BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
$rhofly Owned Government of Karnataka Undertakingf
No:BESCoM:CGM(o!/DGM(oP-31/AGM -rt2r-221 CVs _ Corporate Office
ls Lts
K.R. Circle
Bangalore-56o OO1
Date:
AMENDMENT 202t ,- g N0v
Sub: Amendment to the Circular issued for arranging Power supply under Sub-
Meter Applications including EV Charging Stations with respect to gth
Amendment of Cos and 1lth Amendment to ROE of KERC.

Ref: 1) T.O. Circular Dated on CGM(O)/DGM(O)-3/AGM(O)-3lF-332120-


21lCYS-83128.tO.2O2O
2) Note Approved by DT, BESCOM dated on 18.1O.2O21
******
Preamble: This office has issued a circular for adopting the procedures for
arranging power supply under Sub- Meter applications including EV Charging
stations vide letter cited under reference (1). Further KERC has issued an
amendment for arranging Power supply on LT basis up to 150 KVA vide Notification
Number KERC/ CoS / tech/ DDD I 05 I 20-21 I 97 6, Bengaluru, dated I | .I2.2O2O

Further , DGM(SG&EV) has requested this office to issue Amendments to the


circular vide under ref(1) with respect to provision made under 9th Amendment of
CoS and 11th Amendment of RoE

Hence the following amendment.

sl. Scen As Existing As Amended


No ario
1 A. In the case, where the A.In the case, where the applicant is
applicant is the owner of the owner of single domestic
a single domestic installation: installation:
o
+)
d
o
d. As per clause No.3.1.1 of d. As per clause No.3.1.1 (A) & Note
KERC up to 34KW (Including (ii) (ii| (iv) (v) of KERC up to 150
o.
o. Additional Load) can be KW can be arranged from licensee
arranged from licensee network under LT basis.
a
o network under LT basis. g. If the total load is more than 35KW
tr
fL g. If the total load is more and up to and inclusive of 150 KW
than 35KW and less than 99 power supply can be arranged
KW power supply can be under LT tariff but Necessary
arranged under LT tariff but infrastructure to be develoPed bY
Necessary infrastructure to be I applicant.
developed by applicant.

{.},

PR

,6 ro\..\r; +
+
ti
B. In all other cases B. In all other cases
b. As per clause No.3.1.1 of b. As per clause No.3.1.1(A) and Note
KERC up to 34KW (Including (ii)(iii)(iv)(v) of KERC up to 150 KW carl
Additional Load) cal be arranged be arranged from licensee network under
from licensee network under LT LT basis
basis. . . ,
d. If the total load is more than 35KW
d. If the total load is riiiit'e than
35KW and less than 99 KW power and upto and inclusive of 150KW power
supply can be arranged under LT supply can be arranged under LT tariff
tariff but Necessary infrastructure but Necessary infrastructure to be
to be developed by applicant and developed by applicant and load to the
load to the single installation single installation restricted to 150KW. .

restricted to 99KW..
2 b. As per clause No.3.1. i of b. As per clause No.3.1.1(A) and Note
KERC up to 34KW (including (ii)(iii)(iv)(v) of KERC up to 150 Kw can be
Additional Load) can be arranged arranged from licensee network under LT
rc from iicensee network under LT basis
cd basis.
o
d. If the total load is more than d. If the total load is more than 35KW
C) 35KW and up to and less than and up to and inclusive of 150KW power
X 99 KW power supply can be supply can be arranged under LT tariff
arranged under LT tariff but but Necessary infrastructure to be
Necessar5r infrastructure to be developed by applicant and load to the
developed by applicant and load single installation restricted to 150KW.
to the single instailation
restricted to SOKW.
-
.) l- d. Sub meter can be provided d. Sub meter can be provided on
l l*
*CrI-
(g
on LT side for the total load LT side for the total load not
a4F not exceeding the 99 KW and exceeding the 150 KW and power
power supply restricted to 50 supply restricted to 150 KW for
C,* KW for single installation and single installation and to be billed
(*..s The
!H) to be billed under LT6(c) tariff. under LT6(c) tariff. The Clause
d try Clause 8.14(ii) is 8.14(iil is applicable defined in CoS of
!dk
'b Fr i; applicable defined in CoS of KERC.
.H
c{ KERC.
o
bo-9{ e. If the total load crosses e. If the total load crosses more than
.=
u
d )<
o +1
.F!
-l
14.
more than 99 kW power 150 kW power supply can be
bI:i
'*jel
l

supply can be arranged on HT arranged on HT Basis and to be billed


fd cd orl Basis and to be billed under under LT6(c) on HT basis.
-a ?l LT6(c) on HT basis.
(H
H.r C IEI ^l

chie f #";*, {Wr(operations}


BESCOM
Draft DT

copv to:
L. Chief General Manager (CA/l/Al, Corporate office, BESCOM, Bangalore for information
2. All Chief Engineers, C, O & M Zones, BESCOM for information
3. The General Managers (lT/Revenue/F&R/Commercial/M&C/Procurement), corporate
office, BESCOM, Bangalore for information.
4. AllSupe(ntqnding Engineers, C, O & M Circles, BESCOM for information and for needful action
5. DGM (SG&EV)& DGM(RA), Corporate office BESCOM
6. All Executive Engineers, C, O & M Divisions & MT Divisions, BESCOM for needfulaction.
7. All Assistant Executive Engineers, C, O & M Sub-Divisions, BESCOM for needful action.
8. PS to MD/DTto place before Hon'ble MD/D (T)for kind information. g) M/f