You are on page 1of 39
SLOPE STABILITY ANALYSIS REPORT for | “Preparation of GADs of Station Builds and Rob, Structural Designs of Rob, Minor Bridges, Retaining Walls, Buildings and Slope Stability Analysis at High Bank/Cutting Locations Including Geotechnical Investigation for Manikpur and Baroud Siding of SECL”, (CH No. 3500) Client: | Indian Port Rall & Ropeway Corporation i, Srutancceee Prepared ARCHITECTURE & ENGINEERING CONSULTANCY SERVICES (P) LTD. Ar nots un hing, atin of eiraga Pole Sato, AFCS Bhubaneswar-751022. Conan STope Stability —] Cents Analysis Report A ARCHITECTURE BENGINEERING [100 No. EY Cees, nk Pot a & Fey ees tia noc nas [ancsaiv0 “peer ner CONTENTS CharerNo. Desriton Pras. List of Tables Appendices io Induction 1 20 Laboratory Examination and Testing 1 30 Propertes of substrata 2 40 ‘Slope Stab Analysis of cuting 2 30 Espana regarding Slope Stabiy Anais 2 60 Conehasion 3 70 ‘Suggestion 3 *0 Closure 4 ST OF TABLES Table 1 Laboratory tests conducted APPENDICES Aepenarca Bore Logs Aependic® Laboratory test resus ApendbeC —Caluaton of Slope Stabity popenanen S108 See Ditrbiton Cane AapendicE Graphical Representation of Sear Stenth Parameters Aopendic# Cross-Section bar ame of Project: Bridges, Retaining Wale, Bullings And’ Sope Stbity “Anayes At High Bani/Cuttng Locabons Including GeoTecnnical Investgaton For Manipur And “Preparation OF GADs OF Staion BulGs Ard Reb, Susur Designs OF Rob, Mine Baroud Sng OF ECL” 20 Consaan Slope Stability] Giont> Analysis Report cSactemuemersre, fet Ramey Les mneadanee [coc na |ascso ‘pratt ter 10 Introduction: Group General Manager, Indian Port Rail and Ropeway Corporation Ltd, Bhubaneswar| has taken up the work of “Preparation of Gads of Station Builds and Rob, Structural Designs of Rob, Minor Bridges, Retaining Walls, Bullding sand Slope Stability Analysis at High Bank/Cutting Locations including Geotechnical Investigation, For Manikpur And Baroud Siding Of SECL.” Incian Port Ral and Ropeway Corporation Ltd, Bhubaneswar has| ven the work to Architecture & Engineering Consultancy Services (P) Lt, Bhubaneswar to carry out the slope stability analysis fr cutting slope reated to the above| ‘mentioned construction work at chainage ie. Ch.-3600, The geotechrica investigation work| Comprises of stope stability analysis of proposed cutting. From the field & laboratory tests, the| subsoil condition & soll parameters are envisaged and considered for the slope stabilty| analysis. ‘As per the client's information & crawings, the cuting slope Is checked with provided slopes, In the cuting, slope stably analysis with pictorial dagrams showing approximate failure ‘surfaces are appended wit this report for ready reference, Laboratory Examination and Testing: Laboratory methods in accordance with relevant standard codes of practices are adopted to ascertain the diferent essential characteristics of sub-sol using fleld samples obtained in| ‘course of fled investigations. The teste a6 under have been conducted to esccrtain the ‘parameters indicated in the test The finding ofthese test are required to use in relevant Engineering Designs, ‘The tests as under have been conducted to ascertain the parameters indcated in the test ‘The finding of these test are used later for stability analysis, oe [Name of Project] | Preparation OF GADs OF Staion Guilds And Rob, Swueual Designs OF Reb] Minor Briges, Retaining Wal, Buldngs And Slope stably Analyse At High ‘BankiCuting Locatone Incuaing GeoTechnie!Invesigaton For Mankpur And 1 Siding OF SEC Cansaiane Stope Stability | Cant Analysis Report Seremamonnyes pte: at tek Rey i oe a ee Dato reer Table: -Laborator tests conducted SW: | Tabor teas 5 Codes 1_| Gian se ana 15272 4}-185 Retired 2020) 2 Index ropes 1S: 2720(par-5)-1986 Refi 2020) 2 | Field moisture content| 1S: 2720(par.2}-1973 (Rati 2020) 4 Spectcgrety | 1: 2720ipart) (eo--1980 Retest 2021) 5] Shas svengh Prater | 18.2720(pat-2- 108 Restmed 7021) 8 Feo sve ox 1S 2720(par 40-1877 (Resfmed 2021) 7 Balk densty = Uneonned Compressne al erence 15 0148-197 Reatimed 2021) 3.0 Ground Water: ‘The depth at which groundwater is struck dui table was ascertained subsequently in the completed borehole. “The depth of water table inside the driled hole was measured by a “bell sounder” method 28 per IS 6995:1973. After competion of cling of bore holes up tothe desired depth, the bore hole was thoroughly flushed and washed by clean water At tha time eagm shoul ha taken to ensure the stabity of sides of bore holes. ‘Then bore hole was measured by increasing the probe of bell saunder with wire and ‘measuring tape. When the bell sounder touched the water level, it wes gave a Plop' sound ‘and measured the water level by measuring tape attached with i During dling of bore hole ground water able was investigated and was found as below. Table 1. Depth of ground water table of bore holes ing boring was carefully noted and the depth of water Note: E.G L. = Existing Ground Level Chainage | Max depth of exploration | Ground wate table Reference inm below E.G.Lim) oH 3500 450 280 ER eee |e | ee “Name of Project: | Preparation Of GADs Banking Locatons Baroud Sting OF SECL ‘minor Briges, Retaining Wals, Buldngs And Spe Stbity Anajeie At High ‘OF Staton Bois And: Rab, Srumural Designs OF Rob, ncuing GeoTechncal Inesigeton For Manipur AAS “a Consultant: ‘Slope Stability] Clent= Analysis Report A ae: teeta ees ORES [onc ne [acai [Cod crete, ‘40 Properties of Sub-Strata at CH No. ~ 3600: 4.4, Discussion on the Engineering Properties of Soil & Rock ‘+ From E.GLL to 1.6 m depth, it was seen that a non-plastic, non-expansive sity sand stratum ‘exists from which one DS was collected at 0.5 m depth, ‘+ From 1.5m to 4.5 m depth highly weathered sand stone mixed with send stratum exiss from which core samples could not be collected, only washed out samples have been colected whose field SPT N values were found tobe greater than 60. ‘+ From 45 m to 7.5 m depth, a medium plastic, low expansive clayey said stratum exists from hich UDS was collected at 6.0 m depth, The field SPT N values was found tobe 20 at 4.5m depth, ‘+ From 7.5 m to 8.0 m depth, @ boulder stratum exists from which boulfer pieces have been collected whose field SPT N values were found to be greater than 50. ‘+ From 9.0 m to 120m depth, @ medium plastic, low expansive eit and clay with low ‘compressibilty stratum found, The field SPT N values were found to be 19 and 20 at 90 m, and 10.5 m depth respectively ‘+ From 12.0 m to 13.5 m depth, a medium plastic, low expansive clayey sand stratum exist from hich UDS was collected at 12.0 m depth, ‘+ From 135 m to 150 m depth, a medium plastic, low expansive eit and clay with low compressibility stratum found. The ld SPT N values were found tobe 22 at 125 m depth. ‘+ From 15.0 m to 16.5 m depth, a medium plastic, low expansive clayey sand stratum e hich UDS was collected at 15.0 m depth trom ‘+ From 165 m to 19.8 m depth, a medium plastic, ow expansive sit and clay with tow ‘compressibity stratum found from which UDS was collected at 16.0 m depth, The field SPT N| value was found to be 25 at 10.5 m depth. ‘+ From 19.5 m to 21.0 m depth, @ rock stratum exists from which core samples has been collected. The core recovery was found tobe 12.85% and ROD was found tobe ri, ‘From 21.0 m to 24.1 m depth, a highly weathered sand stone mixed wih sand stratum exists {rom which core sampes could not be collected, only washed out samples have been colected hose fleld SPT N values were found tobe greater than 100, “Name of Project: | Preparation OF GADs OF Saton Guise And Rob, Sworual Desens OF Rob Minor Sng, Retaiing Wal, Buildings And Sipe Stablty Analyse At High ‘Bank{Cuttrg Locatons Incuaing GeoTechnealInvesigston For Mankpur And Baroud Siig OF SECL Toast Slope Stability Cents Analysis Report coareeamseamrge pte felt Ray ee a fuser pot lr ‘+ From 241 m to 30.0 m depth, a rock stratum exsis rom which cere samples has been collected. The core recovery was varying fom 7.33% to 14.67% and RAD was found to be ‘From 30.0 m to 46.0 m depth, a medium plastic, low expansive clayey send stratum exits frm which UDS were collected at 33.0 m. The field SPT N values were fourd to be 28, 29,36, 37 45, 48, 48, 5 ,52 and greater than 50 at 30.0, 31.5, 34.8,380, 37.5 99.0,40,5.42.0.43.5 and| 45.0 m depth respectively. bes ‘Name of Project: | Piepsrsion OF GADs OF Sain Buiis Ard Rob, Stuual Designs OF Reb] of Project: | rar rdges, Retaining Wal, Buldngs Ans Sepe Stzity Aragos A High BannCutng Lecatone Incxing GeoTecnia! Investgcton For Mankpur And Beroud Sng OF SEL” 7 oo Slope Stability] Uiar> Analysis Report oer umaneees, [abt Pt tal Pt et poy acs mmneacanae | oc [assvnire [Cged Serer aae | 5.0 Slope stability analysis of cuttin, [Ate ch-3500, the depth of cuting slope is 38.0 m, the cuting slope 1:15, a8 per the drawing ‘provided by the client, ‘As per the RDSO guidelines GE: G-1, the stability of euting slope has ben checked by software GEOS, 6.0 Analysis of cutting using GEOS Software: ‘AS per the provided cross section, the total height of cutting is given a8 many layers, and full height of the cuting is analyzed by using GEOS, sofware, The software (GEOS) is used to Perform slope stability analysis (embankments, earth cuts, anchored reining structures, MSE walls etc). The sip surface is considered as circular (Bishop, Felleniws / Petterton, Janbu, Morgenstom- Price or Spencer methods) or Polygon, 6.1 GEOS Software: + In analysis, choose the intial sip surface using the coordinates of the center (x.y) and its ‘radius by clicking on the interface to enter three points through which the lip surface passes, ‘+ Incohesive soit rotational sip surfaces occur most ften. These are moceled using circular ‘ip surfaces, This surface is used to find the ertical areas ofan analyzed slope, Fornon- Cohesive sols, an analysis using a polygonal slp surface should alo be performed in order to very the slope stati, ‘After chooting the intl ap ourface, choose “Bishop” asthe analysis method arden tthe |ype of analysis to "Optimization". Then perform the actual verification by eliking on “Analyze” ‘+ Optimization consists of finding the cxcular slip suface withthe lowest stabity he erica sip surface. The optimization of circular sip surface inthe slope stability program evaluates the lentie slope and is very reiable. This way we will gt the same resul fora crtical slip surface ‘even with inital ip surfaces ‘+ The stabilty analysis for the ertical slip surface using “Bishop” evaluation method is found ‘atsfator if Factor of safety is found to be greater than 1.4 “Name of Project: | Prebarsion OF GADs OF Staion Bulge And Rab Staal Designs OF Rb Mor Bridges, Retaining Wals, Buldings Ang Slope Sbotty Anajis At High BankiCuting Locations Incuding GeoTecknealInvesigeton For Mankpur And roud Siding OF SECL™ Consul Slope Stability | Clant> Analysis Report Sacteaumsemorse, pa tek ht aevey Lacs mnmatsacettia'* | oocnes | ascspro ‘tn aber CONCLUSION: ‘+ The slope stablty analysis has been caried out by considering following cases. By Using the software GeoS for euting slope (H-36.0 m) of Chalange-3500 with cutting slope of 11.5. > CASE-A: With fatter the top 60 m depth in 1V-2H with 6.0 m berm at that depth and Fest(H=20.0) ofthe depth as per the given cross-section slope in 1V1.SH, the cuting slope is stable and gives the FOS 1.48 which is greater than the minimum requirement FOS. value 0. ‘+ CASE-2: If we consider the full depth(=36.0 M) of cuting slope as fer given cross-section in 1V-1.5H then the cutting slope is also stable, but the obtained FOS is determined to be less than the above value and found to be 1.43 which is greater than the minimum requirement FOS valuet 40 ‘+ Hence the cuting section is stable forthe cuting slope of 1V-2H (or op 6.0 m depth) and also (0M) with 1V:1.SH with respect to the properties of eub go as mentioned in 7.0 SUGGESTION: However, to stable the cutting slope folowing may be suggested: ‘+ Retaining wal or Gabion wall of appropiate height may be constructed atthe toe ofthe bottom ‘ope to provide lateral suppor tothe vertical slope, + Effective steps need to be taken to avert any eventuality of ingress of surface water into the sting, This can be accomplished by provision of catch water drain or berm drains. ‘+ For backfill of retaining wall GP, GW, SW materials should be used with 600mm fiter media can ‘+ Berm drains shall be constructed at each berm of slope to protect the slope from ran cut and for smooth drainage of water. Catchment drain shall be provided for surface drainage. + If necessary, sol naling process may be adopted with geo-net to protect he slope and suitable ‘drainage system shal be provided forthe flow of water from the top ofthe sop + The slope stability canbe improved by turing because the roots the plant makes the sol stable, '+ Care must be taken to prevent the slope faire during the execution of work = Ni ‘Project: | Preparation OF GROE OF Siaion Bulls And Rob, Siusural Designs OF Rob, ‘Name of Project: es niges, Rang Wal, Bubs ted Sope Sebly heaios ot Rk BankCuttng Locations Incuing GeoTecicalInvestgaton For Mankpur ANd Baroud Sig OF SEC 15 Consultant ‘Slope Stability _] Client: Analysis Report arcarectune sexcnecna [10No: [128 Breiner semnets ee, da Rta Rey WECS ‘wonweawan’ "Voc na: | ancs/t170 Orpen Pater 8.0 CLOSURE: Iwas a great pleasure working for this project and performing this Sub-soil investigation and Cutting Slope Stability Analysis for you. Here with we are submiting this report. Please contac us fc further service required. ‘Quality Control Division, ‘AECS (P) Ltd, Saheed Nagar, Bhubaneswar. "Name of Project: | Prepataion OF GADs OF Siaton Buide And Rob, Srirural Desgrs OF Reb Minor Bridges, Retaining Wal, Buings And Sope Stbity Anais At High BankiCuting Locations Incuing GeoTechnical Invesigeton For Manipur And Baroud Siding OF SECU" “7 Consultants Slope Stability Analysis Report, Aa cattseesmensemes, [= Lvecs ‘Sieaneswan OC No Aucs/1170 (hn Pat Pal SPepasey Bore Log ‘Name of Project: “Pparaion OF GADé OF Staion Gulds And Rb, Seustral Designs OF Rob Minor Sng, Retaining Wal, Buldings And Spe Sboity Anajse St High ‘BankCuting Locstons Including GeoTechnialInvestgsion For Mamkpur And Baroud Sing OF SECL” Consultants [ARCNTECTURE aenonecRNa eens ‘Name of Project: “Preparation OF GADs OF Staton Bulds And RO, Smucural Designs OT Rob, Minor Bridges. Retaining Walls, Buisngs And Sipe Stay Anajis At High BankiCuting Locations incuding GecTectcalInvesigaton For Mankpur And Baroud Siding OF SEC oo Cannan Slope Stability — | Giant? Analysis Report corasrerersemmausenns, Hebe ‘ko ROR Rey Lees en tisesmee” [oocta [asim Sri nar a] |i li £ i] jai} af it aT TEE @ ele ee HE fl oe 3q8 ili flail op lal elit | " Sep festa. cE fo a fan | oe fs so | a faa A ‘Name of Project: | Preparation OF GADs OF Staton Buide And Rob, Shucval Designs OF Rob Moor Biges, Retaing Wals, Buaings And Spe Skbty Arayes At High BanWcutng Locate inusng GeoTesnna!Inestgeion For Manigur An Bsoud Sng OF SECU” “10 Consultant Slope Stability | Client Analysis Report ancrrectune aeveweenne [JoNos [125 iethaney sence (re, IAECS SHUSANESWAR, poc.ne: | akesy1170 ean Pet Pal Ray Sept atari Appendix-B Laboratory Test Results Bow | Name of Project: Barood Siding OF SECL” “Preparation OF GAD OF Siaion Guide And Rob, Siuaural Designs Of Rob Iino Bridges, Retaining Wals, Buidngs Ane Slope Sabity Analyse At High [Bank/Cuting Locabons Including GeoTechnica Inesigaion For Wankpur And “TT Consultant ‘Slope Stability] Client: Analysis Report Carte enor [aed nme Lecs ati owen [assnire [Qed Speen cece SS noo08 nog mls] f ela afl =—— 0000 fat ee el ‘Name of Project: | Preparaion OF GADs OF Staion Buide And RB Stocural Designs OF ROB, Minor Bridges. Retaining Walls, Buiciogs And Slope Stanly Analyis At High Bank/Cutng Locations including GeeTechnicalInvesigaton For Mankpur Ard Barous Siig O1SECL” “Tie Consultants | Slope Stability Analysis Report ancurecrune acvoncenws [JobNo= [128 Lacs mentee Toca | acre age ana mom | [x] el e]u] ale ]e]e]s]e]e ‘DBERATORY TEST RESULT OF HRT i i ! - iz al alt H if fle = alilelalals Talat vommwcsed 31H aT HT Halle ARBRE aa i “Name of Project: | Preparation Of GADs OF Staion BUIGE And Rob, Studd Designs OF Rob, Minor Bridges, Retaining Wats, Bulings And Slope Slaity Analysis At High BankiCuting Locations Incluing GeoTectnicalInvestgaton For Monkpur ARd Bsroud Sing OF ECL” airs Toa Slope Stabiity | Cia Analysis Report weregaenesans fe — [eh ees eos atest Tove: [acme [Od mera, = fel ele = [=] = T= ve fom u pute [map [ow | = wm feme ele toml = Po le fe epee [oom] fe |e fo [mele Pw Po Po fo pe wr fem] ue afm [ool@ | lw Pe fe pt a ac x fem fe [vf [aol ow Pw [or = Femara As pertabe 2 of 2014 : E [ttre Uncuted Compress Sen (U8 in | eee Bron +a ms ‘Very Strona Ton te 00° 7 $ on aieio8 | wri So ism | Wray Weak Tour he = atios 7 We Waar or ‘aie of Project: | PepSaS OF GADs OF Salon Dns Ad Rb. Sencar Dwg OF Ra Minor Bridges. Retaining Wals, Buildings And Scope Stabty Analyes At gh BankCuting Locations Including GeoTectacal Investgaton For Mankpur Ana Baroud Siding OF SECU” AL conan ry A amase taht afm ees NBER [ccna [acename (ged ‘Sacco TTA sw |] | ayant stmt] ec acts tiowe| Se Wat i ie | aseenage itins a 7 s 7 [owes mee [Ea | ae 7 7 3 | smpiea] rock | Frm’iSme | ag Mt 8 u "Name of Project: | Preparation OF GADs OF Staion Buss And Rob, Stuchral Designs OT Rob, Manor Bridges. Retaiing Wale, Buings And Slope Stebity Anayes At Hah BankCuting Locations Including GeoTectnicalInvestgaion For Manikour And Baroud Sing OF SEC” “15 Calculation of Slope Stability ‘Consultant: Slope Stability | Client > Analysis Report A See = nh Roy ay ee om fearon AQ) momo Appendix-C bea [ Namie of Project: ‘reparaton Of GADs Of Staion ulGs And Rob, Stucural Desgns OF Rob] Minor Bridges. Retaring Wals, Buildings And Slope Stabity Anajis At High BaniiCuting Locations Including GeoTecncalInvestgaion For Mamnkpur Ana Baroud Sing OFSECL™ Consultant cotgeliane sence 7, (on Pr a5 Bperay Lvecs omnenesman’*”” poc no: | asessnz0 Capra Baer Tae aT TAT i ere 2 . Spa 07916008 OK “Name of Project | reparation OF GADs OF Staton Guide And Rab, Sivclal Designs OF ‘nr Bes, Retaang Ws, Bains te Spo Sabty Anas I Consultant: ‘Slope Stability | Client Analysis Report coaerarersermeases, [M8 Pat gery ees enetecenase Toc nos | acco [(@O) Papen beter 7 BLACK COLOURED STONE (COAL)-01 38004000 ama "Name of Project: | Prepataion OF GADs OF Staion Buide Ard Reb, Sine! Designs Minor Brdgos. Retaning Was, Buldns And Sipe Sadly Anais BerkiCuting Locators Inducing GeoTechncal vestigation For Mankpur ‘Brood Sting OF SECL” "20 Consultant Cent Settarersenees Pm, (nin Prt a & Bgeray ECS Thosaneswa voce: | atcsjax70 aration i boner [ese ee i ae deaf re pe Sd peaee| i a 0 parameters wih "Name of Project: | eption O ADS O Sain skh Ra, Skea Doers OF FB ‘Consultant: Slope Stability | Client Anaiyss Report BD axcnirecrure senonccrine [Job Nox ie ‘CONSULTANCY SERVICES (PTD, snontnanneney \eecs REET Nace um [asenie [Ge Set ty SAE seme ira fT eS ite Er St agence orn aaee ee Seeman) (nciscs meagerwonion comers g Spectra tton: See 400 Sey cece Srtweor een’ ttm Cchewen oreo SS FRB are Ssurmeduntweont: Vans 2DSDENm2 Ph aR Ro seg irra ton "800° Sma vn wooht: Yn 2050400 BLACK COLOURED STONE (COAL) Satie rach Rage ner roton -Pieparaion OF GADs OF Salon Buss Ao Rew, Seka’ Dasgns OF EE I ear Bes Retaring Wl, Danger lps Sait Aras At Hoh | Bawcuting Loeions cura GroTecrcalInresigton Far Morag A Smid Seg OSE” a Name of Projec Consultant ‘Slope Stability | lear Anaiysin Report ‘ancumecrune senoneenm [10 No: 128. ‘CONSULTANCY SERVICES (P)LTD, ndan Pert a & Rapouay ecs natin Toc nos [acco |G) Sowa eer meee a sesoxgpiomen someon ose $A Sow Smee ome amen — eerie oc eaee a. SEm sarees essai Saece ST ee Smo. ED as sue eat eer Ss eee EO seas ms SS eee on [Name of Project: Consultant Cent ECs UBANESNA ‘imam a wat cuevewo-ce Tl Preparaion Of GADs OF Staion Bulds Ad Rob, Sticural Designs OF Minor Bridges, Retaning Wels, Bulangs And Slope Subily Analys At BerkiCutrg Locatens Incuding GeoTestncalInvesbgtion For Mankpur Baroud Seng OF SECL” <2 Consultant: ‘Slope Stability | Clent= Acetyads Report AL sansa FS ‘Pt a pony ey eee lcs |amyem ABP) semermimeete 2 selene eros rs Resta tgs of contruction 1) sett saa = _ aan a Sen = 1077209 jj “OR es 85407) ee ao natt a ap SENT Re wm Saoemets ae stat am | Name of Project: | eparaion OF GADs OF Satin Bugs Ard Reb Sica Desire OF Rb] ‘ine Bridges, tang Was, Buns And Slope Sebity Anas At Hh | Benicutg ioraters metry Geotechnical imesipston Fo Mankgu A eow Seng 01SEC" “a5 Consultant Slope Stability | Client: Analysis Report A cues [ee ‘nan Patt gery Zcs “mtatias’ Toc nes _ [ascsnre Srp cer rors peat s Scare, | Preparaion OF GADs OF Station Bulls And Rob. Stueural Dasigns OF Rab | | minor Bridges, Retaining Wats, Buldngs And Slope Sibily Any Al High | aarkicuting Locations Including GooTechnica!Imesigaton Far Mano ANd | Garou Sng OF SECL” ‘Consultant: Slope Stability | | Client: ‘Analysis Report mgmecuncscmneane [BPN [8 SST ERUN mT NS ‘nd Pa aera Wecs mntatsorenie™|oc. nos | cso ‘operand tera Appendix-D Grain size distribution curve [Name of Project: | Preparion OF GADs OF Staion Buide And Rab, Staciural Dass BankiCuting Locators Incuding GeoTechncal investigation For Mankpur ARG Barous Sing OF SECL” ae ‘OF Ra, Minor Bridges, Retaining Wil, Bulings And Slepo Sabi Ansiyes At Wh a Consular ‘Slope Stability] Cent iyshade nagar A seuss P= = nt tat gen oe, nana | noc nes [anes (Od Settee, “GRAIN SIZE DISTRIBUTION CURVES OF BRNO-3500_, 5 4 “Preparaion OF GADS OF Siaion Buds And Rob, Shiela Designs OF Mor Bridges, Retaining Wal, Buidings And Slope Say BanlCuting Locators Incudng GeoTechnical vestigation For Manik Barous Sig OF ECL” "2B ; Anatys At Hi 2g Consulta “Slope Stability] Uient™= Analysis Report D aimee == Baar etanees we ‘nd Prt at Reger Wecs ttwmntesnas’ "| 0c nos | akcsaz0 ‘apt aera Appendix-E Graphical Representation of Shear Strength Parameters Name of Project: “Prsparaion OF GADe OF Slaton Bulge And Rab Sixdural Dasgns OF Rod, Minor Bridges. Rearing Wats, Bulkrs And Slope Stblty Aniys At High BankiCuting Locaene Inusing GeoTechnica! investigation For Mankpue Ard ‘Baroud Sing OF SECL" Be Consultant: ‘Slope Stability _] (ent Analysis Report AL secre, Pe ee stat pny ges, atatani [occas |ancsrve [COL Spat eta (CHLNO-3500, DEFTH-60 Oo C= ait Ke gem y 530 g - B20 & = = $10 2 a 0 1 ao se 4 NORMAL STRESS ( Kg/Sq em ) —> ot ‘Name of Project: | Pepertion Of GADs GF Staion Buls Rod Rob, Smstual Designs OF Rob] Minor Brges, Retaining Wal, Buldngs And Slope Sbliiy Analysis At High BanlCuting Locatons Incuting GeoTecrical ivestgaian For Manipur Ard | Baroud Sangorsect, 30 oat Siope Staiity [ont Report —_ = rotate cis RSE Yc naz [ansivo (Ged pre er (CHLNO-3500, DEPTH. 120M Onue Coen Ke Sem o ae ‘SHEAR STRESS ( Kg!Sq om) —> 0 WC ao ao aD NORMAL STRESS ( Kg/Sq cm) —> "Name of Project: | Prepa:sion Of GADs OF Sation Guida Ard Rob, Shictral Designs OF Reb anor Bridges, Retaining Walls, Bulings And Slope Sibaty Ansys At High BanidCuting Locatonscuting GeoTecrnca! investiga For Mankpur Ard Barous Sising OF SECL” Consultant ‘Slope Stability] Caen Analysis Report AL ssumeuneees, a Pt try IAECS ‘BHUBANESWAR, "| D0c.No: | ABCS/1170 Surpeation Ltd Bhubaneswar carnosang per. isan eae ‘SHEAR STRESS ( Kg/Sq om) —> S cm adeig Sem, 1020 30°°~«40~”~*« eal NORMAL STRESS ( Kg/Sq em ) —> LI Bate sing Or sce “Name of Project: | Pepsaan OT GADs OF Staion Bae ARt Rob, Sera! Dass OF Re Minor Bridges, Retaining Wal, Bulkings And Slope Sabity Analysis At High BankiCuting Locators Icuding GeoTecrnica! Investigation For Manipur ANd Be 6 8 ‘SHEAR STRESS ( Kg/Sq om) —> : Connaa ‘Slope Stability —] Caen Analysis Report A. somos: [et i Pt fa peay acs mnetasie [oes [acco Spat bear (cno-0e parr eal ta 10 20 sg a ao NORMAL STRESS ( Kg/Sq.em ) —> ‘Name of Project: | Preparsion OF GADs OF Siaton Guide Ard Reb, Shicural Designs OF Rob.) Minor Bridges, Retaining Wals, Butdngs Ard Slope Stabiy Analysis Al High | BenidCutteg Locations Incudng GeoTechnealInvestgaion For Mansur Ard | Baroud Seang OF SEC” Toa <= Analysis Report Scaeaereaniensyat, [= ‘et bl eray cs omnBnttbin™™* Fnocne: [aucsnivo (GO) Seance (CHLNO-3500 DEPTH. 38.0. ‘B28 c= 0NKe/ Sqm < 8 ~ & ‘SHEAR STRESS ( Kg/Sqem) —> =a ao ae a ee NORMAL STRESS ( Kg/Sq.om ) > Nam ct: | eparaion OF GADs OF Salon Bas Ard Reb, Sica! Deir OF Rob. Name of Project: er eraoe, Retarng Wale, Bangs wr Spe Suaty Aras AH | Benticuting Locate Inui GacTechncs! vesiton For Mankur Bed | Baroud Sing OF SECU” Me Coan Slope Stability] Coon Analysis Report comers in Pt aery Fe —— ee OO ee Appendix-F Cross-section ‘Name of Pi ‘reparaon Of GADs OF Slaton Guide Ard Reb, Sisal Dealgns OF Rob] Minor Bridges, Retaining Walls, Buldngs Are Slope Stbity Analyts At High BenlCuting Locators Ickng GeoTecnneal Investigation For Mankpur Are Baroud Sing OF SECL om Consallant ‘Slope Stability | ent Analysis Report ‘rcorecrnzacvoncenna [BNO [128 astray Seances i, nan Prt 6 apovay Wecs imenweawe [voces [ascs/x170 pratense WITH GIVEN CROSS-SECTION BY IPRCL IN 1V:1.5H ed | "Preparation OF GADE OF Sion Buide And Rab, Sinz Designe OF Reb, | Minor Brass, Retering Wal, Duikings And Slope Stby Anais A High | BankiCuting Locations Incuding GeoTecrncal ivestgson For Mankpur Ana l Barous Sing O1SECL” "a6 Cera ‘Slope Stability | Client Ansiysie Report ol ae tacit Ses ARERR recta: [oase [Qed Mecca | WITH FLATTENING THE TOP 6.0M DEPTH IN 1V:2H TTT aaa ‘Name of Project: | Preparaion OF GADs OF Staion Buide And Rob Swaual Designs OF Rob, Minor Bridges, Rearing Wels, Buéngs And Slope Stbily Anais At Hh BankiCuting Locaiens Inuding GeoTeshnica! vestigation For Mankpur Ard Baroud Siding OF SECL” 2 SS I eae eg Saeed =

You might also like