WORK METHOD STATEMENT

Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 1 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

Project ASU GAS YARD


CADANGAN MENDIRIKAN 1 UNIT 'ASU GAS YARD', 1 UNIT PEJABAT ADMIN 2
TINGKAT, 1 UNIT PENCAWANG ELEKTRIK 11KV 2 TINGKAT, 1 UNIT ‘33KV
TRANSFORMER YARD’ 1 TINGKAT, 1 UNIT BANGUNAN MEKANIKAL 1 TINGKAT
DAN 1 UNIT 'METERING SKID' 1 TINGKAT, DI ATAS LOT 1956, JALAN KAMPUNG
JAWA, KAWASAN PERINDUSTRIAN BEBAS CUKAI, BAYAN LEPAS, FASA 3, MUKIM
12, D.B.D., PULAU PINANG UNTUK TETUAN INTEL ELECTRONICS (MALAYSIA)
SDN. BHD.

DOCUMENT TITLE:-

METHOD OF STATEMENT:
ELECTRICAL RESISTIVITY SURVEY
(WENNER FOUR PIN METHOD)

DC RESOURCES SDN BHD IPM CONSULTANT LINDE


Rev Date Status Prepare By Review By Review By Approved By Approved By

0 3/11/2022 REV 0

ROZELIM SUHADI

DC Resources SdnBhd
Page 1 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 2 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

CONTENTS

1.0 Purpose

2.0 Scope of works

3.0 Reasonability

4.0 Risk Assessments

5.0 Equipment and Tools

6.0 Man Power

7.0 Methodology

8.0 Safety

DC Resources SdnBhd
Page 2 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 3 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

1.0 Purpose
The purpose of this Job Method Statement is to outline in detail the method and
actions required to control The Electrical Resistivity Survey.

2.0 Scope of works

The Geologist and General Worker must ensure to follow the guideline at the
field during the survey.

3.0 Reasonability

3.1 Geologist

Has the responsibility to ensuring that all the activity is done without endangering
health and safety in accordance with the local legislation, clients are requirements and
stipulations laid down in the HSE management system document. Ensure that all under
groundwork related an accidents are reported, investigated and that corrective and
preventive measures are taken, the accident investigation team has the power to stop any
work or operation under his authority on health, safety or environmental grounds until
effective measure have been taken. He will be control all site progress and management.

3.2 General Workers

 Understand their role


 Are competent to undertake that role
 Have appropriate Basic PPE and including vests
 Know how handle the tools or machinery n know what additional PPE need to
use like hand glove, Face shield, ear plug and etc.
 Workers are not required to be handle any equipment/machinery without
training or knowledge.

DC Resources SdnBhd
Page 3 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 4 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

4.0 Risk Assessments

Before proceedings to any survey work, Risk hazard Identification to be conducted


for the particular works. This is required to be done for every site operation
activity/work.

5.0 Equipment and Tools

Equipment and Tools shall be verified and certified/stickered before deploying


at site. The following table of Plant, Equipment and Tools will be utilized as and when
necessary to assist in the works. The quantity will depend on the scope works.

No. ITEM QUANTITY


1 MAE E612EM+ 1
2 ABMN Cable 4
3 Jumpers and Non Polarized electrode 5
4 Cable 1
5 12 volt Battery 1
6 GPS 1

6.0 Man Power

Item Direct Man Power Item

1 Senior Geologist 1

2 Geologist 2

3 General Worker 2

7.0 METHODOLOGY

DC Resources SdnBhd
Page 4 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 5 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

The earth resistivities were measured by using Wenner Four-Pin-Point method or Four-Pole Soil-
Testing method based on BS 7430:2011 Test Standard. Typical configuration of soil test measurement
is shown in Figure 4. Current is injected between the two outer electrodes and the resistance (R) is given
by the ratio of the voltage between the inside electrodes to the current. In homogenous soil, the average
resistivity (ρ) in ohm meter is given by the following equation:
𝜌=2𝜋𝑎R
where
ρ = resistivity, in Ωm
a = the spacing between electrodes, in m
R = the resistance measured between the middle electrodes, in ohm ( Ω)
The resistivity values obtained at certain soil depth (D), by repeating the measurement with different
length of spacing (a), the average resistivity to various depths can be found and the results indicate
whether any advantage is to be gained by installing deeply driven electrodes in order to reach strata of
a lower resistivity. MAE X612EM+, clip wires and four electrodes copper- clad were used. Four
electrodes were buried in one line spaced “a” spacing between each electrode. The expected depth was
generated by using formula AB/4 whereas AB is the length between C1 and C2. Figure 5 shows the
tools and equipment used for vertical electrical sounding survey. The resistivity values of common
rocks and soil materials are shown in Table 2. Resistivity values of these rocks were greatly dependent
on the degree of weathering and the moisture content.

Figure 1: Typical configuration of soil test measurement using Wenner four-point method

DC Resources SdnBhd
Page 5 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 6 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

FIELD DATA ACQUISITION


MAE X612EM+ were setup at the center point of study length survey. Begin at the center, measure 22
m length to the left and right that will be placed four (4) electrodes as P1, P2 as potential electrode and
C1, C2 are current electrode. Four (4) electrodes will be buried in one line spaced ‘a’ spacing between
each electrode. The arrangement of the electrode will be pair left and right with P1 – C1 and P2 – C2.
The expected depth generate by using formula AB/4 whereas AB is the length between C1 and C2.
Thus, after the setup configuration will be referred from VES form and the spacing start from AB/2 –
1.5m and MN/2 – 0.5m and move to the next spacing until achieve requirement.
In LS2 the setup is VESC1C2P1P2 and protocol is Wenner to measure the resistance of soil. To
complete and aware the next move spacing, site supervisor will be using VES form to record data
measurement value for each move spacing ‘a’.

Table 2: Example of field acquisition form samples

DC Resources SdnBhd
Page 6 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 7 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

Table 3: Soil resistivity (modified from Keller & Frishcknecht 1966, Daniel & Alberty, 1966 &
Dinwiddie et al, 2007)

MATERIALS RESISTIVTIY (Ohm-m)


Igneous and Metamorphic Rock
Granite 5 x 102 - 106
Basalt 103 - 106
Schist 50 - 103
Marble 102 – 2.5 x 108
Quartzite 102 – 2.0 x 108
Hornfel 8 x 103 – 6.0 x 107
Saturated tuff 400 – 800
Unsaturated tuff 1,000 – 2,000
Sedimentary Rock
Sandstone 8 – 4.0 x 103
Shale 20 – 20 x 103
Limestone 50 – 4.0 x 102
Soil and Water
Clay 10 – 800
Alluvium 1 – 100
Fresh Water 10 – 100
Salt water 0.15

DC Resources SdnBhd
Page 7 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 8 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

DC Resources SdnBhd
Page 8 of 6
WORK METHOD STATEMENT
Reference : MS-LINDE INTEL-DCR-013 PM/APM Initial :

Page 9 of6 Revision No. 01 Revision Date: 03/11/2022


Method of Statement Electrical Resistivity Survey

8.0 SAFETY

8.1 Personal Protective Equipment (PPE)

The PPE shall strictly implement and distribute to all related worker. All PPE used by
construction personnel shall be in good quality and condition, such as:
Safety Helmet, Safety Shoes, Hand Gloves, Safety Glasses, Proper Clothes
Safety Welding Shield, Hearing Protection, safety harness (if require)

8.2 Daily Tool Box Talk and Pre Task Talk

- Prior to start the task, site supervisor along with safety supervisor shall conduct tool
box, they have to present in detail the task, potential risk, safe activity implementation
and the preventive measures, PPE requirement of safe works.
- All activities shall be planned, supervised and carried out in a safe manner under the
control of a competent person, who knows the responsibilities.
- All equipment shall be suitable for the specified works.

8.3 Emergency Response Plan

- Emergency Response Plan must be developed and implement to all personnel


acquainted with the relevant provisions and know what to do in case of any emergency.
- Contractor shall have suitable trained Fire Watcher among his crew at all times during
on site operation.
- The contractor shall display emergency evacuation procedures at strategic location on
the site and ensure arrangements are in place to call for outside help, if need be assist in
any emergency associated with the works on site.
- Contractor shall at all-time keep company updated with list of addresses and telephone
number of the contractor staff who are responsible for organizing emergency responses
at site.

9.0 House Keeping

 After finish works all material are to be dismantle and repack

DC Resources SdnBhd
Page 9 of 6