You are on page 1of 2

Metal Clad Switchgear

DNF7 Instructions for cables test on


33kV Incoming cubicles

In cases where it is required, the use of


NOTICE CAUTION gloves was deliberately excluded from this
documentation to provide more claritication
This manual doesn’t explain the instruction of All of the operations explained in this manual for the tracking of operations.
safety interlocking to be applied. should be performed on the cubicle out of
service (during the commissioning or out of Also, do not appear the markups, the safety
service). instruction, locks or other devices required
before any work on the equipment.

1 Devices for earthing and short-circuit


The devices for earthing can have different The clamps of tightening should be selected
shapes. and adapted to anchor points considered.

2 Installation of a device for earthing switch

Consignment of the cable compartment

J Visually check the absence of voltage. J Switch off the LV circuit breakers J Open the cable compartment.
J Check than the earthing switch is closed. secondary VT in the LV cabinet.

J Carry out the mandatory audit for J Fix the master jaw of the devices for J Clip the first jaw on the insulating rod.
absence of voltage on each phase. earthing on the circuit main earth. J Tighten the jaw on the phase L1
connection.

J Repeat for the other two phases. J Switch the contacts of VT’s primary
connections.

1
3 Test procedure (tests of cables)

J Open earthing switch for tests.

Example of cable test phase L1


Connect the injection clamp on phase L1.
Put insulated gloves.
Disconnect the jaw of the devices for earthing
on phase L1.
Note: The other 2 phases are always
grounded.
Test this cable phase L1 (Max 100V DC
current continuous).

Reconnect the jaw of the devices for earthing


on phase L1.
Disconnect the clamp injection on phase L1

Repeat for the other two phases.

After the tests of three phases


Close the earthing switch.

Reconnect the contacts of VT’s primary


connections.

E 2013 Schneider Electric - All rights reserved

J Remove the device for earthing.


J Close the cable compartment door.
J Switch on the LV circuit breakers of VT in
the LV box.

Schneider Electric Energy France As standards, specifications and designs change from time to time, please ask for confirmation
35, rue Joseph Monier of the information given in this publication.
CS 30323
F - 92506 Rueil-Malmaison Cedex

RCS Nanterre 511 746 356 Design: Schneider Electric


Capital social 6 909 620 € Photos: Schneider Electric
www.schneider-electric.com

03-2013
AMTNoT217-02 revision: 00

You might also like