You are on page 1of 40

5 09.12.

2023 As-Built JM NER SR


4 22-08-2022 Revised as per Client Comments CR NER SW
3 08-07-2022 Revised as per Client Comment CR NER SW
2 15-06-2022 Revised as per Client comments CR NER SW
1 30-4-2022 Revised as per Client comments CR NER SW
0 04.03.2022 Issued For Approval CR NER SW
Rev. Date Description Prepared Chkd. Appd.
PLACE RESERVED FOR STAMPS: Issued for Approval
Date : 22-07-2022
Prev. CS No. :
Prev. CS Date : 15-6-2022

OWNER:
SUDAIR ONE RENEWABLE ENERGY COMPANY
2ND FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

OWNER’S ENGINEER:
ASTROM TECHNICAL ADVISORS, S.L.
SERRANO 8, 3º IZQDA. 28001 MADRID (SPAIN)

CONTRACTOR: LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020, RIYADH, KSA.

SUB CONTRACTOR:
REDA TRADING AND DEVELOPMENT CO. FOR
MACHINERY & EQUIPMENT LTD. FIRE & SAFETY DIVISION
AL-KHOBAR – DAMMAM EXPRESSWAY P.O BOX 2923,31952
AL-KHOBAR, KINGDOM OF SAUDI ARABIA
PROJECT:
SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

NAME DATE TITLE:

PREPARED CR 22-08-2022
CHECKED NER 22-08-2022 FIRE WATER NETWORK
APPROVED SW 22-08-2022 LAYOUT & CALCULATIONS
DRAWING /DOCUMENT NUMBER REVISON NO TOTAL PAGE

SUD-1-SS-F-DLD-007-5-AB 5 40

AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
Vendor Document
Project Name : CONSTRUCTION OF SUDAIR SOLAR PLANT

REDA Project No : 8151

Document Description : FIRE WATER NETWORK HYDRAULIC CALCULATION

Document Number : 8151-02C-009

Vendor Document Review

Action Code Description

1 Approved

2 Approved with comments

Commented
3
Resubmit for Review
4 Rejected

By: Date:

1 30-03-2022 Issued for Approval CR NER SW


0 23-02-2022 Issued for Approval CR NER SW
Approved
Rev. Date Description Prepared Checked Approved
(Client)
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

HYDRAULIC CALCULATIONS for

Project Name CONSTRUCTION OF SUDAIR SOLAR PLANT


Location SUDAIR, CENTRAL KSA
Drawing Number 8151-02P-010
Date 30-Mar-2022 at 15:48

Design

Remote Area Number FIRE HYDRATN - 02


Remote Area Location POOLING SUBSTATION A (PSS-A)
Occupancy Classification INDUSTRIAL OCCUPANCY
Density N/A
Area of Application N/A
Coverage per Sprinkler 60m
Type of sprinklers calculated DRY BARREL HYDRANT
Number of sprinklers calculated 6, of which 1 are on
In Rack Demand N/A
Hose Stream Demand N/A
Total Water Required
1900.000 l/min
(including hose stream)
Required Pressure 7.986 Bar G
Type of System FIRE HYDRANT SYSTEM
Volume of dry or preaction system N/A

Water Supply Information

Date 30-Mar-2022
Location FIRE PUMP ROOM AT SUDAIR SOLAR PLANT
Source FIRE PUMP DISCHARGE OUTLET

Contractor Information

Name of Contractor REDA HAZARD CONTROL


Address
Phone Number
Name of Designer
Authority having Jurisdiction HCIS

Page 1 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

Project Information: Notes

Name of Contractor
Calculator - PIPENET VISION Spray calculator, version 1.11.0

Friction Loss Formula Hazen-Williams

Design Standard NFPA 2013


Notes

Page 2 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

SUPPLY ANALYSIS

Static Residual Supply Flow At Total Demand Including Outside Hose


Node at Required Pressure Available Pressure
Pressure Pressure Residual Pressure Hose Stream Allowance Stream Allowance
Source (Bar G) (Bar G)
(Bar G) (Bar G) (l/min) (l/min) (l/min)
1 8.61 8.27 3217.6 1900 0 7.986 8.4817

Notes

These values have been calculated using the Supply Curve points as entered by the user.

Page 3 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

NODE ANALYSIS

Pressure (Bar Discharge


Node tag Elevation (m) Node Type Notes
G) (l/min)
1 0.00 INPUT 7.986
2 0.00 7.943
3 1.85 7.737
4 1.85 7.732
5 5.57 7.362
6 5.57 7.346
7 5.57 7.305
8 5.57 7.186
9 5.57 7.186
10 6.77 SPRINKLER 7.069 0.000 Nozzle label: 1 , K-Factor: 723.316
11 5.57 7.172
12 5.57 7.104
13 5.57 7.084
14 6.77 SPRINKLER 6.964 1900.000 Nozzle label: 2 , K-Factor: 720
15 5.57 7.282
16 5.57 7.268
17 5.57 7.268
18 6.77 SPRINKLER 7.150 0.000 Nozzle label: 3 , K-Factor: 723.316
19 5.57 7.145
20 5.57 7.330
21 5.57 7.330
22 6.77 SPRINKLER 7.213 0.000 Nozzle label: 4 , K-Factor: 723.316
23 5.57 7.282
24 1.85 7.731
25 6.77 SPRINKLER 7.164 0.000 Nozzle label: 5 , K-Factor: 723.316
26 5.57 7.282
27 5.57 7.357
28 5.57 7.346
29 3.77 7.537
30 3.77 7.537
31 3.77 SPRINKLER 7.537 0.000 Nozzle label: 6 , K-Factor: 730

Node Analysis Notes

The node order in the table may not reflect the order of nodes in the network.
Discharge values are only shown for flow exiting the network.

Page 4 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

2.100 7.943
150
1xE=4.27
2* 0.00 17.380 120.0 0.000
154.080 Vel = 1.698 m/sec
1xG=0.91
1 0.00 1 1900.000 0.000 0.002 0.043
ANSI B36.10
1xNR=12.20
Sch.40 : No lining
19.480 7.986

1.850 7.737
150
1xT=9.14
3* 1.85 864.734 9.144 120.0 0.181
1035.266 154.080 Vel = 1.698 m/sec

2 0.00 2 0.000 0.002 0.024


1900.000 ANSI B36.10
Sch.40 : No lining
10.994 7.943

3.010 7.732
150
1xE=4.27
4* 1.85 4.267 120.0 0.000
154.080 Vel = 0.925 m/sec

3 1.85 3 1035.266 0.000 0.001 0.005


ANSI B36.10
Sch.40 : No lining
7.277 7.737

3.720 7.362
150
1xE=4.27
5* 5.57 4.267 120.0 0.364
154.080 Vel = 0.925 m/sec

4 1.85 4 1035.266 0.000 0.001 0.006


ANSI B36.10
Sch.40 : No lining
7.987 7.732

8.800 7.346
150
1xT=6.25
6* 5.57 85.081 6.246 150.0 0.000
950.185 130.900 Vel = 1.282 m/sec

5 5.57 5 0.000 0.001 0.016


1035.266 HDPE : No
lining
15.046 7.362

41.720 7.305
150
1xE=2.91
7* 5.57 3.539 150.0 0.000
130.900 Vel = 1.177 m/sec
1xG=0.62
6 5.57 6 950.185 0.000 0.001 0.041
HDPE : No
lining
45.259 7.346

Page 5 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

126.000 7.186
150
1xT=6.25
8* 5.57 6.246 150.0 0.000
130.900 Vel = 1.177 m/sec

7 5.57 7 950.185 0.000 0.001 0.119


HDPE : No
lining
132.246 7.305

5.000 7.186
150
1xE=2.91
9* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
8 5.57 8 0.000 0.000 0.000 0.000
HDPE : No
lining
8.539 7.186

1.200 7.069
150
723.32
10* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
9 0.000
9 5.57 0.000 0.000 -0.000
1 ANSI B36.10
Sch.40 : No lining
1.200 7.186

16.000 7.172
150

11* 5.57 0.000 150.0 0.000


130.900 Vel = 1.177 m/sec

8 5.57 10 950.185 0.000 0.001 0.014


HDPE : No
lining
16.000 7.186

68.630 7.104
150
1xT=6.25
12* 5.57 6.870 150.0 0.000
130.900 Vel = 1.177 m/sec
1xG=0.62
11 5.57 11 950.185 0.000 0.001 0.068
HDPE : No
lining
75.500 7.172

2.500 7.084
150
1xE=2.91
13* 5.57 3.539 150.0 0.000
130.900 Vel = 2.353 m/sec
1xG=0.62
12 5.57 12 1900.000 0.000 0.003 0.020
HDPE : No
lining
6.039 7.104

Page 6 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

1.200 6.964
150
720.00
14* 6.77 0.000 120.0 0.117
154.080 Vel = 1.698 m/sec
13 1900.000
13 5.57 0.000 0.002 0.003
2 ANSI B36.10
Sch.40 : No lining
1.200 7.084

14.820 7.346
150
1xT=6.25
28* 5.57 6.870 150.0 0.000
130.900 Vel = 0.105 m/sec
1xG=0.62
6 5.57 14 85.081 0.000 0.000 0.000
HDPE : No
lining
21.690 7.346

9.035 7.268
150
1xT=6.25
16* 5.57 6.870 150.0 0.000
130.900 Vel = 1.176 m/sec
1xG=0.62
15 5.57 15 949.815 0.000 0.001 0.014
HDPE : No
lining
15.905 7.282

5.000 7.268
150
1xE=2.91
17* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
16 5.57 16 0.000 0.000 0.000 0.000
HDPE : No
lining
8.539 7.268

1.200 7.150
150
723.32
18* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
17 0.000
17 5.57 0.000 0.000 -0.000
3 ANSI B36.10
Sch.40 : No lining
1.200 7.268

133.000 7.145
150
1xE=2.91
19* 5.57 2.915 150.0 0.000
130.900 Vel = 1.176 m/sec

16 5.57 18 949.815 0.000 0.001 0.123


HDPE : No
lining
135.915 7.268

Page 7 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

46.000 7.104
150

12* 5.57 0.000 150.0 0.000


130.900 Vel = 1.176 m/sec

19 5.57 19 949.815 0.000 0.001 0.041


HDPE : No
lining
46.000 7.145

47.510 7.282
150
1xT=6.25
15* 5.57 6.246 150.0 0.000
130.900 Vel = 1.176 m/sec

20 5.57 20 949.815 0.000 0.001 0.048


HDPE : No
lining
53.756 7.330

5.000 7.330
150
1xE=2.91
21* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
20 5.57 21 0.000 0.000 0.000 0.000
HDPE : No
lining
8.539 7.330

1.200 7.213
150
723.32
22* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
22 0.000
21 5.57 0.000 0.000 -0.000
4 ANSI B36.10
Sch.40 : No lining
1.200 7.330

125.300 7.282
150
1xE=2.91
23* 5.57 2.915 150.0 0.000
130.900 Vel = 0.000 m/sec

15 5.57 23 0.000 0.000 0.000 0.000


HDPE : No
lining
128.215 7.282

13.810 7.282
150
1xE=2.91
26* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
23 5.57 24 0.000 0.000 0.000 0.000
HDPE : No
lining
17.349 7.282

Page 8 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

1.200 7.164
150
723.32
25* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
25 0.000
26 5.57 0.000 0.000 -0.000
5 ANSI B36.10
Sch.40 : No lining
1.200 7.282

8.520 7.731
150

24* 1.85 0.000 150.0 0.000


130.900 Vel = 1.071 m/sec

3 1.85 26 864.734 0.000 0.001 0.006


HDPE : No
lining
8.520 7.737

1.920 7.537
150
1xT=6.25
29* 3.77 6.246 150.0 0.188
130.900 Vel = 1.071 m/sec

24 1.85 27 864.734 0.000 0.001 0.006


HDPE : No
lining
8.166 7.731

8.800 7.346
150
1xT=6.25
28* 5.57 6.246 150.0 0.000
130.900 Vel = 1.071 m/sec

27 5.57 28 864.734 0.000 0.001 0.011


HDPE : No
lining
15.046 7.357

10.590 7.330
150
1xT=6.25
20* 5.57 6.870 150.0 0.000
130.900 Vel = 1.176 m/sec
1xG=0.62
28 5.57 29 949.815 0.000 0.001 0.016
HDPE : No
lining
17.460 7.346

1.800 7.357
150
1xE=4.27
27* 5.57 4.267 120.0 0.176
154.080 Vel = 0.773 m/sec

29 3.77 30 864.734 0.000 0.001 0.003


ANSI B36.10
Sch.40 : No lining
6.067 7.537

Page 9 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

0.450 7.537
80
1xE=2.13
30* 3.77 2.134 120.0 0.000
77.920 Vel = 0.000 m/sec

29 3.77 31 0.000 0.000 0.000 0.000


ANSI B36.10
Sch.40 : No lining
2.584 7.537

0.400 7.537
80
730.00
31* 3.77 0.000 120.0 0.000
77.920 Vel = 0.000 m/sec
32 0.000
30 3.77 0.000 0.000 0.000
6 ANSI B36.10
Sch.40 : No lining
0.400 7.537

Notes

For full NFPA compliance, a detailed schematic drawing from PIPENET is required, showing pipe labels as well as node and nozzle labels
Reference Node at which flowrates calculated denoted by bold and with an asterisk and are always the flow outlets
To calculate Pt (2) from Pt (1) add elevation pressure and friction loss
K-Factor is considered for the nozzles only
Notes use actual labels for their pressure values
L - Pipe Length, F - Fittings Equivalent Length, Q - Special Equipment Item Equivalent Length, T - Total Equivalent Length

Page 10 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE FITTINGS CODES

HE Standard 45° Elbow E Standard 90° Elbow LE Long radius 90° Elbow
T Tee or Cross (Flow turned 90°) G Gate Valve C Swing Check Valve
NR Non-return Valve BV Ball Valve B Butterfly Valve

Page 11 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

Hydraulic Graph
10
Supply
Demand
Residual pressure
Operating point
8

(1900,7.98623)
Pressure / Bar G

0
0
0

00

00

00

00

00

00

00

00
40
80

12

16

20

24

28

32

36

40
Flow Rate (Q1.85) / l/min

Page 12 of 13
4

3
1
7
2
24
30
5
29
31
27 25
6

26
22
28
23
21

20

10
8

15
18
11 9

17

14
16

13

12

19

CONSTRUCTION OF SUDAIR SOLAR PLANT


Reda Trading & Development
PIPENET Schematic Wednesday, March 30, 2022 Page 1 of 1
KEY PLAN:

W W E E=556931.694
N=2852042.232

S
E E=556803.329
N=2851981.516

S
E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3

PARKING-16

PARKING-2
PARKING-15

PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10

3
10
16

2
9
15
PARKING-9

1
8
14
13

7
20

5
12
19
4

18

3
9

2
8
13

1
E=556671.030

12

7
6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE
ENTRY
BUSBAR

CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

GENERAL NOTES

LEGENDS

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE

1 FIRE PUMP ROOM LAYOUT


057 SCALE : 1:40

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
CL 28001 MADRID (SPAIN)

CL LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
DN15

RIYADH, KSA.
LS

AS-BUILT SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

DATE: 13/01/2024
FROM
FIRE
TO
ENGINE FUEL PUMP 1.5 GWac SUDAIR PV PROJECT
SYSTEM CL ELEVATION 'A' 'A'

LARSEN & TOUBRO LLC


PUMP

SECTION A-A
FIRE WATER PUMP
GENERAL ARRANGEMENT DRAWING

AS-BUILT A0 1:40

DATE: dd/mm/yyyy
TRADING & DEVELOPMENT Co. FOR MACHINERY &
EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-DLD-007-4-AB 4 1 OF 1
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
KEY PLAN:

W E E=556931.694
N=2852042.232

S
E=556803.329
N=2851981.516

E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3

PARKING-16

PARKING-2
PARKING-15

PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10

3
10
16

2
9
15
PARKING-9

1
8
14
13

7
20

5
12
19
4

18

3
9

2
8
13

1
E=556671.030

12

7
6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE
ENTRY
BUSBAR

CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

GENERAL NOTES

LEGENDS

1 SECTION-AA 2 SECTION-BB
058 SCALE : 1:40 058 SCALE : 1:40

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE

AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.
3 SECTION-CC 4 SECTION-DD
058 SCALE : 1:40 058 SCALE : 1:40

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

FIRE WATER PUMP


SECTION DRAWING

A0 1:40

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-DLD-007-4-AB 4 1 OF 1
0M
+2 .97 .P.)
. KEY PLAN:
EL (C.O
N

W E E=556931.694
N=2852042.232

S
E=556803.329
N=2851981.516

E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3

PARKING-16

PARKING-2
PARKING-15

PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10

3
10
16

2
9
15
PARKING-9

1
8
14
13

7
20

5
12
19
4

18

3
9

2
8
13

1
E=556671.030

12

7
6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE
ENTRY
BUSBAR

CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

5M GENERAL NOTES
+ 1 .13 .P.)
.
EL (C.O

LEGENDS

05M
. + 3.6
M EL .O.P ).
2.970 (C
.+
EL .O.P.)
(C

EL
(C. . +0.4
O.P 35
.) M
5M
+ 2.03 REFERENCE DRAWING NO.
.
EL .O.P.) DRAWING NO. DRAWING TITLE
(C DIE
SEL
PUM
P

AS-BUILT
JOC DATE: 13/01/2024
EL
KEY . +0
. 1.5 GWac SUDAIR PV PROJECT
PUM (C. 835M
O.P
P .) LARSEN & TOUBRO LLC

AS-BUILT
ELE DATE: dd/mm/yyyy
CTR
IC P RED MARKUP APPLICABLE YES  NO 
UMP
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

EL.
+0.
(C.O435M
.P.)
SUDAIR ONE RENEWABLE ENERGY COMPANY
ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.
EL
. +0
.
(C. 835M ASTROM TECHNICAL ADVISOR, S.L.
O.P
.) SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

1 FIRE PUMP ROOM PIPING ISOMETRIC


FIRE WATER PUMP
- SCALE : N.T.S ISOMETRIC DRAWING

A0 N.T.S

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-DLD-007-3-AB 3 1 OF 1
KEY PLAN:

W E E=556931.694
N=2852042.232

S
E=556803.329
N=2851981.516

E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3

PARKING-16

PARKING-2
PARKING-15

PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10

3
10
16

2
9
15
PARKING-9

1
8
14
13

7
20

5
12
19
4

18

3
9

2
8
13

1
E=556671.030

12

7
6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE
ENTRY
BUSBAR

CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

GENERAL NOTES

LEGENDS

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE

AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

FIRE WATER PUMPS ARRANGEMENT P&I DIAGRAM


- SCALE : N.T.S SUDAIR ONE RENEWABLE ENERGY COMPANY
ND
2 FLOOR, BUILDINGS 5,
PUMPS OPERATION PROCEDURE: BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

FIRE WATER PUMP PIPING &


INSTRUMENTATION DRAWING

A0 N.T.S

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-DLD-007-3-AB 3 1 OF 1
Vendor Document
Project Name : CONSTRUCTION OF SUDAIR SOLAR PLANT

REDA Project No : 8151

Document Description : WET SPRINKLER SYSTEM HYDRAULIC CALCULATION

Document Number : 8151-03C-085

Vendor Document Review

Action Code Description

1 Approved

2 Approved with comments

Commented
3
Resubmit for Review
4 Rejected

By: Date:

1 21-04-2022 Issued for Approval CR NER SW


0 23-02-2022 Issued for Approval CR NER SW
Approved
Rev. Date Description Prepared Checked Approved
(Client)
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

HYDRAULIC CALCULATIONS for

Project Name CONSTRUCTION OF SUDAIR SOLAR PLANT


Location SUDAIR, CENTRAL KSA
Drawing Number 8151-03P-056
Date 21-Apr-2022 at 17:02

Design

Remote Area Number N/A


Remote Area Location PUMP ROOM
Occupancy Classification EXTRA HAZARD GROUP-2
Density 16.3 LPM/M2
Area of Application 77 M2
Coverage per Sprinkler 9 SQ.M
Type of sprinklers calculated K80 UPRIGHT SPRINKLER, STANDARD RESPONSE, ORDINARY TEMPERATURE 68 Deg C
Number of sprinklers calculated 12, of which 12 are on
In Rack Demand N/A
Hose Stream Demand 1900 LPM
Total Water Required
3201.245 l/min
(including hose stream)
Required Pressure 3.190 Bar G
Type of System WET SPRINKLER SYSTEM
Volume of dry or preaction system N/A

Water Supply Information

Date 21-Apr-2022
Location FIRE PUMP ROOM AT SUDAIR SOLAR PLANT
Source FIRE PUMP DISCHARGE OUTLET

Contractor Information

Name of Contractor REDA HAZARD CONTROL


Address
Phone Number
Name of Designer
Authority having Jurisdiction HCIS

Page 1 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

Project Information: Notes

Name of Contractor
Calculator - PIPENET VISION Spray calculator, version 1.11.0

Friction Loss Formula Hazen-Williams

Design Standard NFPA 2013


Notes

Page 2 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

SUPPLY ANALYSIS

Static Residual Supply Flow At Total Demand Including Outside Hose


Node at Required Pressure Available Pressure
Pressure Pressure Residual Pressure Hose Stream Allowance Stream Allowance
Source (Bar G) (Bar G)
(Bar G) (Bar G) (l/min) (l/min) (l/min)
1 9.79056 7.92897 3217.6 3201.24 1900 3.190 7.94644

Notes

These values have been calculated using the Supply Curve points as entered by the user.

Page 3 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

NODE ANALYSIS

Pressure (Bar Discharge


Node tag Elevation (m) Node Type Notes
G) (l/min)
1 0.00 INPUT 3.190
2 3.70 2.360
3 3.70 2.347
4 3.70 2.546
5 4.20 2.201
6 4.20 2.044
7 4.45 SPRINKLER 2.004 114.097 Nozzle label: 1 , K-Factor: 80.6
8 4.20 1.908
9 4.45 SPRINKLER 1.869 110.181 Nozzle label: 2 , K-Factor: 80.6
10 4.20 1.871
11 3.70 2.250
12 4.20 2.108
13 4.20 1.957
14 4.45 SPRINKLER 1.917 111.609 Nozzle label: 5 , K-Factor: 80.6
15 4.20 1.826
16 4.45 SPRINKLER 1.788 107.767 Nozzle label: 4 , K-Factor: 80.6
17 4.20 1.790
18 4.45 SPRINKLER 1.752 106.687 Nozzle label: 6 , K-Factor: 80.6
19 3.70 2.190
21 4.20 2.051
22 4.20 1.904
23 4.45 SPRINKLER 1.865 110.067 Nozzle label: 9 , K-Factor: 80.6
24 4.20 1.777
25 4.45 SPRINKLER 1.738 106.271 Nozzle label: 7 , K-Factor: 80.6
26 4.20 1.742
27 4.45 SPRINKLER 1.704 105.204 Nozzle label: 12 , K-Factor: 80.6
28 4.45 SPRINKLER 1.832 109.081 Nozzle label: 3 , K-Factor: 80.6
31 4.20 1.763
32 4.45 SPRINKLER 1.850 109.638 Nozzle label: 10 , K-Factor: 80.6
33 4.45 SPRINKLER 1.725 105.854 Nozzle label: 11 , K-Factor: 80.6
34 4.20 1.889
35 4.20 1.728
36 4.45 SPRINKLER 1.690 104.790 Nozzle label: 8 , K-Factor: 80.6
38 3.70 2.174
39 4.20 2.035

Node Analysis Notes

The node order in the table may not reflect the order of nodes in the network.
Discharge values are only shown for flow exiting the network.

Page 4 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

3.700 2.546
80
1xE=2.13
4* 3.70 2.438 120.0 0.362
77.920 Vel = 4.548 m/sec
1xG=0.30
1 0.00 1 1301.245 3.100 0.031 0.282
ANSI B36.10
Sch.40 : No lining
9.238 3.190

1.700 2.250
80
1xT=4.57
11* 3.70 326.062 4.572 120.0 0.000
641.823 77.920 Vel = 3.383 m/sec

2 3.70 2 0.000 0.018 0.111


967.886 ANSI B36.10
Sch.40 : No lining
6.272 2.360

0.500 2.201
40
1xE=1.22
5* 4.20 1.219 120.0 0.049
40.940 Vel = 4.221 m/sec

3 3.70 3 333.359 0.000 0.056 0.097


ANSI B36.10
Sch.40 : No lining
1.719 2.347

0.340 2.044
40
1xT=2.44
6* 4.20 114.097 2.438 120.0 0.000
219.262 40.940 Vel = 4.221 m/sec

5 4.20 4 0.000 0.056 0.157


333.359 ANSI B36.10
Sch.40 : No lining
2.778 2.201

0.250 2.004
25
80.60
7* 4.45 0.000 120.0 0.024
26.640 Vel = 3.412 m/sec
5 114.097
6 4.20 0.000 0.063 0.016
1 ANSI B36.10
Sch.40 : No lining
0.250 2.044

2.800 1.908
40
1xT=2.44
8* 4.20 110.181 2.438 120.0 0.000
109.081 40.940 Vel = 2.776 m/sec

6 4.20 6 0.000 0.026 0.136


219.262 ANSI B36.10
Sch.40 : No lining
5.238 2.044

Page 5 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

0.250 1.869
25
80.60
9* 4.45 0.000 120.0 0.024
26.640 Vel = 3.295 m/sec
7 110.181
8 4.20 0.000 0.059 0.015
2 ANSI B36.10
Sch.40 : No lining
0.250 1.908

2.800 1.871
40
1xT=2.44
10* 4.20 2.438 120.0 0.000
40.940 Vel = 1.381 m/sec

8 4.20 8 109.081 0.000 0.007 0.037


ANSI B36.10
Sch.40 : No lining
5.238 1.908

0.250 1.832
25
80.60
28* 4.45 0.000 120.0 0.024
26.640 Vel = 3.262 m/sec
9 109.081
10 4.20 0.000 0.058 0.014
3 ANSI B36.10
Sch.40 : No lining
0.250 1.871

0.500 2.108
40
1xE=1.22
12* 4.20 1.219 120.0 0.049
40.940 Vel = 4.128 m/sec

11 3.70 10 326.062 0.000 0.054 0.093


ANSI B36.10
Sch.40 : No lining
1.719 2.250

0.340 1.957
40
1xT=2.44
13* 4.20 111.609 2.438 120.0 0.000
214.453 40.940 Vel = 4.128 m/sec

12 4.20 11 0.000 0.054 0.150


326.062 ANSI B36.10
Sch.40 : No lining
2.778 2.108

0.250 1.917
25
80.60
14* 4.45 0.000 120.0 0.024
26.640 Vel = 3.337 m/sec
12 111.609
13 4.20 0.000 0.060 0.015
5 ANSI B36.10
Sch.40 : No lining
0.250 1.957

Page 6 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

2.800 1.826
40
1xT=2.44
15* 4.20 107.767 2.438 120.0 0.000
106.687 40.940 Vel = 2.715 m/sec

13 4.20 13 0.000 0.025 0.131


214.453 ANSI B36.10
Sch.40 : No lining
5.238 1.957

0.250 1.788
25
80.60
16* 4.45 0.000 120.0 0.024
26.640 Vel = 3.222 m/sec
14 107.767
15 4.20 0.000 0.057 0.014
4 ANSI B36.10
Sch.40 : No lining
0.250 1.826

2.800 1.790
40
1xT=2.44
17* 4.20 2.438 120.0 0.000
40.940 Vel = 1.351 m/sec

15 4.20 15 106.687 0.000 0.007 0.036


ANSI B36.10
Sch.40 : No lining
5.238 1.826

0.250 1.752
25
80.60
18* 4.45 0.000 120.0 0.024
26.640 Vel = 3.190 m/sec
16 106.687
17 4.20 0.000 0.056 0.014
6 ANSI B36.10
Sch.40 : No lining
0.250 1.790

0.500 2.051
40
1xE=1.22
21* 4.20 1.219 120.0 0.049
40.940 Vel = 4.071 m/sec

19 3.70 17 321.542 0.000 0.053 0.091


ANSI B36.10
Sch.40 : No lining
1.719 2.190

0.340 1.904
40
1xT=2.44
22* 4.20 110.067 2.438 120.0 0.000
211.474 40.940 Vel = 4.071 m/sec

21 4.20 18 0.000 0.053 0.147


321.542 ANSI B36.10
Sch.40 : No lining
2.778 2.051

Page 7 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

0.250 1.865
25
80.60
23* 4.45 0.000 120.0 0.024
26.640 Vel = 3.291 m/sec
19 110.067
22 4.20 0.000 0.059 0.015
9 ANSI B36.10
Sch.40 : No lining
0.250 1.904

2.800 1.777
40
1xT=2.44
24* 4.20 106.271 2.438 120.0 0.000
105.204 40.940 Vel = 2.677 m/sec

22 4.20 20 0.000 0.024 0.127


211.474 ANSI B36.10
Sch.40 : No lining
5.238 1.904

0.250 1.738
25
80.60
25* 4.45 0.000 120.0 0.024
26.640 Vel = 3.178 m/sec
21 106.271
24 4.20 0.000 0.055 0.014
7 ANSI B36.10
Sch.40 : No lining
0.250 1.777

2.800 1.742
40
1xT=2.44
26* 4.20 2.438 120.0 0.000
40.940 Vel = 1.332 m/sec

24 4.20 22 105.204 0.000 0.007 0.035


ANSI B36.10
Sch.40 : No lining
5.238 1.777

0.250 1.704
25
80.60
27* 4.45 0.000 120.0 0.024
26.640 Vel = 3.146 m/sec
23 105.204
26 4.20 0.000 0.054 0.014
12 ANSI B36.10
Sch.40 : No lining
0.250 1.742

0.500 2.035
40
1xE=1.22
39* 4.20 1.219 120.0 0.049
40.940 Vel = 4.055 m/sec

38 3.70 24 320.281 0.000 0.052 0.090


ANSI B36.10
Sch.40 : No lining
1.719 2.174

Page 8 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

0.340 1.889
40
1xT=2.44
34* 4.20 109.638 2.438 120.0 0.000
210.644 40.940 Vel = 4.055 m/sec

39 4.20 25 0.000 0.052 0.146


320.281 ANSI B36.10
Sch.40 : No lining
2.778 2.035

0.250 1.850
25
80.60
32* 4.45 0.000 120.0 0.024
26.640 Vel = 3.278 m/sec
26 109.638
34 4.20 0.000 0.058 0.015
10 ANSI B36.10
Sch.40 : No lining
0.250 1.889

2.800 1.763
40
1xT=2.44
31* 4.20 105.854 2.438 120.0 0.000
104.790 40.940 Vel = 2.667 m/sec

34 4.20 27 0.000 0.024 0.126


210.644 ANSI B36.10
Sch.40 : No lining
5.238 1.889

0.250 1.725
25
80.60
33* 4.45 0.000 120.0 0.024
26.640 Vel = 3.165 m/sec
28 105.854
31 4.20 0.000 0.055 0.014
11 ANSI B36.10
Sch.40 : No lining
0.250 1.763

2.800 1.728
40
1xT=2.44
35* 4.20 2.438 120.0 0.000
40.940 Vel = 1.327 m/sec

31 4.20 29 104.790 0.000 0.007 0.035


ANSI B36.10
Sch.40 : No lining
5.238 1.763

0.250 1.690
25
80.60
36* 4.45 0.000 120.0 0.024
26.640 Vel = 3.133 m/sec
30 104.790
35 4.20 0.000 0.054 0.013
8 ANSI B36.10
Sch.40 : No lining
0.250 1.728

Page 9 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE INFORMATION

Pt (1) (Bar
Nominal ID L (m) G)

Elev 1 Flow added (q) (mm) Fittings -


K factor C factor
Node 1 (m) (l/min) quantity, F (m) Pe (Bar) Notes
Actual ID type, and
Pipe label (mm) equivalent Pf per m
Node 2 Elev 2 Pipe flow length (m) Q (m) Pf (Bar)
Nozzle label (Bar)
(m) (l/min)
Pipe type T (m) Pt (2) (Bar
G)

0.900 2.347
80
1xT=4.57
3* 3.70 4.572 120.0 0.000
77.920 Vel = 1.165 m/sec

2 3.70 31 333.359 0.000 0.002 0.013


ANSI B36.10
Sch.40 : No lining
5.472 2.360

2.600 2.190
80
1xT=4.57
19* 3.70 321.542 4.572 120.0 0.000
320.281 77.920 Vel = 2.243 m/sec

11 3.70 32 0.000 0.008 0.059


641.823 ANSI B36.10
Sch.40 : No lining
7.172 2.250

2.600 2.174
80
1xT=4.57
38* 3.70 4.572 120.0 0.000
77.920 Vel = 1.119 m/sec

19 3.70 33 320.281 0.000 0.002 0.016


ANSI B36.10
Sch.40 : No lining
7.172 2.190

1.520 2.360
80
1xT=4.57
2* 3.70 967.886 4.572 120.0 0.000
333.359 77.920 Vel = 4.548 m/sec

4 3.70 34 0.000 0.031 0.186


1301.245 ANSI B36.10
Sch.40 : No lining
6.092 2.546

Notes

For full NFPA compliance, a detailed schematic drawing from PIPENET is required, showing pipe labels as well as node and nozzle labels
Reference Node at which flowrates calculated denoted by bold and with an asterisk and are always the flow outlets
To calculate Pt (2) from Pt (1) add elevation pressure and friction loss
K-Factor is considered for the nozzles only
Notes use actual labels for their pressure values
L - Pipe Length, F - Fittings Equivalent Length, Q - Special Equipment Item Equivalent Length, T - Total Equivalent Length

Page 10 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

PIPE FITTINGS CODES

HE Standard 45° Elbow E Standard 90° Elbow LE Long radius 90° Elbow
T Tee or Cross (Flow turned 90°) G Gate Valve C Swing Check Valve
NR Non-return Valve BV Ball Valve B Butterfly Valve

Page 11 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT

Hydraulic Graph
10

Supply
Pressure / Bar G

Demand
Residual pressure
6 Operating point
Outside hose stream allowance

(1301.24,3.19029)
2

0
0
0

00

00

00

00

00

00

00

00
40
80

12

16

20

24

28

32

36

40
Flow Rate (Q1.85) / l/min

Page 12 of 13
39
32
38
21
34
23
33
19
12
22
14 31
25
4 11 36
13
2 24
16 35
5 27

15
3 1 7
26
18

6
17
9

8
28

10

CONSTRUCTION OF SUDAIR SOLAR PLANT


Reda Trading & Development
PIPENET Schematic Thursday, April 21, 2022 Page 1 of 1
KEY PLAN:

W W E E=556931.694
N=2852042.232

S
E E=556803.329
N=2851981.516

S
E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3
PARKING-16

PARKING-2
PARKING-15
PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10

3
10
16

2
9
15

1
PARKING-9

8
14
13

7
20

5
12
19

4
18

3
9

2
8
13

1
7
E=556671.030

12

6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE

ENTRY
BUSBAR
ALUMINUM

CHAMBER
GLAND
PLATE

BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

6M WIDE COMPACTED ROAD+0.5 GENERAL NOTES


SHOULDER ON BOTH SIDE

6M WIDE ROAD 6M WIDE ROAD

LEGENDS

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE
CAM-A06 CAM-B06

CAM-A05

CAM-B05

CAM-A07 CAM-B07

M
HC5 CDE

HC5 CDE
AS-BUILT
DATE: 13/01/2024
https://www.lntecc.com/
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
CAM-A03 CAM-A04 CAM-B03 CAM-B04

CAM-A01 CAM-B01

ACS CONTROLLER
ACP-A01 CAM-A02 ACP-B01 CAM-B02

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

FIREWATER NETWORK
OVERALL LAYOUT

A0 1:400

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-DLD-007-3-AB 3 1 OF 2
KEY PLAN:

W E E=556931.694
N=2852042.232

S
E=556803.329
N=2851981.516

E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3

PARKING-16

PARKING-2
PARKING-15

PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10
10
16
23

9
15
PARKING-9

1
8
14
13

7
20

5
12
19

4
18

3
9

2
13

1
E=556671.030

12
78

6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE

ENTRY
BUSBAR
CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR

CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

GENERAL NOTES

LEGENDS

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE

AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

FIRE WATER NETWORK


P&ID

A0 N.T.S

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-F-DLD-007-3-AB 3 2 OF 3
KEY PLAN:

W E E=556931.694
N=2852042.232

S
E=556803.329
N=2851981.516

E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3

PARKING-16

PARKING-2
PARKING-15

PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10
10
16
23

9
15
PARKING-9

1
8
14
13

7
20

5
12
19

4
18

3
9

2
13

1
E=556671.030

12
78

6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE

ENTRY
BUSBAR
CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR

CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

GENERAL NOTES

LEGENDS

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE

AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

FIREWATER NETWORK
ISOMETRIC

A0 N.T.S

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-F-007-3-AB 3 3 OF 3
KEY PLAN:

W E E=556931.694
N=2852042.232

S
E=556803.329
N=2851981.516

E=556983.326
N=2851933.072
PARKING-8

PARKING-7

PARKING-6

PARKING-5

PARKING-4

PARKING-3

PARKING-16

PARKING-2
PARKING-15

PARKING-1

PARKING-14

PARKING-13

PARKING-12

F1
PARKING-11

6
5
11
PARKING-10

4
10

3
10
16

2
9
15
PARKING-9

1
8
14
13

7
20

5
12
19
4

18

3
9

2
8
13

1
E=556671.030

12

7
6
11
10
15
14
N=2851918.939

E=556854.961
N=2851872.356
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE
ENTRY
BUSBAR

CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570

GENERAL NOTES

PLAN VIEW SECTIONAL ELEVATION AT X-X

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE

POST INDICATOR WITH NRS GATE VALVE DETAIL OF ROAD CROSSING


- SCALE : NTS - SCALE : NTS
FIRE HYDRANT W/ POST INDICATOR INSTALLATION DETAILS
- SCALE : NTS

A A

AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

-
CRASH BARRIER DETAIL
SCALE : NTS
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
OUTDOOR FIRE HOSE CABINET DETAIL
- SCALE : NTS 1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

GENERAL INSTALLATION DETAILS


FIRE WATER NETWORK

A0 N.T.S

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-DLD-007-3-AB 3 1 OF 1
KEY PLAN:

W W E

S
E
S
AREA
CAPE
LANDS

6
5
11

4
10
10
16
23

9
15

1
8
14
13

7
20

5
12
19

4
18

3
9

2
13

1
12
78

6
11
10
15
14
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE

ENTRY
BUSBAR
CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR

CHAMBER
CABLE
ENTRY
GENERAL NOTES

LEGENDS
A
-

REFERENCE DRAWING NO.


DRAWING NO. DRAWING TITLE

AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

WET SPRINKLER SYSTEM


FIRE PUMP HOUSE

A0 1.50

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION 8151-03P-056 2 1 OF 2
KEY PLAN:

W W E

S
E
S
AREA
CAPE
LANDS

6
5
11

4
10
10
16
23

9
15

1
8
14
13

7
20

5
12
19

4
18

3
9

2
13

1
12
78

6
11
10
15
14
ALUMINUM

GLAND
PLATE

CABLE
ENTRY

CABLE

ENTRY
BUSBAR
CHAMBER
ALUMINUM

GLAND
PLATE

BUSBAR

CHAMBER
CABLE
ENTRY
GENERAL NOTES

5M
+4 .73
.
EL .O.P.) LEGENDS
(C

5M REFERENCE DRAWING NO.


+ 4.23 .P.)
. O
EL (C.
DRAWING NO. DRAWING TITLE

.L)
(F.F
35M
.+0.0
EL

5M
+ 3 .03 .P.)
. O
EL (C. TO FIRE HYDRANT SYSTEM FROM FIRE PUMPS

EL
. +0
.
AS-BUILT
(C. 535M
O.P
.)
DATE: 13/01/2024
EL
. +0
.03 1.5 GWac SUDAIR PV PROJECT
5M
(F.F
.L) LARSEN & TOUBRO LLC

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

SUDAIR ONE RENEWABLE ENERGY COMPANY


ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.

ASTROM TECHNICAL ADVISOR, S.L.


SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)

LARSEN & TOUBRO SAUDI ARABIA LLC


INDUSTRIAL CREATIVITY CENTRE BUILDING,
3RD FLOOR, P.O.BOX – 295020,
RIYADH, KSA.

SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT

WET SPRINKLER SYSTEM


FIRE PUMP HOUSE

A0 N.T.S

TRADING & DEVELOPMENT Co. FOR MACHINERY &


EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION 8151-03P-056 2 2 OF 2
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC

AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES  NO 
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC