CS1 - Construction Evideo Workbook - ANSWERS
CS1 - Construction Evideo Workbook - ANSWERS
Contents:
Listening exercises
Vocabulary matching
Vocabulary sentence completion
Writing and speaking activity
ANSWERS
Case Study Lesson Module CS1
1. The biggest _ LOGISTICAL__ challenge was moving the traveler equipment from one side of the
bridge to the other.
2. The bridge was the largest __ PRIVATELY FUNDED_____ project of its kind in Vietnam. Most
projects are paid for by the government.
3. Building a new, unfamiliar project type involves climbing a very steep, long ___ LEARNING CURVE.
When typhoons or other bad weather occurs, it can cause major _ SETBACK_ in the construction
process.
4. Engineers work on different kinds of _ INFRASTRUCURE _ projects: roads, bridges, subways, etc.
5. Contractors often get rewarded for finishing a project __ AHEAD OF SCHEDULE__.
6. The project manager was able _ DRAW ON _ his many years of experience building bridges.
7. Everybody wins when a project is completed _ WITHIN BUDGE _ and there are not any unexpected,
costly change orders.
8. Most large international project teams are _ CONSORTIUMS _ of local agencies and companies
working with contractors and specialized consultants from various locations around the world.
9. Horizontal structural members _ BEAR_ on walls, columns or other transfer / collector beams.
10. In order to increase efficiency and reduce waste, it’s crucial to _ OPTIMIZE_ the production of any
components or systems that are _ REPLICATED_ many times.
11. Seoul, South Korea is a _ VIBRANT _ city of over 10 million people and is always full of life and
activity.
12. Because Seoul is so large, a sophisticated transportation system is _ VITAL _ to maintain the
uninterrupted flow of people and products throughout the capital.
13. Vertical supports or columns can be minimized on long spans if they are _ CABLE STAYED _.
14. The opposite of ahead of schedule is _ BEHIND SCHEDULE _ and the opposite of on budget is _
OVER BUDGET_.
2. Which two parts of Hoh Chi Minh City does it connect? District 7
and District 2
and australia
7. How many bridges did the engineering company design before the Phu My bridge? 3
8. What was the large piece of equipment called that was being lifted into place? a traveler
9. How long did it take to move these pieces of equipment into place? 1 week
10. What was the ceremony called when they finished the deck of the bridge? a deck closure
ceremony