iraq b.v. Technical Query N. 2510-TQ-C12-ENI-F-0003 Consortium
Rev: 00
Date: 31-May-2022
Subject: Change in Types of Fire & Gas Detectors for proposed scope DGS Facility
ATTENTION:
FACILITY: PRE’D: Jagdish Jadhav
Zubair Mishrif New DGS and Water
Injection Plant CHE’D: Poornachandran Rajendran / Guo
Zhendong
DESCRIPTION
Rev: 00
Date: 31-May-2022
Subject: Change in Types of Fire & Gas Detectors for proposed scope DGS Facility
CONTRACTOR has reviewed the FEED Fire and Gas Detector Layouts (Process Area) of Zubair
Mishrif Facility, (Doc No: 00251034BFDD57307 Sheet 1 to10).
Voting Logic :
The FEED Fire and Gas Detector Layouts are not in line with FEED "Fire and Gas
Detection Philosophy (Doc No 251034DFRB50765)". As per FEED Philosophy, 200N
voting logic shall be followed for Pre- Alarm, and Alarm. In FEED this logic has not been
followed for any detector.
CONTRACTOR will follow the 200N Voting logic for Flame and Gas Detection in the
Process area.
2 Nos of Linear Heat Detectors (LHD) are provided for each Vessel in Oil Treatment
Areas for Fire Detection; However Fire & Gas Philosophy recommends the IR3
Multispectrum Flame Detector. IR3 flame detectors will be provided in areas where
extensive pool fires potentially may occur or generally in areas characterized by a
considerable quantity of flammable liquid and/or characteristic process system.
IR3 Multispectrum Flame Detector is the appropriate detector for outdoor fire detection.
The response time of this type of detector will be higher than Linear Heat Detector. Hence
Except for the transformer area, all outdoor LHD will be replaced with IR3 Multispectrum
Flame Detector in EPC with 200N Voting logic.
Please note that IR3 Multispectrum Flame Detector is insensitive to solar, welding,
lightning, X-rays, sparks, arcs etc.
------------------------------------------------------------------------------------------------------------------------
File name: 2510-TQ-C12-ENI-F-0003
Project Zubair Mishrif DGS Expansion
CPECC – PEG
iraq b.v. Technical Query N. 2510-TQ-C12-ENI-F-0003 Consortium
Rev: 00
Date: 31-May-2022
Subject: Change in Types of Fire & Gas Detectors for proposed scope DGS Facility
ATTACHMENTS NO YES
Insert files:
1.
REPLY FROM COMPANY:
Rev: 00
Date: 31-May-2022
Subject: Change in Types of Fire & Gas Detectors for proposed scope DGS Facility
Jagdish
ORIGINATOR: Jadhav DATE: 31-May-2022
SIGNATURE:
Guo
Zhendong