1 Overview of Revisions 2
2 Table Drawings 3
3 Notes 5
3.1 Safety information 5
3.2 National and international standards and directives 5
3.3 Installation/ Handling electronic components 5
3.4 Safety before/while aligning tracking system 6
3.5 Handling with steel components 6
3.6 Symbols used and their meanings 6
3.7 Disclaimer 7
3.8 Storage Regulations 7
3.9 Minimum Load Calculation 7
3.10 Bonding / Grounding Illustration 8
4 Screw tightening torques 9
4.1 Frame tightening torques 9
4.2 Gear unit tightening torques 9
5 Pre-installation 10
5.1 Pre-installation Gearbox (one per Tracker) 10
5.2 Pre-Installation Power Lock Sprocket 11
5.3 Pre-Installation Bearingplate Driven 12
5.4 Pre-installation Bearingplate Drive with Driveshaft Bearing (Hexagon) 13
5.5 Pre- installation Head Plate Sprocket 14
5.6 Pre-Installation 1P Sliding Bearing 15
6 installation of LTEC 16
6.1 Assembly of Head plate (Posts With Power Lock Sprocket 16
6.2 Assembly of 1P Bearing Plate Drive 17
(Posts without Power Lock Sprocket) 17
6.3 Assembly of 1P Bearing Plate Driven 18
(Without Power Lock Sprocket) 18
6.4 Assembly of Head Bearing Light 19
6.5 Aligning Head Plates and Lower Racket 20
6.6 Assembly of Head Bearing bottom part & 1P Sliding 22
6.7 Assembly of Main Carrier 23
6.8 Assembly of Main Carrier Connector 25
6.9 Assembly of Head Bearing Top Part & Upper Racket 26
6.10 Assembly of Power Lock Sprocket 28
6.11 Assembly of Driveshafts and Drive Transmission 30
6.12 Assembly of Gearbox & Drive 32
1 OVERVIEW OF REVISIONS
Rev. 0 25.05.2023
Rev. 1 13.06.2023 → Update 3.8 Storage Regulations
The 5 Rules of Safety should always be followed when working with electrical
parts:
- Isolate
- Protect against unauthorized restarting
- Confirm absence of voltage
- Ground and short circuit
- Cover neighboring live parts or make them inaccessible
• Always use personal protective equipment that includes, but is not limited to a
safety helmet, safety boots, and safety gloves.
• Never enter the restricted area during a thunderstorm or severe weather.
• In the event that a thunderstorm or severe weather occurs while you are in the
restricted area, leave that area immediately and seek shelter.
• Never enter the restricted area alone.
• Never stand within the tracker’s slewing range.
• The solar modules must be treated as live parts.
• The design load the tracker is designed to is 800Pa with a safety factor of 1,5
according to UL 2703.
• The Bonding Grounding has been evaluated according to UL2703.
• Never install damaged parts.
• Only schooled workers are allowed to enter the restricted area
This symbol indicates a hazardous situation that, if not avoided, could result in
damage to or destruction of the Product or other property.
Viewing direction
Assembly Tools
Ideematec Deutschland, Ideematec Inc. and its affiliates expressly disclaim any and all
liability for any injury or damage resulting from the following:
• Failure to follow the safety information stipulated in this Manual and/or any other
operating Manual provided by the manufacturer or its affiliates
• Failure to follow the safety information provided on the product
• Failure to comply with national and international standards and directives
• Improper transportation
• Improper storage
• Improper use of the product or use in a manner other than which was intended
by the manufacturer or its affiliates
• Incorrect assembly and installation
• The usage of tools for tracker installation only by briefed personal and exclusive
for assembly operations due to installation instructions for SafeTrack Horizon of
Ideematec Deutschland GmbH allowed
• Failure to properly handle Electrostatic Sensitive Devices (“ESD”) as directed
• Faulty storage of the components on sit
The storage area should be prepared properly. The area should be flat compacted
ground with additional top layer of gravel. The gravel will minimize the dust and mud
and will prevent water from accumulating.
Materials stored at site, depending on the individual characteristics, shall be protected
properly to avoid deterioration:
• Motorized gearboxes, control units and electronic components must be stored
in dry, dust-free and temperature-controlled rooms as per datasheet.
• All parts that are packed in boxes, such as: fasteners, cables, bearings, etc.
should be stored in dry conditions (protected from rain, flood and mud).
• Long steel parts may be stored outdoors. When storing steel parts with
corrosion protection, ensure that the items are stacked using spacers in
between the parts and are well ventilated and away from direct soil contact.
Moisture between metal sheets or other adjacent parts made of hot-dip coated
flat products can lead to formation of corrosion products.
Size Nm ft / lbs
M 4 5.6 Torques 1,4 Nm 1,1
M 5 5.6 Torques 2,8 Nm 2,1
M 6 8.8 Torques 10 Nm 7,4
M 8 8.8 Torques 25 Nm 18,5
M 8 grub screw Torques 8 Nm 6,0
M10 8.8 Torques 50 Nm 36,9
M12 8.8 Torques 87 Nm 64,2
M12 DIN 936 Torques 50 Nm 36,9
M16 8.8 Torques 200 Nm 147,6
M20 8.8 Torques 400 Nm 295,0
Use these torque values only if no other values are given in this installation manual!
Ideematec accepts bolt torque tolerances of +-10%. It is not allowed to use high torque
impact wrench which lead to defect the fasteners and as sequence to avoidable
corrosion.
1 1PLT-05-352-6438-I_1 1
3 4x 20,5 Limesring
DIN 74361-C
Role
1P Bearingplate Driven
5mm +- 1mm
Driveshaft Bearing
Bearingplate Drive
For posts with Power Lock Sprocket, use the parts shown Tighten by hand in this step
below.
Post
Lower Racket
Use the HML-Leveler to align every position (post). They have to be in one axis.
Torque the Lower Racket at the first and last post in optimal position.
Align the top plate in one table to each other to guarantee a straight rotation axis.
Align the first and last Head Plate in one table to the center position of the hole
pattern and torque the first and last one
± 30 mm
Lift the main carrier and Power Lock Sprocket onto the bearings.
Tube positions according to table overview drawings
Main Carrier
Main Carrier
Bolts has to stay loose in this step
Secure the Power Lock Sprocket against moving back and forth
Lock Tool
Radius Washer
Drive Transmission
Position the drive horizontal on the roles at
other posts
Recommended Gearbox tightening sequence to avoid bracing. See tightening torques on page 7
Use Tooth-
Adjustment Plier 1P
& Spacer
to get correct
position of the drive
Tooth adjustment
plier 1P in connection with
the Sprocket teeth
Spacer is used as a
stop that the
Driveshaft cannot be
assembled too high
2x 1P Gearbox Fixation
M8 grub screws
8 Nm / 6,0 ft/lbs
Role
1-2 mm space
Drive Transmission
1P Additional
Bearing
Holder
1,5°- 9°
After cutting the drive, fit in the Universal Joint and screw the connections
HM-Drill-Sleeve 60 alignment
Safe position with 2 screws here
1P Panel Support
Use Panel Support Spacer temporary for Start Panel Support Assembly from
mounting the Panel Supports and safe the south to north
correct distance between the panel supports.
After that tighten the nuts of the Panel Support
Bracket
Panel
One Person should secure the panels from falling down while the other
person torques the fixation.
7 MECHANICAL CHECKLIST
L-TEC
Project Number & Name: ______________________________________ Tracker Row Number_____________
Notes:
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Neusling 9c
94574 Wallerfing
Germany