to applicable documentation for each riser joint including MDB, valid product certificate/type
approval and any re-manufacture documentation as applicable
— access to service and inspection history
— access control to ensure that changes to the system cannot be made by unauthorised personnel and
assure that any input will be traceable to the individual user
— back up of data.
Records shall be retained for a minimum of ten (10) years following the date the equipment was received by
the service supplier, see API 16AR.

15.2.10 Quality management
The supplier shall have a documented quality management system, see ISO 9001, covering:
— internal audits, see [15.2.10.1]
— competence requirements and training programmes for the personnel, see [15.2.10.2]
— continuous improvement, see [15.2.10.3]
— verification of work, see [15.2.10.4]
— personnel records, see [15.2.10.5].

15.2.10.1 Internal audits
The supplier shall have a documented internal audit programme to measure and evaluate compliance with
internal work procedures and process. Audit findings shall be reported, followed up and concluded in a
systematic way as part of the continuous improvement, see [15.2.10.3].
Guidance note:
It is recommended that the auditor(s) performing internal audits is independent of the organization that is being audited.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

15.2.10.2 Competence and training
The supplier is responsible for ensuring that all personnel part of the service in which the supplier have
chosen to qualify, has sufficient training and are qualified to the appropriate level for their scope of work.
The supplier shall document personnel with a sufficient combination of education, training and experience to
ensure that they understand the principles and process applicable to techniques and/or theories used.
The supplier shall have a supervisor responsible for the appropriate execution and professional standard of
the service sought. The responsibilities for the role shall be documented and include:
— sufficient resources to uphold an uninterrupted service
— that the inspection and maintenance programmes are developed and implemented according to approved
process
— that only quality assured data and information are used as part of the service
— a sufficient level of information and data security

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 86
Approval  of  service  supplier  scheme

DNV AS
— operation in accordance with the quality management system, see [15.2.10].

Appendix B
The supervisor shall be a qualified professional with a technical education and with documented relevant
experience.
Guidance note:
Relevant experience typically includes inspection and maintenance management, structural analysis (fatigue/FEM), risk based
inspection analysis (RBI), riser/drilling operations or riser design.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
The supplier is responsible for ensuring that all maintenance, inspection and repairs are performed by
approved service suppliers with qualified and certified personnel following approved procedures.
Guidance note:
For service suppliers engaged in performing NDT (non-destructive testing), see [4].
For thickness measurements on ships and mobile offshore units, see [1].

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

15.2.10.3 Continuous improvement
The supplier shall have a documented process for continuous improvement. The process shall be an ongoing
effort to improve the services and any internal process. The process shall as a minimum collect information
from:
— experience with work processes and tools
— effectiveness of inspection and maintenance activities, see [15.2.5]
— feedback from clients and maintenance/inspection personnel
— information collected from Original equipment manufacturer (OEM)
— industry developments (equipment, inspection methods and measurement techniques)
— internal audits
— root cause analysis (RCA).

15.2.10.4 Verification of work
The supplier shall have a documented system for verifying that the services provided are carried out
in accordance with approved work procedures. Verification of work shall be executed by personnel with
documented competence and a technical capacity in order to verify that the work carried out to the required
technical standard and in compliance with applicable work process (procedures).

15.2.10.5 Personnel records
The supplier is required to keep personnel records containing information on competence, training and
relevant experience.
Records shall be maintained on a continuous basis and kept up to date.

15.2.11 Data management
All parameters (sensor data) collected and applied to track usage, see [15.2.3], and to predict the condition
of riser joints shall be quality assured. The supplier shall have a sufficient level of data management to
ensure correct data quality and that the riser tracking and monitoring system, see [15.2.9], do not use
unprotected data or introduce data security threats/breaches to the vessel network. The data management
shall be a documented process of coordinated activities ensuring sufficient:
— data quality, see [15.2.11.1]
— data security (cyber security), see [15.2.11.2]
— data infrastructure, see [15.2.11.3].

15.2.11.1 Data quality
The supplier shall have a documented information and data quality management covering the following
elements:
— data flow diagram

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 87
Approval  of  service  supplier  scheme

DNV AS
— responsibilities and competence requirements

Appendix B
— work process that defines characteristics of information and data that determines its quality and provides
methods to manage, measure and improve the quality of information and data from sensor system/data
logger through applicable nodes before made available for analysis and other processing, see ISO 8000-8.
— technologies and tools to support data quality processes.
Guidance note:
As part of a process to evaluate sufficient level of data and information management, the supplier is recommended to apply DNV-
RP-0497 to perform a data quality assessment with respect to relevant data flow(s) and an organisational maturity assessment to
evaluate the suppliers ability to manage data quality according to the service sought.
Information and data quality assurance may be performed completely or partly by the riser owner.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

15.2.11.2 Data security
The supplier shall have a documented information and data security management, see IEC 62443-2-4 ,
covering:
— security system specification and diagram
— work process to integrate applicable systems, analyse and identify security threats and provide methods
to manage, measure and improve the information and data security at a sufficient level.
— responsibilities and competence requirements
— malware and patch management
— remote access
— access control and account management.
Guidance note:
Information and data security management may be performed completely or partly by the machine or equipment owner.
For suppliers providing services including limited data transfer and secure tunnels a limited scope may be accepted on a case by
case basis.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

15.2.11.3 Data infrastructure
The supplier is responsible for ensuring that applicable infrastructure used to collect data is capable of
performing according to required availability level and providing the resources to ensure sufficient support.
Hardware installed onboard shall be able to perform according to applicable conditions where it is installed
and any applicable limitations shall be documented.
Guidance note:
Data infrastructure is used for data creation, consumption and sharing. Data infrastructure is the sum of functions, methods,
mechanisms and tools that ensure interoperability, transparency and trust in data value chains cross composite hardware,
software, network resources and services.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

16 Approval of service suppliers supporting automated boiler water
maintenance system

16.1 Introduction
Companies providing support to vessels equipped with DNV type approved automated boiler water
maintenance systems shall be approved according this programme. Involvement of an approved service
supplier is mandatory when the automatic water maintenance system replaces part of the manual feed water
testing required by class.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 88
Approval  of  service  supplier  scheme

DNV AS
An approved service supplier shall ensure that the system is able to measure and monitor data representing

Appendix B
the boiler water condition and to regulate the dosing system to ensure that the condition of the boiler water
is maintained within the range recommended by the boiler maker.
In addition the supplier shall provide guidance necessary to maintain the system.

16.1.1 Objectives
The objective of this programme is to verify that the supplier's processes ensures:
— knowledge about the type approved system
— reliable data is collected, transferred, processed and utilized
— supplier personnel involved are sufficiently trained
— a frame work for a contract, describing the involved parties obligations.

16.1.2 Reference documents

Table 11 References

Document code Title

DNV-RU-SHIP Pt.6 Ch.9 Sec.5 Boiler monitoring - BMON

DNV-RU-SHIP Pt.7 Ch.1 Sec.2
Annual survey extent - main class
[3.1.19]

DNV-RU-SHIP Pt.7 Ch.1 Sec.6 [25.2] Additional class notation surveys

DNV-CP-0500 Automated boiler water maintenance system

16.2  Terms and definitions
operator = technical staff onboard responsible for operation and maintenance of systems and
equipment onboard
supplier = the service supplier which is subject to this approval
the system = the automated boiler water maintenance system
procedural = collection of all procedures define a specific method for each action related to the
policy supplier's services
process = persons involved with evaluation of data and producing the reports/feed back to vessel
responsible
person

16.3 Approval procedure
16.3.1 Documentation:
The supplier shall provide a procedural policy with following information included, which shall be submitted
for review:
— description of all actions and procedures in connection with intended service, that should include the
requirements stated under paragraph [16.4]
— list of equipment and the calibration procedure, schedule and status
— qualification and recorded experience of the process responsible persons, see [16.3.2]
— the system's type approval certificate (by DNV)
— examples of measurements, analysis and calculation report
— example copy of contract between the supplier and the vessel owner.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 89
Approval  of  service  supplier  scheme

DNV AS
16.3.2 Process responsible person

Appendix B
There shall be a responsible person, in charge of the process with following qualifications:
— sufficient training or recorded experience about boiler types and damages
— sufficient experience about utilization and maintenance of the type approved system and the calibration
procedures.
— experienced with relevant data analysis calculations and drafting reports
— familiar with relevant DNV requirements.

16.3.3 Inspection and audit
An initial assessment of the supplier shall be carried out by DNV surveyor that may incorporate a physical
inspection and audit in the suppliers premises.
The surveyor will carry out the initial audit after all documentation and information are received and have
been evaluated.
DNV will verify the following points during the audit:
— interview with the process responsible persons
— verification and spot check of quality management documentation, (in case the supplier holds ISO 9001
quality management certificate from DNV this part may be waived)
— spot check of reports, records and equipment as defined in the suppliers procedural policy.

16.4 Process requirements
There shall be an official contract between the supplier and the owner of the vessel stating the rights and
obligations of both parties.

16.4.1 Operator's obligation
The contract shall include following contents as the operator's obligations:
— Operator shall review the monthly report and follow up the recommendations.
— Operator shall perform boiler water test manually at least once in a week and submit the results to the
supplier.
— Operator shall ensure that the system is working satisfactory by daily test of self diagnose push button
(applicable for systems with control system not integrated with vessel's alarm and automation system).
— Agreement about detailed planned maintenance for the hardware including the support for supplement of
sensors and other consumable spares in order to ensure there is no interruption in system's operation.
— Operator shall accept that the manual testing and treatment shall be restored as per DNV requirements
for vessel not equipped with the system, in cases where the system accuracy of the monitoring or
treatment cannot be assured.

16.4.2 Supplier's obligations
There shall be a transfer of data established between vessel and supplier's database. The connection shall be
either continuous or in intervals as frequent as possible limited to maximum 30 days intervals.
— The supplier shall be able to have an overview of the measured parameters and assure the correct
function of the system and components.
— The supplier shall be able to receive the manually measured boiler test results by the vessel's engineers
and compare them with the automatic measured values.
— The supplier shall be able to detect the daily self diagnosis push button activated by the responsible
engineer onboard, and provide feed back to the operators in case the signal is not received .

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 90
Approval  of  service  supplier  scheme

DNV AS
— Monthly reporting:

Appendix B
As minimum the monthly report shall contain the following information:
— A summary of system function and the recorded data during last month.
— A brief summary of system function during past 12 months using colour codes.
— In addition to the monthly report, immediate notification shall be given to the vessel's technical
operators in the cases of:
— deviation in any part of system
— lack of data transfer
— lack of maintenance i.e. failure in submitting weekly manual test results or operating self diagnose
push button (when applicable).

16.5 Validity
The approval certificate remains valid for three (3) years unless any evidence proves that the supplier fails to
comply with class requirements.
The certificate may be renewed based on a renewal assessment.

17 Service suppliers engaged in renewal survey examination of
offshore fibre ropes intended for mooring of mobile offshore units
The content of this programme has been superseded by [12].

18 Service suppliers engaged in indoor climate measurements
according to DNV's comfort class - COMF(C-crn)

18.1 Objective
The objective of this programme is to ensure that the service supplier is using appropriate procedures and
test equipment, has qualified personnel and has implemented procedures for training, performance, reporting
and verification of indoor climate measurements.

18.2 Scope
Certain indoor climate measurements are required for the additional class notation COMF(C-crn), which may
be applied to all ship types.

18.3 Application
This programme is applicable to service suppliers engaged in performing indoor climate measurements for
compliance with DNV's comfort class notation COMF(C -crn). In the following, such a company is referred to
as the service supplier. The service supplier may apply for a combined approval for measurements according
to this programme and according to measurements of noise and vibration measurements according to DNV's
comfort class - COMF(V-crn), see [13].

18.4 Reference documents
The service supplier shall have access to and knowledge of the latest revision of the following documents:
— relevant parts of the Society’s rules and guidelines
— relevant international standards referred to in the Society's rules and guidelines

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 91
Approval  of  service  supplier  scheme

DNV AS
— IACS UR Z17

Appendix B
— ISO 7726.

18.5 Procedure for approval and certification
The general procedure for approval and certification as given in IACS UR Z17 applies.
In addition, the additional requirements and clarifications as given in the following [18.6] to [18.8] applies.

18.6  Submission of documents
The following documents shall be submitted for review in addition to the documents listed in IACS UR Z17
[5.1.1]:
— typical measurement reports or protocols, e.g. report template or reports from previous measurements
— calibration certificates of the equipment to be used for the particular service for which the approval is
sought
— calibration procedures for the equipment to be used for the particular service for which the approval is
sought.

18.7 Requirements to service suppliers
18.7.1  Supervisor
The supervisor shall have a minimum of two (2) years of experience and more than five (5) measurement
jobs as an operator in indoor climate measurements.

18.7.2  Operators
The operator shall have the following qualifications:
— Knowledge in the field of measurements of relevant climate parameters with temperature probes and air
velocity measurement equipment.
— Adequate knowledge of the applicable rules and international standards referred to in the Society's rules.
— Adequate knowledge of ship HVAC systems in order to verify that the HVAC has the required operational
conditions during the measurements.
— At least one (1) year experience and shall have had minimum three (3) complete on-the-job training jobs
of indoor climate measurements for comfort class. Where it is not possible to perform internal training by
competent personnel, external training shall be provided by competent DNV personnel or a competent
external party.
— Be able to document theoretical and practical training onboard in using the instruments.
— The operator shall be able to identify possible errors in the measurement results related to e.g.
malfunctioning measurement equipment.

18.7.3  Equipment
Measurements of indoor climate parameters inside the accommodation spaces shall be carried out with digital
instruments and probes in accordance with the requirements given in ISO 7726 and applicable DNV rules.
A record of equipment used for the measurements shall be kept. The records shall contain information on
maintenance and calibration. Where the supplier hires equipment from external resources such equipment
shall have available calibration records.
All instruments shall be verified at least every two (2) years by a national standard laboratory or a competent
laboratory accredited according to ISO 17025.
All calibration reports shall include a statement of conformity with a relevant standard (ISO 7726) or
manufacturer's specification.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 92
Approval  of  service  supplier  scheme

DNV AS
18.7.4  Procedure and instructions

Appendix B
The supplier shall have documented procedures and instructions to carry out service of the equipment.
Documented work procedures shall at least contain information on inspection preparation, selection and
identification of measurement locations, calibration checks and report preparation.
Before the measurements are carried out a measurement procedure shall be submitted to the Society for
approval. The measurements should be made according to this approved measurement procedure.

18.7.5  Reporting
A climate survey report in accordance with the approved measurement procedure, see [18.7.4], shall
be made for each individual ship. The report shall comprise information about the measured outdoor
ambient temperature, the HVAC operating condition and the measured parameters in the various spaces
on board. The report shall show the reading at each specified point marked on a general arrangement plan,
or on accommodation drawings attached to the report. A description of any deviations from the approved
measurement procedures shall be included. Further requirements to the content of the report are given in
the applicable DNV-RU-SHIP Pt.6 Ch.8 Sec.1 [3.3.4].
The report shall include a copy of the supplier's certificate of approval.
All measurement records shall be properly documented and kept in such a way that all results may be
reviewed at a later stage.

18.7.6  Verification
The name of the attending surveyor of the Society that witnessed the measurements shall be included in the
report.

18.8 Validity
The approval will be valid for three (3) years. For cancellation of approval, see IACS UR Z17 [8].

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 93
Approval  of  service  supplier  scheme

DNV AS
APPENDIX C GUIDELINES FOR THE TECHNICAL INSPECTION OF

Appendix C
RADIO INSTALLATIONS ONBOARD SHIPS FITTED FOR COMPLIANCE
WITH GMDSS


The general guidelines apply to cargo ships above 300 tons gross and to all passenger ships irrespective of
size, dynamically supported crafts, and high speed and light craft (DNV-RU-HSLC).

Terms and definitions
DSC digital selective calling
EPIRB emergency position indicating radio beacon
device designed for monitoring transmitted frequencies and the verification of
EPIRB testing device
correct coding of the float-free satellite EPIRBS
GMDSS global maritime distress and safety system
MMSI maritime mobile service identity
NAVTEX system for reception of messages to seafarers related to safety at sea using NBDP
NBDP narrow band direct printing (radio telex)
NICA nickel-cadmium
NIFE nickel-ferro
Scanning watch receiver continuously scanning dedicated frequencies used solely for safety
receiver purposes
SES ship earth station

2 Introduction
The intention of the guidelines is to enable the radio inspectors contracted by DNV to carry out the radio
inspections in a unified and correct manner on ships of any flag.

2.1 Performance of radio inspection
The technical radio inspection shall always be performed by a qualified radio inspector from an approved
radio inspection service supplier, hereafter referred to as radio inspector.
Radio inspection should be carried out using suitable test equipment capable of performing all the relevant
measurements required by these guidelines.

2.2 Interpretations
The radio inspector may occasionally observe that compliance with GMDSS requirements are met in different
ways. Therefore, in order to avoid any confusion that may arise, IMO has made a set of clarifications.
Relevant IMO clarifications are added where appropriate, also referring to relevant regulation of the 1974
SOLAS convention as amended. DNV statutory interpretations for SOLAS IV, as amended, contains also
useful information.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 94
Approval  of  service  supplier  scheme

DNV AS
Appendix C
3 Documentation

3.1 Initial inspection
For the radio installations of cargo ships the examination of plans and designs should consist of:
— Examining the plans for the provision and positioning of the radio installation including sources of energy
and antennas (SOLAS 74/88-II-1/43, IV/6 and 14).
— Examining the plans for the provision and positioning of the radio life-saving appliances (SOLAS
74/88III/6). For the radio installations, including radio life-saving appliances, of cargo ships the inspection
during construction and after installation should consist of:
— Examining the position, physical and electromagnetic protection and illumination of each radio installation
(SOLAS 74/88-IV/6).
Guidance note:
If public correspondence from the communication workstation might cause audible or visual interference to the navigator, such
communication shall be performed from another place or room in the ship.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
— Confirming the provision of equipment for the radio installation with due regard to the declared sea areas
in which the ship will trade and the declared means of maintaining availability of functional requirements
(SOLAS 74/88-III/6, IV/7 to 11, 14 and 15).
— Confirming the ability to initiate the transmission of ship-to-shore distress alerts by at least two separate
and independent means, each using a different radio communication service, from the position from which
the ship is normally navigated (SOLAS 74/88-IV/4, 7 to 11).

3.2 Ships in service
Prior to the technical inspection, it shall be checked that the radio equipment fitted is in accordance with the
information stated in Form R – record of equipment.
Identification of radio equipment and the result of the inspection shall be recorded in the relevant survey
report forms CRC 629a and CRC 630a.

4 Antennae

4.1 Examining all antennae, including:
— visually checking all antennae, including INMARSAT antennas, and feeders for satisfactory siting and
absence of defects (SOLAS 74/88-IV/14)
— checking insulation and safety of all antennae.
Guidance note:

1) check for protection against inadvertent touching by the ship's staff
2) check for possible mutual electrical interference:

— vertical separation and safe distances with respect to transmitting and receiving antennae
— free line of sight – INMARSAT antennae.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 95
Approval  of  service  supplier  scheme

DNV AS
Appendix C
5 Inspection of the reserve source of energy and automatic battery
charger(s)

5.1 Reserve source of energy is a battery
— Checking its siting and installation (SOLAS 74/88-IV/13).
Guidance note:
Lead-acid accumulator batteries and NiCd batteries must not be located in the same battery compartment.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
— Where appropriate, checking its condition by specific gravity measurement or voltage measurement.
Guidance note:

— For lead accumulators specific gravity readings between 1.24 and 1.30 are acceptable. Readings below 1.24 indicates defective
charger/ wrong setting on charger, or that the battery needs to be replaced. Variations in the specific gravity between the
battery cells (variation in specific gravity of 0.03 or more) indicates a defective cell, and hence that the battery must be
replaced.
— For alkali accumulators, including sealed accumulators, a voltage reading of 1.2 V per cell at maximum discharge current
is acceptable.
— If there is doubt as to the condition of accumulators and whether the capacity requirement has been met, the accumulators
must be replaced or alternatively undergo capacity testing.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
— With the battery off charge, and the maximum required radio installation load connected to the reserve
source of energy, checking the battery voltage and discharge current.
— Checking there is sufficient capacity to operate the basic or duplicated equipment for 1 hour or 6 hours, as
appropriate (SOLAS 74/88-IV/13), and:
— Checking that the charger(s) are capable of re-charging the reserve battery to the required capacity
within 10 hours (SOLAS 74/88-IV/13).
— Inspecting mechanical condition of accumulators, connections, cables, fuse circuits etc.
— The battery compartment shall be inspected for mechanical defects and sufficient ventilation. Where
outdoors wooden or composite battery compartments are used, the accumulator specifications regarding
the ability to withstand extreme temperature variations to be checked.

5.2 Automatic chargers
Maintenance voltage for lead accumulators shall be 26.8 V, boost 28.8 V. When using NiCd accumulators, 28
V and 32 V, respectively.

5.3 General
The following items shall be checked:
— That dedicated AC and DC fuses/circuit breakers for both basic and duplicated GMDSS equipment are
provided.
— That the main DC supply line from the radio battery is provided with fuses/circuit breaker – alternatively
has been protected by separate and secured pipes.
— That the basic and duplicated GMDSS equipment are electrically separated. A 'line by line black-out test'
should be carried out.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 96
Approval  of  service  supplier  scheme

DNV AS
Appendix C
6 Inspection of maritime VHF

6.1 The examination should include
— Checking for operation on channels 6, 13 and 16 (SOLAS 74/88-IV/7 and 14).
— Frequency tolerance, transmission line quality and radio frequency power output (SOLAS 74/88-IV/14).
— For correct operation of all controls including priority of control units in conning positions (SOLAS
74/88IV/14).
— The operation of the VHF control unit(s) or portable VHF equipment provided for navigational safety
(SOLAS 74/88-III/6).
— For correct operation by on-air contact with a coast station or other ship.
— That the equipment operates from the main, emergency (if provided) and reserve sources of energy
(SOLAS 74/88-IV/13).

6.2 VHF DSC controller
The examination should include:
— Performing an off-air check confirming the correct maritime mobile service identity is programmed in the
equipment (SOLAS 74/88-IV/14).
— Checking for correct transmission/receiving by means of a routine or test call to a coast station, other
ship, onboard duplicate equipment or special test equipment.
— Checking that the equipment is capable of automatically including the ship's position in the distress alert
and that such data is provided from an external/internal GPS receiver (SOLAS Reg. IV/18).

6.3 VHF channel 70 DSC watch receiver
Clarification:
The requirement may be met by:
— a separate VHF channel 70 DSC watch receiver, or
— a dedicated VHF channel 70 DSC watch receiver combined with the VHF radiotelephone, or
— a standard VHF radiotelephone permanently locked on channel 70.

6.4 Power supply
Checking that the equipment operates from the main, emergency (if provided) and reserve sources of energy
(SOLAS 74/88-IV/13). Tick off as appropriate.

6.5 Alarm
Checking the audibility of the VHF/DSC alarm.

7 MF or MF/HF radiotelephone equipment including DSC and NBDP

7.1 The examination should include
— Checking that the equipment operates from the main, emergency (if provided) and reserve sources of
energy (SOLAS 74/88-IV/13).
— Checking the antenna tuning in all appropriate bands.
— Checking the equipment is within frequency tolerance on all appropriate bands (SOLAS 74/88-IV/14).

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 97
Approval  of  service  supplier  scheme

DNV AS
— Checking for correct operation by contact with a coast station and/or measuring transmission line quality

Appendix C
and radio frequency output.
— Checking receiver performance by monitoring known stations on all appropriate bands.
If control units are provided outside the navigating bridge, checking the control unit on the bridge has first
priority for the purpose of initiating distress alerts (SOLAS 74/88-IV/9, 10, 11 and 14).
— Checking that the equipment is capable of automatically including the ship's position in the distress alert
and that such data is provided from an external/internal GPS receiver (SOLAS Reg. IV/18).

7.2 Examining the MF or MF/HF DSC controller(s), including
— checking that the equipment operates from the main, emergency (if provided) and reserve sources of
energy (SOLAS 74/88-IV/13)
— confirming that the correct maritime mobile service identity is programmed in the equipment
— checking the off-air self test programme.
— checking operation by means of a test call on MF and/or HF to a coast radio station if the rules of the port
permit the use of MF/HF transmissions (SOLAS 74/88-IV/9, 10 and 11)
— checking that the equipment is capable of automatically including the ship's position in the distress alert
and that such data is provided from an external/internal GPS receiver (SOLAS Reg. IV/18).

7.3 Examining the MF or MF/HF DSC watch receiver(s), including
— confirming that only distress and safety DSC frequencies are being monitored (SOLAS 74/88-IV/9 to 12)
— checking that a continuous watch is being maintained whilst keying MF/HF radio transmitters (SOLAS
74/88 IV/12)
— checking for correct operation by means of a test call from a coats station or other ship.
Clarification:
This requirement can be met by:
— a separate MF/HF DSC scanning watch receiver for distress and safety DSC frequencies only, or
— a dedicated MF/HF DSC scanning watch receiver for distress and safety DSC frequencies only combined
with the MF/HF radiotelephone
— if MF mode DSC only is required, a separate MF DSC watch receiver locked on 2187.5 KHz or a dedicated
2187.5 KHz watch receiver combined with the MF radiotelephone installation will suffice.
If DSC operation is desirable on other frequencies, an additional scanning receiver shall be provided.

7.4 Examining the MF/HF radiotelex equipment, including
— confirming that the correct selective calling number is programmed in the equipment
— checking correct operation by inspection of recent hard copy or by a test with a coast radio station
(SOLAS 74/88 IV/10 and 11).
Guidance note:
A test of the telex may be performed by sending the telex message to the vessels INMARSAT-C installation (i.e. through the
INMARSAT system).

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

7.5 Power supply
Checking that the equipment operates from the main, emergency (if provided) and reserve sources of energy
(SOLAS 74/88-IV/13). Tick off as appropriate.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 98
Approval  of  service  supplier  scheme

DNV AS
Appendix C
7.6 MF or MF/HF DSC alarm
Checking the audibility of the MF or MF/HF DSC alarm.

8 INMARSAT ship earth station

8.1 INMARSAT ship earth station
Examining the INMARSAT ship earth station(s), including:
— Checking that the equipment operates from the main, emergency (if provided) and reserve sources of
energy.

8.2 Examination of the distress function should include
— checking the distress function by means of an approved test procedure where possible (SOLAS 74/88-
IV/10, 11, 12 and 14)
— checking for correct operation by inspection of recent hard copy or by link test.

8.3 Automatic position updating support
Checking that the equipment is capable of automatically including the ship's position in the distress alert and
that such data is provided from an external/internal GPS receiver (SOLAS Reg. IV/18).

9 Float-free satellite EPIRB

9.1 Examining the 406 MHz satellite EPIRB (SOLAS 74/88 IV/7 and 14) or
1.6 GHz INMARSAT including
The items listed in form CRC 630a Annual testing of 406 MHz EPIRBs to be attended to, filled in, signed and
left onboard for documentation. A copy to be given to DNV attending surveyor (follow annexed to the report
form CRC 629a).
Guidance note:
If the float-free satellite EPIRB is used as the secondary means of alert (see record of equipment, form R) the EPIRB can be
accepted if it is installed in the vicinity of the bridge, e.g. in the wings, on top of the wheelhouse, if accessible by stairs, or if its
activation is possible by remote control from the position from which the ship is normally navigated.
Where intended for remote activation, the EPIRB should be installed so that it has unobstructed hemispherical line of sight to the
satellites.
See also DNV statutory interpretations for SOLAS, as amended.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

10 Enhanced group call (EGC) receiver

10.1 Examining the EGC receiver should include
— checking for correct operation and area by monitoring incoming messages or by inspecting recent hard
copy
— running the self-test programme if provided.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 99
Approval  of  service  supplier  scheme

DNV AS
Appendix C
11 HF MSI with direct-printing (NBDP) receiver
If appropriate, examining the radio equipment for receipt of maritime safety information by HF NBDP (SOLAS
74/88 Rs.IV/7, 12 and 14) including:
— checking for correct operation by monitoring incoming messages or inspecting recent hard copy
— running the self-test programme if provided.
Guidance note:
The surveyor shall check that the MF/HF/DSC/NBDP equipment is capable of receiving MSI.
Refer to IMO “GMDSS MASTER PLAN” regarding HF MSI transmitting station’s schedules and frequencies.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

12 NAVTEX receiver
If appropriate, examining the NAVTEX equipment (SOLAS 74/88-IV/7, 12 and 14) including:
— checking for correct operation by monitoring incoming messages or inspecting recent hard copy
— running the self-test programme if provided.

13 Two-way VHF radiotelephone apparatus
SOLAS III/6.2.1, IV/4
1) checking for correct operation on channel 16 and one other channel by testing with another fixed or
portable VHF
2) checking the battery charging arrangement where rechargeable batteries are used
Guidance note:
Sealed batteries should normally be provided. If sealed batteries are not provided, documentation should be available so it
may be verified that the equipment was installed prior to 1996-11-23. See also guidance note in CRC629a.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
3) checking expiry date of primary battery where used
4) checking outside markings; ship's name and call sign to be permanently fixed and clearly readable.

14 Radar transponders
(SOLAS 74/88, III/6, IV/7 and 14)
1) checking position, mounting and monitoring response on the ship's 9 GHz (x-band) radar. Manufacturer's
test procedure to be followed
2) checking battery expiry date
3) checking outside markings, ship's name and call sign to be permanently fixed and clearly readable.
Guidance note:
One radar transponder shall be mounted in each free-fall life boat, if provided.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---

15 Methods of maintenance
Check Flag info for special national requirements with regards to carriage of spare parts.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 100
Approval  of  service  supplier  scheme

DNV AS
Appendix C
15.1 Test equipment
Examining the test equipment and spares carried to ensure carriage is adequate and in accordance with
the sea areas in which the ship trades and the declared options for maintaining availability of the functional
requirements (SOLAS 74/88-IV/15).

16 Handbooks and documentation

16.1 Examination of documentation
For the radio installations, including those used in life-saving appliances, the check that documentation, etc.,
has been placed on board should consist of:
— checking for a valid radio licence issued by the flag administration (ITU RR Art.18).

OBSERVE
Flag restrictions regarding the validity of the safety radio certificate in case of outdated radio license, please
contact DNV surveyor for information and handling.
— checking the carriage of up-to-date ITU publications (ITU RR App.11).
Guidance note:
The required publications are:

— list of coast stations
— list of ship stations
— list of radio determination and special services stations
— list of call signs and numerical identities
— manual for use by the maritime mobile and maritime mobile-satellite services.

Regarding what editions are the latest, please refer to ITU list of coast stations (back cover), which lists the various publication
dates.

---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e---
— checking the carriage of operating manuals for all equipment (SOLAS 74/88-IV/15)
— checking the carriage of service manuals for all equipment when at-sea maintenance is the declared
option (SOLAS 74/88-IV/15).

16.2 Radio record
Checking the radio record (log) for correct entries (SOLAS 74/88-IV/17 and ITU RR App.11).

16.3 Radio operator's certificates
Checking the radio operator's certificates of competence (SOLAS 74/88-IV/16 and ITU RR Art.47).
OBSERVE
Flag restrictions regarding the validity of the radio certificate in cases where the holder does not possess GOC
issued by the flag authorities, please contact DNV surveyor for information and handling.

17 Signs and labels
Checking that signs/labels indicating the ship's name, call sign, MMSI number and telex identification are
permanently posted and is clearly readable for the operator using the relevant GMDSS equipment.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 101
Approval  of  service  supplier  scheme

DNV AS
Appendix C
18 Special requirements for passenger vessels
This section applies to:
— all passenger ships
— HSLC, of which keels were laid (or at a similar stage of construction) on or after 2002-07-01.
The following shall be checked by the radio inspector:
1) Check that all two-way communication equipment capable of transmitting the ships position is
continuously and automatically updated with the ships position from the ships navigation receiver (i.e.
GPS).
2) Activation of the EPIRB to be possible from the conning position. This will require remote activation of
the EPIRB, or alternatively the provision of two EPIRBs (as the EPIRB also shall be located where it may
float freely, should the vessel sink).
3) If possible, verify that the distress panel and distress alarm panel are operating satisfactory.
4) Check that VHF operating on the aeronautical distress frequencies (121.5 MHz and 123.1 MHz FM) are
operational and in good working order, and are available on the navigation bridge.
5) Verify that one of the officers onboard holding valid GOC is especially assigned to perform radio
communication duties only during distress incidents.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 102
Approval  of  service  supplier  scheme

DNV AS
APPENDIX D GUIDELINES FOR THE TECHNICAL INSPECTION OF

Appendix D
AUTOMATIC IDENTIFICATION SYSTEM ONBOARD SHIPS FITTED
FOR COMPLIANCE WITH SOLAS V

1  General
The guidelines apply to cargo ships above 300 GT engaged on international voyages, cargo ships above 500
GT not engaged on international voyages and all passenger ships irrespective of size, dynamically supported
crafts, mobile offshore units and high speed light crafts (DNV-RU-HSLC).

Terms and definitions:

AIS = automatic identification system
UPS = uninterrupted power supply.

2 Introduction
The intention of the guidelines is to enable the AIS inspectors contracted by DNV to carry out the initial,
annual and renewal AIS inspections in a unified and correct manner on ships of any flag.

2.1 Performance of AIS inspection
The technical AIS inspection shall always be performed by a qualified AIS inspector from an approved
AIS inspection firm, hereafter referred to as AIS inspector (a list of DNV approved AIS inspection service
suppliers can be on the DNV website: https://approvalfinder.dnv.com), who has adequate knowledge of
the current SOLAS conventions and associated performance standard, and the latest radio regulations as
appropriate.
AIS inspection should be carried out using suitable test equipment capable of performing all the relevant
measurements required by these guidelines.

3 Documentation
For the AIS installation the examination of plans and designs should consist of:
— Antenna layout, initial configuration report, interconnection diagrams, provision of the pilot plug and
power supply arrangements (SOLAS 74 as amended regulations II-1/4 and V/19; and SN/Circ.227).

4 Antennae

4.1 General installation requirements in SN/Circ.227
The AIS installation should generally comply with SN/Circ.227. The AIS inspector may occasionally observe
that compliance with AIS antennae installation requirements as defined by SN/Circ.227 are difficult to meet
(especially for ships in service). Hence:
1) For initial inspections: The AIS inspector shall check that the antennae installation is in accordance with
the plans approved by DNV or flag.
2) For periodical and renewal inspections: If the antennae arrangement does not meet the installation
requirements in SN/Circ.227 and if no evidence exists that either DNV or the flag have accepted/
approved the installation then the AIS inspector shall evaluate the arrangement in order to conclude
whether or not improvement can be achieved by rearranging the antennae installation and if such
rearrangement is practical.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 103
Approval  of  service  supplier  scheme

DNV AS
3) If, for any technical or practical reasons, it is not possible to comply with all antennae arrangement

Appendix D
requirements in SN/Circ.227 then the AIS inspector shall find out which antennae may cause the
greatest risk of interference with the AIS operation; and check the AIS performance towards a vessel
traffic centre (VTC) or another ship station while those interfering antennae are transmitting. A test
towards a VTC would be preferable.

4.2 Examining the AIS-VHF and AIS-GPS antennae, including:
— visually checking all antennae, and feeders for satisfactory siting and absence of defects
— checking insulation and safety of all antennae.

4.3 Inspection of the source of power
— checking that the AIS is supplied by the mains and emergency source of power
— checking that the AIS is also supplied by an UPS if IMO SN Circ.227 is made mandatory by the flag state.
Note:
AIS shall not be supplied by the radio batteries, unless stated otherwise by the flag.

---e-n-d---o-f---n-o-t-e---

4.4 Functional testing
— checking the proper location of the AIS and provision of pilot plug near pilots operating position
— checking the correct programming of the ships static information (all static information)
— checking the ability of the AIS to receive ships dynamic information from the appropriate sensors
— checking the ability to correctly input the ships voyage related data
— carrying out a performance test of the equipment including radio frequency measurements, transmitting
output, polling information, read data, send data and AIS response to virtual vessels, and
— carrying out an on-air test that the unit is working correctly using for example an appropriate vessel
traffic service (VTS) station or a suitable test equipment.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 104
Approval  of  service  supplier  scheme

DNV AS
CHANGES – HISTORIC

Changes – historic
November 2020 edition

Changes November 2020
Topic Reference Description

Programme for service App.B [13] and App.B The previous B13 programme is split into two separate


suppliers engaged in noise, [18] programmes:
vibration and/or indoor climate - for suppliers involved in noise and vibration measurements
measurements according - for suppliers involved in indoor climate measurements.
to DNV GL's comfort class
split into two separate App.B [13.7.3] and Requirements to measurement equipment added.
programmes. App.B [18.7.3]

Renewal survey examination App.B [17] New approval programme for service suppliers that perform


of fibre ropes for mooring of renewal survey examination of fibre ropes for mooring of
mobile offshore units mobile offshore units.

Testing of ballast water App.B [19] New programme for service suppliers engaged in testing of


management systems ballast water management systems (validation of biological
efficacy at commissioning).

February 2020 edition

Changes February 2020
Topic Reference Description

Update of App.A [12]: previous App.A [12.3] Requirement to list and document licenses granted by


Testing of coating systems equipment manufacturer deleted.
in accordance with IMO
App.A [12.4] Requirement for training and qualification scheme inserted.
Resolution MSC.215(82) and/
or MSC.288(87). App.A [12.5] Specific required procedures given.

Update of App.A [13]: App.A [13] New description of service supplier:


Servicing and maintenance of Maintenance, thorough examination, operational testing,
lifeboats, launching appliances, overhaul and repair of lifeboats and rescue boats, launching
on-load release gear and appliances and release gear.
davit-launched liferaft
automatic release gear.

Update of App.B [5]: App.B [5.1.6.2] IEC 61025 - Fault tree analysis added to informative


Service suppliers firms references.
engaged in condition
App.B [5.2.3.2] Clarifications made to define the extent of a condition
monitoring and condition
monitoring (CM) method and the difference between a CM
based maintenance.
method and a CM model.
Confidence level added to the list of elements that shall be
documented for a CM method.
Accuracy to be documented for the whole CM method (not just
the parameters).

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 105
Approval  of  service  supplier  scheme

DNV AS
Topic Reference Description

Changes – historic
App.B [5.2.3.3] New subsection CM measuring technique extracted from section
covering CM method.

App.B [5.2.3.4] Subsection previous called Diagnostics modified and renamed
to Failure modelling technique.

App.B [5.2.3.5] New subsection Development process extracted from previous
section called Diagnostics.

App.B [5.2.3.6] New subsection Accuracy extracted from previous section called
Diagnostics.
Description of binary accuracy added.

App.B [5.2.3.7] New subsection Confidence level extracted from previous
section called Diagnostics.
New guidance note added.

App.B [5.2.4] New subsection Data management added, covering data
quality, data security and data infrastructure.

New App.B [15]: App.B [15] New subsection Service suppliers firms engaged in marine riser


Service suppliers firms management (MRM).
engaged in marine riser
management (MRM).

New App.B [16]: App.B [16] New subsection Approval of service suppliers supporting


Approval of service suppliers automated boiler water maintenance system.
supporting automated boiler
water maintenance system.

February 2019 edition

Changes February 2019
Topic Reference Description

Acceptance of hired level App.B [4.2.5] Described that the full-time employed supervisor may not be


3 NDT supervisor for some qualified in all relevant methods. If so, agreement with external
methods level 3 shall be documented in writing.

Coverage of the suppliers App.B [4.4.2] Clarified that the certificate only cover the suppliers locations


locations covered by the Society's audit.

Implementation of IACS App.A [1] The title of service category A1 has been amended with the text


UR Z17 rev. 13, changes to "and mobile offshore units".
service category A1

Implementation of IACS UR App.A [16] Added a new service category for companies delivering services


Z17 rev. 13, new service based on remote inspection techniques.
category

New requirements for data App.B [5.2.2] Submission of documents - new documentation requirements


management and data security for data management and data security.

App.B [5.2.4] Data quality requirements - new documented information and
data management based on ISO 8000-8.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 106
Approval  of  service  supplier  scheme

DNV AS
Topic Reference Description

Changes – historic
App.B [5.2.5] Data security - new documented information and data security
management based on IEC 62443-2-4.

New service category App.B [14] Added a new service category for service suppliers providing


services within alignment and installation of rotating machinery.

Practical examination of NDT App.B [4.7.5] Requirements for mock-up test may be requested by the


supervisor and operators Society.

Reference to relevant App.B Table 1 Added relevant American and ISO standards to the list of


American standards references.

Removal of DNV GL additional App.A [1.4.5] Deleted requirement for two UTM operators.


requirements for thickness
measurement operators
compared to IACS Z17 and
competitors

Requirements for acceptance App.B [4.7] Clarified requirements in case of acceptance of operators


of NDT operators qualified to qualified to ASNT's SNT-TC-1A or ANSI/ASNT CP-189 or similar.
ASNT's SNT-TC-1A or ANSI/
ASNT CP-189 or similar

Scope of the approval App.B [5.1.1] Scope of the approval programme - changed from condition


programme - extended from monitoring (CM) to also include condition based maintenance
CM to CBM (CBM).

App.B [5.1.5] Introduction of terms, definitions and abbreviations.

App.B [5.1.6] Split in to normative and informative references.

App.B [5.2.1] Extent of approval - new CM measuring techniques, use of
parameters (non-manipulated) and testing and inspection
(condition assessment). New service level data-driven CM
supplier and CBM supplier.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 107
Approval  of  service  supplier  scheme

DNV AS
Topic Reference Description

Changes – historic
App.B [5.2.3] — New and updated requirements for the maintenance
programme:
— App.B [5.2.3.1] Maintenance task analysis
— New App.B [5.2.3.2] Monitoring method - Changed, new
requirements for additional measurement techniques,
ref. ISO 1843
— App.B [5.2.3.3] Diagnostics - New requirements:
— documentation
— diagnostic accuracy
— confidence level.
— App.B [5.2.3.4] Prognostics - New requirements:
— documentation
— expected remaining useful life (RUL) or time to
failure
— prognostics confidence.
— App.B [5.2.3.5] Reporting - New requirements:
— current state (diagnostics)
— estimated RUL or ETTF with level of confidence
— applicable conditions
— maintenance recommendations.

App.B [5.2.6.2] Training, competence and certification of condition monitoring
personnel: new requirements for services including data-driven,
knowledge-based or other physics-based models.

App.B [5.2.6.3] New position for service responsible including competence
requirements and responsibilities.

March 2018 edition

Changes March 2018
Topic Reference Description

Tightness testing of hatches Inserted general reference to IACS UR Z17 in addition to
and doors App.A [2] requirements normally applied to the ultrasonic measurement
equipment.

In-water survey of ships and Inserted reference to IACS UR Z17 in addition to requirements
App.A [3]
mobile offshore units to reporting.

Examination of Ro-Ro ships Inserted reference to IACS UR Z17 for requirements to approval
bow, stern, side and inner App.A [8] of service suppliers.
doors

Approval of service suppliers Added service for service suppliers engaged in noise, vibration
procedure for COMF App.B [13] and/or indoor climate measurements according to DNV GL's
measurements comfort class onboard ships.

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 108
Approval  of  service  supplier  scheme

DNV AS
Changes – historic
July 2016 edition

Main changes July 2016

• Appendix A Special requirements for categories of service suppliers listed in IACS UR
Z17
The following services have been added with additions and/or clarifications to IACS UR Z17:
— Thickness measurements on ships
— Inspection and maintenance of fire extinguishing equipment and systems
— Service of inflatable liferafts, inflatable lifejackets, hydrostatic release units, inflatable rescue boats,
marine evacuation systems
— Inspection and testing of radio communication equipment and Automatic Identification Systems (AIS)
— Inspections and maintenance of self-contained breathing apparatus
— Annual performance testing of Voyage Data Recorders (VDR) and simplified Voyage Data Recorders (S-
VDR)
— Inspection of low location lighting systems using photo luminescent materials and evacuation guidance
systems used as an alternative to low-location lighting systems
— Sound pressure level measurements of public address and general alarm systems on board ships
— Testing of coating systems in accordance with IMO Resolution MSC.215(82) as amended and IACS UI
SC223 and/or MSC.288(87) as amended
— Servicing and maintenance of lifeboats, launching appliances, on-load release gear and davit-launched
liferaft automatic release hooks
— Measurements of noise level on board ships
— Tightness testing of primary and secondary barriers of gas carriers with membrane cargo containment
systems for vessels in service

• Appendix B Special requirements for categories of service suppliers not listed in IACS
UR Z17
The following services have been added:
— Service suppliers engaged in testing of navigational equipment and systems
— Service suppliers engaged in preparation of Inventory of Hazardous Materials (IHM)
— Service suppliers engaged in inspection and testing of centralised gas welding and cutting equipment
— Service suppliers engaged in Non-Destructive Testing (NDT) on classification projects
— Service suppliers firms engaged in condition monitoring of machinery on board ships and mobile offshore
units
— Service suppliers engaged in resin casting of chock foundations, stern tubes, etc.
— Service suppliers engaged in testing of ballast water management systems (environmental testing)
— Service suppliers engaged in testing of ballast water management systems (land-based and shipboard
testing)
— Laboratories engaged in mechanical and analytical testing
— Laboratories engaged in corrosion testing of corrosion resistant steels

• New
— Appendix C Guidelines for the technical inspection of radio installations onboard ships fitted for compliance
with GMDSS
— Appendix D Guidelines for the technical inspection of automatic identification system onboard ships fitted
for compliance with SOLAS V

Class programme: Approval of service suppliers — DNV-CP-0484. Edition October 2021 Page 109
Approval  of  service  supplier  scheme

DNV AS
About DNV
DNV is the independent expert in risk management and assurance, operating in more than 100
countries. Through its broad experience and deep expertise DNV advances safety and sustainable
performance, sets industry benchmarks, and inspires and invents solutions.

Whether assessing a new ship design, optimizing the performance of a wind farm, analyzing sensor
data from a gas pipeline or certifying a food company’s supply chain, DNV enables its customers and
their stakeholders to make critical decisions with confidence.

Driven by its purpose, to safeguard life, property, and the environment, DNV helps tackle the
challenges and global transformations facing its customers and the world today and is a trusted
voice for many of the world’s most successful and forward-thinking companies.