SAUDI ARABIAN OIL COMPANY

INSTRUMENT LOOP FOLDER

INSTRUMENT TAG NUMBER :


INSTRUMENT LOOP NUMBER :
LOCATION

PASSED
LOOP CHECK RESULT
FAILED

CPP SAUDI ARAMCO


CHECKED BY
Construction QC SAPID SAPMT PROPONENT

SIGNATURE

NAME

DATE
SAUDI ARABIAN OIL COMPANY
CONTRACT NO.
CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LTD.
PROJECT BI:
INSTRUMENT LOOP FOLDER
TAG #
TABLE OF CONTENTS
STATUS
S.NO. DESCRIPTION
A N/A
1 INSTRUMENT LOOP CHECK COVER SHEET (FORM # J-014) √
2 INSTRUMENTATION LOOP CHECK ACCEPTANCE CERTIFICATE √
3 INSTRUMENTATION INSTALLATION INSPECTION FORM (FORM # J-013) √
PRE-COMMISSIONING FORM FOR INSTRUMENT (SEE NOTE-1 & 2) √
3.1 FIELD TRANSMITTER CALIBRATION TEST REPORT (FORM # J-001) √
3.2 SWITCHES (FORM # J-003) √
3.3 ORIFICE PLATES (FORM # J-005) √
3
3.4 CONTROL VALVE FIELD CALIBRATION (FORM # J-006) √
3.5 CONTROLLERS ( FORM # J-009) √
3.6 INSTRUMENT CABLE TEST REPORT (FORM # J-015) √
3.7 INSTRUMENT AIR LINE PRESSURE TEST REPORT (FORM # J-010) √
4 INSTRUMENT SPECIFICATION SHEET (ISS) √
5 INSTRUMENTATION I/O LIST √
6 INSTRUMENT BLOCK DIAGRAM √
7 CABLE & CONDUIT SCHEDULE √
8 INSTRUMENT CONNECTION DIAGRAM (JB) √
9 INSTRUMENT WIRING DIAGRAM (MARSHALLING CABINET) √
10 INSTRUMENT LOOP DIGRAM (ILD) √
11 PIPING & INSTRUMENT DIAGRAM (P&ID) √
12 INSTRUMENT POINTS & LINES (IPL) √
13 INSTRUMENT INSTALLATION SCHEDULE (IIS) √
14 INSTRUMENT MOUNTING DETIALS √
15 INSTRUMENT HOOK-UP DRAWING √
16 INSTRUMENT LOOP CHECK PUNCHLIST √
17 SAUDI ARAMCO LOOP TEST REPORT/CHECK LIST √
REMARKS:

LEGEND:
A= Applicable
N/A= Not Applicable

NOTE 1: SAUDI ARAMCO APPROVED FORMAT= APPROPRIATE TO INSTRUMENT TYPE TO BE APPLIED.


NOTE 2: ALL APPLICABLE PRE-COMMISSIONIG FORMS SHALL BE FINISHED DURING PRE-COMMISSIONING PHASE.
FORM # J-014 (5/19) SHT 1 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


LOOP CHECK COVER SHEET
EQUIPMENT TYPE: PT USER REFERENCE: SATR-J-6501
EQUIPMENT TAG NO.: DESCRIPTION: PRESSURE TRANSMITTER
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER: YOKOGAWA
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

CHECKS TO BE PERFORMED RESULT


PASS FAIL
INSTALLATION INSPECTION (J-013)

PRIMARY ELEMENT INSTALLATION


AND CALIBRATION

TRANSMITTER (J-001)

IMPULSE LINES (J-010)

WIRING (J-015)

WIRES AND TERMINALS TAGGING


AT INSTRUMENT, JUNCTION BOX,
MARSHALING CABINET AND
INPUT/OUTPUT CABINET

CONNECTIONS AND SETTINGS ARE


DONE AS SHOWN ON THE ILD

ELECTRICAL/AIR SUPPLY

CONTROLLER (J-009)

TRANSDUCER (J-002)

TABLE IS CONTINUED ON THE NEXT PAGE

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
FORM # J-014 (5/19) SHT 2 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


LOOP CHECK COVER SHEET
EQUIPMENT TYPE: PT USER REFERENCE: SATR-J-6501
EQUIPMENT TAG NO.: 271-PIT-1254 DESCRIPTION: PRESSURE TRANSMITTER
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER: YOKOGAWA
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

CHECKS TO BE PERFORMED RESULT


PASS FAIL
CONTROL VALVE (J-006)

SWITCHES (J-003)

ALARM INDICATION

CONTROLLER SET POINT

IN ADDITION TO THE ABOVE, THE FOLLOWING SIMULATION SHOULD BE DONE

• DRIVE SIGNAL INTO THE CONTROLLER FROM TRANSMITTER

• DRIVE OUTPUT FROM CONTROLLER TO THE VALVE

• WATCH ALARMS, SHUTDOWNS, ETC.

• FAIL SENSOR AND WATCH ALARM AND SUBSEQUENT ACTION

FOR THE TEST EQUIPMENT USED, PLEASE ENTER THE FOLLOWING:

EQUIPMENT NAME:

MANUFACTURER: DATE CALIBRATED:

REMARKS:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
SAUDI ARABIAN OIL COMPANY
CONTRACT NO.

PROJECT: RE-ROUT PIPELINES IN RAS TANURA AREA BI:

LOOP CHECK ACCEPTANCE CERTIFICATE

INSTRUMENT TAG NUMBER : -PIT-

INSTRUMENT LOOP NUMBER :


:
LOCATION

PASSED
LOOP CHECK RESULT
FAILED

CPP SAUDI ARAMCO


CHECKED BY
Construction QC SAPID SAPMT PROPONENT

SIGNATURE

NAME

DATE
FORM # J-013 (5/19) SHT 1 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


INSTALLATION INSPECTION
EQUIPMENT TYPE: PIT USER REFERENCE: SATR-J-6203
EQUIPMENT TAG NO.: 271-PIT-1254 DESCRIPTION:
BI/JO NO.: PLANT NO. / LOCATION:

REF. DRAWINGS & DOCUMENTS:


MANUFACTURER: YOKOGAWA
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:
CHECKS TO BE PERFORMED RESULT
PASS FAIL
FABRICATION AS PER
STANDARD DRAWING

DEBURRED, PRIMED AND


PAINTED

LOCATION AS PER LAYOUT

SUPPORT ACCESS IS NOT OBSTRUCTED

GROUNDING CONDUCTOR
INSTALLED

AREA CLEAR FOR


MAINTENANCE

FIXING ON STRUCTURAL
STEEL SECURE

FIELD CALIBRATION
COMPLETE

INSTRUMENT MOUNTING AS PER


APPROVED DRAWING

TABLE IS CONTINUED IN NEXT PAGE

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
FORM # J-013 (5/19) SHT 2 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


INSTALLATION INSPECTION
EQUIPMENT TYPE: PIT USER REFERENCE: SATR-J-6203
EQUIPMENT TAG NO.: DESCRIPTION:
BI/JO NO.: PLANT NO. / LOCATION:

REF. DRAWINGS & DOCUMENTS:


MANUFACTURER: YOKOGAWA
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:
INSTRUMENT SECURED

INSTRUMENT ELEVATION CORRECT WITH


(CONTINUED FORM RESPECT TO TAPPING POINTS
PAGE 1)

SEAL FITTING INSTALLED AD


FILLED (IF REQUIRED)

SUNSHADE INSTALLED

MATERIAL AS PER
SPECIFICATION

ISOLATION AND EQUALIZING


VALVES INSTALLED

IMPULSE VENT AND DRAIN INSTALLED


TUBING
PIPING SLOPE AS PER
STANDARDS

TUBES CONNECTED TO THE


CORRECT PORTS

LEAKAGE TEST

REMARKS:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
FORM # J-001 (5/19) SHT 1 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


CONVENTIONAL ELECTRONIC AND PNEUMATIC TRANSMITTERS
EQUIPMENT TYPE: PIT USER REFERENCE:
EQUIPMENT TAG NO.: DESCRIPTION:
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

FIELD CALIBRATION

OUTPUT
SIMULATED
INPUT (%) PROCESS UPSCALE DOWNSCALE

INPUT READING ERROR READING ERROR

25

50

75

100

PROCESS INPUT RANGE: SIGNAL OUTPUT RANGE:

EXTERNAL ZERO ADJUSTMENT:


SPAN:

ZERO ELEVATION: ZERO SUPPRESSION:

SPECIFIC GRAVITY (FOR LIQUID INTERFACE LEVEL MEASUREMENT):

FOR THE TEST EQUIPMENT USED, PLEASE ENTER THE FOLLOWING:

EQUIPMENT NAME:

MANUFACTURER: DATE CALIBRATED:

REMARKS:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
FORM # J-015 (5/19) SHT 1 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


INSTRUMENT AND CONTROL CABLES
EQUIPMENT TYPE: PT USER REFERENCE: SATR-J-6602
EQUIPMENT TAG NO.: DESCRIPTION: INSULATION TESTER
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

CABLE TAG NO.: CABLE GLANDING:


CABLE TYPE: CABLE SEALING:
CABLE SIZE: CABLE ROUTING:
CABLE MARKING:

MEGGERING

PAIR INSULATION RESISTANCE M Ω CONTINUITY RESULT


NO.
CORE TO CORE CORE TO SCREEN

FOR THE TEST EQUIPMENT USED, PLEASE ENTER THE FOLLOWING:

EQUIPMENT NAME:

MANUFACTURER: DATE CALIBRATED:

REMARKS:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
FORM # J-010 (5/19) SHT 1 of 1

SAUDI ARAMCO PRE-COMMISSIONING FORM


INSTRUMENT AIR LINE PRESSURE TEST
EQUIPMENT TYPE:PIT USER REFERENCE:
EQUIPMENT TAG NO.: DESCRIPTION:
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

TEST BOUNDERIES CATAGORY TEST TEST TEST


MEDIUM PRESSURE RESULT
FROM TO

CATEGORY CODES:

A: AIR SUPPLY LINE


I: PROCESS IMPULSE
P: PNEUMATIC SIGNAL TUBING

FOR THE TEST EQUIPMENT USED, PLEASE ENTER THE FOLLOWING:

EQUIPMENT NAME:

MANUFACTURE DATE CALIBRATED:


R:

REMARKS:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
FORM # J-010 (5/19) SHT 2 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


INSTRUMENT AIR LINE PRESSURE TEST
EQUIPMENT TYPE:PIT USER REFERENCE:
EQUIPMENT TAG NO.: DESCRIPTION:
BI/JO NO.: PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.: SERIAL NO.:
COMMISSIONING DATE:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be
revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.

APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
Saudi Aramco 8020-200-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY

UNTIL CERTIFIED AND DATED


ISSUED FOR CONSTRUCTION

THIS REVISION IS NOT TO BE


USED FOR CONSTRUCTION
REVISION DESCRIPTION
INSTRUMENT SPECIFICATION SHEET PRESSURE TRANSMITTERS - SMART (ABS,GAGE, & DP)

1 INSTRUMENT MARK NUMBER


2 SERVICE
KM-5

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GENERAL DATA
3 P & ID NUMBER CA-894242.001
4 MANUFACTURER *
5 MODEL NUMBER *
6 REQUISITION NO. -
MATERIAL SOURCE
7 SAMS STOCK NO. -
8/24/2017
DATE

8
JOB ORDER/EWO NO.

APPLICATION

9 PROCESS FLUID NGL


10 CORROSIVE COMPOUNDS -
11 MAXIMUM TEMPERATURE ºF
REV. NO.

160
DATA
00

12 MAXIMUM PRESSURE PSIG 507


13 ELECTRICAL AREA CLASSIFICATION CL1,ZN-2,GR2A
14
BY/DATE
OTHER

15
16 OUTPUT SIGNAL RANGE (4 - 20 mA / DIGITAL) 4-20 mA
COMM

17 COMMUNICATIONS PROTOCOL HART


18
OPERATIONS/DATE

19 SENSOR TYPE PIEZO-ELCTRIC


8/24/2017

20 DIAPHRAGM MATERIAL HASTELLOY C


ZAJ
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

21 RANGE LIMITS PSIG 730


ELEMENT

22 SET RANGE PSIG 0-507


23 FACTORY CONFIGURATION YES NO YES NO YES NO YES NO
24 SPECIAL FACTORY CALIBRATION YES NO YES NO YES NO YES NO
CONST. AGENCY/DATE

25 OVERRANGE LIMIT PSIG *


8/24/2017

26
FAQ

27 TOTAL RMS ERROR *


PERFORMANCE

28 STABILITY *
29 MAXIMUM AMBIENT TEMPERATURE ºF 149
TRANSMITTER DATA

30 OUTPUT LINEAR
31
CERTIFIED/DATE

32 MATERIAL (WETTED PARTS) NOTE-5


DESIGN CERTIFICATION

8/24/2017

33 BURST PRESSURE
(DESIGN AGENCY)

PSIG *
EAE

BODY

34 PROCESS CONNECTION SIZE & TYPE NPT / 1/2" NPT / NPT / NPT /
35 MEET NACE MR-01-75 YES NO YES NO YES NO YES NO
36
37 ENCLOSURE TYPE NEMA4X
ENGG./DATE

8/24/2017

HOUSING

38 ELECTRICAL CONNECTION SIZE NPT / 1/2" NPT / NPT / NPT /


BKS

39 MOUNTING 2 INCH PIPE


40 MOUNTING BRACKETS REQUIRED
41 INDICATOR (NONE / REMOTE / INTEGRAL) INTEGRAL
42 INDICATOR SCALE RANGE (ANALOG/DIG / ENGR UNITS) DIG / PSIG
IS COVERED, FOR ALL APPROVAL

ACCESSORIES

43 INDICATOR MAXIMUM AMBIENT TEMPERATURE


AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

149 °F
44 SPECIAL TRANSMITTER FEATURES SMART
45 VALVE MANIFOLD (NONE / TYPE) 2-WAY
46 TRANSMITTER CONNECTED TO RTU
47
REVISION VALIDATION

NOTES: 1. PRESS. "INSTRUCTIONS" TAB OF THIS FILE TO SEE THE INSTRUCTIONS TO FILL THIS FORM.
DRAWING COMPLETION CERTIFICATE NO.

BI-10-01443-0001

2) * TO BE PROVIDED/CONFIRMED BY VENDOR
3) MOUNTING BRACKET AND NUTS & BOLTS SHALL BE SS OR GALVANIZED STEEL.
4) ELECTRICAL ENCLOSER CERTIFICATION AGENCIES SHALL BE AS PER SAES-P-100 PARA #8.2 (ATEX NOT ACCEPTABLE)
5)TRANSMITTER DIAPHRGAM MATERIAL SHALL BE MIN. HASTELLOYC. AND OTHER WETTED PARTS SHALL BE MIN. SS316 (LIKE
00

VALVE MANIFOLD MATERIAL, ETC..).


THIS REVISION NO.

ISS FOR 271-PIT-1254 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
ISSUED FOR CONSTRUCTION
QRT-10R PIPELINE KM-5 (GART-CORRIDOR) ISS
PIPELINE QATIF-ABQ(QA-1,2,3,4,5&6) 271 J CE-896489 002 00
QATIF SAUDI ARABIA
EKRD/8020-200-1110.XLS
Saudi Aramco 2616-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY

UNTIL CERTIFIED AND DATED


THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION
RE-ISSUED FOR CONSTRUCTION
271-RTU-342
SIGNAL
SIGNAL TAG SERVICE DESCRIPTION I/O TYPE P&ID DWG NO. REMARKS
LEVEL
REVISION DESCRIPTION

AI AO DI DO
FACP-342A FIRE COMMON ALARM FROM FACP 24VDC 1 - BY ACS VENDOR
FACP-342B FIRE GENERAL TROUBLE FROM FACP 24VDC 1 - BY ACS VENDOR

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AC-342A AIR CONDITIONER COMMON ALARM 24VDC 1 - BY ACS VENDOR
AC-1-342 AIR CONDITIONER-1/DIRTY FILTER ALARM 24VDC 1 - BY ACS VENDOR
AC-2-342 AIR CONDITIONER-2/DIRTY FILTER ALARM 24VDC 1 - BY ACS VENDOR
TAH-342A TEMPERATURE HIGH ALARM 24VDC 1 - BY ACS VENDOR
DS-1-342 DOOR SWITCH-1 24VDC 1 - BY ACS VENDOR
DS-2-342 DOOR SWITCH-2 24VDC 1 - BY ACS VENDOR
9/27/2018
DATE

EF-1-FAIL ONE EXHAUST FAN FAILURE 24VDC 1 - BY ACS VENDOR


JOB ORDER/EWO NO.

EF-1&2-FAIL BOTH EXHAUST FANS FAILURE 24VDC 1 - BY ACS VENDOR


AAH-342B HUMIDITY HIGH ALARM 24VDC 1 - BY ACS VENDOR
XL-342A BC-A COMMOM ALARM 24VDC 1 - BY ACS VENDOR
REV. NO.

XL-342B BC-A CB OPEN 24VDC 1 - BY ACS VENDOR


0F1

TAH-342B BATTERY ROOM TEMP. HIGH ALARM 24VDC 1 - BY ACS VENDOR


XL-342C BC-B COMMOM ALARM 24VDC 1 - BY ACS VEN., 0F1
XL-342D BC-B CB OPEN 24VDC 1 - BY ACS VEN., 0F1
BY/DATE
OTHER

XSH-10200 MOV-10200 OPEN INDICATION 24VDC 1 CA-894242.001


XSL-10200 MOV-10200 CLOSE INDICATION 24VDC 1 CA-894242.001

XSH-10201 MOV-10201 OPEN INDICATION 24VDC 1 CA-894242.001


XSL-10201 MOV-10201 CLOSE INDICATION 24VDC 1 CA-894242.001
OPERATIONS/DATE

XSH-10202 MOV-10202 OPEN INDICATION 24VDC 1 CA-894242.001


8/24/2017
ZAJ

XSL-10202 MOV-10202 CLOSE INDICATION 24VDC 1 CA-894242.001


REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

SPIS-10009 SCRAPER PASSAGE INDICATION SWITCH 24VDC 1 CA-894242.001


SPIS-10010 SCRAPER PASSAGE INDICATION SWITCH 24VDC 1 CA-894242.001
CONST. AGENCY/DATE

PIT-1254 MAINLINE PRESSURE 4-20mA 1 CA-894242.001


8/24/2017
FAQ

RT-342 RTU ENCLOURE TEMP. 4-20mA 1 - BY RTU VENDOR


RD-342 RTU DOOR OPEN 24VDC 1 - BY RTU VENDOR
CERTIFIED/DATE

8/24/2017
EAE
DESIGN CERTIFICATION
(DESIGN AGENCY)

ENGG./DATE

8/24/2017
BKS
0F1 IS COVERED, FOR ALL APPROVAL

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

I/O SUMMARY >>> 2 0 25 0


REVISION VALIDATION

NOTES:
DRAWING COMPLETION CERTIFICATE NO.

1. RELAYED OUTPUT TO BE CONSIDERED FOR MOV, CONTACT TYPE-SPDT, CONTACT RATING 2A AT 24 VDC.
2. I/O SIGNAL TAG SHALL BE PREFIXED BY PLANT NO. "271".
3. REFER , APPENDIX-A OF RTU FSD CE-896461 FOR TOTAL IOs OF 271-RTU-342.
WorleyParsons

27 SEP 2018
RE-ISSUED FOR CONSTRUCTION
THIS REVISION NO.

I/O LIST DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.

SCH
271 J CE-309942 001 0F1
QATIF SAUDI ARABIA
EKRD/2616-1110.XLS
LOAD GLAND TYPE RUN CONDUITS CONDUCTORS
TOTAL

CONDUIT
NUMBER
FIBER (F) ; STEEL (S) STL PVC

CABLE /
HP T T POWER (P) - CONTROL (C);
SERVICE "FROM" " TO " COATED (SP) GROUND (G) - INSTRUMENT (I)
QTY
OR VOLTS FROM Y PVC (P) Y REMARKS
END END TO P P
KVA INSULATION FEET
E LENGTH E
SIZE BENDS NO. & SIZE
Ft / m TYPE VOLTS METER
IC-3385 DIGITAL SIGNAL 24 VDC - - 271-MOV-10200 271-DJB-10182 SP 1" 3m - I 2PR x 16AWG XLPE/PVC 300 75 1
UNSHIELDED 2
IC-3386 DIGITAL SIGNAL 24 VDC - - 271-MOV-10201 271-DJB-10182 SP 1" 3m - I 2PR x 16AWG XLPE/PVC 300 60 3
UNSHIELDED 4
IC-3387 DIGITAL SIGNAL 24 VDC - - 271-MOV-10202 271-DJB-10182 SP 1" 3m - I 2PR x 16AWG XLPE/PVC 300 80 5
UNSHIELDED 6
IC-3388 DIGITAL SIGNAL 24 VDC - - 271-SPIS-10009 271-DJB-10182 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 80 7
UNSHIELDED 8
IC-3389 DIGITAL SIGNAL 24 VDC - - 271-SPIS-10010 271-DJB-10182 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 60 9
UNSHIELDED 10
IC-3390 DIGITAL SIGNAL 24 VDC - - 271-DJB-10182 271-RTU-342-MB SP 1 ½" 3m - I 12PR x 18AWG XLPE/PVC 300 25 11
O/A SHIELDED 12
IC-3391 DIGITAL SIGNAL 24 VDC - - 271-RTU-342-MB 271-RTU-342 SP 1 ½" 3m - I 12PR x 18AWG XLPE/PVC 300 15 13
O/A SHIELDED 14
IC-3392 ANALOG SIGNAL 24 VDC - - 271-PT-1253 271-LDS-AJB-10183 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 80 15
SHIELDED 16
IC-3393 ANALOG SIGNAL 24 VDC - - 271-LDS-AJB-10183 271-LDS-SP-10183 SP 1" 3m - I 2PR x 18AWG XLPE/PVC 300 30 17
I&O SHIELDED 18
IC-3394 DIGITAL SIGNAL 24 VDC - - 271-LDS-SP-10183 271-SA-10183 SP 1" 3m - I VTA VTA 300 VTA GPS ANTENNA CABLE 19
GPS ANTENNA CABLE BY LDS VENDOR 20
IC-3395 ANALOG SIGNAL 24 VDC - - 271-PIT-1254 271-AJB-10182 SP 1" 3m - I 1PR x 16AWG XLPE/PVC 300 80 21
SHIELDED 22
IC-3396 ANALOG SIGNAL 24 VDC - - 271-AJB-10182 271-RTU-342-MB SP 1 ½" 3m - I 4PR x 18AWG XLPE/PVC 300 25 23
I&O SHIELDED 24
IC-3399 DIGITAL SIGNAL 24VDC - - FACILITY ALARM JUNCTION BOX 271-RTU-342-MB SP 2" 3m - I 16PR x 18AWG XLPE/PVC 300 20 25
(BY ACS VENDOR) UNSHIELDED 26
27
28
29
30
31
32
33
34
35
WorleyParsons
36
37
28 August 2017
38
39
ISSUED FOR CONSTRUCTION
40
LEGEND : Note REVISION VALIDATION
1/ THE CABLES SHOWN ABOVE ARE RELATED TO QRT-10R PIPELINE KM-5 (GART-
SAUDI ARABIAN OIL COMPANY
C - Conduit (Per SAES-P-104) THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
CORRIDOR)
CC - Electrical Control (Per SAES-P-104) REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DWG. TYPE
2/ VTA - VENDOR TO ADVISE.
PC - Power Cable (Per SAES-P-104) CABLE & CONDUIT SCHEDULE
IC - Instrument Cable (Per SAES-J-902) 10-01443-0001 CCS
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
NUMBER IC-3385 THROUGH IC-3399

ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE


REFERENCE DRAWING BKS EAE FAQ ZAJ
DRAWING CONTROL FOR BI-10-014431-0001 CD-893715 8/24/2017 8/24/2017 8/24/2017 8/24/2017
QATIF SAUDI ARABIA
INSTRUMENT BLOCK DIAGRAM CA-896495.001 REV. NO. DATE REVISION DESCRIPTION
00 8/24/2017 ISSUED FOR CONSTRUCTION PLANT NO. INDEX DRAWING NUMBER SHEET NO. REV. NO.
JOB ORDER / EWO NO. THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL
10-01443-0001 CERTIFIED AND DATED 271 P CD-896493 001 00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER. Saudi Aramco 2864-ENG (11/10)'D' SIZE
EXCEL
WorleyParsons

28 August 2017

ISSUED FOR CONSTRUCTION


WorleyParsons

28 August 2017

ISSUED FOR CONSTRUCTION


SAUDIARAMCO.
NOTES:

1. FOR NOTES AND LEGEND REFER TO SHEET 001


OF THIS DRAWING.

OF
CONSENT
TTEN
DRAWING LIMIT

WRI
CALLED

THE
NORTH

THOUT
PREVAI
LING
WI
ND DIRECTI
ON

WIS
THI
FROMNG
DRAWI
9900 4000 1000 2300 2099 1403 4398 1000 4000 9900

NED
42" QR-1 PIPELINE

OBTAI
001

BE
DWG.CA-309954.

PART,SHALL
001
DWG. CA309954.
4000
PT PIT SPIS
SEE MOUNTING
1253 1254 10009 IC-3385
IC-3392 SPIS DETAIL-6E
IC-3395 30"-P-1446-3CS1P SEE DWG NO.
10010
IC-3388 PLATF NO. 103 CA-896524.007
BOP EL 101.000

N
TOG EL 101.330

I
IG IG

FULL,OR
30" QRT-10R PIPELINE SV

ƒ"

ƒ" 2"
ƒ" 2"
SEE

TYP)
1680
EL
NO.

N
SEE
330

I
NO.101

C-3389

(
330
CONT

TOG
101.

ON
IC-3387 PI MOV
SEE MOUNTING

PLATF

101.

REPRODUCTI
DETAIL-6A 1254 10200

I
REFERENCE DRAWINGS

CONT
102
SEE DWG NO.

EL

TYP)
PLATF

1149
CA-896524.003 MOV MOV DWG. CONTROL FOR BI- 10-01443-0001 CD-893715
FOR

TOG
PIPING & INSTRUMENT DIAGRAM CA-894242.001

(
10202 10201
REF HP GRADE EL 100.000
PIPING & INSTRUMENT DIAGRAM CA-896495.001

C-3386
24"-300# 24"-300#

FOR
PIPING PLAN CA-894295.001
RF BV RF BV
REF CONTROL PT
NE

INSTR POINTS & LINES QRT-10R P/L KM-5 CA-309954.001

SAUDIARAMCO.NO
MATCHLI

INSTR POINTS & LINES QRT-10R P/L KM-5 CA-309954.002

TYP)
2271

NE
INSTR BLOCK DIAGRAM QRT-10R P/L KM-5 CA-896495.001

MATCHLI
24"-P-1450-3CS1P

(
INSTR BLOCK DIAGRAM QRT-10R P/L KM-5 CA-896495.002
BOP EL 101.076 INSTR BLOCK DIAGRAM QRT-10R P/L KM-5 CA-896495.003
CABLE AND CONDUIT SCHEDULE QRT-10R P/L KM-5 CD-896493.001
2" V 2" D
CABLE AND CONDUIT SCHEDULE QRT-10R P/L KM-5 CD-896493.002

1800

OF
10"
1CS1P 3CS1P
10" 1" V

PROPERTY
10"-BD-1524-1CS1P IG BOP EL 100.479

10" WARNING TAPE PVC COATED STEEL


FENCE FABRIC

BACKFILL SOIL

SOLE
FIN. GR LEVEL

1080 14445 1072 500 500 2400 2600 1000 1500 2500

THE
610
LEFT TO
RIGHT

300

ARE
MINIMUM DRY
IC-3392 SAND COVER
IC-3395
A A

N
IC-3388

HEREI
150
IC-3387
0 1.0 2.0 3.0 4.0 5.0
IC-3385

IC-3389
METERS
LEFT TO IC-3386 50 TYP

NED
RIGHT 1 : 50M
SCALE:
100
IC-3386
21%)

CONTAI
IC-3389 150 150
IC-3385
0.

REVISION VALIDATION
650
(

IC-3387
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
IC-3388
SLOPE

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

IC-3395
SECTION A-A

ON
10-01443-0001-001
IC-3392

NFORMATI
SCALE
  NONE DESIGN CERTIFICATION

ENGG./DATE
(DESIGN AGENCY)
REVIEW FOR KEY DRAWINGS
REQUIRED

CERTIFIED BY/DATE CONST. AGENCY/DATE


(SAUDI ARAMCO)

OPERATIONS/DATE
OTHER

BY/DATE

MATCHLINE FOR CONT SEE DWG.CA-309954.001 KMM


07/20/17
EAE
07/20/17

REV.NO. DATE REVISION DESCRIPTION


TO 271-JBRK-10182

I
00 07/20/17 ISSUED FOR CONSTRUCTION

WorleyParsons
FOR CONTINUATION

THE
SEE DWG.CA-309954.001 JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-01443-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
28 August 2017
DRAWING TYPE

INSTRUMENT POINTS & LINES IPL

NG
QRT-10R P/L GART CORRIDOR AT KM-5

DRAWI
PIPELINES QATIF-ABQ(QA-1,2,3,4,5&6)

ISSUED FOR CONSTRUCTION QATIF SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
271 J CA-309954 003 00
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05


INSTALLATION

MTG
AMS STOCK OR
ILD / ISD DRAWING P & ID
SPECIFICATION REQUISITION INSTRUMENT

DEV
MOUNTING PIPING
REMARKS MANUFACTURER TYPE SERVICE
F DRAWING NO. TAG NO.

ITEM
SHT.

SHT.
DET

DET
DWG. NO. DWG. NO. DWG. NO. DWG. NO. NUMBER
P
1 NOTE 1 BOURDON F ------ CA-896524.009 9A ------ CA-894242 001 CE-896489.001 ------ LOCAL PRESSURE INDICATOR 271-PI-1254
2 @ QRT-10R PL KM-5 GART-CORRIDOR
3 BY BURN PIT VENDOR NOTE 1 BOURDON F ------ ------ ------ CA-894243 001 CE-895135.001 ------ PRESSURE INDICATOR, (271-F-0105) 271-PI-1268A
4 @ QRT-10R PL KM-5 GART-CORRIDOR
5 BY BURN PIT VENDOR NOTE 1 BOURDON F ------ ------ ------ CA-894243 001 CE-895135.002 ------ PRESSURE INDICATOR, (271-F-0105) 271-PI-1268B
6 @ QRT-10R PL KM-5 GART-CORRIDOR
7 NOTE 1 PIEZO-ELCTRIC F CA-896524.003 6A CA-896524.010 5 CB-309955 010 CA-894242 001 CE-896489.002 ------ PRESSURE INDICATING TRANSMITTER H 271-PIT-1254
8 @ QRT-10R PL KM-5 GART-CORRIDOR
9 BY BURN PIT VENDOR NOTE 1 NOTE 1 F ------ ------ ------ CA-894243 001 CE-895136.001 ------ PRESSURE CONTROL VLV, (271-F-0105) 271-PCV-1268
10 @ QRT-10R PL KM-5 GART-CORRIDOR
11 NOTE 1 NOTE 1 F CA-896524.003 6A CB-894320.001 - CB-309955 009 CA-894242 001 CE-896488.001 ------ LDS PRESSURE TRANSMITTER 271-PT-1253
12 @ QRT-10R PL KM-5 GART-CORRIDOR
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
WorleyParsons
34
35
28 August 2017
36
37
38
ISSUED FOR CONSTRUCTION
39
40

LEGEND: NOTES: REVISION VALIDATION


SAUDI ARABIAN OIL COMPANY
MTG - Mounting 1. VENDOR TO PROVIDE AND ADVISE THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
F - LOCAL MOUNTED INSTRUMENT REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO: DWG. TYPE
INSTRUMENT INSTALLATION SCHEDULE
P - BOARD MOUNTED INSTRUMENT IIS
DEV - DEVICE PROTOCOL 10-01443-0001
C - CONVENTIONAL (e.g. 4 -20 mA)
PRESSURE INSTRUMENTS
F - FOUNDATION FIELDBUS DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS
OTHER PIPELINE QATIF-ABQ(QA-1,2,3,4,5&6)
H - HART (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERT. BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
P - PROPRIETARY PROTOCOL
BKS EAE FAQ ZAJ
QATIF SAUDI ARABIA
(e.g. FoxCom, DE, etc.) 8/24/2017 8/24/2017 8/24/2017 8/24/2017
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
ILD INSTRUMENT LOOP DIAGRAM REV. NO. DATE REVISION DESCRIPTION
00 8/24/2017 ISSUED FOR CONSTRUCTION
ISD INSTRUMENT SEGMENT DIAGRAM JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION 271 J CD-309956 001 00
10-01443-0001 UNTIL CERTIFIED AND DATED
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER. Saudi Aramco 2781A-ENG (11/2010) "D" SIZE

EXCEL
WorleyParsons

28 August 2017

ISSUED FOR CONSTRUCTION


WorleyParsons

28 August 2017

ISSUED FOR CONSTRUCTION


SAUDI ARABIAN OIL COMPANY
CONTRACT No.

PROJECT: BI:
LOOP CHECK PUNCH LIST FORM
INST. TAG NO: 271-PIT-1254 INST. LOOP NO: 271-PIT-1254 SERVICE: QRT-10R NGL LOCATION: KM-5 QRT-10R
ORIGINATOR CATEGORY ACTION BY RECTIFIED BY
S.No Date PUNCH DESCRIPTION
NAME SIGNATURE A/B CPP CLIENT NAME SIGNATURE DATE

10

11

12

13

14

15
1 - CATEGORY:
A - MUST BE COMPLETED BEFORE LOOP CHECK ACTIVITY
B - SHALL BE COMPLETED TO A LATER PHASE (Which are not effecting for Pre-Commissioning/Commissioning stage)

COMPLETED BY: CONTRACTOR CLIENT REPRESENTATIVE

COMPANY: CPP SAPMT SAPID

SIGNATURE:

DATE:
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A Pre-Loop Check - Works Inspection


SAEP-16
A1 Ensure that actual field installation is completed in all aspects .
Sec. 4.1.13
The installation Record sheets to be verified and formed as part of loop SAEP-16
A2
folder Sec. 4.1.13
SAEP-16
A3 Ensure that all individual loop components have been calibrated
Sec. 4.1.13
Aramco Inspection / Proponent , Contractor QC signatures to be verified SAEP-16
A4
on installation inspection as well as test / calibration sheets. Sec. 4.1.13

The completed instrument loop shall be tested as one system, and SAEP-16
A5
where necessary adjustments shall be made to the calibrations. Sec. 4.1.13

The loop testing shall be performed from the field instrument through to
SAEP-16
A6 the DCS maintenance consoles and associated systems located either
Sec. 4.1.13
at the CCR or PIB control rooms.
DCS loop checks may include verification of all PCS functions such as
SAEP-16
A7 database parameters, alarm initiations, trending, report generation,
Sec. 4.1.13
graphics etc.
Verify the transmitter set (Calibration) range as per latest ISS, by using Vendor Manuals
A8 Foxcom (HHT) communicator for Foxboro Transmitters / HART for and test
Rosemount Transmitters or in DCS as applicable procedures

Apply the pressure for digital smart transmitters by using test equipment Vendor Manuals
A9 (Hand Pump) for 50% simulation to check the transmitter response at and test
DCS. This method shall be used for digital smart transmitters case only. procedures

Vendor Manuals
Confirm / Verify the corresponding reading in the DCS / Integral indicator
A10 and test
and at remote indicator if applicable.
procedures
However, for analog Foxboro smart transmitters case Foxcom (HHT) Vendor Manuals
A11 communicator shall be used for simulation purpose instead of hand and test
pump. procedures
Vendor Manuals
For Rosemount smart transmitters case (HART) communicator shall be
A12 and test
used for simulation purpose instead of hand pump.
procedures
Vendor Manuals
For Non- smart transmitters case (4~20 mA) source to be used for
A13 and test
simulation purpose instead of hand pump.
procedures
Vendor Manuals
Alarms function (in DCS) shall be checked by Simulating /Verifying the
A14 and test
required signal.
procedures
Vendor Manuals
Transmitter loop test should be performed after completion of the
A15 and test
impulse line works including pressure test.
procedures

Page 1 of 1
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

B Calibration Record and Test Equipment Model

C Test Equipment S. No and Calibration Details

D Test Procedure - Transmitter Circuit Test (Flow / Level / Pressure)


Transmitters Loops (Flow/Level/Pressure):
a) Check and verify the DCS Configuration for applicable points.
b) Verify the transmitter set (Calibration) range as per latest ISS, by using Foxcom (HHT) communicator for Foxboro Transmitters / HART for
Rosemount Transmitters or in DCS as applicable
c) Apply the pressure for digital smart transmitters by using test equipment (Hand Pump) for 50% simulation to check the transmitter response at
DCS. This method shall be used for digital smart transmitters case only.
d) Confirm / Verify the corresponding reading in the DCS / Integral indicator and at remote indicator if applicable.
e) However, for analog Foxboro smart transmitters case Foxcom (HHT) communicator shall be used for simulation purpose instead of hand pump.
f) For Rosemount smart transmitters case (HART) communicator shall be used for simulation purpose instead of hand pump.
g) For Non- smart transmitters case (4~20 mA) source to be used for simulation purpose instead of hand pump.
h) Alarms function (in DCS) shall be checked by Simulating /Verifying the required signal.
i) Transmitter loop test should be performed after completion of the impulse line works including pressure test.

E Results
Loop Continuity Check Sheet (Pre-Loop Check)
Unit NO System NO Loop No. Loop Drawing No
From To Checks per Section Name-sign/
Tag / Item no Area Cable Number Tag no Area continuity test Termination Remarks and date

F Conclusions

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
2. Schedule Q - Quality Requirements (Pro Forma Contract), November 2003 and February 2008
3. SAES-J-901 - Instrument Air Supply Systems, 30 June 2003
4. SAEP-16 - Project Execution Guide for Process Automation Systems, 20 November 2007
5. SAEP-1636 - Installation and Checkout Plan , 12 September 2007
6. SAEP-1638 - Site Acceptance Test Plan, 12 September 2007

Page 1 of 2
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

ATTACHMENTS:
1. Attachment 1: Instrument Loop Check sheet

NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.

4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Page 2 of 2
SAUDI ARAMCO ID/PID - 18 MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Loop - Inputs - Transmitter Circuit Test SATR-J-6501 15-Dec-09 INST

Attachment 1: Instrument Loop Check Sheet

Unit No.: System No.: Loop No. Loop Dwg. No.:

DCS INSPECTION PERFORMED

POINTING TAG YES NO N/A


POINT DESCRIPTION YES NO N/A
POINT CONFIGURATION YES NO N/A
POINT RANGE ( YES
) NO N/A
INPUT / OUTPUT FUNCTION YES NO N/A
CONTROLLER ACTION ( YES) NO N/A
SCHEM. & ASSOCIATED GRAPHICS (NO.
YES NO )N/A
ALARM (LL) YES NO N/A
ALARM (L) YES NO N/A
ALARM (HH) YES NO N/A
ALARM (H) YES NO N/A

DCS / FIELD INSPECTION PERFORMED

MOTOR CONTROLS / SWITCHES / MOV'S / AOV'S GAS DETECTOR

COMMANDS INDICATION GAS DETECTOR NO.:


YES NO N/A YES NO N/A
RESET ON INPUT
OUTPUT
BY PASS OFF (PPM/LEL)
ON / START RUNNING
OFF / STOP STOPPED
OPEN OPEN
CLOSE CLOSE
STOP CMDIS

SIMULATION RESULTS

TAG NO. : VALVE TAG NO.: SWITCH TAG NO. :


PROCESS INPUT RANGE : SWITCH SET POINT :
PROCESSOUTPUT VALVE SWITCH FUNCTION RESULT
INPUT % INPUT %
INPUT TO DCS TRAVEL SWITCH ACTIVATES AT
0 0 SWITCH ACTION AT SET POINT
25 25 SWITCH RESET AT
50 50
75 75
100 100
75 75
50 50
25 25
0 0

Page 1 of 1
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Instrument Cable - Continuity, Insulation Resistance
SATR-J-6602 15-Dec-09 INST
(Installed) and Termination Torque Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A Document Review
Specific tools and equipment shall be identified to make and perform Schedule Q
A1
tests in the field with instructions for their use, calibration, and storage. Att. IV
The CONTRACTOR shall identify, maintain, control, adjust, and calibrate
Schedule Q
A2 all tools, gauges, instruments and other measuring and testing devices
Att. IV
used for controlling quality.
Calibration shall be performed at established periods as specified in
the most stringent of SAUDI ARAMCO standards, other applicable Schedule Q
A3
standards, or manufacturer recommendations; if no standards apply, Att. IV
the calibration cycle shall not exceed six months.

CONTRACTOR shall provide backup equipment when the primary Schedule Q


A4
equipment is being calibrated or tested. Att. IV

CONTRACTOR personnel performing test and calibrations shall be Schedule Q


A5
trained per applicable international or manufacturer requirements. Att. IV

B Test Procedure and Cheklist


Inspect all bolted electrical connections for high resistance using one of
the following methods:
1. Use of low-resistance ohmmeter in accordance with Section 7.3.2.2
(Electrical Tests). Schedule Q
B1
2. Verify tightness of accessible bolted electrical connections by Att. IV
calibrated torque-wrench method in accordance with manufacturer’s
published data or Table 100.12.
[NETA ATS Sec.7.3.2.1.3]

Inspect compression-applied connectors for correct cable match and Schedule Q


B2
indentation. [NETA ATS Sec.7.3.2.1.4] Att. IV

NEC 110-14
B3 Check that the installed connector size match with the size of wire.
& 250-110
NEC 110-14
B4 Check that the required information is marked on the compression lugs.
& 250-110
NEC 110-14
B5 Check the bolt & hole size of termination lugs installed for correctness.
& 250-110
Electrical Tests:
Perform insulation-resistance test on each conductor with respect to
ground and adjacent conductors. Applied potential shall be 500 volts dc Schedule Q
B6
for 300 volt rated cable and 1000 volts dc for 600 volt rated cable. Test Att. IV
duration shall be one minute.
[NETA ATS Sec. 7.3.2.2.2]

Page 1 of 1