OWNER:
SUDAIR ONE RENEWABLE ENERGY COMPANY
2ND FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.
OWNER’S ENGINEER:
ASTROM TECHNICAL ADVISORS, S.L.
SERRANO 8, 3º IZQDA. 28001 MADRID (SPAIN)
SUB CONTRACTOR:
REDA TRADING AND DEVELOPMENT CO. FOR
MACHINERY & EQUIPMENT LTD. FIRE & SAFETY DIVISION
AL-KHOBAR – DAMMAM EXPRESSWAY P.O BOX 2923,31952
AL-KHOBAR, KINGDOM OF SAUDI ARABIA
PROJECT:
SUDAIR SOLAR PHOTOVOLTAIC INDEPENDENT POWER PLANT
PREPARED CR 22-08-2022
CHECKED NER 22-08-2022 FIRE WATER NETWORK
APPROVED SW 22-08-2022 LAYOUT & CALCULATIONS
DRAWING /DOCUMENT NUMBER REVISON NO TOTAL PAGE
SUD-1-SS-F-DLD-007-5-AB 5 40
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
Vendor Document
Project Name : CONSTRUCTION OF SUDAIR SOLAR PLANT
1 Approved
Commented
3
Resubmit for Review
4 Rejected
By: Date:
Design
Date 30-Mar-2022
Location FIRE PUMP ROOM AT SUDAIR SOLAR PLANT
Source FIRE PUMP DISCHARGE OUTLET
Contractor Information
Page 1 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
Name of Contractor
Calculator - PIPENET VISION Spray calculator, version 1.11.0
Page 2 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
SUPPLY ANALYSIS
Notes
These values have been calculated using the Supply Curve points as entered by the user.
Page 3 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
NODE ANALYSIS
The node order in the table may not reflect the order of nodes in the network.
Discharge values are only shown for flow exiting the network.
Page 4 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
2.100 7.943
150
1xE=4.27
2* 0.00 17.380 120.0 0.000
154.080 Vel = 1.698 m/sec
1xG=0.91
1 0.00 1 1900.000 0.000 0.002 0.043
ANSI B36.10
1xNR=12.20
Sch.40 : No lining
19.480 7.986
1.850 7.737
150
1xT=9.14
3* 1.85 864.734 9.144 120.0 0.181
1035.266 154.080 Vel = 1.698 m/sec
3.010 7.732
150
1xE=4.27
4* 1.85 4.267 120.0 0.000
154.080 Vel = 0.925 m/sec
3.720 7.362
150
1xE=4.27
5* 5.57 4.267 120.0 0.364
154.080 Vel = 0.925 m/sec
8.800 7.346
150
1xT=6.25
6* 5.57 85.081 6.246 150.0 0.000
950.185 130.900 Vel = 1.282 m/sec
41.720 7.305
150
1xE=2.91
7* 5.57 3.539 150.0 0.000
130.900 Vel = 1.177 m/sec
1xG=0.62
6 5.57 6 950.185 0.000 0.001 0.041
HDPE : No
lining
45.259 7.346
Page 5 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
126.000 7.186
150
1xT=6.25
8* 5.57 6.246 150.0 0.000
130.900 Vel = 1.177 m/sec
5.000 7.186
150
1xE=2.91
9* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
8 5.57 8 0.000 0.000 0.000 0.000
HDPE : No
lining
8.539 7.186
1.200 7.069
150
723.32
10* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
9 0.000
9 5.57 0.000 0.000 -0.000
1 ANSI B36.10
Sch.40 : No lining
1.200 7.186
16.000 7.172
150
68.630 7.104
150
1xT=6.25
12* 5.57 6.870 150.0 0.000
130.900 Vel = 1.177 m/sec
1xG=0.62
11 5.57 11 950.185 0.000 0.001 0.068
HDPE : No
lining
75.500 7.172
2.500 7.084
150
1xE=2.91
13* 5.57 3.539 150.0 0.000
130.900 Vel = 2.353 m/sec
1xG=0.62
12 5.57 12 1900.000 0.000 0.003 0.020
HDPE : No
lining
6.039 7.104
Page 6 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
1.200 6.964
150
720.00
14* 6.77 0.000 120.0 0.117
154.080 Vel = 1.698 m/sec
13 1900.000
13 5.57 0.000 0.002 0.003
2 ANSI B36.10
Sch.40 : No lining
1.200 7.084
14.820 7.346
150
1xT=6.25
28* 5.57 6.870 150.0 0.000
130.900 Vel = 0.105 m/sec
1xG=0.62
6 5.57 14 85.081 0.000 0.000 0.000
HDPE : No
lining
21.690 7.346
9.035 7.268
150
1xT=6.25
16* 5.57 6.870 150.0 0.000
130.900 Vel = 1.176 m/sec
1xG=0.62
15 5.57 15 949.815 0.000 0.001 0.014
HDPE : No
lining
15.905 7.282
5.000 7.268
150
1xE=2.91
17* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
16 5.57 16 0.000 0.000 0.000 0.000
HDPE : No
lining
8.539 7.268
1.200 7.150
150
723.32
18* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
17 0.000
17 5.57 0.000 0.000 -0.000
3 ANSI B36.10
Sch.40 : No lining
1.200 7.268
133.000 7.145
150
1xE=2.91
19* 5.57 2.915 150.0 0.000
130.900 Vel = 1.176 m/sec
Page 7 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
46.000 7.104
150
47.510 7.282
150
1xT=6.25
15* 5.57 6.246 150.0 0.000
130.900 Vel = 1.176 m/sec
5.000 7.330
150
1xE=2.91
21* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
20 5.57 21 0.000 0.000 0.000 0.000
HDPE : No
lining
8.539 7.330
1.200 7.213
150
723.32
22* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
22 0.000
21 5.57 0.000 0.000 -0.000
4 ANSI B36.10
Sch.40 : No lining
1.200 7.330
125.300 7.282
150
1xE=2.91
23* 5.57 2.915 150.0 0.000
130.900 Vel = 0.000 m/sec
13.810 7.282
150
1xE=2.91
26* 5.57 3.539 150.0 0.000
130.900 Vel = 0.000 m/sec
1xG=0.62
23 5.57 24 0.000 0.000 0.000 0.000
HDPE : No
lining
17.349 7.282
Page 8 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
1.200 7.164
150
723.32
25* 6.77 0.000 120.0 0.117
154.080 Vel = 0.000 m/sec
25 0.000
26 5.57 0.000 0.000 -0.000
5 ANSI B36.10
Sch.40 : No lining
1.200 7.282
8.520 7.731
150
1.920 7.537
150
1xT=6.25
29* 3.77 6.246 150.0 0.188
130.900 Vel = 1.071 m/sec
8.800 7.346
150
1xT=6.25
28* 5.57 6.246 150.0 0.000
130.900 Vel = 1.071 m/sec
10.590 7.330
150
1xT=6.25
20* 5.57 6.870 150.0 0.000
130.900 Vel = 1.176 m/sec
1xG=0.62
28 5.57 29 949.815 0.000 0.001 0.016
HDPE : No
lining
17.460 7.346
1.800 7.357
150
1xE=4.27
27* 5.57 4.267 120.0 0.176
154.080 Vel = 0.773 m/sec
Page 9 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
0.450 7.537
80
1xE=2.13
30* 3.77 2.134 120.0 0.000
77.920 Vel = 0.000 m/sec
0.400 7.537
80
730.00
31* 3.77 0.000 120.0 0.000
77.920 Vel = 0.000 m/sec
32 0.000
30 3.77 0.000 0.000 0.000
6 ANSI B36.10
Sch.40 : No lining
0.400 7.537
Notes
For full NFPA compliance, a detailed schematic drawing from PIPENET is required, showing pipe labels as well as node and nozzle labels
Reference Node at which flowrates calculated denoted by bold and with an asterisk and are always the flow outlets
To calculate Pt (2) from Pt (1) add elevation pressure and friction loss
K-Factor is considered for the nozzles only
Notes use actual labels for their pressure values
L - Pipe Length, F - Fittings Equivalent Length, Q - Special Equipment Item Equivalent Length, T - Total Equivalent Length
Page 10 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
HE Standard 45° Elbow E Standard 90° Elbow LE Long radius 90° Elbow
T Tee or Cross (Flow turned 90°) G Gate Valve C Swing Check Valve
NR Non-return Valve BV Ball Valve B Butterfly Valve
Page 11 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
Hydraulic Graph
10
Supply
Demand
Residual pressure
Operating point
8
(1900,7.98623)
Pressure / Bar G
0
0
0
00
00
00
00
00
00
00
00
40
80
12
16
20
24
28
32
36
40
Flow Rate (Q1.85) / l/min
Page 12 of 13
4
3
1
7
2
24
30
5
29
31
27 25
6
26
22
28
23
21
20
10
8
15
18
11 9
17
14
16
13
12
19
W W E E=556931.694
N=2852042.232
S
E E=556803.329
N=2851981.516
S
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
3
10
16
2
9
15
PARKING-9
1
8
14
13
7
20
5
12
19
4
18
3
9
2
8
13
1
E=556671.030
12
7
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
GENERAL NOTES
LEGENDS
RIYADH, KSA.
LS
DATE: 13/01/2024
FROM
FIRE
TO
ENGINE FUEL PUMP 1.5 GWac SUDAIR PV PROJECT
SYSTEM CL ELEVATION 'A' 'A'
SECTION A-A
FIRE WATER PUMP
GENERAL ARRANGEMENT DRAWING
AS-BUILT A0 1:40
DATE: dd/mm/yyyy
TRADING & DEVELOPMENT Co. FOR MACHINERY &
EQUIPMENT LTD. FIRE & HAZARD CONTROL DIVISION SUD-1-SS-DLD-007-4-AB 4 1 OF 1
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
KEY PLAN:
W E E=556931.694
N=2852042.232
S
E=556803.329
N=2851981.516
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
3
10
16
2
9
15
PARKING-9
1
8
14
13
7
20
5
12
19
4
18
3
9
2
8
13
1
E=556671.030
12
7
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
GENERAL NOTES
LEGENDS
1 SECTION-AA 2 SECTION-BB
058 SCALE : 1:40 058 SCALE : 1:40
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
A0 1:40
W E E=556931.694
N=2852042.232
S
E=556803.329
N=2851981.516
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
3
10
16
2
9
15
PARKING-9
1
8
14
13
7
20
5
12
19
4
18
3
9
2
8
13
1
E=556671.030
12
7
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
5M GENERAL NOTES
+ 1 .13 .P.)
.
EL (C.O
LEGENDS
05M
. + 3.6
M EL .O.P ).
2.970 (C
.+
EL .O.P.)
(C
EL
(C. . +0.4
O.P 35
.) M
5M
+ 2.03 REFERENCE DRAWING NO.
.
EL .O.P.) DRAWING NO. DRAWING TITLE
(C DIE
SEL
PUM
P
AS-BUILT
JOC DATE: 13/01/2024
EL
KEY . +0
. 1.5 GWac SUDAIR PV PROJECT
PUM (C. 835M
O.P
P .) LARSEN & TOUBRO LLC
AS-BUILT
ELE DATE: dd/mm/yyyy
CTR
IC P RED MARKUP APPLICABLE YES NO
UMP
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
EL.
+0.
(C.O435M
.P.)
SUDAIR ONE RENEWABLE ENERGY COMPANY
ND
2 FLOOR, BUILDINGS 5,
BUSINESS GATE OFFICE COMPLEX, AIRPORT ROAD,
P.O.BOX – 22616, RIYADH, KSA.
EL
. +0
.
(C. 835M ASTROM TECHNICAL ADVISOR, S.L.
O.P
.) SERRANO 8, 3° IZQDA.
28001 MADRID (SPAIN)
A0 N.T.S
W E E=556931.694
N=2852042.232
S
E=556803.329
N=2851981.516
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
3
10
16
2
9
15
PARKING-9
1
8
14
13
7
20
5
12
19
4
18
3
9
2
8
13
1
E=556671.030
12
7
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
GENERAL NOTES
LEGENDS
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
A0 N.T.S
1 Approved
Commented
3
Resubmit for Review
4 Rejected
By: Date:
Design
Date 21-Apr-2022
Location FIRE PUMP ROOM AT SUDAIR SOLAR PLANT
Source FIRE PUMP DISCHARGE OUTLET
Contractor Information
Page 1 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
Name of Contractor
Calculator - PIPENET VISION Spray calculator, version 1.11.0
Page 2 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
SUPPLY ANALYSIS
Notes
These values have been calculated using the Supply Curve points as entered by the user.
Page 3 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
NODE ANALYSIS
The node order in the table may not reflect the order of nodes in the network.
Discharge values are only shown for flow exiting the network.
Page 4 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
3.700 2.546
80
1xE=2.13
4* 3.70 2.438 120.0 0.362
77.920 Vel = 4.548 m/sec
1xG=0.30
1 0.00 1 1301.245 3.100 0.031 0.282
ANSI B36.10
Sch.40 : No lining
9.238 3.190
1.700 2.250
80
1xT=4.57
11* 3.70 326.062 4.572 120.0 0.000
641.823 77.920 Vel = 3.383 m/sec
0.500 2.201
40
1xE=1.22
5* 4.20 1.219 120.0 0.049
40.940 Vel = 4.221 m/sec
0.340 2.044
40
1xT=2.44
6* 4.20 114.097 2.438 120.0 0.000
219.262 40.940 Vel = 4.221 m/sec
0.250 2.004
25
80.60
7* 4.45 0.000 120.0 0.024
26.640 Vel = 3.412 m/sec
5 114.097
6 4.20 0.000 0.063 0.016
1 ANSI B36.10
Sch.40 : No lining
0.250 2.044
2.800 1.908
40
1xT=2.44
8* 4.20 110.181 2.438 120.0 0.000
109.081 40.940 Vel = 2.776 m/sec
Page 5 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
0.250 1.869
25
80.60
9* 4.45 0.000 120.0 0.024
26.640 Vel = 3.295 m/sec
7 110.181
8 4.20 0.000 0.059 0.015
2 ANSI B36.10
Sch.40 : No lining
0.250 1.908
2.800 1.871
40
1xT=2.44
10* 4.20 2.438 120.0 0.000
40.940 Vel = 1.381 m/sec
0.250 1.832
25
80.60
28* 4.45 0.000 120.0 0.024
26.640 Vel = 3.262 m/sec
9 109.081
10 4.20 0.000 0.058 0.014
3 ANSI B36.10
Sch.40 : No lining
0.250 1.871
0.500 2.108
40
1xE=1.22
12* 4.20 1.219 120.0 0.049
40.940 Vel = 4.128 m/sec
0.340 1.957
40
1xT=2.44
13* 4.20 111.609 2.438 120.0 0.000
214.453 40.940 Vel = 4.128 m/sec
0.250 1.917
25
80.60
14* 4.45 0.000 120.0 0.024
26.640 Vel = 3.337 m/sec
12 111.609
13 4.20 0.000 0.060 0.015
5 ANSI B36.10
Sch.40 : No lining
0.250 1.957
Page 6 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
2.800 1.826
40
1xT=2.44
15* 4.20 107.767 2.438 120.0 0.000
106.687 40.940 Vel = 2.715 m/sec
0.250 1.788
25
80.60
16* 4.45 0.000 120.0 0.024
26.640 Vel = 3.222 m/sec
14 107.767
15 4.20 0.000 0.057 0.014
4 ANSI B36.10
Sch.40 : No lining
0.250 1.826
2.800 1.790
40
1xT=2.44
17* 4.20 2.438 120.0 0.000
40.940 Vel = 1.351 m/sec
0.250 1.752
25
80.60
18* 4.45 0.000 120.0 0.024
26.640 Vel = 3.190 m/sec
16 106.687
17 4.20 0.000 0.056 0.014
6 ANSI B36.10
Sch.40 : No lining
0.250 1.790
0.500 2.051
40
1xE=1.22
21* 4.20 1.219 120.0 0.049
40.940 Vel = 4.071 m/sec
0.340 1.904
40
1xT=2.44
22* 4.20 110.067 2.438 120.0 0.000
211.474 40.940 Vel = 4.071 m/sec
Page 7 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
0.250 1.865
25
80.60
23* 4.45 0.000 120.0 0.024
26.640 Vel = 3.291 m/sec
19 110.067
22 4.20 0.000 0.059 0.015
9 ANSI B36.10
Sch.40 : No lining
0.250 1.904
2.800 1.777
40
1xT=2.44
24* 4.20 106.271 2.438 120.0 0.000
105.204 40.940 Vel = 2.677 m/sec
0.250 1.738
25
80.60
25* 4.45 0.000 120.0 0.024
26.640 Vel = 3.178 m/sec
21 106.271
24 4.20 0.000 0.055 0.014
7 ANSI B36.10
Sch.40 : No lining
0.250 1.777
2.800 1.742
40
1xT=2.44
26* 4.20 2.438 120.0 0.000
40.940 Vel = 1.332 m/sec
0.250 1.704
25
80.60
27* 4.45 0.000 120.0 0.024
26.640 Vel = 3.146 m/sec
23 105.204
26 4.20 0.000 0.054 0.014
12 ANSI B36.10
Sch.40 : No lining
0.250 1.742
0.500 2.035
40
1xE=1.22
39* 4.20 1.219 120.0 0.049
40.940 Vel = 4.055 m/sec
Page 8 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
0.340 1.889
40
1xT=2.44
34* 4.20 109.638 2.438 120.0 0.000
210.644 40.940 Vel = 4.055 m/sec
0.250 1.850
25
80.60
32* 4.45 0.000 120.0 0.024
26.640 Vel = 3.278 m/sec
26 109.638
34 4.20 0.000 0.058 0.015
10 ANSI B36.10
Sch.40 : No lining
0.250 1.889
2.800 1.763
40
1xT=2.44
31* 4.20 105.854 2.438 120.0 0.000
104.790 40.940 Vel = 2.667 m/sec
0.250 1.725
25
80.60
33* 4.45 0.000 120.0 0.024
26.640 Vel = 3.165 m/sec
28 105.854
31 4.20 0.000 0.055 0.014
11 ANSI B36.10
Sch.40 : No lining
0.250 1.763
2.800 1.728
40
1xT=2.44
35* 4.20 2.438 120.0 0.000
40.940 Vel = 1.327 m/sec
0.250 1.690
25
80.60
36* 4.45 0.000 120.0 0.024
26.640 Vel = 3.133 m/sec
30 104.790
35 4.20 0.000 0.054 0.013
8 ANSI B36.10
Sch.40 : No lining
0.250 1.728
Page 9 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
PIPE INFORMATION
Pt (1) (Bar
Nominal ID L (m) G)
0.900 2.347
80
1xT=4.57
3* 3.70 4.572 120.0 0.000
77.920 Vel = 1.165 m/sec
2.600 2.190
80
1xT=4.57
19* 3.70 321.542 4.572 120.0 0.000
320.281 77.920 Vel = 2.243 m/sec
2.600 2.174
80
1xT=4.57
38* 3.70 4.572 120.0 0.000
77.920 Vel = 1.119 m/sec
1.520 2.360
80
1xT=4.57
2* 3.70 967.886 4.572 120.0 0.000
333.359 77.920 Vel = 4.548 m/sec
Notes
For full NFPA compliance, a detailed schematic drawing from PIPENET is required, showing pipe labels as well as node and nozzle labels
Reference Node at which flowrates calculated denoted by bold and with an asterisk and are always the flow outlets
To calculate Pt (2) from Pt (1) add elevation pressure and friction loss
K-Factor is considered for the nozzles only
Notes use actual labels for their pressure values
L - Pipe Length, F - Fittings Equivalent Length, Q - Special Equipment Item Equivalent Length, T - Total Equivalent Length
Page 10 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
HE Standard 45° Elbow E Standard 90° Elbow LE Long radius 90° Elbow
T Tee or Cross (Flow turned 90°) G Gate Valve C Swing Check Valve
NR Non-return Valve BV Ball Valve B Butterfly Valve
Page 11 of 13
PIPENET® Fire Protection Report
CONSTRUCTION OF SUDAIR SOLAR PLANT
Hydraulic Graph
10
Supply
Pressure / Bar G
Demand
Residual pressure
6 Operating point
Outside hose stream allowance
(1301.24,3.19029)
2
0
0
0
00
00
00
00
00
00
00
00
40
80
12
16
20
24
28
32
36
40
Flow Rate (Q1.85) / l/min
Page 12 of 13
39
32
38
21
34
23
33
19
12
22
14 31
25
4 11 36
13
2 24
16 35
5 27
15
3 1 7
26
18
6
17
9
8
28
10
W W E E=556931.694
N=2852042.232
S
E E=556803.329
N=2851981.516
S
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
3
10
16
2
9
15
1
PARKING-9
8
14
13
7
20
5
12
19
4
18
3
9
2
8
13
1
7
E=556671.030
12
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
ALUMINUM
CHAMBER
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
LEGENDS
CAM-A05
CAM-B05
CAM-A07 CAM-B07
M
HC5 CDE
HC5 CDE
AS-BUILT
DATE: 13/01/2024
https://www.lntecc.com/
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
CAM-A03 CAM-A04 CAM-B03 CAM-B04
CAM-A01 CAM-B01
ACS CONTROLLER
ACP-A01 CAM-A02 ACP-B01 CAM-B02
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
FIREWATER NETWORK
OVERALL LAYOUT
A0 1:400
W E E=556931.694
N=2852042.232
S
E=556803.329
N=2851981.516
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
10
16
23
9
15
PARKING-9
1
8
14
13
7
20
5
12
19
4
18
3
9
2
13
1
E=556671.030
12
78
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
GENERAL NOTES
LEGENDS
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
A0 N.T.S
W E E=556931.694
N=2852042.232
S
E=556803.329
N=2851981.516
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
10
16
23
9
15
PARKING-9
1
8
14
13
7
20
5
12
19
4
18
3
9
2
13
1
E=556671.030
12
78
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
GENERAL NOTES
LEGENDS
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
FIREWATER NETWORK
ISOMETRIC
A0 N.T.S
W E E=556931.694
N=2852042.232
S
E=556803.329
N=2851981.516
E=556983.326
N=2851933.072
PARKING-8
PARKING-7
PARKING-6
PARKING-5
PARKING-4
PARKING-3
PARKING-16
PARKING-2
PARKING-15
PARKING-1
PARKING-14
PARKING-13
PARKING-12
F1
PARKING-11
6
5
11
PARKING-10
4
10
3
10
16
2
9
15
PARKING-9
1
8
14
13
7
20
5
12
19
4
18
3
9
2
8
13
1
E=556671.030
12
7
6
11
10
15
14
N=2851918.939
E=556854.961
N=2851872.356
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
E=556722.218
N=2851809.570
GENERAL NOTES
A A
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
-
CRASH BARRIER DETAIL
SCALE : NTS
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
OUTDOOR FIRE HOSE CABINET DETAIL
- SCALE : NTS 1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
A0 N.T.S
W W E
S
E
S
AREA
CAPE
LANDS
6
5
11
4
10
10
16
23
9
15
1
8
14
13
7
20
5
12
19
4
18
3
9
2
13
1
12
78
6
11
10
15
14
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
GENERAL NOTES
LEGENDS
A
-
AS-BUILT
DATE: 13/01/2024
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
A0 1.50
W W E
S
E
S
AREA
CAPE
LANDS
6
5
11
4
10
10
16
23
9
15
1
8
14
13
7
20
5
12
19
4
18
3
9
2
13
1
12
78
6
11
10
15
14
ALUMINUM
GLAND
PLATE
CABLE
ENTRY
CABLE
ENTRY
BUSBAR
CHAMBER
ALUMINUM
GLAND
PLATE
BUSBAR
CHAMBER
CABLE
ENTRY
GENERAL NOTES
5M
+4 .73
.
EL .O.P.) LEGENDS
(C
.L)
(F.F
35M
.+0.0
EL
5M
+ 3 .03 .P.)
. O
EL (C. TO FIRE HYDRANT SYSTEM FROM FIRE PUMPS
EL
. +0
.
AS-BUILT
(C. 535M
O.P
.)
DATE: 13/01/2024
EL
. +0
.03 1.5 GWac SUDAIR PV PROJECT
5M
(F.F
.L) LARSEN & TOUBRO LLC
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC
A0 N.T.S
AS-BUILT
DATE: dd/mm/yyyy
RED MARKUP APPLICABLE YES NO
1.5 GWac SUDAIR PV PROJECT
LARSEN & TOUBRO LLC