You are on page 1of 30

ENI - IRAQ

ZUBAIR MISHRIF DGS EXPANSION

EQUIPMENT LIST

EX-DE 01 12/8/2022 Issued for Approval O.Hamadani A. Perfetto L. Ippoliti D. Pietrosanti


EX-DE 00 4/1/2022 Issued for Comments S.Prakash A. Perfetto L. Ippoliti D. Pietrosanti
Validity Rev.
Prepared Checked Approved Contractor Company
Status Number Date Description
by by by Approval Approval
Revision index
Company logo and business name Project name Company Identification

ZUBAIR MISHRIF DGS 251034DPEA02857


eni iraq b.v. EXPANSION
Job N. '022026
Contractor logo and business name Contractor Identification
ZMDE-P-EA-02857
CPECC - PEG Consortium Contract N. 4600041121

Vendor logo and business name Vendor Identification


n.a N.A.
Order N.
Facility Name Location Scale Sheet of Sheets
Zubair Mishrif DGS ONSHORE N.A. 1 of 30
Document Title Supersedes N.
Superseded by N.
EQUIPMENT LIST Plant area Plant unit
COMMON 2510
File N° 251034DPEA02857

This document is property of eni iraq bv.


It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.
CPECC - PEG Company Document Owner Document Identification
Identification Revision Index
Consortium
Validity Sheet of sheets
Rev. N. 2 of 10
Status
251034DPEA02857 ZMDE-P-EA-02857
EX-DE 01

REVISION HISTORY

Rev. Date No. of sheets Description


EX-DE 4/1/2022 30 Issued For Comments
Validity Status 12/8/2022 30 Issued For Approval

Sheet Revision Number of the following drawing sheets

SHEET EX-DE EX-DE ----


3 00 01
4 00 01
5 00 01
6 00 01
7 00 01
8 00 01
9 00 01
10 00 01
11 00 01
12 00 01
13 00 01
14 00 01
15 00 01
16 00 01
17 00 01
18 00 01
19 00 01
20 00 01
21 00 01
22 00 01
23 00 01
24 00 01
25 00 01
26 00 01
27 00 01
28 00 01
29 00 01
30 00 01

This document is property of eni iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Document Identification Owner Document Identification
Revision Index

CPECC - PEG Validity Sheet of sheets


Consortium Rev. N. 3 of 10
Status
251034DPEA02857 ZMDE-P-EA-02857
EX-DE 01

GENERAL NOTES

1. OIL TRAINS EQUIPMENT DESIGN HAS BEEN BASED ON HEAT AND MATERIAL BALANCES DOC. NO. 251034DPRV03050 REV. 02.
2. EQUIPMENTS ALREADY PROCURED BY THE COMPANY ARE INDICATED WITH LLI (LONG LEAD ITEMS) IN THE 'EQUIPMENT STATUS'.

GENERAL HOLDS
01

1. Deleted
2. Deleted
3. Deleted

This document is property of eni iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 4 of 30

PUMP SUMMARY Rev.

1 DRIVER ESTIMATED MATERIALS


QTY CAPACITY OPERATING CONDITIONS
2 N.P.S.H. (2) B.H.P. (3)

TYPE (1)
3 ITEM SERVICE NORM. DESIGN PRESSURE TEMP. HEAD DENS. kW EQUIPMENT NOTES
STATUS

SPARE
4 AVAIL. INSTALLED

MAIN
5 bar a REQUIR. MAIN POWER CASING (4)
6 m³/h m³/h SUCT. DISCH. °C m kg/m³ m SPARE kW IMPELLER
7 342101PA001A/B M 122 CS + 6 mm CA
Oil Desalting Feed Pumps CH 1 1 457.0 6.13 13.77 95.0 95.9 818
8 (train1) 01 M 132 25 Cr SDSS

9 342102PA001A/B M 122 CS + 6 mm CA
Oil Desalting Feed Pumps CH 1 1 457.0 6.13 13.77 95.0 95.9 818
10 (train2) 01 M 132 25 Cr SDSS

11 342103PA001A/B M 122 CS + 6 mm CA
Oil Desalting Feed Pumps CH 1 1 457.0 6.13 13.77 95.0 95.9 818
12 (train3) 01 M 132 25 Cr SDSS
13 342104PA001A/B M 122 CS + 6 mm CA
Oil Desalting Feed Pumps CH 1 1 457.0 6.13 13.77 95.0 95.9 818
14 (train4) 01 M 132 25 Cr SDSS

15 342101PA002A/B M 10 NI-Resist+3mm CA Minimum continous flow value will be be specified by


Recycle Water Pumps CH 1 1 26+MCF 7.95 14.26 94.0 67.4 953
16 (train 1) 01 M 15 25 Cr SDSS 01 Pump vendor

17 342102PA002A/B M 10 NI-Resist+3mm CA Minimum continous flow value will be be specified by


Recycle Water Pumps CH 1 1 26+MCF 7.95 14.26 94.0 67.4 953
18 (train 2) 01 M 15 25 Cr SDSS 01 Pump vendor

19 342103PA002A/B M 10 NI-Resist+3mm CA Minimum continous flow value will be be specified by


Recycle Water Pumps CH 1 1 26+MCF 7.95 14.26 94.0 67.4 953
20 (train 3) 01 M 15 25 Cr SDSS Pump vendor

21 NOTES: (1) CH-Centrifugal Horiontal; CV-Centrifugal Vertical; CL-Centrifugal in Line; CS-Centrifugal Submerged; R:Reciprocating; M-Metering; RO:Rotary.
22 (2) M-Motor; T-Turbine; D-Diesel engine; G-Gas engine.
23 (3) CI-Cast Iron; CS-Carbon Steel; ASS-Autentic Stainless Steel or 12% Cr; B-Bronze; NI-Ni resistent; MON-Monel; KMON-Kmonel hardened; AIS4-AISI 410 steel;
24 AIS3-Type 316 austenitic stainless steel; HAI3-Hard-faced type 316 austenitic stainless steel; A304-AISI304 stainless steel.
25 (4) Or cylinder / piston in case of reciprocating or metering pump.
26 (5) Power is preliminary. To be confirmed by vendor
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 5 of 30

PUMP SUMMARY Rev.

1 DRIVER ESTIMATED MATERIALS


QTY CAPACITY OPERATING CONDITIONS
2 N.P.S.H. (2) B.H.P. (3)

TYPE (1)
3 ITEM SERVICE NORM. DESIGN PRESSURE TEMP. HEAD DENS. kW EQUIPMENT NOTES
STATUS

SPARE
4 AVAIL. INSTALLED

MAIN
5 bar a REQUIR. MAIN POWER CASING (4)
6 m³/h m³/h SUCT. DISCH. °C m kg/m³ m SPARE kW IMPELLER
7 342104PA002A/B M 10 NI-Resist+3mm CA Minimum continous flow value will be be specified by
Recycle Water Pumps CH 1 1 26+MCF 7.95 14.3 94.0 67.4 953
8 (train 4) 01 M 15 25 Cr SDSS 01 Pump vendor

9 M 40 CS + 3 mm CA
342200PH001A/B Off-spec Oil Pumps CV 1 1 66.3 1.03 11.09 87.0 125.0 825
10 M 55 25 Cr SDSS

11 M 206 CS + 3 mm CA
342200PH002 A/B/C/D/E/F Oil Transfer Pumps CV 4 2 360.0 540.0 1.04 11.14 87.0 125 825 LLI
12 M 240 SS 316
13 M 5 NI-Resist+3mm CA
342200PA001A/B Flow Tank Oily water Pumps CH 2 13.0 1.01 5.24 87 43.1 1000
14 M 7.5 25 Cr SDSS
15 M 9.5 25 Cr SDSS
342300PH001A/B ATM Flare Pumps CV 1 1 50 1.15 4.87 77 45.1 842 01 Hold (2)
16 M 15 25 Cr SDSS

17 M 20 25 Cr SDSS
342300PH002A/B LP Flare Pumps CV 1 1 125 1.2 4.88 95 46.3 811 Hold (2)
18 01 M 30 25 Cr SDSS 01
19 M 28.2 25 Cr SDSS
342300PH003A/B HP Flare Pumps CV 1 1 200 1.13 5.05 77 49.3 811 Hold (2)
20 01 M 37 25 Cr SDSS 01
21 NOTES: (1) CH-Centrifugal Horiontal; CV-Centrifugal Vertical; CL-Centrifugal in Line; CS-Centrifugal Submerged; R:Reciprocating; M-Metering; RO:Rotary.
22 (2) M-Motor; T-Turbine; D-Diesel engine; G-Gas engine.
23 (3) CI-Cast Iron; CS-Carbon Steel; ASS-Autentic Stainless Steel or 12% Cr; B-Bronze; NI-Ni resistent; MON-Monel; KMON-Kmonel hardened; AIS4-AISI 410 steel;
24 AIS3-Type 316 austenitic stainless steel; HAI3-Hard-faced type 316 austenitic stainless steel; A304-AISI304 stainless steel.
25 (4) Or cylinder / piston in case of reciprocating or metering pump.
26 (5) Power is preliminary. To be confirmed by vendor
27 HOLDS: (1) Deleted
28 (2) Flare Pump capacity and operating data are to be confirmed following flare system study
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 6 of 30

PUMP SUMMARY Rev.

1 DRIVER ESTIMATED MATERIALS


QTY CAPACITY OPERATING CONDITIONS
2 N.P.S.H. (2) B.H.P. (3)

TYPE (1)
3 ITEM SERVICE NORM. DESIGN PRESSURE TEMP. HEAD DENS. kW EQUIPMENT NOTES
STATUS

SPARE
4 AVAIL. INSTALLED

MAIN
5 bar a REQUIR. MAIN POWER CASING (4)
6 m³/h m³/h SUCT. DISCH. °C m kg/m³ m SPARE kW IMPELLER

7 M 4 CS + 1mm CA
344100PH001A/B Hot Oil Drain Pump CV 1 1 01 24.35 1.35 3.83 220 34.4 734
8 M 5.5 12Cr

9 M 350 CS + 1mm CA
344100PA001A/B/C/D Hot Oil Pumps CH 2 2 480 3.89 17.12 220 183.8 734
10 01 M 400 12Cr

11 M 11 CS + 1mm CA
344100PA002 Hot Oil Storage Pump CH 1 40 0.97 7.29 90 78.1 825
01 M 15 12Cr
12
13 M 6.13 CS + 3mm CA
344300PA001A/B Diesel Pumps CH 1 1 15 1.01 6.75 50 70.4 830
14 01 M 11 12Cr
15 M 432 Ni+ 3 mm CA
345100PA001 A/B/C/D/E/F Water Injection Booster Pumps CH 5 1 1100 1.42 12.2 77 105.64 1063.75 LLI
16 01 M 500 25 Cr SDSS
17 M 7055.4 Ni+ 3 mmmCA
345100PA002 A/B/C/D/E/F Water Injection Main Pumps CH 5 1 1100 11.5 191 77 1721.2 1063.75 LLI Note 5
18 01 M 8500 25 Cr SDSS
19 M 68.7 CS + 3mm CA
345200PA001A/B Desalination Feed Pumps CH 1 1 283 0.97 7 40 61.6 992
20 01 M 75 25 CrSDSS
21 NOTES: (1) CH-Centrifugal Horiontal; CV-Centrifugal Vertical; CL-Centrifugal in Line; CS-Centrifugal Submerged; R:Reciprocating; M-Metering; RO:Rotary.
22 (2) M-Motor; T-Turbine; D-Diesel engine; G-Gas engine.
23 (3) CI-Cast Iron; CS-Carbon Steel; ASS-Autentic Stainless Steel or 12% Cr; B-Bronze; NI-Ni resistent; MON-Monel; KMON-Kmonel hardened; AIS4-AISI 410 steel;
24 AIS3-Type 316 austenitic stainless steel; HAI3-Hard-faced type 316 austenitic stainless steel; A304-AISI304 stainless steel.
25 (4) Or cylinder / piston in case of reciprocating or metering pump.
26 (5) Pump equipped with Variable speed driver
27 (6) Power is preliminary. To be confirmed by vendor
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 7 of 30

PUMP SUMMARY Rev.

1 DRIVER ESTIMATED MATERIALS


QTY CAPACITY OPERATING CONDITIONS
2 N.P.S.H. (2) B.H.P. (3)

TYPE (1)
3 ITEM SERVICE NORM. DESIGN PRESSURE TEMP. HEAD DENS. kW EQUIPMENT NOTES
STATUS

SPARE
4 AVAIL. INSTALLED

MAIN
5 bar a REQUIR. MAIN POWER CASING (4)
6 m³/h m³/h SUCT. DISCH. °C m kg/m³ m SPARE kW IMPELLER
7 345200PA002 M 14.3 CS + 6mm CA
Wash Water Pumps CH 5 1 22 0.96 14.0 40 134.1 992
8 A/B/C/D/E/F 01 M 30 SS 316

9 M 8.2 NI-Resist+3mm CA
345300PA001A/B Potable Water Pumps CH 1 1 15 0.99 7 20 61.9 1000
10
01 M 11 SS 316

11 M 5.2 CS + 6mm CA
345400PS001A/B Open Drain Sump Pumps (North Area) CS 1 1 01 10 1 4.66 AMB 37 1020 Submersible pump
12 M 7.5 SS 316

13 M 6 CS + 6mm CA
345400PS002A/B Open Drain Sump Pumps (Central Area) CS 1 1 01 10 1.00 4.06 AMB 30.92 1000 Submersible pump
14 M 7.5 SS 316

15 M 6 CS + 6mm CA
01 Submersible pump
345400PS003A/B Open Drain Sump Pumps (South Area) CS 1 1 10 1.00 5.24 AMB 43.89 1020
16 M 7.5 SS 316

17 M 4.5 CS + 6mm CA
345500PH001A/B
Closed Drain Pumps CV 1 1 01 50 1.08 5.03 95 48 842 /1106
18 M 15 25 Cr SDSS

19 M 152 CS + 6mm CA
345550PA001
Intermediate Produced Water Pumps CH 4 1 01 437 0.943 9.6 80 79.9 1106 / 1135
A/B/C/D/E
20 M 185 25 Cr SDSS

21 NOTES: (1) CH-Centrifugal Horiontal; CV-Centrifugal Vertical; CL-Centrifugal in Line; CS-Centrifugal Submerged; R:Reciprocating; M-Metering; RO:Rotary.
22 (2) M-Motor; T-Turbine; D-Diesel engine; G-Gas engine.
23 (3) CI-Cast Iron; CS-Carbon Steel; ASS-Autentic Stainless Steel or 12% Cr; B-Bronze; NI-Ni resistent; MON-Monel; KMON-Kmonel hardened; AIS4-AISI 410 steel;
24 AIS3-Type 316 austenitic stainless steel; HAI3-Hard-faced type 316 austenitic stainless steel; A304-AISI304 stainless steel.
25 (4) Or cylinder / piston in case of reciprocating or metering pump.
26 (5) Power is preliminary. To be confirmed by vendor
27 HOLDS (1) Deleted
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 8 of 30

PUMP SUMMARY Rev.

1 DRIVER ESTIMATED MATERIALS


QTY CAPACITY OPERATING CONDITIONS
2 N.P.S.H. (2) B.H.P. (3)

TYPE (1)
3 ITEM SERVICE NORM. DESIGN PRESSURE TEMP. HEAD DENS. kW EQUIPMENT NOTES
STATUS

SPARE
4 AVAIL. INSTALLED

MAIN
5 bar a REQUIR. MAIN POWER CASING (4)
6 m³/h m³/h SUCT. DISCH. °C m kg/m³ m SPARE kW IMPELLER

7 M 1.7 by Vendor
01 Two submersible pumps installed 345700PS001A/B and other
345700PS001 A/B Sanitary Sewage Sump Pumps CS 2 6 1.20 3.4 AMB 25.0 1050 8.95 two pumps (345700PS001C/D) are stored in the warehouse area
8 M by Vendor as common spare. (Note 5)

9 M 1.7 by Vendor
01 Two submersible pumps installed 345700PS002A/B and other
345700PS002 A/B Sanitary Sewage Sump Pumps CS 2 6 1.20 3.4 AMB 25.0 1050 8.95 two pumps (345700PS001C/D) are stored in the warehouse area
10 M 2.20 by Vendor as common spare. (Note 5)

11 01 M 1.7 by Vendor Two submersible pumps installed 345700PS003A/B and the


345700PS003 A/B Sanitary Sewage Sump Pumps CS 2 6 1.20 3.4 AMB 25.0 1050 8.95 other two pumps (345700PS001C/D) are stored in the
warehouse area as common spare. (Note 5)
12 M 2.20 by Vendor

13
01 M 1.7 by Vendor Two submersible pumps installed 345700PS004A/B and the
345700PS004 A/B Sanitary Sewage Sump Pumps CS 2 6 1.20 3.4 AMB 25.0 1050 8.95 other two pumps (345700PS001C/D) are stored in the
warehouse area as common spare. (Note 5)
14 M 2.20 by Vendor

17 M 2.8 by Vendor Two submersible pumps installed. The third pump


345700PS007 A/B/C Irrigation Sump Pumps CS 2 1 5 1.26 5.53 AMB 46 1010 8.95 345700PS007C, packaged for storage, shall be provided in
18 M 5.50 by Vendor warehouse as spare pump.

19 M 13.6 NI-Resist+3mm CA
347300PA001A/B Fire Water Jockey Pumps CH 1 1 34 1.00 9.4 40 100.9 1000 Note (6)
20 01 M 18.5 SS 316
21 NOTES: (1) CH-Centrifugal Horiontal; CV-Centrifugal Vertical; CL-Centrifugal in Line; CS-Centrifugal Submerged; R:Reciprocating; M-Metering; RO:Rotary.
22 (2) M-Motor; T-Turbine; D-Diesel engine; G-Gas engine.
23 (3) CI-Cast Iron; CS-Carbon Steel; ASS-Autentic Stainless Steel or 12% Cr; B-Bronze; NI-Ni resistent; MON-Monel; KMON-Kmonel hardened; AIS4-AISI 410 steel;
24 AIS3-Type 316 austenitic stainless steel; HAI3-Hard-faced type 316 austenitic stainless steel; A304-AISI304 stainless steel.
25 (4) Or cylinder / piston in case of reciprocating or metering pump.
26 (5) Deleted
27 (6) Deleted
28 (7) Power is preliminary. To be confirmed by vendor
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 9 of 30

PUMP SUMMARY Rev.

1 DRIVER ESTIMATED MATERIALS


QTY CAPACITY OPERATING CONDITIONS
2 N.P.S.H. (2) B.H.P. (3)

TYPE (1)
3 ITEM SERVICE NORM. DESIGN PRESSURE TEMP. HEAD DENS. kW EQUIPMENT NOTES
STATUS

SPARE
4 AVAIL. INSTALLED

MAIN
5 bar a REQUIR. MAIN POWER CASING (4)
6 m³/h m³/h SUCT. DISCH. °C m kg/m³ m SPARE kW IMPELLER

M 410 NI-Resist+3mm CA
347300PA002A/B Fire Water Electrical Pumps CH 2 01 1135 1 12.3 35 110.3 1000 Note (5)
M 475 SS 316

9 410 NI-Resist+3mm CA
347300PA003 A/B/C Fire Water Diesel Pumps CH 3 1135 1 12.3 35 110.3 1000 Note (5)
10
01 D SS 316

11

12

13

14

15

16

17

18
19

20
21 NOTES: (1) CH-Centrifugal Horiontal; CV-Centrifugal Vertical; CL-Centrifugal in Line; CS-Centrifugal Submerged; R:Reciprocating; M-Metering; RO:Rotary.
22 (2) M-Motor; T-Turbine; D-Diesel engine; G-Gas engine.
23 (3) CI-Cast Iron; CS-Carbon Steel; ASS-Autentic Stainless Steel or 12% Cr; B-Bronze; NI-Ni resistent; MON-Monel; KMON-Kmonel hardened; AIS4-AISI 410 steel;
24 AIS3-Type 316 austenitic stainless steel; HAI3-Hard-faced type 316 austenitic stainless steel; A304-AISI304 stainless steel.
25 (4) Or cylinder / piston in case of reciprocating or metering pump.
26 (5) Deleted
27 (6) Power is preliminary. To be confirmed by vendor
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 10 of 30

COMPRESSOR SUMMARY Rev.

1 QUAN- CAPACITY OPERATING DRIVER ESTIMATED MATERIALS


2 TITY CONDITIONS (2) B.H.P. (3)

TYPE (1)
3 ITEM SERVICE NORM. DESIGN PRESSURE SUCT. kW EQUIPMENT NOTES
STATUS

SPARE
4 TEMP. INSTALLED

MAIN
5 bar(g) MAIN POWER CASING
6 Nm³/h Nm³/h SUCT. DISCH. °C SPARE kW IMPELLER

7 EM 341 BY VENDOR
344600KC001A/B/C/D Air compressors RO 4 01 2600 0 9.5 50 Included in Compressed Air Package 344600XX001
8 EM 355 BY VENDOR

9 EM 165 BY VENDOR Included in Compressed Air Package344600XX001.


In order to limit the Emergency Air Compressor installed power to 200 kW,
344600KC002A/B Emergency Air compressors RO 2 1300 0 9.5 50
3 compression stage configuration has been selected.
10 EM 200 BY VENDOR Compression stages number is preliminary, to be confirmed AS PER Vendor inputs.

11 EM 231 BY VENDOR
346000KB001A/B Nitrogen Backup Compressors RC 1 1 1500 7.5 40 60 Included in Nitrogen Backup Compressor Package 346000XX002
12 EM 250 BY VENDOR
13
14
15
16
17
18
19
20
21
22
23
24
25 NOTES: (1) RO-Rotary Compressor; AC-Axial Compressor; CC-Centrifugal Compressor; RC-Reciprocating Compressor
26 (2) EM-Electric Motor; GT-Gas Turbine; STC-Steam Turbine/Condensing; STB-SteamTurbine/Back pressure
27 (3) CI-Cast Iron; CS-Carbon Steel; ASS-Autentic Stainless Steel or 12% Cr; B-Bronze; NI-Ni resistent; MON-Monel; KMON-Kmonel hardened; AIS4-AISI 410 steel;
28 AIS3-Type 316 austenitic stainless steel; HAI3-Hard-faced type 316 austenitic stainless steel; A304-AISI304 stainless steel.
29 (4) Power is preliminary. To be confirmed by vendor

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 11 of 30

AIR COOLER SUMMARY Rev.

1 DESIGN CONDITIONS MATERIALS ESTIMATED

NUMBER OF DRIVER
TOTAL BARE
SURFACE
2 TYPE BHP

QUANTITY

PER ITEM
3 ITEM SERVICE DUTY PROC. FLUID AIR BARE C.A. OF kW S.R. EQUIPMENT NOTES
PRES. TEMP. TEMP. TUBES mm DRIVER INSTALLED (2) STATUS
4
5 HEADERS C.A. (1) POWER (3)
6 kW bar(g) °C SUCT. mm m² kW
7 CS 3 31
342200HC001 (A/B) Oil Cooler 2 18852.8 46 115 50 EM
8 01 CS 3 37
9 SS 316L 20
344100HC001 (A/B) Hot Oil Trim Cooler 2 16620.2 26.7/FV 260 50 EM Protection Perosnal Insulation
10 01 CS 1 30
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 NOTES: (1) EM-Electric Motor; ST-Steam Turbine; DE-Diesel Engine; HT-Hydraulic Turbine
26 (2) Special Requirement: ML-Manual Louvers; AL-Automatic Louvers;W-Winterizing; SC-Steam Coil; TF-Toxic Fluid
27 (3) Tube lenght shall be selected by Vendor in order to locate the air cooler with the pipe rack in the same axis
28

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification
CPECC - PEG Consortium Validity Status Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 12 of 30

TANK SUMMARY Rev.

1 DIMENSIONS DESIGN CONDITIONS GEOMETRIC

INSULATION
ROOF TYPE (2)
2 CAPACITY

PWHT (4)

HEATER

MIXER

IST (5)
TYPE (1)
3 ITEM SERVICE INTERNAL HEIGHT TEMP. PRESSURE MATERIALS C.A. EQUIPMENT NOTES
DIAMETER °C STATUS
4
5 M.D.M.T.(3)
6 m m °C mbar(g) mm m³ Y/N Y/N Y/N Y/N Y/N
7 120 CS+IEC(bottom + 1st shell Working Capacity of 2,380.0 m3;
342200TA001 Off-Spec Oil Tank AT DR 18.3 11 - 6.0 / 50.0 1 2893 Y N N Y
8 01 -5 course)+CP Fabricated Weight (Mt)= 188

9 120 Oil Received From Train 1/2 - Working Capacity of


342200TA002 CS+IEC(bottom + 1st shell
01 Flow Tank AT DR 36.00 15.86 - 6.0 / 50.0 1 16144 Y N N Y 11,880.0 m3;
10 (Train 1/2) -5 course)+CP
Fabricated Weight (Mt)= 730

11 120 Oil Received From Train 3/4 - Working Capacity of


342200TA003 CS+IEC(bottom + 1st shell
01 Flow Tank AT DR 36 15.86 - 6.0 / 50.0 1 15981 Y N N Y 11,880.0 m3;
12 (Train 3/4) -5 course)+CP
Fabricated Weight (Mt)= 730

13 120 Working Capacity of 400 m3;


344100TA001 Hot Oil Storage Tank AT CR 7.62 10.6 -6/50 CS 1 484.4 Y N N
14 01 -5 Fabricated Weight (Mt)= 26

15 120
CS with min. C.A. + Internal Each Tank having a net capacity 9650m3,
01 345100TA001A/B Water Injection Surge Tanks AT DR 36.2 12.8 -6 / 50 1 13122 Y N N
16 -5 Epoxy Coating + CP Fabricated Weight (Mt)= 325

17 90.0 Working Capacity of 850 m3;


345200TA001 Desalination Feed Water Tank AT DR 12.2 9.22 -6/50 CS+IEC+CP 1 1076 N N N Fabricated Weight (Mt)= 46
18 01 -5.0
19 120 Working Capacity of 1056 m3;
345200TA002 Wash Water Tank AT DR 13.7 8.71 -6/50 CS+IEC+CP 1 1281 Y N N
20 01 -5 Fabricated Weight (Mt)= 51

21 120 Working Capacity of 4800 m3;


345550TA001A Intermediate Produced Water Tank AT DR 25.3 12.23 -6/50 CS + IEC + CP 1 6083 Y N N
22 01 -5 Fabricated Weight (Mt)= 164

23 120 Working Capacity of 4800 m3;


345550TA001B Intermediate Produced Water Tank AT DR 25.3 12.23 -6/50 CS + IEC + CP 1 6083 Y N N
24 01 -5 Fabricated Weight (Mt)= 164

25 NOTES: (1) AT-Atmospheric Tank; CT-Cryogenic Tank; RT-Refrigerated Tank. (2) CR-Cone Roof; FR-Floating Roof; DR-Dome Roof; IF-Internal Floating Roof; Fl Flat roof .
26 (3) Minimum Design Metal Temperature. (4) Postweld Heat Treatment. (5) Internal Surface Treatment.
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR
COMPANY Document Identification Sheet of sheets
Document Identification
CPECC - PEG Consortium Validity Status Rev.

34DPEA02857 ZMDE-P-EA-02857 EX-DE 01 13 of 30

TANK SUMMARY Rev.

1 DIMENSIONS DESIGN CONDITIONS GEOMETRIC

INSULATION
ROOF TYPE (2)
2 CAPACITY

PWHT (4)

HEATER

MIXER

IST (5)
TYPE (1)
3 ITEM SERVICE INTERNAL HEIGHT TEMP. PRESSURE MATERIALS C.A. EQUIPMENT NOTES
DIAMETER °C STATUS
4
5 M.D.M.T.(3)
6 m m °C mbar(g) mm m³ Y/N Y/N Y/N Y/N Y/N
7 85 atm For the each tank, Working Capacity of 13620 m3;
347300TA001A/B Fire Water Tanks AT DR 36.00 15.86 CS + IEC + CP 1 16092 N N N
01 -5 Fabricated Weight (Mt)= 373
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 NOTES: (1) AT-Atmospheric Tank; CT-Cryogenic Tank; RT-Refrigerated Tank. (2) CR-Cone Roof; FR-Floating Roof; DR-Dome Roof; IF-Internal Floating Roof; Fl Flat roof .
26 (3) Minimum Design Metal Temperature. (4) Postweld Heat Treatment. (5) Internal Surface Treatment.
27
28

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 14 of 30

VESSEL SUMMARY Rev.

1 DIMENSIONS DESIGN CONDITIONS MATERIALS BOOT

INSULATION

DEMISTER
2 SHELL C.A.

PWHT (3)
QUANTITY

BOOT
TYPE (1)
3 ITEM SERVICE INTERNAL HEIGHT TEMP. PRESSURE (CLAD) ( THK ) EQUIPMENT NOTES
DIAMETER OR °C mm DIAM. STATUS
4
5 LENGTH (T/T) M.D.M.T.(2) INTERNALS C.A. HEIGHT
6 mm mm °C bar(g) mm Y/N Y/N Y/N Y/N mm
7 342001VS001 107 CS+625 clad
Internal Lining; Weight (t)= 114.2
First Stage Separator HO 1 3600 17500 40.2 Y Y Y N LLI
8 01 (train 1) -5 see Notes Internals : 25 CrSDSS

9 342002VS001 107 CS+625 clad


Internal Lining; Weight (t)= 114.2
First Stage Separator HO 1 3600 17500 40.2 Y Y Y N LLI
10 01 (train 2) -5 see Notes Internals : 25 CrSDSS

11 342003VS001 107 CS+625 clad


Internal Lining; Weight (t)= 114.2
First Stage Separator HO 1 3600 17500 40.2 Y Y Y N LLI
12 01 (train 3) -5 see Notes Internals : 25 CrSDSS

13 342004VS001 107 CS+625 clad


Internal Lining; Weight (t)= 114.2
First Stage Separator HO 1 3600 17500 40.2 Y Y Y N LLI
14 01 (train 4) -5 see Notes Internals : 25 CrSDSS

15 342001VS002 125 CS+625 clad


Internal Lining; Weight (t)= 24.4
01 Second Stage Separator HO 1 3100 15000 7 N Y Y N LLI
(train 1) Internals : 25 CrSDSS
16 -5 see Notes

17 342002VS002 125 CS+625 clad


Internal Lining; Weight (t)= 24.4
Second Stage Separator HO 1 3100 15000 7 N Y Y N LLI
18 01 (train 2) -5 see Notes Internals :25 CrSDSS

19 342003VS002 125 CS+625 clad


Internal Lining; Weight (t)= 24.4
Second Stage Separator HO 1 3100 15000 7 N Y Y N LLI
20 01 (train 3) -5 see Notes Internals : 25 CrSDSS

21 342004VS002 125 CS+625 clad


Internal Lining; Weight (t)= 24.4
Second Stage Separator HO 1 3100 15000 7 N Y Y N LLI
22 01 (train 4) -5 see Notes Internals : 25 CrSDSS

23 125 CS 6
342000VD001 Off-spec Oil Gas Boot VE 1 2600 6120 3.5/FV N Y N N Fabricated Weight (t)= 12.5
24 01 -5 CS 6
25 NOTES: (1) HO-Horizontal; VE-Vertical.
26 (2) Minimum Design Metal Temperature.
27 (3) Postweld Heat Treatment.
28 (4) According to code.
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 15 of 30

VESSEL SUMMARY Rev.

1 DIMENSIONS DESIGN CONDITIONS MATERIALS BOOT

INSULATION

DEMISTER
2 SHELL C.A.

PWHT (3)
QUANTITY

BOOT
TYPE (1)
3 ITEM SERVICE INTERNAL HEIGHT TEMP. PRESSURE (cladding) ( THK ) EQUIPMENT NOTES
DIAMETER OR °C mm DIAM. STATUS
4
5 LENGTH (T/T) M.D.M.T.(2) INTERNALS C.A. HEIGHT
6 mm mm °C bar(g) mm Y/N Y/N Y/N Y/N mm
7 342000VD002 125 CS 6
Gas Boot VE 1 3000 7800 3.5/FV N Y N N Oil Received From Train 1/2; Weight (t)= 19.7
8 01 (trains 1/2) -5 CS 6
9 342000VD003 125 CS 6
Gas Boot VE 1 3000 7800 3.5/FV N Y N N Oil Received From Train 3/4; Weight (t)= 19.7
10 01 (trains 3/4) -5 CS 6
11 107 CS+625 clad
Weight (t)= 68.9
342000VP001 Test Separator HO 1 3000 12000 40.2 Y Y Y N
12 -5 See Notes Internals: 25Cr SDSS

13 342101VU001 125 CS+625 clad


Included in package 342101XX001
Dehydrator HO 1 3000 11800 16 N Y N N LLI
14 (train 1) -5 See Notes Internals: 25Cr SDSS

15 342102VU001 125 CS+625 clad


Included in package 342102XX001
Dehydrator HO 1 3000 11800 16 N Y N N LLI
16 (train 2) -5 See Notes Internals: 25Cr SDSS

17 342103VU001 125 CS+625 clad


Included in package 342103XX001
Dehydrator HO 1 3000 11800 16 N Y N N LLI
18 (train 3) -5 See Notes Internals: 25Cr SDSS

19 342104VU001 125 CS+625 clad


Included in package 342104XX001
Dehydrator HO 1 3000 11800 16 N Y N N LLI
20 (train 4) -5 See Notes Internals: 25Cr SDSS

21 342101VU002 125 CS+625 clad


Included in package 342101XX001
Desalter HO 1 3000 11800 16 N Y N N LLI
22 (train 1) -5 See Notes Internals: 25Cr SDSS

23 342102VU002 125 CS+625 clad


Included in package 342102XX001
Desalter HO 1 3000 11800 16 N Y N N LLI
24 (train 2) -5 See Notes Internals: 25Cr SDSS

25 NOTES: (1) HO-Horizontal; VE-Vertical.


26 (2) Minimum Design Metal Temperature.
27 (3) Postweld Heat Treatment.
28 (4) According to code.
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 16 of 30

VESSEL SUMMARY Rev.

1 DIMENSIONS DESIGN CONDITIONS MATERIALS BOOT

INSULATION

DEMISTER
2 SHELL C.A.

PWHT (3)
QUANTITY

BOOT
TYPE (1)
3 ITEM SERVICE INTERNAL HEIGHT TEMP. PRESSURE (CLAD) ( THK ) EQUIPMENT NOTES
DIAMETER OR °C mm DIAM. STATUS
4
5 LENGTH (T/T) M.D.M.T.(2) INTERNALS C.A. HEIGHT
6 mm mm °C bar(g) mm Y/N Y/N Y/N Y/N mm
7 342103VU002 125 CS+NickelAlloy625 clad
Included in package 342103XX001;
Desalter HO 1 3000 11800 16 N Y N N LLI
8 (train 3) -5 See Notes Internals:25Cr SDSS

9 342104VU002 125 CS+NickelAlloy625 clad


Included in package 342104XX001;
Desalter HO 1 3000 11800 16 N Y N N LLI
10 (train 4) -5 See Notes Internals: 25Cr SDSS

11 342300VN001 125 CS+IEC(HLL) 3 Insulation for personal protection;


ATM Flare KO Drum HO 1 2300 14200 3.5 (4) Y N N
12 (Hold 1) -5 Fabricated Weight (Mt)= 16.6
01
13 342300VN002A/B 400 LTCS 6 Insulation for personal protection;
LP Flare KO Drum HO 2 4200 18000 3.5 (4) Y N N
14 (Hold 1) -40 Fabricated Weight (t)= 48.0

15 250 LTCS 6 HP Flare : Sonic Type;


342300VN003A/B
HP Flare KO Drum HO 2 4300 26000 10 (4) Y N N Insulation for personal protection;
16 (Hold 1) -40 Fabricated Weight (Mt)= 93.8
17 260 CS 1
344100VB001 Hot Oil Expansion Drum HO 1 3500 12500 4.5/FV (4) Y N N Fabricated Weight (Mt)= 24.3
18 01 -5
19 260 CS 1 Insulation for personal protection;
01 344100VA001 Hot Oil Drain Drum HO 1 2800 9000 3.5/FV (4) Y N Y Working Capacity= 39 m3 ;
20 -5 CS
Fabricated Weight (Mt)= 16.01
21 107 CS+ SS316L Clad Insulation for personal protection;
344200VA001 Fuel Gas KO Drum VE 1 2600 5000 10 (4) Y Y N
22 01 -5 SS316L Fabricated Weight (Mt)= 4.0

23 90 CS+IEC(HLL)+CP 1
344300VA001 Diesel Storage Drum HO 1 3,000 9,000 3.5 (4) N N N Working Capacity= 50m3
24 -5
25 NOTES: (1) HO-Horizontal; VE-Vertical.
26 (2) Minimum Design Metal Temperature.
27 (3) Postweld Heat Treatment.
28 (4) According to code.
29 Hold: (1) Number and Size of Flare KO Drum to be confirmed following Flare system study conclusions

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 17 of 30

VESSEL SUMMARY Rev.

1 DIMENSIONS DESIGN CONDITIONS MATERIALS BOOT

INSULATION

DEMISTER
2 SHELL C.A.

PWHT (3)
QUANTITY

BOOT
TYPE (1)
3 ITEM SERVICE INTERNAL HEIGHT TEMP. PRESSURE (CLAD) ( THK ) EQUIPMENT NOTES
DIAMETER OR °C mm DIAM. STATUS
4
5 LENGTH M.D.M.T.(2) INTERNALS C.A. HEIGHT
6 mm mm °C bar(g) mm Y/N Y/N Y/N Y/N mm
7 90 CS+IEC 1
344600VA001 Instrument Air Receiver VE 1 3600 15500 11 (4) N N N Fabricated Weight (Mt)= 35.6
8 -5 01
9 90 CS+IEC 1
344600VA002 Plant Air Receiver VE 1 4400 18000 11 (4) N N N Fabricated Weight (Mt)= 60.0
10 -5 01
11 85 CS+IEC 1
345300VA001 Potable Water Vessel HO 1 2800 5700 3.5 (4) Y N N Fabricated Weight (Mt)= 7.8
12 -5 01

13 125 CS+IEC+CP 3 Personal Protection is required;


345500VA001 Closed Drain Vessel HO 1 3400 15000 3.5 (4) Y N N 01 Vessel is placed in the pit;
14 -5 Fabricaetd Weight (Mt)=27.2

15 90 CS 3
346000VA001 Nitrogen Receiver VE 1 1100 3800 11 (4) N N N Fabricated Weight (Mt)= 2.3
16 -5 01
17 90 CS 3 Fabricated Weight (Mt)=93.8;
346000VA002 Nitrogen Snuffing Drum VE 1 3300 15000 44 (4) Y N N
18 -29 01 Personal Protection is required

19 90 CS 3 Fabricated Weight (Mt)=111.25;


346000VA003 A/B Nitrogen Backup Drum VE 2 3600 15000 44 (4) Y N N
20 -29 01 Personal Protection is required

21
22
23
24
25 NOTES: (1) HO-Horizontal; VE-Vertical.
26 (2) Minimum Design Metal Temperature.
27 (3) Postweld Heat Treatment.
28 (4) According to code.
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification
CPECC - PEG Consortium Validity Status Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 18 of 30

HEAT EXCHANGER SUMMARY Rev.

1 SERVICE TEMA DESIGN CONDITIONS MATERIALS MECHANICAL DATA SURF. MASS TOTAL

EXPANS. JOINTS
NUMBER OF SHELLS

TOXIC FLUID
2 TYPE PER PER MASS

QUANTITY
3 ITEM DUTY SHELL SIDE C. A. SHELL TUBES SHELL SHELL NOTES
SHELL SIDE EQUIPMENT
4 TUBE SIDE mm I.D. LENGTH O.D. STATUS

5 SHELL SIDE TEMP. M.D.M.T. (1) PRESSURE mm mm


TUBE SIDE
6 TUBE SIDE kW °C °C bar(g) Y/N Y/N mm No. TUBES BWG m² Mg Mg

7 Treated Oil From Desalter 125 -5 30.9 CS+3mm Alloy 625 Clad 3
Oil Preheater (train 1) Dimensions: I.D.
342001HA001A/B
01 AES 1 6939 (3) N N (m)= 1.23 / Length (m)= 9; Fabricated
8 Crude Oil Pre-Heating 125 -5 40.2 Alloy 625 Weight (Mt)= 67

9 Treated Oil From Desalter 125 -5 30.9 CS+3mm Alloy 625 Clad 3 Oil Preheater (train 2) Dimensions: I.D.
342002HA001A/B
01 AES 1 6939 (3) N N (m)= 1.23/ Length(m)= 9; Fabricated
10 Crude Oil Pre-Heating 125 -5 40.2 Alloy 625 Weight (Mt)= 67

11 Treated Oil From Desalter 125 -5 30.9 CS+3mm Alloy 625 Clad 3
Oil Preheater (train 3) Dimensions: I.D.
342003HA001A/B
01 AES 1 6939 (3) N N (m)= 1.23 / Length(m)= 9;
12 Crude Oil Pre-Heating 125 -5 40.2 Alloy 625 Fabricated Weight (Mt)= 67

13 Treated Oil From Desalter 125 -5 30.9 CS+3mm Alloy 625 Clad 3 Oil Preheater (train 4) Dimensions: I.D.
342004HA001A/B
01 AES 1 6939 (3) N N (m)= 1.23 / Lenght(m)= 9; Fabricated
14 Crude Oil Pre-Heating 125 -5 40.2 Alloy 625 Weight (Mt)= 67

Oil Heater (train 1) Dimensions:


15 Hot Oil (THERMINOL 55) 260 -5 30.9 CS 3
I.D.(m)= 1.1 / Length(m)=9.0;
342001HA002 A/B AFS 1+1 11396 (2) N Fabricated Weight (Mt)= 26.35
16 01 Oil From Pre-Heater 260 -5 40.2 Alloy 625
Oil Heater (train 2) Dimensions:
17 Hot Oil (THERMINOL 55) 260 -5 30.9 CS 3
I.D.(m)= 1.05 / Length (m)= 9.0 ;
342002HA002 A/B AFS 1+1 11396 (2) N Fabricated Weight (Mt)= 26.35
18 Oil From Pre-Heater 260 -5 40.2 Alloy 625
01
19 NOTES: (1) Minimum Design Metal Temperature
20 (2) Two Shells in parallel
01
21 (3) Exchanger is in series (stacked arrangemnet)
22
23
24
25
26
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification
CPECC - PEG Consortium Validity Status Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 19 of 30

HEAT EXCHANGER SUMMARY Rev.

1 SERVICE TEMA DESIGN CONDITIONS MATERIALS MECHANICAL DATA SURF. MASS TOTAL

NUMBER OF SHELLS

EXPANS. JOINTS

TOXIC FLUID
2 TYPE PER PER MASS

QUANTITY
3 ITEM DUTY SHELL SIDE C. A. SHELL TUBES SHELL SHELL EQUIPMENT NOTES
SHELL SIDE
TUBE SIDE mm I.D. LENGTH O.D. STATUS
4
5 SHELL SIDE TEMP. M.D.M.T. (1) PRESSURE mm mm
TUBE SIDE
6 TUBE SIDE kW °C °C bar(g) Y/N Y/N mm No. TUBES BWG m² Mg Mg
7 Hot Oil (THERMINOL 55) 260 -5 30.9 CS 3 Oil Heater (train 1) Dimensions: I.D.
(m)= 1.1 / Length(m)=9.0; Fabricated
01 342003HA002 A/B AFS 1+1 11396 (3) N Weight (Mt)= 26.35
8 Oil From Pre-Heater 260 -5 40.2 Alloy 625

9 Hot Oil (THERMINOL 55) 260 -5 30.9 CS 3 Oil Heater (train 2); Dimensions: I.D.
01 342004HA002 A/B AFS 1+1 11396 (3) N (m)= 1.05, Lengtth(m)= 9.0; Fabricated
10 Oil From Pre-Heater 260 -5 40.2 Alloy 625 Weight (Mt)= 26.35

11 Produce Water Side "A" 125 -5 16 6 mo


01 Plate and
Effluent Water / Wash Water
342101HB001 A/B Frame (Note - 1+1 2074 (3) N Economiser (Train 1)
12 Wash Water Side "B" 2) 125 -5 16 6 mo

13 Produce Water Side "A" 125 -5 16 6 mo


01 Plate and
Effluent Water / Wash Water
342102HB001 A/B Frame (Note - 1+1 2074 (3) N Economiser (Train 2)
14 Wash Water Side "B" 2) 125 -5 16 6 mo

15 Produce Water Side "A" 125 -5 16 6 mo


01 Plate and
Effluent Water / Wash Water
342103HB001 A/B Frame (Note - 1+1 2074 (3) N Economiser (Train 3)
16 Wash Water Side "B" 2) 125 -5 16 6 mo

17 Produce Water Side "A" 125 -5 16 6 mo


01 Plate and
Effluent Water / Wash Water
342104HB001 A/B Frame (Note - 1+1 2074 (3) N Economiser (Train 4)
18 Wash Water Side "B" 2) 125 -5 16 6 mo

19 NOTES: (1) Minimum Design Metal Temperature


20 (2) For Plate and Frame heat Exchanger its Hot and Cold fluid side (not Shell and Tube side)
21 (3) Exchangers in parallel
22
23
24
25
26
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 20 of 30

HEAT EXCHANGER SUMMARY Rev.

1 SERVICE TEMA DESIGN CONDITIONS MATERIALS MECHANICAL DATA SURF. MASS TOTAL

NUMBER OF SHELLS

EXPANS. JOINTS

TOXIC FLUID
2 TYPE PER PER MASS

QUANTITY
3 ITEM DUTY SHELL SIDE C. A. SHELL TUBES SHELL SHELL EQUIPMENT NOTES
SHELL SIDE
TUBE SIDE mm I.D. LENGTH O.D. STATUS
4
5 SHELL SIDE TEMP. M.D.M.T. (1) PRESSURE mm mm
TUBE SIDE
6 TUBE SIDE kW °C °C bar(g) Y/N Y/N mm No. TUBES BWG m² Mg Mg
13 SS316 The heater is insulated with Hot
344200HM001 A/B Fuel Gas Electric Heater Electric 2 246.4 121 -5 10 (2) N Insulation
14 01
15
16
17
18
19 NOTES: (1) Minimum Design Metal Temperature
20 (2) In addition liquid hydrostatic pressure has to be considered.
21 HOLDS (1)
22
23
24
25
26
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification
CPECC - PEG Consortium Validity Status Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 21 of 30

FIRED HEATER SUMMARY Rev.

1 STEAM TYPE DUTY PROCESS TUBES MATERIAL OVERALL APPROX.

SOOTBLOWER
2 SUPER- OF DESIGN DIMENSIONS MASS

No. OF PASSES
DECOKING
QUANTITY

STACK (4)
3 ITEM SERVICE HEATER WASTE CONDITIONS RADIANT SECTION C.A. mm NOTES

TYPE (1)

PROCESS
EQUIPMENT

DESIGN
OTHER
4 Y/N HEAT TEMP. PRES. CONVECTIVE SECT. C.A. LENGTH STATUS

5 FUEL RECOV. OTHER SECTION (STACK) C.A. WIDTH EACH

6 TYPE(2) (3) kW kW kW °C bar(g) mm Y/N Y/N HEIGHT TOTAL


7 344100FA002 A/B/C are sized for 4 oil
CS
8 01 treatment trains.
Hot oil design flow rate for each fired
9 heater is 413319 kg/h. Each Hot Oil Fired
344100FA002 A/B/C Hot Oil Fired Heater 3 20897.3 22994 260 26.7 CS N 2 LLI
10 Heater including a purge air blower
(344100KE002), fuel gas skid, local
11 control panel and burner managment
CS 1.5
12 system (BMS)

13

14

15

16

17

18
19 NOTES: (1) BH-Box; VH-Vertical Cylindrical; CH-Cabin. (2) FO-Fuel Oil; FG-Fuel Gas; MX-Fuel Oil and/or Fuel Gas
20 (3) ST-Steam Generation; RCAP-Recuperative Air Preheater; RGAP-Regenerative Air Preheater; OTAP-Other Air Preheater
21 (4) IND-Indipendent; COM-Common
22
23
24
25
26
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
COMPANY Document Identification CONTRACTOR Document Identification Sheet of sheets
Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 22 of 30

FILTER SUMMARY Rev.

1 HANDLED DESIGN CONDITIONS MATERIALS SOLID


2 FLUID TO BE

DENSITY
QUANTITY
TYPE (1)
3 ITEM SERVICE TOTAL TEMP. PRES. MAX RETAINED EQUIPMENT NOTES
FLOW PRES. STATUS
4
5 RATE DROP CASING SIZE μm
6 kg/m³ SUCT. °C bar(g) bar FILTER MEDIA wt %
7 344100CL001A/B CS+1mmCA 10
Hot Oil Filters CF 2 Hot Oil 734/865 22 -5/260 26.7/FV 0.5
8 01 SS316 L 99
9 SS316 L 3
344200CL001A/B Fuel Gas Filters (4) 2 Fuel Gas 8.72 5142.4 -5/107 10 0.5
10 01 SS316 L 99.5
11 SS316 L 10
344300CL001A/B Diesel Filters CF 2 Diesel Fuel 850 36 -5/90 7.8 0.5
12 01 SS316 L 99.5
13 CS+1mmCA+IEC (Boot) 98% d>=
344300CQ001A/B Diesel Filter Coalescers (2) 2 Diesel Fuel 850 15 -5/90 7.8 0.5 Water content at the outlet is around 10 ppm
14 01 4 μm

CS+ 6mmCA 4 Skid Mounted filter package, three filters are operating
15 345100CY001
Make-up River Water Filters BW 3 Water 1020 607.2 -5/85 17.4 1 continuously for total capacity of 1822 m3/h including design
16 01 A/B/C Internal SS margain.
17 345100CY002 CS+ 6mmCA 98% d>= Three filters are operating and one in stand by for total capacity of
River Water Guard Filters CF 4 Water 1020 607.2 -5/85 17.4 1
18 01 A/B/C/D Internal SS 4 μm 1822 m3/h. (Note 3)

19 NOTES: (1) CF-Cartridge Filter; BF-Basket Filter; CA-Continuous Flow Automatic Filter; BW-Backwashing Filter
20 (2) Coaleshing type filters
21 (3) Water to be treated comes from an upstream filtration step able to remove 98% particles with diameter ≥ 10µm.
22 (4) Candle Type
23
24
25
26
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 23 of 30

PACKAGE SYSTEM SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
4 STATUS

5
6
7 341201XX001
Package is provided with two pumps (one main, one spare) Flowrate: 107.8 l/h and one Surge Tank Volume: 36.3 m3. N°5 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet;
(train 1) Demulsifier Injection Unit 1
8 01 Dehydrator inlet upstream the mixing valve; Desalter inlet upstream the mixing valve; Test Separator inlet
(Note 1)
9 341202XX001 Package is provided with two pumps (one main, one spare) Flowrate: 90.4 l/h and one Surge Tank Volume: 30.4 m3. N°4 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet;
Demulsifier Injection Unit 1
10 (train 2) 01 Dehydrator inlet upstream the mixing valve; Desalter inlet upstream the mixing valve

11 341203XX001 Package is provided with two pumps (one main, one spare) Flowrate: 90.4 l/h and one Surge Tank Volume: 30.4 m3. N°4 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet;
Demulsifier Injection Unit 1
12 (train 3) 01 Dehydrator inlet upstream the mixing valve; Desalter inlet upstream the mixing valve

13 341204XX001 Package is provided with two pumps (one main, one spare) Flowrate: 90.4 l/h and one Surge Tank Volume: 30.4 m3. N°4 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet;
Demulsifier Injection Unit 1 01
14 (train 4) Dehydrator inlet upstream the mixing valve; Desalter inlet upstream the mixing valve

15 341201XX002
Package is provided with two pumps (one main, one spare) Flowrate: 164.4 l/h and one Surge Tank Volume: 55.2 m3. N°3 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet;
(train 1) Antifoam Injection Unit 1 01
16 Test Separator inlet
(Note 1)
17 341202XX002
Antifoam Injection Unit 1 01 Package is provided with two pumps (one main, one spare) Flowrate: 135.4 l/h and one Surge Tank Volume: 45.5 m3. N°2 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet
18 (train 2)

19 341203XX002
Antifoam Injection Unit 1 01 Package is provided with two pumps (one main, one spare) Flowrate: 135.4 l/h and one Surge Tank Volume: 45.5 m3. N°2 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet
20 (train 3)

21 341204XX002
Antifoam Injection Unit 1 01 Package is provided with two pumps (one main, one spare) Flowrate: 135.4 l/h and one Surge Tank Volume: 45.5 m3. N°2 injection point: 1st Stage Separator inlet; 2nd Stage Separator inlet
22 (train 4)

23
341201XX003 Package is provided with four pumps (two main, two spare) Flowrate: 39.34 l/h and one Surge Tank Volume: 13.2 m3. N°09 injection point: 1st Stage Separator inlet; 1st Stage Separator water
(train 1) Corrosion Inhibitor Injection Unit 1 01 outlet; 2nd Stage Separator inlet; 2nd Stage Separator water outlet; Desalter water outlet; Dehydrator water outlet, upstream wash water economizer; Desalter inlet upstream the mixing valve;
24 (Note 1) Test Separator inlet; Test Separator water outlet.
25 NOTES: (1) Package is dedicated to 1st train and test separator.
26
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 24 of 30

PACKAGE SYSTEM SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
STATUS
4
5
6
7 341202XX003 Package is provided with four pumps (two main, two spare) Flowrate: 31.5 l/h and one Surge Tank Volume: 10.6 m3. N°7 injection point: 1st Stage Separator inlet; 1st Stage Separator water
Corrosion Inhibitor Injection Unit 1
8 (train 2) 01 outlet; 2nd Stage Separator inlet; 2nd Stage Separator water outlet; Desalter water outlet; Dehydrator water outlet, upstream wash water economizer; Desalter inlet upstream the mixing valve

9 341203XX003 Package is provided with four pumps (two main, two spare) Flowrate: 31.5 l/h and one Surge Tank Volume: 10.6 m3. N°7 injection point: 1st Stage Separator inlet; 1st Stage Separator water
Corrosion Inhibitor Injection Unit 1
10 (train 3) 01 outlet; 2nd Stage Separator inlet; 2nd Stage Separator water outlet; Desalter water outlet; Dehydrator water outlet, upstream wash water economizer; Desalter inlet upstream the mixing valve

11 341204XX003
Package is provided with four pumps (two main, two spare) Flowrate: 31.5 l/h and one Surge Tank Volume: 10.6 m3. N°7 injection point: 1st Stage Separator inlet; 1st Stage Separator water
(train 4) Corrosion Inhibitor Injection Unit 1 01
12 outlet; 2nd Stage Separator inlet; 2nd Stage Separator water outlet; Desalter water outlet; Dehydrator water outlet, upstream wash water economizer; Desalter inlet upstream the mixing valve

13 345100XX003
Corrosion Inhibitor Injection Unit 1
01 Package is provided with two pumps (one main, one spare) Flowrate: 20.6 l/h and one Surge Tank Volume: 6.9 m 3. N°1 injection point: Water Injection Surge Tank Inlet.
14 Water Injection System

15 341201XX004
Package is provided with two pumps (one main, one spare) Flowrate: 29.6 l/h and one Surge Tank Volume: 10 m3. N°4 injection point: 1st Stage Separator Water Outlet; 2nd Stage Separator
(train 1) Scale Inhibitor Injection Unit 1
16 01 Water Outlet; Dehydrator water outlet upstream of wash water economizer; Test Separator Water Outlet.
(Note 1)
17 341202XX004
Package is provided with two pumps (one main, one spare) Flowrate: 21.4 l/h and one Surge Tank Volume: 7.3 m3. N°3 injection point: 1st Stage Separator Water Outlet; 2nd Stage Separator
(train 2) Scale Inhibitor Injection Unit 1
18 01 Water Outlet; Dehydrator water outlet upstream of wash water economizer.
(Note 1)
19 341203XX004 Package is provided with two pumps (one main, one spare) Flowrate: 21.4 l/h and one Surge Tank Volume: 7.3 m3. N°3 injection point: 1st Stage Separator Water Outlet; 2nd Stage Separator
Scale Inhibitor Injection Unit 1
20 (train 3) 01 Water Outlet; Dehydrator water outlet upstream of wash water economizer.

21 341204XX004 Package is provided with two pumps (one main, one spare) Flowrate: 21.4 l/h and one Surge Tank Volume: 7.3 m3. N°3 injection point: 1st Stage Separator Water Outlet; 2nd Stage Separator
Scale Inhibitor Injection Unit 1 01
22 (train 4) Water Outlet; Dehydrator water outlet upstream of wash water economizer.

23 341201XX005
Polyelectrolyte Injection Unit 1 01 Package is provided with two Pumps (one main, one spare) Flowrate: 4.81 l/h and one Storage Tank Volume: 1.6 m3 N° 2 Injection points: PWT Package train 1 (CPI, IGF)
24 (train 1)

25 341202XX005
Polyelectrolyte Injection Unit 1 01 Package is provided with two Pumps (one main, one spare) Flowrate: 4.81 l/h and one Storage Tank Volume: 1.6 m3 N° 2 Injection points: PWT Package train 2 (CPI, IGF)
26 (train 2)

27
28
29
30
31

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 25 of 30

PACKAGE SYSTEM SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
STATUS
4
5
6
7 341203XX005
Polyelectrolyte Injection Unit 1 Package is provided with two Pumps (one main, one spare) Flowrate: 4.81 l/h and one Storage Tank Volume: 1.6 m3 N° 2 Injection points: PWT Package train 3 (CPI, IGF)
8 (Train 3) 01
9 341204XX005
Polyelectrolyte Injection Unit 1 01 Package is provided with two Pumps (one main, one spare) Flowrate: 4.81 l/h and one Storage Tank Volume: 1.6 m3 N° 2 Injection points: PWT Package train 4 (CPI, IGF)
10 (Train 4)

11 341201XX007 Package is provided with two Pumps (one main, one spare) and one Storage Tank .Pump Flow rate 56.2 l/h and Tank volume 18.9 m3 N° 2 Injection points: Test Separator Inlet and 1st Stage
Asphaltene Injection Unit 1 01
12 (Train 1) Separator Inlet.

13 341202XX007
Asphaltene Injection Unit 1 01 Package is provided with two Pumps (one main, one spare) and one Storage Tank .Pump Flow rate 41.7 l/h and Tank volume 14 m3 N° 1 Injection points: 1st Stage Separator Inlet.
14 (Train 2)

15 341203XX007
Asphaltene Injection Unit 1 01 Package is provided with two Pumps (one main, one spare) and one Storage Tank .Pump Flow rate 41.7 l/h and Tank volume 14 m3 N° 1 Injection points: 1st Stage Separator Inlet.
(Train 3)
16

17 341204XX007
Asphaltene Injection Unit 1 01 Package is provided with two Pumps (one main, one spare) and one Storage Tank .Pump Flow rate 41.7 I/h and Tank volume 14 m3 N° 1 Injection points: 1st Stage Separator Inlet.
18 (Train 4)

19 Package is provided with two Pumps (one main, one spare) Flowrate: 20.4 l/h and one Storage Tank Volume: 6.9 m3. N° 2 Injection points : Intermediate Produced Water Tank Inletand Wash
341200XX001 Oxygen Scavenger Injection Unit 1 01
20 Water Tank Inlet

21 Package is provided with two Pumps (one main, one spare) Flowrate: 89.8 l/h and two Storage Tank Volume: 30.2 m3 (each) N° 3 Injection points: Desalination Feed Water Tank Inlet; Wash
341200XX002 Biocide A/B Injection Unit 1
22 01 Water Tank Inlet; Potable Water Vessel

23 342101XX001
Desalting System 1 LLI Including Dehydrator 342101VU001 (Power Required 60 kW, to be confirmed by vendor) and Desalter 342101VU002 (Power Required 60 kW, to be confirmed by vendor)
24 (Train 1) 01
25 342102XX001
Desalting System 1 LLI Including Dehydrator 342102VU001 (Power Required 60 kW, to be confirmed by vendor) and Desalter 342102VU002 (Power Required 60 kW, to be confirmed by vendor)
26 (Train 2) 01
27
28
29
30
31

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 26 of 30

PACKAGE SYSTEM SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
STATUS
4
5
6
7 341201XX008 Package is provided with two Pumps (one main, one spare) Flowrate: 1.17 l/h and Storage Tank Volume: 0.4 m 3 N° 3 Injection points: 1st Stage separator Gas Outlet, 2nd Stage Separator Gas
Corrosion Inhibitor (gas) Injection Package 1
8 (Train 1) 01 Outlet, and Test Separator Gas Outlet

9 341202/203/204XX008 Package is provided with two Pumps (one main, one spare) Flowrate: 0.73 l/h and Storage Tank Volume: 0.2 m 3 N° 3 Injection points: 1st Stage separator Gas Outlet, and 2nd Stage Separator
Corrosion Inhibitor (gas) Injection Package 1
10 (Train 2,3,&4) 01 Gas Outlet.

11 342103XX001
Desalting System 1 LLI Including Dehydrator 342104VU001 (Power Required 60 kW, to be confirmed by vendor) and Desalter 342104VU002 (Power Required 60 kW, to be confirmed by vendor) LLI
12 (Train 3) 01
13 342104XX001
Desalting System 1 LLI Including Dehydrator 342104VU001 (Power Required 60 kW, to be confirmed by vendor) and Desalter 342104VU002 (Power Required 60 kW, to be confirmed by vendor) LLI
14 (Train 4) 01
15
342300XX001 ATM Flare Package 1 LLI Refer to doc n° 002510102300XX001 A/B (Flare data sheet for ATM Flare Package)
16

17
342300XX002 LP Flare Package 1 LLI Refer to doc n° 002510102300XX002 A/B (Flare data sheet for LP Flare Package)
18

19
342300XX003 HP Flare Package 1 LLI Refer to doc n° 002510102300XX003 A/B (Flare data sheet for LP Flare Package)
20

21
344600XX001 Compressed Air Package 1
01 Dewpoint Temperature= -15oC / Capacity= 9470 Nm3/hr, Refer to doc n° 251034DMGA02371
22

23
344600XX002 Air Dryer Package 1 Capacity= 9470 Nm3/hr, Refer to doc n° 251034DMGA02371
24 01

25
344800XX001 Emergency Diesel Generator Package 1 Refer to doc n° 251034DMGA02379 (Data sheet for diesel engine generator)
26

27
344800XX002 Emergency Diesel Generator Package 1 Refer to doc n° 251034DMGA02379 (Data sheet for diesel engine generator)
28

29 Package is provided with two Pumps (one main, one spare) Flowrate: 129.5 l/h and one Storage Tank Volume: 43.5 m3 N. 4 Injection points: Treated River Water header supply line, Water
345100XX001 Oxygen scavenger injection package 1
30
01 Injection Booster Pumps suction header, MOD Water Supply Line, and Treated NU Water Supply line.

31
32
33
34
35

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR
COMPANY Document Identification Sheet of sheets
Document Identification
CPECC - PEG Consortium Validity Status Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 27 of 30

PACKAGE SYSTEM SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
STATUS
4
5
6
7 Package is provided with two Pumps (one main, one spare) Flowrate: 1100 l/h and twin Storage Tank Volume (each Tank) : 250 mc N. 2 Injection point: New W.I. Surge Tanks and NU
345100XX002 Biocide A/B injection package 1
8 01 Water package

9 Desalinated Water Flowrate: 283 m3/h. Refer to doc n° 251034DMGA02377.


345200XX001 Desalination Package 1 Analyzers for conductivity and pH monitoring for produced desalinated water (both for wash water and potable water service), shall be included in Desalination Package Vendor scope of
10 01
supply.
11
345300XX001 Potabilization Package 1 Potable Water Flowrate: 15m3/h. Refer to doc n° 251034DMGA02401
12
13
345300XX002 Potable Water Chiller Package 1 Potable Water Flowrate: 15 m3/h. Refer to doc n° 251034DMGA02401
14
15 345551XX001
Produced Water Treatment Package 1 Design Flowrate: 437 m3/h and the power requirement to be confirmed by Vendor.
16 (PWT Train 1) 01
17 345552XX001
Produced Water Treatment Package 1 Design Flowrate: 437 m3/h and the power requirement to be confirmed by Vendor.
18 (PWT Train 2) 01
19 345553XX001
Produced Water Treatment Package 1 Design Flowrate: 437 m3/h and the power requirement to be confirmed by Vendor.
20 (PWT Train 3) 01
21 345554XX001
Produced Water Treatment Package 1 Design Flowrate: 437 m3/h and the power requirement to be confirmed by Vendor.
22 (PWT Train 4) 01
23
24
25
26
27

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 28 of 30

PACKAGE SYSTEM SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
STATUS
4
5
6

345100XX004 NAHR UMR (NU) WATER TREATMENT PACKAGE Total Capacity: 1365 m3/hr, refer to doc n° 251034DMGA51322
01
7 345551XX002
Sand Removal Package 1 Tota Capacity: 10 tonnes per week, Refer data sheet for sand removal package to doc n° 251034DMGA02404
8 (Oil Train 1) 01
9 345552XX002
Sand Removal Package 1 Tota Capacity: 10 tonnes per week, Refer data sheet for sand removal package to doc n° 251034DMGA02404
10 (Oil Train 2) 01
11 345553XX002 Sand Removal Package
1 Total Capacity: 10 tonnes per week, Refer data sheet for sand removal package to doc n° 251034DMGA02404
12 (Oil Train 3) 01
13 345554XX002 Sand Removal Package
1 Tota Capcity: 10 tonnes per week, Refer data sheet for sand removal package to doc n° 251034DMGA02404
14 (Oil Train 4) 01
15
345700XX001 Sewage Treatment Plant 1 Total capacity: 31.6 m3/day, Refer to doc n° 251034DMGA50936
16 01
17
346000XX001 Nitrogen Generation Package 1 Total Capacity: 1500 Nm3/h, Nitrogen Purity 98%, Refer to doc n° 251034DMGA02393
18 01
19
346000XX002 Nitrogen backup Compressor Package 1 Total Capacity: 1500 Nm3/hr, Refer to doc n° 251034DMGA50928
20 01
21
22
23 NOTES: (1) Deleted
24
25
26
27

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
CONTRACTOR Document
COMPANY Document Identification Sheet of sheets
Identification Validity
CPECC - PEG Consortium Status
Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 29 of 30

MISCELLANEOUS SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
STATUS
4
5
6
7
345400VW001 Open Drain Sump (North Area) 1 Dimensions: L=10 m; W=10 m; depth= 5.5 m. Reinforced Concrete Epoxy Lined. Sump to be provided with underweir for non-contaminated water and oil skimmer. (Note 3)
8
9
345400VW002 Open Drain Sump (Central Area) 1 Dimensions: L=10 m; W=20 m; depth= 5.5 m. Reinforced Concrete Epoxy Lined. Sump to be provided with underweir for non-contaminated water and oil skimmer. (Note 3)
10
11
345400VW003 Open Drain Sump (South Area) 1 Dimensions: L=10 m; W=10 m; depth= 5.5 m. Reinforced Concrete Epoxy Lined. Sump to be provided with underweir for non-contaminated water and oil skimmer. (Note 3)
12
13 Dimensions (each pond): L=80 m; W = 95 m; depth = 2m. (Note 2)
345400XZ001 A/B Evaporation Ponds 2
14 Earth work (compacted layer) with HDPE lining (Civil Dept. To confirm).

15
345700TP001 Sanitary Sewage Sump 1 Dimensions: L=1.5 m; W=1.5 m; depth= 3m. Reinforced Concrete Epoxy Lined. (Note 1)
16
17
345700TP002 Sanitary Sewage Sump 1 Dimensions: L=1.5 m; W=1.5 m; depth= 3m. Reinforced Concrete Epoxy Lined. (Note 1)
18
19
345700TP003 Sanitary Sewage Sump 1 Dimensions: L=1.5 m; W=1.5 m; depth= 3m. Reinforced Concrete Epoxy Lined. (Note 1)
20
21
345700TP004 Sanitary Sewage Sump 1 Dimensions: L=1.5 m; W=1.5 m; depth= 3m. Reinforced Concrete Epoxy Lined. (Note 1)
22
25 NOTES: (1) Sanitary System Design to be confirmed later based on final population equivalent of each building and final Plot Plan.
26 (2) Dimensions to be confirmed / revised after 345100CY001 A/B/C/D finalization later based on backwash flowrate and frequency of filters.
27 (3) Dimensions based on a maximum invert level of 3 m, to be to be confirmed / revised during later based on Open Drain Network final layout.
28
29
Revision Index
CONTRACTOR
COMPANY Document Identification Sheet of sheets
Document Identification
CPECC - PEG Consortium Validity Status Rev.

251034DPEA02857 ZMDE-P-EA-02857 EX-DE 01 30 of 30

MISCELLANEOUS SUMMARY Rev.

1
2

QUANTITY
3 ITEM SERVICE EQUIPMENT DESCRIPTION
STATUS
4
5
6
7
345700TP007 Irrigation Sump 1 Dimensions: L=10 m; W=10 m; depth= 3.5m. Reinforced Concrete Epoxy Lined.
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

This document is property of eni iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

You might also like