You are on page 1of 9
enea Ur usa Ferree Vir Wee aay fet ts, feel de ag feeeh — 110010 24016/DGBRIPolicy/ | 2. JEPC Cell GA Rear 2022 yer FEM oar wenfreeres (gd) toe Henfreerera (Gera) ATDa 99 GAT SIHEN ATDe 56 TAT STE WA uaa ERI 56/99 GAT STHER AMENDMENT TO SCHEDULE ‘H’ OF STANDARD EPC AGREEMENT FOR NATIONAL HIGHWAYS AND CENTRALLY SPONSORED ROAD WORKS PROPOSED TO BE IMPLEMENTED ON ENGINEERING PROCUREMENT AN CONSTRUCTION (EPC) MODE OF CONTRACT AND ANNEXURE-1 OF SCHEDULE ‘G’ OF MODEL Ci SSSION AGREEMENT OF HYBRID ANNUITY PROJECT 1. __A copy of MoRT&H letter No. RW/NH-33044/88/2021-S&R(P&B)/DNT(215840) dated 28 Dec 2022, under which MoRT&H has issued amendment with the approval of Competent Authority to Schedule ‘H’ of Standard EPC Agreement for NHs and Centrally Sponsored Road works proposed to be implemented on EPC mode of Contract as per Annexure enclosed with ibid MORT&H letter, is forwarded herewith for your information and further necessary action please. Encls. :- »} Sheets pa Wen Use FaeeE Government of india Ministry of Road Trarisport & Highways {SBR Zone) No.1, Parliament Street, Transport Bhavan, New Delhi-11 File No: RW/NH-33044/88/2021-S&R(P&B)/DNT(215840) Dated: 28 December, 2022 To, 1. The Chief Secretaries of all State Gaveroments/UTs 2. The Principal Secretaries/ Secretaries of all States/ UTs PWD dealing with National Highways, other centrally sponsored schemes and state schemes 3. The Chairperson, National Highways Authority of India (NHAI), G-5&6, Sector-10, Dwarka, New Dethi-110075. 4. The Managing Director, National Highway infrastructure Development Corporation Ltd., 3 floor, PTI Building, Partiament Street, New Dethi-110001 5. Director General (Border Roads}, Seema Sadak Bhawan, Ring Road, New Delhi- 110010. 6. Secretary General, IRC, IRC Bhawan, Kama Koti Marg, Sector-6, R.K.Puram, New Dethi-110022 7. Director, |AHE, Industrial Area, A-5, Sector-62, Noida-201309 8. NIC for uploading on Ministry’s websites Subject: Amendment to Schedule H of Standard EPC Agreement for National Highways and Centrally Sponsored Road works proposed to be implemented on Engineering procurement and Construction (EPC) mode of Contract and Annexure-| of Schedule G of Mode! Concession Agreement of Hybrid Annuity Project. Ref.: Ministry Circular No: RW/NH-33044/88/2021-S&R(P&B)/DNT(215840) Dated- 19.12.2022. ‘Madam/Sir, In continuation to Ministry's Circular cited above, it is to state that keeping in view relaxation given by Government of India under “Atmanirbhar Bharat”, the provisions of the said circular shall also be made appitcable to schedule H of the ongoing projects being implemented on EPC mode of contract upto 31.03.2023. 2. __It is further to state that to allow the similar facility in HAM Concession Agreement (CA), a sub-stage has been introduced in Annexure! of Schedule G of HAM CA for calculation Of progress against casting of precast items such as bridge girders and RE-wall facia panels/blocks for determining achievement of project milestones, 3. ___ In view of above, the following amendments has been made in Annexure-I of Schedule G of HAM CA as shown in the (ast column of the respective tables in Annexure, The amendments shall be made applicable to ongoing HAM concession agreements upto 31.03.2023. Voprs faighfull & waha) 3. This is issues with the approval of Competent Authority. SE, S&R (Roads) For DG (RD) & SS LOs of MoRTH and alt Technical Officers at MoRTH Headquarter. 2. Sr. PPS te Secretary (RTH), Sr. PPS to OG (RD) GSS, PS to ASBFA, PS to all ADGs. Page 1 of 7 ery oos [ogee | Policy| Epc cell Annexure ‘Amendments to Annexure-| of Schedule G of Model Concession Agreement of Hybrid Annuity Model (HAM) Projects. Annexure-! of Schedule G Format for contract price weightages for highways projects with Flexible Pavements. 1.2 Proportions of the contract price for different stages of construction of the project. highway shall be as specify below. ~TStage for measurement | Amended stage for measurement | lof physical progress _of physical progress I Road works including! ‘- New culverts, minor) C- New culverts, minor bridges, | culverts, ‘minor | bridges, _ underpasses, | underpasses, overpasses on bridges. underpasses, overpasses on existing existing road, realignments, overpasses, road, —_realignments, | bypasses: approaches to | bypass ROB/RUB/Major (2) Minor bridges ‘@) Minor bridges Bridges/Structures (but “(¢) __Super-structure (c) Super-structure (including crash | jexctiaing service (including crash barriers barriers etc. complete) If pre-cast| jreads) jetc. complete) | girders/ segments are used, 40% of | jthe weightage of the stage in| | percentage to the bid project cost | ‘is assigned to the casting of such __ precast girders/segmer | | le {c) ‘Super-structure | (c) Super-structure (including crash | {including crash barriers| barriers etc. complete) If pre-cast} | etc. complete) girders/ segments are used, 40% of | | the weightage of the stage in ‘percentage to the bid project cost lis assigned to the casting of such! | structures | precast girders/segments. | | @ Pedestrian (4) Pedestrian overpasses overpasses ee! i Ke pet | | (including crash barriers| barriers etc. complete) If pre-cast | | etc. complete) girders/ segments are used, 40% of | | i ithe weightage of the stage in| { | | percentage to the bid project cost | | 1 lis assigned to the casting of such| i |(5) Grade separated | (5) Grade separated structures 1 i Super-structure (iii) Super-structure _ (including| | (including crash barriers crash barriers etc. complete) If pre-| jetc. complete) “cast girders/ segments are used, | Page 2 0f7 \w in percentage to the bid project) i cost is assigned to the casting of| such precast girders/segments. Mb) Overpass {b) Overpass (iii) Super-structure | (iil) Super-structure (including | (including crash barriers | crash barriers etc. complete) If pre=| \ etc. complete) ‘cast girders/ segments are used, | 40% of the weightage of the stage, ‘in percentage to the bid project \ cost is assigned to the casting of such precast girders/segments. (Flyover (iti) uper-structure | (if “structure — (including | (including crash barriers | crash barriers etc. complete) If pre- etc. complete} ‘cast girders/ segments are used, | | 40% of the weightage of the stage | in percentage to the bid project! } cost is assigned to the casting of | - __ stich precast girders/segments. “Major Bridge works and) A. - Widening and | Widening and repairs of Major | ROB/RUB i repairs of Major | Bridges Bridges i 1 | i {including greek barriers barriers etc. compiete)} If pre-cast) etc. complet | girders/ segments are used, 40% of! the weightage of the stage in percentage to the bid project cost, is assigned to the casting of such) precast girders/segments.. jening of repair of | repair of - “a ROB TRB —— @) Super-séructire | (3) Super-structure (including crash’ (including crash barriers | barriers etc. complete} If pre-cast | “ete. complete) | girders/ segments are used, 40% of the weightage of the stage in | percentage to the bid project cost! \is assigned to the casting of such} oo | precast girders/segme | wb RUB "RUB | o Super-structure (3) Super-structure (including crash | (including, crash barriers, barriers etc, complete) If pre-cast ‘etc. complete) girders/ segments are used, 40% of | the weightage of the stage in, 1 a "Tis assigned to the casting of such| lin percentage to the bid project cost is assigned to the casting of such precast girders/segments. _ | | ____|precast girders/segments. _| | ro |G. = New Major {New Major Bridges | LE Bridges i r i a) ~~ Super-structure a Super-structure (including | \(including crash barriers | crash barriers etc. complete) If pre- \ ‘tc. complete) cast girders/ segments are used, | | F | 40% of the weightage of the stage | | i} = 13) Super-structure | (3) Super-structure (including « crash] |tincluding crash barriers | barriers etc. complete) If pre-cast | letc. compiete) girders/ segments are used, 40% of | ‘the weightage of the stage in! i percentage to the bid project cost | is assigned to the casting of such} _____ precast girders/segments. _ & RUB ‘RUB | | | 13) Super-structure | (3) Super-structure (including crash! \ |tineluding crash barriers (barriers etc. complete) If pre-cast ‘etc. complete) | girders/ segments are used, 40% of | | \the weightage of the stage in| | | percentage to the bid project cost \ is assigned to the casting of such | eee | ee precast girders/segments, | ‘Structures (elevated |) Super-structure | (3) Super-structure (including crash |sections, reinforced | (including crash barriers barriers etc. complete) If pre-cast earth) etc. complete) “girders/ segments are used, 40% of | { the weightage of the stage in| percentage to the bid project cost fs assigned to the casting of such] } ) Reinforces Earth Wail (4) Reinforces Earth Wall (includes, {includes Approaches of Approaches cf ROB, Underpasses,| ROB, Underpasses, Overpasses, Flyover etc. If RE-wall is| i ‘Overpasses, Flyover etc. iused with facia panels/blocks, 5% | ‘of weightage of the stage inj ‘percentage to bid project cost is { [assigned to the casting of such facia, panels/biocks for one complete. approach. | | Page 4of7 he Format for contract price weightages fer highways projects with Rigid Pavements. 1.2 Proportions of the contract price for different stages of construction of the project highway shall he as specify betow_ 7 Stage for measurement | Amended stage for measurement | lof physical progress _| of physical progress V Road works including - New culverts, minor) C- New culverts, minor bridges, ‘culverts, minor! bridges, —_ underpasses, | underpasses, overpasses on bridges, underpasses, overpasses on existing existing road, realignments, overpasses, ‘road, —_reatignments, bypasses: ‘[ (2) Minor bridges __ | | Bridges/Structures (but “(¢)~””Super-structure | (c) Super structure (including crash | jexcluding SerVICE including crash barriers | barriers etc. complete} If pre-cast! roads) etc. complete} girders/ segments are used, 40% of | | “the weightage of the stage in] percentage to the bid project cost | is assigned to the casting of such cture | (c) Super-structure (incl {including crash barriers barriers etc. complete) If pre-cast! etc. complete) ' girders/ segments are used, 40% of | ithe weightage of the stage in| “percentage to the bid project cost _1s assigned to the casting of such (4) overpasses ee (ce) Super-structore | (c) Super-structure (including crash (including crash barriers barriers etc. complete) If pre-cast ete. complete} girders/ segments are used, 40% of ithe weightage of the stage in| percentage to the bid project cost! [is assigned to the casting of such | | | 16) Grade separated’ (5) G istructures: (ajUnderpasses —__—(a)Underpasses_ j ii) Super-structure (it) Super-structure ~(includins | (including crash barriers | crash barriers etc. complete) If pré etc. complete) ‘east girders/ segments are used, | | | 40% of the weightage of the stage | | ‘in percentage to the bid project! | cost is assigned to the casting of ! such precast girders/segments. Page $ of 7 { 1 (ii) Super-structure |(iii) Super-structure (including | { | Gineluding crash barriers | crash barriers etc. complete) If pre- | etc. compiete) ‘cast girders/ segments are used, | i | | 40% of the weightage of the stage in percentage to the bid project cost is assigned to the casting of ch precast girders/s (including crash barriers | crash barriers etc. complete) If pre: jetc. complete) [cast girders/ segments are use i | 40% of the weightage of the stage | 1 Jin percentage to the bid project | | cost is assigned to the casting of | Loa _such precast girders/segments. | Major Bridge works and |A- Widening and repairs | A- Widening and repairs of Major | ROB/RUB “lof Major Bridges Bridges a Cc Wh Atay Super-structure | (3) Super-structure (including crash | i {including crash barriers barriers etc. complete) If pre-cast | } ‘etc. complete) | girders/ segments are used, 40% of ! \the weightage of the stage in| | percentage to the bid project cost | Lis assigned to the casting of such, | zs ___ precast girders/segments._ | f repair of | 'Gi)_ Super-structure (iii) Super-structure ‘itor ‘ture (including crash] | including crash barriers | barriers etc. complete) If pre-cast | | etc. complete) | girders/ segments are used, 40% of | i the weightage of the stage in| percentage to the bid project cost | ‘is assigned to the casting of such} { J ders/segments. | | | pe | | |tincluding crash barriers barriers etc. complete) If pre-cast | jetc. complete) girders/ segments are used, 40% of | } ithe weightage of the stage in| | percentage to the bid project cost | ! is assigned to the casting of such/ jetc. complete) ‘cast girders/ segments are used, | | 40% of the weightage of the stage | in percentage to the bid project cost is assigned to the casting of | i | ilinctuding crash barriers crash barriers etc. complete) If pre-_ \ _-_Such precast girders/segments. D- New ~ Tait-road!D- New rail-road bridges 1 Super-structure (3) Super-structure (including crash) including crash barriers barriers etc. complete} If pre-cast etc. complete) girders/ segments are used, 40% of | i “the weightage of the stage in} percentage to the bid project cost \is assigned to the casting of such t girders/segments. (5) RUB 3) Super-structure’ ( i per structure Gncluding crash (Gincluding crash barriers | barriers etc complete) If pre-cast ‘etc. complete} | girders/ segments are used, 40% of ithe weightage of the stage in} ‘ percentage to the bid project cost | { 1s assignad to the casting of such) [precast girders/segments. [Structures (elevated G) ~~ Super-structure (3) Super-structure (including ¢ crash} sections, reinforced (including crash barriers barriers etc. complete) If pre-cast | vearth) ‘etc. complete) girders/ segments are used, 40% of | { “the weightage of the stage in| percentage to the bid project cost; |is assigned to the casting of such | /segments. | " (4) Reinforces Earth Wait (4) Reinforces Earth Wall (includes, {includes Approaches of Approaches of ROB, Underpasses,| | /ROB, Underpasses, Overpasses, Flyover etc. If RE-wall i ! | Overpasses, Flyover etc. used with facia panets/blocks, 10% i i ‘of weightage of the stage in | percentage to bid project cost is, ‘assigned to the casting of such facia, panels/blocks for one cme ‘approach. annne i Page 7 0f7

You might also like