PASSED
LOOP CHECK RESULT
FAILED
SIGNATURE
NAME
DATE
SAUDI ARABIAN OIL COMPANY
CONTRACT NO.
CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LTD.
PROJECT BI:
INSTRUMENT LOOP FOLDER
TAG #
TABLE OF CONTENTS
STATUS
S.NO. DESCRIPTION
A N/A
1 INSTRUMENT LOOP CHECK COVER SHEET (FORM # J-014) √
2 INSTRUMENTATION LOOP CHECK ACCEPTANCE CERTIFICATE √
3 INSTRUMENTATION INSTALLATION INSPECTION FORM (FORM # J-013) √
PRE-COMMISSIONING FORM FOR INSTRUMENT (SEE NOTE-1 & 2) √
3.1 FIELD TRANSMITTER CALIBRATION TEST REPORT (FORM # J-001) √
3.2 SWITCHES (FORM # J-003) √
3.3 ORIFICE PLATES (FORM # J-005) √
3
3.4 CONTROL VALVE FIELD CALIBRATION (FORM # J-006) √
3.5 CONTROLLERS ( FORM # J-009) √
3.6 INSTRUMENT CABLE TEST REPORT (FORM # J-015) √
3.7 INSTRUMENT AIR LINE PRESSURE TEST REPORT (FORM # J-010) √
4 INSTRUMENT SPECIFICATION SHEET (ISS) √
5 INSTRUMENTATION I/O LIST √
6 INSTRUMENT BLOCK DIAGRAM √
7 CABLE & CONDUIT SCHEDULE √
8 INSTRUMENT CONNECTION DIAGRAM (JB) √
9 INSTRUMENT WIRING DIAGRAM (MARSHALLING CABINET) √
10 INSTRUMENT LOOP DIGRAM (ILD) √
11 PIPING & INSTRUMENT DIAGRAM (P&ID) √
12 INSTRUMENT POINTS & LINES (IPL) √
13 INSTRUMENT INSTALLATION SCHEDULE (IIS) √
14 INSTRUMENT MOUNTING DETIALS √
15 INSTRUMENT HOOK-UP DRAWING √
16 INSTRUMENT LOOP CHECK PUNCHLIST √
17 SAUDI ARAMCO LOOP TEST REPORT/CHECK LIST √
REMARKS:
LEGEND:
A= Applicable
N/A= Not Applicable
TRANSMITTER (J-001)
WIRING (J-015)
ELECTRICAL/AIR SUPPLY
CONTROLLER (J-009)
TRANSDUCER (J-002)
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
SWITCHES (J-003)
ALARM INDICATION
EQUIPMENT NAME:
REMARKS:
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
PASSED
LOOP CHECK RESULT
FAILED
SIGNATURE
NAME
DATE
FORM # J-013 (5/19) SHT 1 of 2
GROUNDING CONDUCTOR
INSTALLED
FIXING ON STRUCTURAL
STEEL SECURE
FIELD CALIBRATION
COMPLETE
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
SUNSHADE INSTALLED
MATERIAL AS PER
SPECIFICATION
LEAKAGE TEST
REMARKS:
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
FIELD CALIBRATION
OUTPUT
SIMULATED
INPUT (%) PROCESS UPSCALE DOWNSCALE
25
50
75
100
EQUIPMENT NAME:
REMARKS:
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
MEGGERING
EQUIPMENT NAME:
REMARKS:
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
CATEGORY CODES:
EQUIPMENT NAME:
REMARKS:
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GENERAL DATA
3 P & ID NUMBER CA-894242.001
4 MANUFACTURER *
5 MODEL NUMBER *
6 REQUISITION NO. -
MATERIAL SOURCE
7 SAMS STOCK NO. -
8/24/2017
DATE
8
JOB ORDER/EWO NO.
APPLICATION
160
DATA
00
15
16 OUTPUT SIGNAL RANGE (4 - 20 mA / DIGITAL) 4-20 mA
COMM
26
FAQ
28 STABILITY *
29 MAXIMUM AMBIENT TEMPERATURE ºF 149
TRANSMITTER DATA
30 OUTPUT LINEAR
31
CERTIFIED/DATE
8/24/2017
33 BURST PRESSURE
(DESIGN AGENCY)
PSIG *
EAE
BODY
34 PROCESS CONNECTION SIZE & TYPE NPT / 1/2" NPT / NPT / NPT /
35 MEET NACE MR-01-75 YES NO YES NO YES NO YES NO
36
37 ENCLOSURE TYPE NEMA4X
ENGG./DATE
8/24/2017
HOUSING
ACCESSORIES
149 °F
44 SPECIAL TRANSMITTER FEATURES SMART
45 VALVE MANIFOLD (NONE / TYPE) 2-WAY
46 TRANSMITTER CONNECTED TO RTU
47
REVISION VALIDATION
NOTES: 1. PRESS. "INSTRUCTIONS" TAB OF THIS FILE TO SEE THE INSTRUCTIONS TO FILL THIS FORM.
DRAWING COMPLETION CERTIFICATE NO.
BI-10-01443-0001
2) * TO BE PROVIDED/CONFIRMED BY VENDOR
3) MOUNTING BRACKET AND NUTS & BOLTS SHALL BE SS OR GALVANIZED STEEL.
4) ELECTRICAL ENCLOSER CERTIFICATION AGENCIES SHALL BE AS PER SAES-P-100 PARA #8.2 (ATEX NOT ACCEPTABLE)
5)TRANSMITTER DIAPHRGAM MATERIAL SHALL BE MIN. HASTELLOYC. AND OTHER WETTED PARTS SHALL BE MIN. SS316 (LIKE
00
ISS FOR 271-PIT-1254 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
ISSUED FOR CONSTRUCTION
QRT-10R PIPELINE KM-5 (GART-CORRIDOR) ISS
PIPELINE QATIF-ABQ(QA-1,2,3,4,5&6) 271 J CE-896489 002 00
QATIF SAUDI ARABIA
EKRD/8020-200-1110.XLS
Saudi Aramco 2616-ENG (11/2010)
AI AO DI DO
FACP-342A FIRE COMMON ALARM FROM FACP 24VDC 1 - BY ACS VENDOR
FACP-342B FIRE GENERAL TROUBLE FROM FACP 24VDC 1 - BY ACS VENDOR
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AC-342A AIR CONDITIONER COMMON ALARM 24VDC 1 - BY ACS VENDOR
AC-1-342 AIR CONDITIONER-1/DIRTY FILTER ALARM 24VDC 1 - BY ACS VENDOR
AC-2-342 AIR CONDITIONER-2/DIRTY FILTER ALARM 24VDC 1 - BY ACS VENDOR
TAH-342A TEMPERATURE HIGH ALARM 24VDC 1 - BY ACS VENDOR
DS-1-342 DOOR SWITCH-1 24VDC 1 - BY ACS VENDOR
DS-2-342 DOOR SWITCH-2 24VDC 1 - BY ACS VENDOR
9/27/2018
DATE
8/24/2017
EAE
DESIGN CERTIFICATION
(DESIGN AGENCY)
ENGG./DATE
8/24/2017
BKS
0F1 IS COVERED, FOR ALL APPROVAL
NOTES:
DRAWING COMPLETION CERTIFICATE NO.
1. RELAYED OUTPUT TO BE CONSIDERED FOR MOV, CONTACT TYPE-SPDT, CONTACT RATING 2A AT 24 VDC.
2. I/O SIGNAL TAG SHALL BE PREFIXED BY PLANT NO. "271".
3. REFER , APPENDIX-A OF RTU FSD CE-896461 FOR TOTAL IOs OF 271-RTU-342.
WorleyParsons
27 SEP 2018
RE-ISSUED FOR CONSTRUCTION
THIS REVISION NO.
I/O LIST DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.
SCH
271 J CE-309942 001 0F1
QATIF SAUDI ARABIA
EKRD/2616-1110.XLS
LOAD GLAND TYPE RUN CONDUITS CONDUCTORS
TOTAL
CONDUIT
NUMBER
FIBER (F) ; STEEL (S) STL PVC
CABLE /
HP T T POWER (P) - CONTROL (C);
SERVICE "FROM" " TO " COATED (SP) GROUND (G) - INSTRUMENT (I)
QTY
OR VOLTS FROM Y PVC (P) Y REMARKS
END END TO P P
KVA INSULATION FEET
E LENGTH E
SIZE BENDS NO. & SIZE
Ft / m TYPE VOLTS METER
IC-3385 DIGITAL SIGNAL 24 VDC - - 271-MOV-10200 271-DJB-10182 SP 1" 3m - I 2PR x 16AWG XLPE/PVC 300 75 1
UNSHIELDED 2
IC-3386 DIGITAL SIGNAL 24 VDC - - 271-MOV-10201 271-DJB-10182 SP 1" 3m - I 2PR x 16AWG XLPE/PVC 300 60 3
UNSHIELDED 4
IC-3387 DIGITAL SIGNAL 24 VDC - - 271-MOV-10202 271-DJB-10182 SP 1" 3m - I 2PR x 16AWG XLPE/PVC 300 80 5
UNSHIELDED 6
IC-3388 DIGITAL SIGNAL 24 VDC - - 271-SPIS-10009 271-DJB-10182 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 80 7
UNSHIELDED 8
IC-3389 DIGITAL SIGNAL 24 VDC - - 271-SPIS-10010 271-DJB-10182 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 60 9
UNSHIELDED 10
IC-3390 DIGITAL SIGNAL 24 VDC - - 271-DJB-10182 271-RTU-342-MB SP 1 ½" 3m - I 12PR x 18AWG XLPE/PVC 300 25 11
O/A SHIELDED 12
IC-3391 DIGITAL SIGNAL 24 VDC - - 271-RTU-342-MB 271-RTU-342 SP 1 ½" 3m - I 12PR x 18AWG XLPE/PVC 300 15 13
O/A SHIELDED 14
IC-3392 ANALOG SIGNAL 24 VDC - - 271-PT-1253 271-LDS-AJB-10183 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 80 15
SHIELDED 16
IC-3393 ANALOG SIGNAL 24 VDC - - 271-LDS-AJB-10183 271-LDS-SP-10183 SP 1" 3m - I 2PR x 18AWG XLPE/PVC 300 30 17
I&O SHIELDED 18
IC-3394 DIGITAL SIGNAL 24 VDC - - 271-LDS-SP-10183 271-SA-10183 SP 1" 3m - I VTA VTA 300 VTA GPS ANTENNA CABLE 19
GPS ANTENNA CABLE BY LDS VENDOR 20
IC-3395 ANALOG SIGNAL 24 VDC - - 271-PIT-1254 271-AJB-10182 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 80 21
SHIELDED 22
IC-3396 ANALOG SIGNAL 24 VDC - - 271-AJB-10182 271-RTU-342-MB SP 1 ½" 3m - I 4PR x 18AWG XLPE/PVC 300 25 23
I&O SHIELDED 24
IC-3399 DIGITAL SIGNAL 24VDC - - FACILITY ALARM JUNCTION BOX 271-RTU-342-MB SP 2" 3m - I 16PR x 18AWG XLPE/PVC 300 20 25
(BY ACS VENDOR) UNSHIELDED 26
27
28
29
30
31
32
33
34
35
WorleyParsons
36
37
28 August 2017
38
39
ISSUED FOR CONSTRUCTION
40
LEGEND : Note REVISION VALIDATION
1/ THE CABLES SHOWN ABOVE ARE RELATED TO QRT-10R PIPELINE KM-5 (GART-
SAUDI ARABIAN OIL COMPANY
C - Conduit (Per SAES-P-104) THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
CORRIDOR)
CC - Electrical Control (Per SAES-P-104) REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DWG. TYPE
2/ VTA - VENDOR TO ADVISE.
PC - Power Cable (Per SAES-P-104) CABLE & CONDUIT SCHEDULE
IC - Instrument Cable (Per SAES-J-902) 10-01443-0001 CCS
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
NUMBER IC-3385 THROUGH IC-3399
28 August 2017
28 August 2017
OF
CONSENT
TTEN
DRAWING LIMIT
WRI
CALLED
THE
NORTH
THOUT
PREVAI
LING
WI
ND DIRECTI
ON
WIS
THI
FROMNG
DRAWI
9900 4000 1000 2300 2099 1403 4398 1000 4000 9900
NED
42" QR-1 PIPELINE
OBTAI
001
BE
DWG.CA-309954.
PART,SHALL
001
DWG. CA309954.
4000
PT PIT SPIS
SEE MOUNTING
1253 1254 10009 IC-3385
IC-3392 SPIS DETAIL-6E
IC-3395 30"-P-1446-3CS1P SEE DWG NO.
10010
IC-3388 PLATF NO. 103 CA-896524.007
BOP EL 101.000
N
TOG EL 101.330
I
IG IG
FULL,OR
30" QRT-10R PIPELINE SV
ƒ"
ƒ" 2"
ƒ" 2"
SEE
TYP)
1680
EL
NO.
N
SEE
330
I
NO.101
C-3389
(
330
CONT
TOG
101.
ON
IC-3387 PI MOV
SEE MOUNTING
PLATF
101.
REPRODUCTI
DETAIL-6A 1254 10200
I
REFERENCE DRAWINGS
CONT
102
SEE DWG NO.
EL
TYP)
PLATF
1149
CA-896524.003 MOV MOV DWG. CONTROL FOR BI- 10-01443-0001 CD-893715
FOR
TOG
PIPING & INSTRUMENT DIAGRAM CA-894242.001
(
10202 10201
REF HP GRADE EL 100.000
PIPING & INSTRUMENT DIAGRAM CA-896495.001
C-3386
24"-300# 24"-300#
FOR
PIPING PLAN CA-894295.001
RF BV RF BV
REF CONTROL PT
NE
SAUDIARAMCO.NO
MATCHLI
TYP)
2271
NE
INSTR BLOCK DIAGRAM QRT-10R P/L KM-5 CA-896495.001
MATCHLI
24"-P-1450-3CS1P
(
INSTR BLOCK DIAGRAM QRT-10R P/L KM-5 CA-896495.002
BOP EL 101.076 INSTR BLOCK DIAGRAM QRT-10R P/L KM-5 CA-896495.003
CABLE AND CONDUIT SCHEDULE QRT-10R P/L KM-5 CD-896493.001
2" V 2" D
CABLE AND CONDUIT SCHEDULE QRT-10R P/L KM-5 CD-896493.002
1800
OF
10"
1CS1P 3CS1P
10" 1" V
PROPERTY
10"-BD-1524-1CS1P IG BOP EL 100.479
BACKFILL SOIL
SOLE
FIN. GR LEVEL
1080 14445 1072 500 500 2400 2600 1000 1500 2500
THE
610
LEFT TO
RIGHT
300
ARE
MINIMUM DRY
IC-3392 SAND COVER
IC-3395
A A
N
IC-3388
HEREI
150
IC-3387
0 1.0 2.0 3.0 4.0 5.0
IC-3385
IC-3389
METERS
LEFT TO IC-3386 50 TYP
NED
RIGHT 1 : 50M
SCALE:
100
IC-3386
21%)
CONTAI
IC-3389 150 150
IC-3385
0.
REVISION VALIDATION
650
(
IC-3387
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
IC-3388
SLOPE
IC-3395
SECTION A-A
ON
10-01443-0001-001
IC-3392
NFORMATI
SCALE
NONE DESIGN CERTIFICATION
ENGG./DATE
(DESIGN AGENCY)
REVIEW FOR KEY DRAWINGS
REQUIRED
OPERATIONS/DATE
OTHER
BY/DATE
I
00 07/20/17 ISSUED FOR CONSTRUCTION
WorleyParsons
FOR CONTINUATION
THE
SEE DWG.CA-309954.001 JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-01443-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
28 August 2017
DRAWING TYPE
NG
QRT-10R P/L GART CORRIDOR AT KM-5
DRAWI
PIPELINES QATIF-ABQ(QA-1,2,3,4,5&6)
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
271 J CA-309954 003 00
Saudi Aramco 2615 ENG. (05/05)
MTG
AMS STOCK OR
ILD / ISD DRAWING P & ID
SPECIFICATION REQUISITION INSTRUMENT
DEV
MOUNTING PIPING
REMARKS MANUFACTURER TYPE SERVICE
F DRAWING NO. TAG NO.
ITEM
SHT.
SHT.
DET
DET
DWG. NO. DWG. NO. DWG. NO. DWG. NO. NUMBER
P
1 NOTE 1 BOURDON F ------ CA-896524.009 9A ------ CA-894242 001 CE-896489.001 ------ LOCAL PRESSURE INDICATOR 271-PI-1254
2 @ QRT-10R PL KM-5 GART-CORRIDOR
3 BY BURN PIT VENDOR NOTE 1 BOURDON F ------ ------ ------ CA-894243 001 CE-895135.001 ------ PRESSURE INDICATOR, (271-F-0105) 271-PI-1268A
4 @ QRT-10R PL KM-5 GART-CORRIDOR
5 BY BURN PIT VENDOR NOTE 1 BOURDON F ------ ------ ------ CA-894243 001 CE-895135.002 ------ PRESSURE INDICATOR, (271-F-0105) 271-PI-1268B
6 @ QRT-10R PL KM-5 GART-CORRIDOR
7 NOTE 1 PIEZO-ELCTRIC F CA-896524.003 6A CA-896524.010 5 CB-309955 010 CA-894242 001 CE-896489.002 ------ PRESSURE INDICATING TRANSMITTER H 271-PIT-1254
8 @ QRT-10R PL KM-5 GART-CORRIDOR
9 BY BURN PIT VENDOR NOTE 1 NOTE 1 F ------ ------ ------ CA-894243 001 CE-895136.001 ------ PRESSURE CONTROL VLV, (271-F-0105) 271-PCV-1268
10 @ QRT-10R PL KM-5 GART-CORRIDOR
11 NOTE 1 NOTE 1 F CA-896524.003 6A CB-894320.001 - CB-309955 009 CA-894242 001 CE-896488.001 ------ LDS PRESSURE TRANSMITTER 271-PT-1253
12 @ QRT-10R PL KM-5 GART-CORRIDOR
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
WorleyParsons
34
35
28 August 2017
36
37
38
ISSUED FOR CONSTRUCTION
39
40
EXCEL
WorleyParsons
28 August 2017
28 August 2017
PROJECT: BI:
LOOP CHECK PUNCH LIST FORM
INST. TAG NO: 271-PIT-1254 INST. LOOP NO: 271-PIT-1254 SERVICE: QRT-10R NGL LOCATION: KM-5 QRT-10R
ORIGINATOR CATEGORY ACTION BY RECTIFIED BY
S.No Date PUNCH DESCRIPTION
NAME SIGNATURE A/B CPP CLIENT NAME SIGNATURE DATE
10
11
12
13
14
15
1 - CATEGORY:
A - MUST BE COMPLETED BEFORE LOOP CHECK ACTIVITY
B - SHALL BE COMPLETED TO A LATER PHASE (Which are not effecting for Pre-Commissioning/Commissioning stage)
SIGNATURE:
DATE:
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
The completed instrument loop shall be tested as one system, and SAEP-16
A5
where necessary adjustments shall be made to the calibrations. Sec. 4.1.13
The loop testing shall be performed from the field instrument through to
SAEP-16
A6 the DCS maintenance consoles and associated systems located either
Sec. 4.1.13
at the CCR or PIB control rooms.
DCS loop checks may include verification of all PCS functions such as
SAEP-16
A7 database parameters, alarm initiations, trending, report generation,
Sec. 4.1.13
graphics etc.
Verify the transmitter set (Calibration) range as per latest ISS, by using Vendor Manuals
A8 Foxcom (HHT) communicator for Foxboro Transmitters / HART for and test
Rosemount Transmitters or in DCS as applicable procedures
Apply the pressure for digital smart transmitters by using test equipment Vendor Manuals
A9 (Hand Pump) for 50% simulation to check the transmitter response at and test
DCS. This method shall be used for digital smart transmitters case only. procedures
Vendor Manuals
Confirm / Verify the corresponding reading in the DCS / Integral indicator
A10 and test
and at remote indicator if applicable.
procedures
However, for analog Foxboro smart transmitters case Foxcom (HHT) Vendor Manuals
A11 communicator shall be used for simulation purpose instead of hand and test
pump. procedures
Vendor Manuals
For Rosemount smart transmitters case (HART) communicator shall be
A12 and test
used for simulation purpose instead of hand pump.
procedures
Vendor Manuals
For Non- smart transmitters case (4~20 mA) source to be used for
A13 and test
simulation purpose instead of hand pump.
procedures
Vendor Manuals
Alarms function (in DCS) shall be checked by Simulating /Verifying the
A14 and test
required signal.
procedures
Vendor Manuals
Transmitter loop test should be performed after completion of the
A15 and test
impulse line works including pressure test.
procedures
Page 1 of 1
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
E Results
Loop Continuity Check Sheet (Pre-Loop Check)
Unit NO System NO Loop No. Loop Drawing No
From To Checks per Section Name-sign/
Tag / Item no Area Cable Number Tag no Area continuity test Termination Remarks and date
F Conclusions
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
2. Schedule Q - Quality Requirements (Pro Forma Contract), November 2003 and February 2008
3. SAES-J-901 - Instrument Air Supply Systems, 30 June 2003
4. SAEP-16 - Project Execution Guide for Process Automation Systems, 20 November 2007
5. SAEP-1636 - Installation and Checkout Plan , 12 September 2007
6. SAEP-1638 - Site Acceptance Test Plan, 12 September 2007
Page 1 of 2
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
ATTACHMENTS:
1. Attachment 1: Instrument Loop Check sheet
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.
Page 2 of 2
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST
SIMULATION RESULTS
Page 1 of 1
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Cable - Continuity, Insulation Resistance
SATR-J-6602 15-Dec-09 INST
(Installed) and Termination Torque Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
A Document Review
Specific tools and equipment shall be identified to make and perform Schedule Q
A1
tests in the field with instructions for their use, calibration, and storage. Att. IV
The CONTRACTOR shall identify, maintain, control, adjust, and calibrate
Schedule Q
A2 all tools, gauges, instruments and other measuring and testing devices
Att. IV
used for controlling quality.
Calibration shall be performed at established periods as specified in
the most stringent of SAUDI ARAMCO standards, other applicable Schedule Q
A3
standards, or manufacturer recommendations; if no standards apply, Att. IV
the calibration cycle shall not exceed six months.
NEC 110-14
B3 Check that the installed connector size match with the size of wire.
& 250-110
NEC 110-14
B4 Check that the required information is marked on the compression lugs.
& 250-110
NEC 110-14
B5 Check the bolt & hole size of termination lugs installed for correctness.
& 250-110
Electrical Tests:
Perform insulation-resistance test on each conductor with respect to
ground and adjacent conductors. Applied potential shall be 500 volts dc Schedule Q
B6
for 300 volt rated cable and 1000 volts dc for 600 volt rated cable. Test Att. IV
duration shall be one minute.
[NETA ATS Sec. 7.3.2.2.2]
Page 1 of 1