342001HA001
A A
OIL PREHEATER A. FOR SYMBOLS, LEGENDA, GENERAL NOTES AND TYPICALS SEE DWG. 00251034BPFM08030.
DESIGN DUTY M Kcal/h 5.673 B. ALL THE EQUIPMENT TAG NUMBERS ON THIS DRAWING SHALL BE PREFIXED BY FACILITY CODE 002510
DESIGN/OPERATING PRESS. SHELL SIDE barg 16/7 UNLESS OTHERWISE SPECIFIED.
DESIGN/OPERATING TEMP. SHELL SIDE °C 125/94 C. ALL INSTRUMENT TAGS ON THIS P&ID ARE PREFIXED WITH THE SUBFACILITY CODE 34.
DESIGN/OPERATING PRESS. TUBE SIDE barg 40.2/7.2 D. THIS P&ID IS ALSO VALID FOR TRAIN 2 ÷ 4.
CASE: FIRE DESIGN/OPERATING TEMP. TUBE SIDE °C 116/67 E. CONTROLLER SET POINTS REFER TO MP SUMMER CASE SIMULATION UNLESS OTHERWISE INDICATED.
SIZE: 1-1/2F2 43B 52A MATERIAL OF COSTRUCTION SHELL/TUBE CS/ALLOY 625
PSET=40.2 barg INSULATION YES/NO NO

B
2001
PSV
+

103 A

— I V
FB
ILV DISCHARGE B

23
6"x2"

4
FREE DRAINING FREE DRAINING 342300HP026 -6"-52A-V 84
Cl
LO
10.0 iTO HP FLARE NETWORK
00251034BPFM86761_01

342301HP027 -6"-52A-V
3"x1-1/2"

FREE DRAINING
CASE: FIRE CASE: FIRE
SIZE:1-1/2F2 43B 52A
SIZE: 1-1/2H3
V PSET=40.2 barg

I
PSET=16.0 barg 42A 52A
2001
2001
FB
LO
PSV
+ V PSV V FB
ILV 103 B 6"x2" LO ILV 12"x10" DISCHARGE

23
+

104 A 10"x3" FREE DRAINING

6
-&
*8*
FREE DRAINING 342300LP040 -10"-52A-V 94
O * 00251034BPFM86762_02
>

43B 52A
3.5
C C

FV
FB LO TO LP FLARE NETWORK
ILV 342301LP041 -10"-52A-V
2" 4"x1-1/2"

342301LP067 -4"-52A-V
3"x1-1/2"

FREE DRAINING
FREE DRAINING 342001CO027 -3"-43B-P

:+e*- V V V
CASE: FIRE
SIZE: 1-1/2H3

I
SET @ 16.0 barg 2001
FB
ILV I LC
342001CO027 -3"-43B-P
CSC
i! FB
ILV $ LO 2001
PSV
+
42A 52A

10"x3"
V
LO
2001
BDV
+
DET. "C" FO
+

015

FREE DRAINING
104 B
-a 52AFREE DRAINING
FB
016
1m V
FB
FREE DRAINING
FB
A 4"x1-1/2" ILV 2" 42A LO FO 4"x2" LO

342301LP043 -12"-52A-V
FB

342001CO024 -2"-43B-I
342001CO027 -2"-43B-P D
D 43B 52A D

342001CO030 -4"-42A-P
V
D ** V
- 2001
TI
H / 2001
PI NOTES:
FB
ILV 1
' LC
342001CO030 -4"-42A-P
CSC ][ 006
L
022
T
1. DEVIATION TO OFF SPEC OIL STORAGE AND RERUN SYSTEM IN THE CASE OF BS & W SPECIFICATION IS NOT
MET WILL BE PERFORMED BY OPERATOR FROM DCS (OPENING 2001-MOV-010B, CLOSING 2001-MOV-010A).
IN NORMAL OPERATION 2001-MOV-010A IS OPEN, 2001-MOV-010B IS CLOSED.
FREE DRAINING 2. TWO PHASE FLOW REGIME, LINE SHALL BE PROPERLY SUPPORTED.
2001 X H 2001 2001 2001 2001
A 2001
PI \
3. VOLUME FLOW RATE REFERS TO T AND P CONDITION.

v
TI
003
A L A 021
A L 342001CO030 -2"-42A-P \ TI
019
PI
008
TIT
006
PIT
022 4. 2001-MOV-010A AND 2001-MOV-010B MUST BE INTERLOCKED IN ORDER
TO HAVE AT LEAST ONE PASSAGE FREE.

y
FREE DRAINING
5. TEMPERATURE CONTROL IS AS FOLLOWS:
PREHEATED OIL
FREE DRAINING 342001CO005 -16"-43B-I 84 a) WHEN T IS LOWER THAN THE SET POINT OF CONTROLLER 2001-TIC-004,
E
2001 2001 2001 2001 NOTE 2 40.2 :TO OIL HEATERS
00251034BPFM08759_02 TV-004A WILL BE OPENED WHILE TV-004B WILL BE CLOSED.
b) WHEN T IS HIGHER THAN THE SET POINT OF CONTROLLER 2001-TIC-004,
E
TIT PIT TI PI
003 021 015 006 342001HA002A/B TV-004A WILL BE CLOSED WHILE TV-004B WILL BE OPENED.
2001 6. TO BE USED ONLY DURING COMMISSIONING WHEN ONE OF THE TWO FLOW TANKS WILL BE
DET. "C" FO USED AS ADDITIONAL OFF SPEC TANK.
OIL 2001
BDV
+

016 rn 7. MAX OPERATING TEMPERATURE IN CASE OF PRE-HEATER BYPASS IS 87°C.


342101CO001 -10"-42A-I 94 +
00251034BPFM08762_01 16 017 8. TIE-IN POINT FOR FUTURE CONDENSATE CONNECTION.
1m V
9. MAX OPERATING TEMPERATURE IN CASE OF PRE-HEATER BYPASS IS 94°C.
o m-a
FROM DESALTER FB FB
342001CO025 -6"-42A-I FREE DRAINING FREE DRAINING
342101VU002
LO FO 12"x6"
<01
LO
D FB
42A 52A
F 0**
V
- F

V
a
D*eV«-

V
I
RS

12"x10" G
G
18"x16" n
342001CO006 -18"-43B-I

OFF SPEC OIL 342001CO002 -10"-42A-I


342201TO315 -6"-42B-V NNF
00251034BPFM08772_01
NOTE 6 342001HA001
FROM OIL COOLER HOLDS:
342200HC001
1. LENGTH OF STRAIGHT PIPE FOR FLOW METER INSTALLATION IS HOLD.
2. EQUIPMENT ELEVATION FROM GRADE IS HOLD.
H 3. SIZE OF CONTROL VALVE AND RELEVANT BY-PASS IS HOLD. H
18"x16" u

r
OIL
342001CO056 -12"-43B-P

s
RS

00251034BPFM08757_04 12"x10"

—-
FROM LP MANIFOLD
PI
A
A 2001 2001
TV
10"x8"

D +

CSC V 012 X L 004 A


C8C3 8"
FL P
D
44A 43B

•: )
10"x8"

2001
OIL PIT SIGNAL
J 00251034BPFM08756_01
342001CO055 -12"-43B-P V
012 : •
D
SET
00251034BPFM08760_01 J
FROM TEST SEPARATOR
345500CD031 -2"-44A-V
Y r 2001
A
PI
A
007 y
H FROM SECOND STAGE
SEPARATOR LEVEL
CONTROLLER 2001-LIC-014
MIN.

A
2001 2001
CD DH TIT TIT
2001 007 005 DIRECT/REVERSE O
D eD«
342001CO003 -10"-42A-I

SDV 2001
-
LC
* +

340 PIT
007
V Y
J.
ACTION NOTE 5

SET @ 75 °C
H <)
TIA
FC A2001 A2001
TI
A H SET @ 370 m³/h
LC 2001
A 2001 » A2001 AH
K DET. "A"
TYPE "B" TI
A 007 y L -
• .. 005 /L
TI
' NOTE 3 A 2001 \ H
TIC K
2001
SC
341
016
.-008
A
yL
A
FIC
006 y
L
v004
A
y L
D
2001
2001 2001 FIT 2001
TV 2001 TIT DET. "D" 2001

y
TIT 006
OIL
+

004 B 008
FV
+ 004 2001 DET. "A" MOV
006 SDV M
+
342101CO004 -20"-42A-I
342001CO004 -16"-43B-I 77 NOTE 2 NOTE 7
+ 010 A
00251034BPFM08758_01 40.2
10"x8"
NOTE 9
20"x10"
022

7- TREATED OIL
12

12

10"x8"
>
5

FROM FIRST STAGE SEPARATOR 81 75


42B 43B

00251034BPFM08763_01
342001VS001 16 16 NOTE 2
2201 FL P FC FC NOTE 1 TO GAS BOOTS
L
SDV
+

020 CSC
I —
D 8"
l
_l
D
2001
TI
017
D 10"
J
D
2001
TI
018
2001
SC
NOTE 4 342000VD002,342000VD003
CD-FE
Validity
Status
00
Rev.
number
Revision index
21/12/17

Date
ISSUED FOR TENDER

Description
S.UGLIETTA

Prepared by
L.BRUNO

Checked by
M.A.RAMPOLDI

Approved by
L
FC

001
DET. "A" XX XX DET. "D" 2001
MOV Company logo and business name Project name OPDS Company Document ID
4"

+
342101CO005 -20"-42A-P
010B fa fa ZUBAIR OIL FIELD 00251034BPFM08759

L
M
-fret - : TYPE B
DEVELOPMENT
44A 42A

NOTE 8 D D H BS&W OFF-SPEC OIL tf» ni eni iraq b.v. Pfll proqetti Job. N

I
2001 2001
AI AIT { 00251034BPFM08765_01
i
Facility and Sub Facility Name Scale Sheet of Sheets

OFF SPEC OIL


D
7 D 345500CD032 -2"-44A-V
001 001 NOTE 1
NOTE 4
NNF NOTE 2
TO OFF-SPEC OIL
GAS BOOT 342000VD001
Document Title
ZUBAIR MISHRIF NEW DGS AND WATER INJECTION PLANT N.A. 1 of 2

342201CO001 -6"-42B-P ZUBAIR MISHRIF DEGASSING STATION - NEW FACILITIES Supersedes N.


00251034BPFM08766_01
M Superseded by N. M
FROM OFF-SPEC RERUN PUMPS DH CD CRUDE OIL / PRODUCT OIL PREHEATER AND CRUDE OIL HEATER
Plant Area Plant Unit
342200PH001A/B P&I DIAGRAM N.A. 200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni Iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00251034BPFM08759_CDFE00_01_02
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

23
GENERAL NOTES:
4 GAS
342001HA002A / B 342301HP031 -4"-52A-V FREE DRAINING 84
00251034BPFM86761_01
A 10 A. FOR SYMBOLS, LEGENDA, GENERAL NOTES AND TYPICALS SEE DWG. 00251034BPFM08030. A
OIL HEATER TO HP FLARE NETWORK B. ALL THE EQUIPMENT TAG NUMBERS ON THIS DRAWING SHALL BE PREFIXED BY FACILITY CODE 002510
DESIGN DUTY: Mkcal/h 9.674 NOTE 3 342301HP032 -4"-52A-V UNLESS OTHERWISE SPECIFIED.

FREE DRAINING
DESIGN/OPERATING PRESS. SHELL SIDE: barg 26.7/10.9 C. ALL INSTRUMENT TAGS ON THIS P&ID ARE PREFIXED WITH THE SUBFACILITY CODE 34 UNLESS OTHERWISE SPECIFIED.

FREE DRAINING
DESIGN/OPERATING TEMP. SHELL SIDE: °C 260/220 CASE: FIRE CASE: FIRE D. THIS P&ID IS ALSO VALID FOR TRAINS 2 ÷ 4.
SIZE: 1D2 43B 52A SIZE: 1D2 43B 52A
DESIGN/OPERATING PRESS. TUBE SIDE: barg 40.2/5.8 E. CONTROLLER SET POINT REFER TO MP SUMMER CASE SIMULATION UNLESS OTHERWISE INDICATED.
DESIGN/OPERATING TEMP. TUBE SIDE: °C 125/95 PSET=40.2 barg PSET=40.2 barg
MATERIAL OF CONSTRUCTION: CS/ALLOY 625 2001 2001
PSV V PSV V
INSULATION: YES/NO YES +
FB
+
FB
105 A 4"x2" 105 B 4"x2"

B LO LO B
2"x1" 2"x1"

43B 52A

43B 52A
V V
2" 2"
4101 H 4101 FB LO FB LO
TI PI
140 145
L V V
CSC CSC
DET. "A"
C 4101
4101
4101 C
TIT
SDV
PIT 342001CO034 -2"-43B-P 342001CO037 -2"-43B-P
140 +
145
114
344101HO036 -10"-07B-I
26
HOT OIL 0
220 NOTE 5
00251034BPFM86790_01 27
FC
FROM 344100FA002A/B/C 40
D 4101 0 OIL
FIT FREE DRAINING 344101HO090 -6"-07A-P 220
129
4101
4
00251034BPFM86791_01
TI
PREHEATER OIL 141 HOT OIL DRAIN DRUM
342001CO005 -16"-43B-I 84 NOTE 5 342001CO005 -16"-43B-I 344100VA001
00251034BPFM08759_01 344101HO104 -6"-07A-V
NOTE 2 40
D FROM PREHEATER D

FREE DRAINING
FREE DRAINING

342001HA001

FREE DRAINING
CASE: TUBE RUPTURE NOTES:

FREE DRAINING
CASE: TUBE RUPTURE
SIZE: 1-1/2H3 07B 07A SIZE: 1-1/2H3 07B 07A
PSET=26.7 barg PSET=26.7 barg 1. VOLUME FLOW RATE REFERS TO T AND P CONDITION.
4101 4101 2. TWO PHASE FLOW REGIME. LINE SHALL BE PROPERLY SUPPORTED.
PSV
+ V PSV V 3. WHEN OIL PREHEATER IS IN OPERATION.
NOTE 4 NOTE 4
+
113 A 6"x3" 113 B 6"x3" 4. STEM ORIENTED HORIZONTALLY OR DOWNWARD (MAXIMUM 45° FROM THE HORIZONTAL).
5. SYMMETRICAL DISTRIBUTION.
LO LO
FB FB
4"x1-1/2" 4"x1-1/2"

E V V E
LO LO
NOTE 4

07B 07A

07B 07A
FB NOTE 4
FB
342001CO034 -2"-43B-P

342001CO037 -2"-43B-P
2" V 2"
V LO LO
NOTE 4 NOTE 4 FB
FB

FREE DRAINING
V D V V D V
FREE DRAINING

CSC CSC

F V D V D F
2001
TI 344101HO086 -4"-07B-P 2001 344101HO088 -4"-07B-P
TI
025
024

V V

G G
RS

RS
20"x18" 20"x18"

342001HA002A 342001HA002B
HOLDS:
1. LENGTH OF STRAIGHT PIPE FOR FLOW METER INSTALLATION IS HOLD.
18"x16" 2. EQUIPMENT ELEVATION FROM GRADE IS HOLD.
18"x16" 3. SIZE OF CONTROL VALVE AND RELEVANT BY-PASS IS HOLD.
H 10"x8" 10"x8" H
RS

RS

4101 4101
PI PI
146 147

4101 4101
TI TI
143 144

CSC CSC
07A 07B

07A 07B
345500CD033 -2"-44A-V

345500CD034 -2"-44A-V

J J
D D SET @ 95 °C
44A 43B

44A 43B

2001 2001 H
PI TIC
024 010
344101HO076 -2"-07A-P

342001CO007 -18"-43B-I
L L
344101HO085 -8"-07B-I

DH DH

2001 2001 2001


PIT TI TIT
DH DH CD 024 022 010
CD

K 342001CO007 -18"-43B-I
HEATED OIL K
95
40.2
00251034BPFM08760_01
NOTE 2
TO 2nd STAGE SEPARATOR
342001VS002

HOT OIL
344101HO076 -2"-07A-P 100 344101HO076 -2"-07A-P
3.5
00251034BPFM86791_01
H 4101 4101 H TO HOT OIL DRAIN DRUM
TI PI 344100VA001
147 148
L L 4101 H CD-FE 00 21/12/17 ISSUED FOR TENDER S.UGLIETTA L.BRUNO M.A.RAMPOLDI
L FIC SET L
Validity Rev.
129 Status number Date Description Prepared by Checked by Approved by
L
4101 4101 4101
4101
NOTE 1 Revision index
TI TIT PIT Company logo and business name Project name OPDS
FV Company Document ID
146 147 148 +
SET @ 64 m³/h 00251034BPFM08759
129 ZUBAIR OIL FIELD
22 DEVELOPMENT Job. N
8"x6" 10"x6" 0 HOT OIL
344101HO085 -8"-07B-I 344101HO085 -10"-07B-I 106
27
00251034BPFM86790_01 Facility and Sub Facility Name Scale Sheet of Sheets
FC TO HOT OIL SYSTEM N.A. 2 of 2
D D 6" D D ZUBAIR MISHRIF NEW DGS AND WATER INJECTION PLANT
Document Title
ZUBAIR-MISHRIF DEGASSING STATION - NEW FACILITIES Supersedes N.
M CRUDE OIL / PRODUCT OIL PREHEATER AND CRUDE OIL HEATER Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM N.A. 200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni Iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00251034BPFM08759_CDFE00_02_02
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

342101PA001A / B GENERAL NOTES


A OIL DESALTING FEED PUMPS A. FOR SYMBOLS, LEGENDA, GENERAL NOTES AND TYPICALS SEE DWG. 00251034BPFM08030. A
DESIGN FLOW RATE: m3/h 476 B. ALL THE EQUIPMENT TAG NUMBERS ON THIS DRAWING SHALL BE PREFIXED BY FACILITY CODE 002510
SUCTION PRESSURE: barg 5.1 UNLESS OTHERWISE SPECIFIED.
DIFFERENTIAL PRESSURE: bar 6.0 C. ALL INSTRUMENT TAGS ON THIS P&ID ARE PREFIXED WITH SUBFACILITY CODE 34.
DRIVER POWER: kW BY VENDOR D. THIS P&ID IS ALSO VALID FOR TRAIN 2 ÷ 4.
E. CONTROLLER SET POINTS REFER TO "MP SUMMER" CASE SIMULATION UNLESS OTHERWISE INDICATED.
I

MATERIAL OF CONSTRUCTION: Ni RESIST./25 Cr SDSS


INSULATION: YES/NO NO
TRIM LINE: - - - HOLD

B B

342101CO006 -10"-44A-I
C C
2101
FI
SET @ 143 m³/h NOTE 3 002 2101
LL PI
2101 H
FIC 016
LL
001
L
ESD
2101
I
342101CO026 -8"-44A-P 2101
FV 2101 H 2101
+
FI I
D 001
003
D
MINIMUM FLOW 8"x6"
342101CO007 -6"-44A-P 95 6"
L NOTES:
00251034BPFM08760_01 16 NOTE 5
TO 2nd STAGE SEPARATOR LO 6"x4" FO 6"x4" LO 1. AUTO VENTING CASE PUMPS.
342001VS002 4" 2. AUTOMATIC START-UP OF SPARE PUMP WILL BE ACTIVATED IN CASE OF FAILURE OF MAIN PUMP.
D 2101 2101
2101 2101 3. VOLUME FLOW RATE REFERS TO T AND P CONDITION.
FIT FIT FIT PIT
4. HIGH LEVEL IN 2ND STAGE SEPARATOR 342001VS002 WILL START THE STAND BY PUMP.
I

001 002 003 016


SET @ 143 m³/h 5. LOW LOW PRESSURE SIGNAL FROM PIT-016 WILL STARTS THE 342101PA001A/B STAND BY PUMP.
2101 H 6. VENT SHALL BE HARD PIPED TO THE FLARE SYSTEM. TO BE DEFINED/CONFIRMED BY EPC CONTRACTOR.
FIC NOTE 3
012 OIL
L 95
16
00251034BPFM08761_01
2101 TO DEHYDRATOR
E FV
+ 342101VU001
E
012

342101CO027 -6"-44A-P 6"

LO 6"x4" FO 6"x4" LO

342101CO006 -10"-44A-I
4" D
[

2101
FIT
012

F OIL F
342001CO009 -12"-44A-I 95 NO POCKETS
00251034BPFM08760_01 7
FROM 2nd STAGE ESD
SEPARATOR 342001VS002 2101 2101

342001CO009 -12"-44A-I
FIT I
342001CO009 -12"-44A-I

013

LO LO
2101
FI
013
G LL G

LO D LO D
I

HOLDS:
D D 1. LENGTH OF STRAIGHT PIPE FOR FLOW METER INSTALLATION IS HOLD.
2001 2001 2. SIZE OF CONTROL VALVE AND RELEVANT BY-PASS IS HOLD.
PDI 2101 PDI 2101
014 PI 015 PI
H NOTE 6
002
NOTE 6
003 H
RS

RS
V V
2001 2001
PI PI
342101PA001A 342101PA001B
I

031 032
NOTE 1,2 NOTE 1,2
RS RS

CSC
J CSC J
NOTE 4 D NOTE 4 D
M M
DET. "I" DET. "I"
I

MCC MCC
345500CD038 -2"-44A-V
345500CD037 -2"-44A-V

ESD ESD
K K
I I

DH CD DH CD

CD-FE 00 21/12/17 ISSUED FOR TENDER S.UGLIETTA L.BRUNO M.A.RAMPOLDI


L Validity Rev. L
Status number Date Description Prepared by Checked by Approved by
Revision index

Company logo and business name Project name OPDS Company Document ID
ZUBAIR OIL FIELD 00251034BPFM08760
DEVELOPMENT Job. N
I

Facility and Sub Facility Name Scale Sheet of Sheets


N.A. 2 of 2
ZUBAIR MISHRIF NEW DGS AND WATER INJECTION PLANT
Document Title Supersedes N.
ZUBAIR-MISHRIF DEGASSING STATION - NEW FACILITIES
M SECOND STAGE SEPARATOR AND OIL DESALTING FEED PUMPS
Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM N.A. 200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni Iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00251034BPFM08760_CDFE00_02_02
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2101 SET @ NOTE 5 NOTES:


PI
004 2101 H
L FIC A. FOR SYMBOLS, LEGENDA, GENERAL NOTES AND TYPICALS SEE DWG. 00251034BPFM08030.
006 B. ALL THE EQUIPMENT TAG NUMBERS ON THIS DRAWING SHALL BE PREFIXED BY FACILITY CODE 002510
A L UNLESS OTHERWISE SPECIFIED. A
C. ALL INSTRUMENT TAGS ON THIS P&ID ARE PREFIXED WITH THE SUBFACILITY CODE 34.
2101 2101 2101 342101HB001A / B D. THIS P&ID IS ALSO VALID FOR TRAIN 2 ÷ 4.
PI PIT FIT 2101
2101 DET. "A"
011 004 006 FV
+
EFFLUENT WATER / WASH WATER ECONOMIZER E. CONTROLLER SET POINTS REFER TO MP SUMMER CASE SIMULATION UNLESS OTHERWISE INDICATED.
SDV
+ 006 DESIGN DUTY: Mkcal/h 1.784
004 DESIGN/OPERAT. PRESS. HOT SIDE barg 16/8.9
WASH WATER 3"x2" 3"x2" DESIGN/OPERAT. TEMP. HOT SIDE °C 125/95
345201TW013 -3"-09A-V 40 342101TW004 -3"-09A-V 40
00251034BPFM86758_03 M DESIGN/OPERAT. PRESS. COLD SIDE barg 16.0/9.7
16.0 16.0
FC FO DESIGN/OPERAT. TEMP. COLD SIDE °C 125/85
FROM WASH WATER
SYSTEM D D 2" MATERIAL OF CONSTRUCTION: 6 Mo
2" INSULATION: YES/NO NO
B B
LC LC

SIGNAL
SET
00251034BPFM08761_01
FROM DEHYDRATOR LEVEL
CONTROL
2101-LIC-001
342101PW006 -4"-44A-V

C CASE: FIRE C
SIZE: 1D2
PSET=16.0 barg 44A 05A
2101
PSV
+

102 A ATM AT
3"x2" 21 SAFE LOCATION
3
95 345401DH005 -3"-05A-V
ATM

2"x1" CASE: FIRE


SIZE: 1D2
09A 05A 345401DH006 -3"-05A-V
PSET=16.0 barg
D 2101 D

FREE DRAINING
PSV
+

103 A ATM AT NOTES:


V SAFE LOCATION
3"x2"

21
2
85 1. ALL INSTRUMENTS VENTS AND DRAINS SHOWN IN THIS DRAWING SHALL BE INSULATED.
342101PW006 -4"-44A-P

V ATM 2. IF DEHYDRATOR IS NOT OPERATIONAL, WATER FROM DESALTER CAN BE DIVERTED TO PRODUCED WATER TREATMENT.
3. IF DESALTER IS NOT OPERATIONAL, WASH WATER CAN BE DIVERTED TO DEHYDRATOR.
2"x1" 4. ALL TW LINES WITH DIAMETERS < 2" SHOWN IN THIS DRAWING AND ALL INSTRUMENT CONNECTIONS SHALL BE INSULATED.
LO 5. SET POINT TO BE DEFINED BY DESALTING SYSTEM VENDOR.

FREE DRAINING
FB 6. VOLUME FLOWRATE REFERS TO T AND P CONDITION.
V
2101 H 7. POSITIONING OF CORROSION PROBES AND CORROSION COUPONS IS IN EPC CONTRACTOR SCOPE OF WORK.
2" PDI
001 V
E E
LO FB NOTE 6
SET @ 60 m³/h
2101
PDIT 2101 H
FIC
001 2"
2101 2101 007
342101PW010 -2"-44A-P

342101TW007 -2"-09A-V
TI PI 2101 H L
004 017 2101 TI
PI 2101 H
003 TI RECYCLE WATER
018 L 005
L 2101 00251034BPFM08762_02
PI

342101PW021 -4"-44A-I
2101 2101 2101 2101 019 FROM DESALTER
TIT TI PIT 2101 2101
PIT TI TIT L
F 004 010 017
018 012 003 F
342101PW005 -6"-44A-I
PRODUCED WATER V 342101HB001A V
DET. "Y" 4"x3" 2101 2101 2101 2101
95 FIT TIT PIT FV
00251034BPFM08761_01 16 007 005 019
+

007
FROM DEHYDRATOR
342101VU001 12
5 PRODUCED WATER
4"x3" 6"x4" 6"x4"
342101PW008 -6"-44A-P 66 66
M 00251034BPFM08771_01
55A 44A

55A 44A

16 7
FC
4" TO PRODUCED WATER
D D D D
TREATMENT

342101TW005 -3"-09A-V
2101
TI
013
G G
2101 2101
TI TI
D D 2101
017 021
TI
342101TW302 -3"-09A-V
341201CH316 -2"-55A-I

341201CH310 -2"-55A-I
342101PW003 -3"-44A-I

342101PW302 -4"-44A-P
011
MIN.

2101 2101 H
TIT TI HOLDS:
006 006
NOTE 2 L 1. LENGTH OF STRAIGHT PIPE FOR FLOW METER INSTALLATION IS HOLD.
2. EQUIPMENT ELEVATION FROM GRADE IS HOLD.
WASH WATER CASE: FIRE 3. SIZE OF CONTROL VALVE AND RELEVANT BY-PASS IS HOLD.
H 2101 2101 H
DET "B"

00251034BPFM08762_02 PIT PI 44A 05A SIZE: 1D2


020 020 2101 PSET=16.0 barg ATM AT
FROM DESALTER
D PSV SAFE LOCATION
342101VU002
DET "B"

102 B
21

3"x2"
3

95 345400DH304 -3"-05A-V
ATM
1201
SDV
009

1201
SDV
+

020
+

2"x1"
CASE: FIRE
CORROSION INHIBITOR V SIZE: 1D2
00251034BPFM86774_01 PSET=16.0 barg 09A 05A
345401DH305 -3"-05A-V
FROM CORROSION INHIBITOR 2101 ATM AT
J PACKAGE 341201XX003 LO PSV
+
SAFE LOCATION J
FB 103 B
3"x2"
21

V
2

SCALE INHIBITOR 85
ATM
00251034BPFM86773_01
342101PW300 -4"-44A-I

342101TW300 -3"-09A-I

FROM SCALE INHIBITOR 2"x1"


2" V
PACKAGE 341201XX004
FREE DRAINING

LO FB
V
342101PW301 -2"-44A-P

K WASH WATER K
2" 342101TW001 -3"-09A-I NOTE 3
00251034BPFM08761_01
NNF
TO DEHYDRATOR
FREE DRAINING

342101TW301 -2"-09A-V 342101VU001

V V
6"x4" 342101HB001B 4"x3"
CD-FE 00 21/12/17 ISSUED FOR TENDER S.UGLIETTA L.BRUNO M.A.RAMPOLDI
L Validity Rev. L
Status number Date Description Prepared by Checked by Approved by
4"x3" 6"x4" Revision index

Company logo and business name Project name OPDS Company Document ID
ZUBAIR OIL FIELD 00251034BPFM08761
D D
DEVELOPMENT Job. N

Facility and Sub Facility Name Scale Sheet of Sheets


2101 2101
TI TI N.A. 2 of 2
019 020
ZUBAIR MISHRIF NEW DGS AND WATER INJECTION PLANT
WASH WATER Document Title
342101TW002 -3"-09A-I 85 ZUBAIR-MISHRIF DEGASSING STATION - NEW FACILITIES Supersedes N.
M 16 00251034BPFM08762_01 Superseded by N. M
TO DESALTER
DEHYDRATOR AND WASH WATER PREHEATER
Plant Area Plant Unit
342101VU002 P&I DIAGRAM N.A. 210
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni Iraq B.V. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00251034BPFM08761_CDFE00_02_02
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
GENERAL NOTES:
A. FOR SYMBOLS, LEGENDA, GENERAL NOTES AND TYPICALS SEE DWG. 00251034BPFM08030.
342101VU002 NOTE 14,11 2101
FO B. ALL THE EQUIPMENT TAG NUMBERS ON THIS DRAWING SHALL BE PREFIXED BY FACILITY CODE 002510
2101
DESALTER BDV DET. "C"
+ 008 UNLESS OTHERWISE SPECIFIED.
A INT. DIAMETER: mm 3000 009 42A 52A C. ALL INSTRUMENT TAGS ON THIS P&ID ARE PREFIXED WITH THE SUBFACILITY CODE 34. A
LENGTH (TL to TL): mm 11800 V D. THIS P&ID IS ALSO VALID FOR TRAIN 2 ÷ 4.
FB LO 10"x8" DEPRESSURIZATION
DESIGN/OPERATING PRESS.: barg 16/7.0 342101CO013 -6"-42A-P FREE DRAINING 94 342301LP053 -8"-52A-V E. CONTROLLER SET POINTS REFER TO MP SUMMER CASE SIMULATION UNLESS OTHERWISE INDICATED.
DESIGN/OPERATING TEMP.: °C 125/95 4 00251034BPFM86762_02
POWER: kW BY VENDOR FREE DRAINING FO 8"x6" TO LP FLARE NETWORK

FV
LO FB
MATERIAL OF CONSTRUCTION: CS+IN625 CLAD D FB 1m
NOTE 1 2101 SET @ 2 bar
INSULATION: YES/NO YES PI 2101 H SIGNAL
TRIM LINE: - - - HOLD PDIC NOTE 4 OVERRIDE
030
00251034BPFM08761_01
2101 2101 2101 LL 006
ON OFF RUNNING L TO DEHYDRATOR
HCH HCI XI
ESD NOTE 10 MIXING VALVE
B 003 004 011
2101 2101 2101
BS&W
2101 H 2101-PDV-026
B
I PIT AIT AI 2101
030 001 001
FREE DRAINING PDIT FREE DRAINING
00251034BPFM08760_01
CONTROL PANEL 006
2101 OIL
ON OFF XA
2101 2101 2101 94 342101CO001 -10"-42A-I
HS HS XA 011
16 00251034BPFM08759_01
CASE: FIRE
003 A 004 A 011 A 2101
SIZE: 2J3 TO OIL PREHEATER
SC TYPE "B"
PSET=16.0 barg 342001HA001
004
2101 2101 2101 2101 42A 52A
EI EI XI PSV FB
+ V 18
002 002 A 011 A 104 A ILV 2.2
RUNNING 10"x3"
C 342301LP054 -10"-52A-V 94 C
3.5
CASE: FIRE LO

FREE DRAINING
FV
ESD NOTE 5
2101 LOCAL SIZE: 2J3
2101 2101 I 4"x2" PSET=16.0 barg
II II SWITCH
RACK 2101 42A 52A
002 002 A
PSV V 52A
+
10"x3" LO
NOTE 2 D 104 B
FB 2" 42A
LO NOTE 5 FB
ILV
4"x2" ILV V
V 342301LP055 -10"-52A-V

FREE DRAINING
NOTES:
D D
CSC 1. ISOLATION VALVES TO BE CLOSE TO THE MAIN LINES.
FB 2. LOCAL CONTROL PANEL FOR DESALTER 342101VU002, CONTROL SYSTEM
LC
NOTE 13 ILV AND PANEL CONFIGURATION WILL BE FULLY DEFINED BY DEHYDRATOR/DESALTER VENDOR.
CASE: BLOCKED OUTLET 4" 3. UTILITY CONNECTION.
FREE DRAINING
SIZE: 1D2 D 4. OVERRIDE IN CASE DIFFERENTIAL PRESSURE <2 bar TO PREVENT VAPOR GENERATION INSIDE DESALTER.
PSET=16.0 barg
5. INTERLOCK OF SAFETY VALVES WITH KEY LOCK SYSTEM OR EQUIVALENT.
2101
FB PSV 6. LOCATE SDV AT MINIMUM DISTANCE FROM VESSEL.
+
ILV D 106 A NOTE 6 7. VALVE TO BE LOCATED AT MINIMUM ELEVATIONS ABOVE GRADE.
LO DET. "A" 8. POSITIONING OF CORROSION PROBES AND CORROSION COUPONS IS IN EPC CONTRACTOR SCOPE OF WORK.
345500CD062 -2"-44A-V 94 FC
9. SYSTEM CONFIGURATION AND NOZZLE NUMBER ARE INDICATIVE ONLY AND SHALL BE

94
16
3.5 NOTE 5 UPDATED DURING DETAIL ENGINEERING ACCORDING TO MFR DOCUMENTS.
2101
NOTE 13 SDV
FREE DRAINING

+ 10. DEVIATION TO OFF SPEC OIL STORAGE AND RERUN SYSTEM BY OPERATOR.
E CASE: BLOCKED OUTLET 007 11. DESALTING SYSTEM PACKAGE 342101XX001 INCLUDES DEHYDRATOR, DESALTER AND RELEVANT MIXING VALVES E
SIZE: 1D2 AND INSTRUMENTATION, CONTROL SYSTEM AND OPERATOR INTERFACE PANEL.
FB D PSET=16.0 barg 2101 12. PACKAGE AUXILIARES SHALL BE DEFINED BY PACKAGE VENDOR, INCLUDING UTILITY CONNECTIONS
ILV PSV
+ WITH THEIR ASSOCIATED CONTROLS, ISOLATION, INSTRUMENTATION AND SAFEGUARDING SYSTEM.
106 B 3"x1"
13. PSV SET PRESSURE CAN BE REDUCED OF THE PORTION OF STATIC HEAD DUE TO INLET LINE FULL OF LIQUID.
CD NOTE 5 TO BE DEFINED DURING EPC PHASE.
LO NO 3/4" 14. VESSEL INTERNALS (IN-LINE DESANDER AND INLET/OUTLET DISTRIBUTORS) TO BE DEFINED BY DESALTER

342101CO014 -4"-42A-P
D POWER
345501CD062 -2"-44A-V VENDOR.
FB UNIT
LO 2" D 15. SPRING RETURN VALVES.
ILV 2101 H 2101 16. MIXING VALVE SET POINT TO BE DEFINED BY DESALTING SYSTEM VENDOR TO OBTAIN SATISFYING MIXING CONDITIONS.
TI PI
17. CORROSION INHIBITOR VENDOR TO CONFIRM CHEMICAL INJECTION POINT.
3"x1" 015 028
2" L L
F F
FREE DRAINING

D
D
3/4"
2101 2101 2101 2101
FB TIT PI PIT TI
LC
ILV 015 027 028 016 3/4"
CSC
12"x10"

RS
3" FREE DRAINING EPC CONTRACTOR
PACKAGE VENDOR

GWR ESD 342101VU002 24" NOTE 12


2101 2101 H 2101 2101 2101 H NOTE 11 MW
LIT LI LIT I LI
G GWR
006 006 007 007
G
L LL

INTERFACE ESD INTERFACE


SIGNAL 2101 H 2101 2101 2101 2101 HH
SPLIT RANGE LIC LIT LIT I LI
00251034BPFM08762_02 GWR HOLDS:
002 002 008 008
TO LEVEL CONTROL VALVE L LL
2101-FIC-011 GWR 1. EQUIPMENT ELEVATION FROM GRADE IS HOLD.
NOTE 14 NOTE 9
2. SIZE OF CONTROL VALVE AND RELEVANT BY-PASS IS HOLD.
NNF
342101PW017 -3"-44A-P

24" MW
342101CO012 -10"-42A-I

SIGNAL
SPLIT RANGE
H 00251034BPFM08762_02 H
D D D
TO LEVEL CONTROL NOTE 3
VALVE 2101-LV-002
43B 44A 12"x10"

WATER MIN. FLOW


342101PW011 -3"-43B-I 94
00251034BPFM08762_02 23.3
FROM 342101PA002A/B LO

3"(HOLD) 05A 44A


3"(HOLD)
J SAND SLURRY
DH
J
342101SL002 - -05A-P 342101CO029 - -44A-P
00251034BPFM08773_01 342101CO020 -2"-44A-V
TO DESANDING SYSTEM NOTE 6
2101
SDV
DET. "A" +

005 D
342101PW020 -3"-44A-I

09A 44A NOTE 11 SET @ NOTE 16


WASH WATER 2101 FC
342101TW002 -3"-09A-I 85 PDIC NOTE 15
00251034BPFM08761_02 D D 345500CD040 -2"-44A-V
16 029
L
FROM WASH WATER SYSTEM
TYPE "B" 2101 H
K TI K
2101 NOTE 1 2101
PDIT 007
SC L 1" CD
029
341
2101 2101 NC
PDV
+
TIT
029 007
OIL AND WATER DET. "Y" DET. "Y" NOTE 7
342101CO009 -10"-44A-I 95 95 2101
00251034BPFM08761_01 16 16 SC
NOTE 17 FO 003
FROM DEHYDRATOR 342101VU001
1201 D D
SDV TYPE "B"
341201CH323 -2"-55A-N +
2101
017 DET. "B" TI
CORROSION INHIBITOR CD-FE 00 21/12/17 ISSUED FOR TENDER S.UGLIETTA L.BRUNO M.A.RAMPOLDI
L 00251034BPFM86774_01
009
Validity Rev. L
FC Status number Date Description Prepared by Checked by Approved by
FROM CORROSION INHIBITOR 55A 44A
1201 Revision index
PACKAGE 341201XX003
MIN.

SDV
+
Company logo and business name Project name OPDS Company Document ID
004 341201CH303 -2"-55A-N
DEMULSIFIER NOTE 6 ZUBAIR OIL FIELD 00251034BPFM08762
DET. "B" DH
00251034BPFM86771_01 DET. "A" DEVELOPMENT Job. N
FROM DEMULSIFIER FC MIN. 2101
SDV
PACKAGE 341201XX001 55A 44A + Facility and Sub Facility Name Scale Sheet of Sheets
3"(HOLD) 006
N.A. 1 of 2
DESANDING WATER RECYCLE WATER ZUBAIR MISHRIF NEW DGS AND WATER INJECTION PLANT
345551PW006 - -44A-P 85 94 342101PW001 -4"-44A-I
00251034BPFM08773_01 16 00251034BPFM08762_02 Document Title
16 ZUBAIR-MISHRIF DEGASSING STATION - NEW FACILITIES Supersedes N.
M FROM SAND JET FC TO RECYCLE WATER PUMPS Superseded by N. M
REMOVAL SYSTEM D D DESALTER AND RECYCLE WATER PUMPS
342101PA002A/B Plant Area Plant Unit
P&I DIAGRAM N.A. 210