Ministry of Science & Technology

Proposed PSDP 2023-24


Rs. In Million
Sr. PSDP Name of Project Approved by Date of Approved Cost Estimated Expected Cumulative Estimated Proposed Allocation Within IBC Additional Demand over and Likely date of completion Objectives
No No. Forum Admin Expenditure during Expenditure upto Throwforwar 2023-24 above IBC 2023-24
with date of Approval 2022-23 (if any) 30.06.2023 d
approval and
01.07.2023
Admin
Approval Total F.Aid Total F.Aid Total F.Aid F.Aid Rupee Total F.Aid Rupee Total As per PC-I Expected

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A Ongoing
1 1135 Certification Incentive Program for CDWP 28-01-2016 800.000 0.000 66.460 0.000 457.498 0.000 342.502 0.000 150.000 150.000 0.000 0.000 0.000 04.02.2021 30.06.2025 • To create awareness among the SMEs for adoption of
21-12-15 certification systems to help improve their performance and
SMEs under PQI Initiative 2025 Rev.I 19.03.18
productivity.
DDWP
Rev. II • To organize training programmes for the stakeholders to
09.11.20 develop and implement certification systems covering Quality,
Rev.III Environment, Safety/ Security, GMP & Product Certifications etc.
04.08.2021

DDWP 31-12-2020 0.000 0.000 0.000 0.000 0.000 04.02.2021 30.06.2024 • To provide
Upgrade financial incentives
of end-of-life to SMEs in
and end-of-support developing
NUST Main Data Centre
2 1136 Cloud Enabled Infrastructure for 57.000 0.000 42.183 14.817 14.817 14.817 0.000 0.000
02-04-2020 facility from Tier-II to Tier-III standard.
Research & Innovation

• Enablement of OpenStack Cloud Infrastructure to Enable


university IT horizon shift from traditional IT environment to
contemporary / futuristic cloud computing environment,
leveraging benefits of scalability and virtualized resources.

3 1137 Competitive Research Programme CDWP 20-06-2018 1964.500 0.000 113.353 0.000 508.488 0.000 1456.012 0.000 190.000 190.000 0.000 0.000 0.000 12.04.2022 30.06.2026 • Provision of the Research Grants to address the mega national
04-12-2017 issues and promote world class research.
DDWP
Rev.
04.08.2021 • Development of the new processes/ products/ applications/
technologies through native knowledge / skills of the researchers
working in the universities and R&D Institutions.

4 1138 Cultivation and Processing of Medicinal DDWP 13-07-2021 1896.820 0.000 262.350 0.000 933.622 0.000 963.198 0.000 300.000 300.000 0.000 0.000 0.000 13.07.2024 30.06.2024 • To develop experimental fields / land for cultivation of industrial
and Industrial Cannabis on Experimental 06-05-2021 cannabis.
Fields and Establishment of testing and • To cultivate industrial cannabis on experimental fields and it's
product developmnet facilities at PCSIR processing.
Laboratories Complex, Lahore, • To develop and validate analytical methods for testing of
Peshawar and Karachi industrial cannabis.
• To conduct research for product development from cannabis.

5 1139 Data Repository of Scientific DDWP 27.08.2021 300.000 0.000 16.635 0.000 60.000 0.000 240.000 0.000 40.000 40.000 0.000 0.000 0.000 27.08.2024 27.08.2026 • To provide funds for instrumental access to the research
27-05-2021 institutions, universities, R & D organizations, and strategic
Instrumentation
research centers of Pakistan to carry out sample analysis.
• To facilitate faculty and research staff of newly developed, as well
as existing institutions that lack scientific instrumental facility

for conducting
6 1140 Development of Computer Controlled DDWP 03-09-2021 1981.607 0.000 221.426 0.000 440.025 0.000 1541.582 0.000 463.743 463.743 0.000 0.000 0.000 03.09.2023 30.06.2026 • Establish a design and manufacturing facility for computerized
06-05-2021 automated fermenters.
Fermentors and Production of
Biochemicals & Bioproducts • Develop indigenous metabolic engineering capability.
• Develop and upgrade the existing essentially required facilities
and infrastructure at PCSIR and ICC/ PAEC. Thus providing
establishment of national level integrated bio-processing
infrastructure.

7 1141 Digital transformation, strengthening DDWP 25-08-2021 960.710 0.000 49.750 0.000 279.388 0.000 681.322 0.000 200.000 200.000 0.000 0.000 0.000 25.08.2023 30.06.2026 • To implement a modern digital organizational network through
27.5.2021 replacing existing/ obsolete IT equipment with modern I.T.
and automation of PCSIR DDWP
equipment including servers, routers, switches, computers etc.
Rev.
17.12.2021 • To develop Key software with data driven management
dashboards to track and monitor progress towards organizational
goals.

8 1142 Establishment of Material Resource DDWP 03-08-2021 1951.683 0.000 112.697 0.000 564.215 0.000 1387.468 0.000 300.000 300.000 0.000 0.000 0.000 03.08.2023 30.06.2024 Part A: Establishment of “Material Resource Center” at PCSIR Labs
27.5.2021 Complex Karachi
Centre and development of additive DDWP
manufacturing and Reverse Rev.
Engineering Centre at PCSIR 17.12.2021 Part B: Development of Additive Manufacturing & Reverse
Engineering Center. PCSIR Labs Complex Peshawar.

12-06-23
Page 1
Sr. PSDP Name of Project Approved by Date of Approved Cost Estimated Expected Cumulative Estimated Proposed Allocation Within IBC Additional Demand over and Likely date of completion Objectives
No No. Forum Admin Expenditure during Expenditure upto Throwforwar 2023-24 above IBC 2023-24
with date of Approval 2022-23 (if any) 30.06.2023 d
approval and
01.07.2023
Admin
Approval Total F.Aid Total F.Aid Total F.Aid F.Aid Rupee Total F.Aid Rupee Total As per PC-I Expected

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
9 1143 Establishment of “National Centre of DDWP 01-12-2021 550.000 0.000 23.160 0.000 47.259 0.000 502.741 0.000 150.000 150.000 0.000 0.000 0.000 01.12.2025 01.12.2025 • To develop a center of excellence at national level for “Failure
10.12.2020 Analysis” of mechanical parts, with an aim to provide in-country
Failure Analysis (NCFA)” - IST
support to variety of organizations from SPD, defense and public /
private sector industries
• To provide a centralized platform for comprehensive material
advisory services for selection of suitable materials to
manufacture parts of high quality standards.

10 1144 Establishment of Additional DDWP 23-07-2021 396.363 0.000 88.860 0.000 178.696 0.000 217.667 0.000 217.667 217.667 0.000 0.000 0.000 23.07.2023 30.06.2024 Establishing facility for indigenous research and development of
26-03-2021 electro-medical devices such as ventilators, PAPRs and syringe
Production lines for Research and
Development of Indigenous pumps etc. Later on these indigenously developed, cost effective
Electromedical Devices at NUST and good quality electro-medical devices will be commercialize
which will cut down hefty foreign exchange being spent on import
of medical devices via import substitution.

11 1145 Establishment of Centre For Artificial CDWP 06-01-2020 321.450 0.000 2.914 0.000 52.829 0.000 268.621 0.000 30.000 30.000 0.000 0.000 0.000 19.09.2023 30.06.2026 • To build up the national / provincial level center in AI for research
09-12- 2019 and training purposes.
Intelligence (AI) In Health Sciences
(Knowledge Economy Initiative) • To raise awareness in the masses of people to the use of AI in
daily life.
• To establish a hub of innovation for the applications of AI and to
create entrepreneurship in AI areas of research.

DDWP 14-07-2021 0.000 0.000 0.000 0.000 0.000 14.07.2023 30.06.2024 •• To host
Serve asthe new startups
a bastion in the
of Peace areas of
& Conflict AI applications
Studies in health
integrating
12 1146 Establishment of Centre for 996.309 91.610 275.000 721.309 350.000 350.000 0.000 0.000
26-03-2021 Peacekeeping Training of military, police and civilian personnel for
International Peace and Stability Rev. DDWP
(CIPS) at NUST UN missions.
24.05.2023
• Promote civil-military diplomacy and interconnectivity with UN
and International Agencies, UN Country Teams and other
associated organizations; and Undertake research on current and
prospective international / regional crisis and issues.

13 1147 Establishment of Facilities for CDWP 01-10-2019 714.533 0.000 56.031 0.000 423.649 0.000 290.884 0.000 290.884 290.884 0.000 0.000 0.000 08.06.2022 30.06.2024 • To develop easy to clean Nano-coated surface on ceramics or
06-08- 2019 glasses through specialized techniques in nanotechnology.
Industrial Production of
Nanomaterials in Latif Ebrahim • To develop metal oxide nanoparticles coat glazing with
Jamal Nanotechnology Center sterilizing and anti-fouling properties. Similarly, with the help of
(Knowledge Economy Initiative) nanotechnology to develop self-cleaning glass.

14 1148 Establishment of PAK-KOREA CDWP 08-08-2019 1391.179 0.000 5.067 0.000 18.089 0.000 52.911 0.000 52.911 52.911 0.000 0.000 0.000 06.05.2024 08.08.2025 •• Establishment
To develop an of
engineered
Accreditedprogram
Testingfor nanofibers
Laboratory to for water the
facilitate and
06-05- 2019 introduction of PV standards for imported and locally developed
Testing Facility for PV Modules &
Allied Equipment, PCRET - Local PV modules in Pakistan
share: Rs. 71.000 Million to be • To improve the quality and curtail the import of sub-standard PV
funded through PSDP) KOICA Share: modules in Pakistan
USD 8.00 Million (Rs. 1319.550 M )

DDWP 16-09-2021 0.000 0.000 0.000 0.000 0.000 16.09.2024 16.09.2025 •• To raiseaawareness
Playing of “Performance
role of mentor in designing,/Safety standards”execution
implementation/ in PV
15 1149 Establishment of Planning, 130.000 0.000 0.292 129.708 50.000 50.000 0.000 0.000
27.5.2021 and completion of projects received through PSDP, Knowledge
Monitoring & Evaluation (PM&E) Rev.
Cell in Ministry of Science & Economy Task Force, CPEC and Civil Military.
04.08.2021
Technology • Provision of necessary support through hiring of Project
Management experts and establishing specialized units to handle
workload of the Ministry.

DDWP 02-08-2017 0.000 0.000 0.000 0.000 0.000 30.06.2023 30.06.2025 Appraisal and periodic
To strengthen monitoring/
the role of evaluationinofPakistan
Scientific Societies the projects
by with
16 1150 Financial Support to Scientific 125.000 16.615 71.599 53.401 27.000 27.000 0.000 0.000
02-04-2020 providing them financial assistance for:
Societies in Pakistan
(Phase-II) • Holding National and International Conferences, Seminars,
Symposia, Workshops and Lectures on important scientific topics
• Publication of Scientific Journals / Books
• Develop and maintain the international linkages

17 1151 Gene Editing of Biological Agents for DDWP 26-04-2021 1799.598 0.000 262.537 0.000 1047.943 0.000 751.655 0.000 430.000 430.000 0.000 0.000 0.000 25.04.2024 30.06.2024 • Establish an advanced gene editing facility at PCSIR along with
10.12.2020 associated equipment and systems that could be used for a wide
Nutritional Biochemical and
Therapeutical purpose range of purposes such as nutritional and therapeutic purposes,
leading to indigenous commercial/industrial manufacturing.
• Develop indigenous strain development genetic engineering
capability in terms of R&D and subsequent commercial production

of biofoods, biochemicals, biopharmaceuticals, biofertilizers,

12-06-23
Page 2
Sr. PSDP Name of Project Approved by Date of Approved Cost Estimated Expected Cumulative Estimated Proposed Allocation Within IBC Additional Demand over and Likely date of completion Objectives
No No. Forum Admin Expenditure during Expenditure upto Throwforwar 2023-24 above IBC 2023-24
with date of Approval 2022-23 (if any) 30.06.2023 d
approval and
01.07.2023
Admin
Approval Total F.Aid Total F.Aid Total F.Aid F.Aid Rupee Total F.Aid Rupee Total As per PC-I Expected

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
18 1152 Launching of STEM in Pakistan, DDWP 31-03-2021 993.784 0.000 41.720 0.000 89.514 0.000 904.270 0.000 200.000 200.000 0.000 0.000 0.000 15.10.2024 15.10.2026 • To officially launch STEM, the modern tool for promotion of
10-12-2020 Science, Technology, Engineering and Mathematics Education in
Phase-I DDWP
Pakistan. In the 1st phase, the project shall be launched initially in
Rev.
04.08.2021 50 pure government Higher Secondary Schools (HSSs) including
06 Cadet Colleges [total 50] from different districts of Pakistan,
further extendable to another 400 schools in the next phase.

19 1153 Medical Equipment & Devices DDWP 09.11.2021 1989.520 0.000 14.490 0.000 94.480 0.000 1895.040 0.000 524.192 524.192 0.000 0.000 0.000 09.11.2025 09.11.2026 The MEDICen will aim to:
27.5.2021 • Assist Pakistani Medical and Surgical Manufacturers in research
Innovation Center (MEDICen)
and development of Medical equipment not only to cater for local
market demand but also for export.
• Understand and synthesize the local medical device industry
support requirement, skill development, ecosystem, viability of
manufacturing in Pakistan.

20 1154 Monitoring theSea Water Intrusion, CDWP 22-10-2020 730.000 0.000 141.292 0.000 355.131 0.000 374.869 0.000 120.000 120.000 0.000 0.000 0.000 02.04.2025 22.08.2025 • To investigate Sea Water Intrusion along the coastal zone of
19-03-2018 Pakistan through scientific observations to assess rate of Sea
Sea Level Rise, Coastal Erosion and DDWP
Land Subsidence along Sindh and Level Rise and Land Subsidence.
Rev. 02-04-
Balochistan Coast 2020 • To find out causes of erosion through scientific observations and
relevant data for assessing its impacts on coastal areas.
• To develop mitigation strategy for countering Seawater Intrusion
and Coastal Erosion.

21 1155 National Digital Archive of Research DDWP 22.08.2020 56.000 0.000 0.876 0.000 19.782 0.000 36.218 0.000 36.218 36.218 0.000 0.000 0.000 02.04.2022 30.06.2024 • Development of National Digital Repository of S&T Journals
02-04-2020 publish in Pakistan
published in Pakistan Journals
• Development of National Consortium of S&T Journals publishers
of Pakistan
• Capacity building of publisher’s/researchers toward
application/content utilization

22 1156 Research, Development and DDWP 04.08.2021 1500.000 0.000 26.430 0.000 79.174 0.000 1420.826 0.000 200.000 200.000 0.000 0.000 0.000 04.08.2023 30.06.2026 Establishing an RD&I Programme facility for a variety of purposes
27.5.2021 in the domain of scientific/ technological/ industrial research such
Innovation Program in PCSIR
as new technology initiatives, cutting-edge/ advanced R&D,
commercialization, digitalization, marketing, industrial-business
linkups/partnerships, etc. leading to indigenous
commercial/industrial ecosystem.

23 1157 Science Talent Farming Scheme CDWP 05-12-2015 1517.071 0.000 19.542 0.000 714.488 0.000 802.583 0.000 400.000 400.000 0.000 0.000 0.000 19.10.2022 30.06.2025 • To identify the young students, interested and passionate
09-06-2015
(STFS) for Young Students– 06-07-2017
towards science education through appropriate selection criteria
Phase-I (Component-I) like 3rd Party evaluation via written test, computer based IQ test
DDWP
Rev. and interview.
17.12.2021 • To groom and support the selected students all the way to the
highest degrees by progressively exposing them to advancements
in science and mathematics

24 1158 Semiconductor Chip Design DDWP 16-10-2020 262.918 0.000 6.101 0.000 87.620 0.000 175.298 0.000 175.298 175.298 0.000 0.000 0.000 04.02.2022 30.06.2024 • To develop capabilities for the design of commerical grade digital
02-04-2020 ICs.
Facilitation Center Rev. DDWP
• To increase the availability of highly skilled professionals in the
24.05.2023
field of Semiconductor Chip Design.
• To develop capabilities for the design of commercial grade digital
ICs.
• To develop design and verification expertise for indigenous IC
layouts as well as the potential for verification of IC designs.
25 1159 Strengthening and Upgradation of DDWP 09-08-2021 80.000 0.000 4.640 0.000 44.642 0.000 35.358 0.000 35.358 35.358 0.000 0.000 0.000 09.08.2023 30.06.2024 • To Strengthen the Research & Development Activities at NUST
02-04-2020 through up gradation of labs.
Research and Development facilities
and Accreditation of Laboratories in • To upgrade the engineering and research labs at NUST to cater
Accordance with ISO (17025 for the requirement of greater integration of advanced lab work.
Certified) Standards (NUST) • To enable NUST to pursue high impact research and
commercialization ventures.

DDWP 23-07-2021 0.000 0.000 0.000 0.000 0.000 23.07.2024 30.06.2025 • To meet the
Strengthen thegrowing
Gwadarneeds of research
Sub-Station, and1teaching
adding more activities
26 1160 Strengthening Of Oceanographic 300.000 12.410 36.613 263.387 85.000 85.000 0.000 0.000
06-05-2021 laboratory (2 labs in total- refurbish the existing),
Research Sub Station Gwadar
Pakistan computer lab/Iibrary /Seminar room, field and
laboratory instrumentations and facilities.
•Improve the living accommodation for out of station
scientists and technicians
•Repairs of boundary wall, walking paths, store room,
covered vehicle garage, maintenance of grounds, fresh
water storage tanks (underground & overhead)

12-06-23
Page 3
Sr. PSDP Name of Project Approved by Date of Approved Cost Estimated Expected Cumulative Estimated Proposed Allocation Within IBC Additional Demand over and Likely date of completion Objectives
No No. Forum Admin Expenditure during Expenditure upto Throwforwar 2023-24 above IBC 2023-24
with date of Approval 2022-23 (if any) 30.06.2023 d
approval and
01.07.2023
Admin
Approval Total F.Aid Total F.Aid Total F.Aid F.Aid Rupee Total F.Aid Rupee Total As per PC-I Expected

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
27 1161 Up gradation of Calibration Centre DDWP 03-08-2021 35.000 0.000 2.240 0.000 18.386 0.000 16.614 0.000 16.614 16.614 0.000 0.000 0.000 03.02.2023 03.02.2024 To enhance the existing capabilities of Calibration Centre for the
11-05-2020 facilitation of Local Manufacturers and Public / Private
Capabilities at PCSIR Peshawar
Organizations. in the fields of Mass, Dimensional, Temperature,
Electrical/Electronics, Mechanical and Chemical

DDWP 15-10-2020 0.000 0.000 0.000 0.000 0.000 02.04.2022 30.06.2024 ii) To provide
• Project is beinga executed
platform for interaction
by PCSIR between
and is relatedmanufacturers
to up gradation
28 1162 Up gradation of Machinery, 125.000 14.982 78.180 46.820 46.820 46.820 0.000 0.000
02-04-2020 of its technical institutes (IIEE and PSTC) for the productivity of
Equipment and Renovation of
Buildings of IIEE & PSTC Karachi. human factor to cope up with the rapid developments in the field
of Engineering & Technology.
• Addition of Lab Trainers, General Lab Equipment, Machinery,
Modernization of Labs and Library

29 1163 Up gradation of Medicinal Botanic CDWP 15-08-2018 286.000 0.000 17.070 0.000 134.474 0.000 151.526 0.000 151.526 151.526 0.000 0.000 0.000 02.05.2020 30.06.2024 • The main objective of the project is to establish National Center
02.05.2018 for Herbal Medicine (NCHM) at PCSIR Laboratories Complex
Centre as National Centre for Herbal 24 months
Medicine, PCSIR Labs. Complex, Peshawar.
DDWP
Peshawar Rev.
04.08.2021 • To upgrade research facilities according to WHO guidelines

30 1164 Up-gradation of Printed Circuit Board DDWP 16-10-2020 169.800 0.000 7.050 0.000 67.848 0.000 101.952 0.000 101.952 101.952 0.000 0.000 0.000 04.02.2022 30.06.2024 • To add new equipment, to support micro-level PCB etching and
02-04-2020 manufacturing.
(PCB) facility Rev. DDWP
• To have small scale state of the art fabrication facility with a
24.05.2023
precision level of 4 mils.
• To equip new PCB design analysis software, which supports
updated data formats which are provided by customers.

DDWP 16-03-2023 0.000 0.000 0.000 0.000 0.000 30.06.2026 30.06.2026 ••


TGetting
o becomeexcellence in of
a nucleus fabrication.
fabless chip design activities in the
31 1165 Establishment of NUST Chip Design 912.000 0.000 70.000 842.000 150.000 150.000 0.000 0.000
11-05-2022 country by having intellectual capital, software and hardware
Centre
resources, foundry process-design kits (PDKs) and chip tape-
out(s) under one roof.

To generate trained integrated circuits (IC) designers through
strengthening relevant undergraduate and graduate programs at
NUST and specialized training modules in all facets of chip-design.

Total Ongoing 25293.845 0.000 1698.308 0.000 7291.107 0.000 16682.559 0.000 5500.000 5500.000 0.000 0.000 0.000

12-06-23
Page 4
Sr. PSDP Name of Project Approved by Date of Approved Cost Estimated Expected Cumulative Estimated Proposed Allocation Within IBC Additional Demand over and Likely date of completion Objectives
No No. Forum Admin Expenditure during Expenditure upto Throwforwar 2023-24 above IBC 2023-24
with date of Approval 2022-23 (if any) 30.06.2023 d
approval and
01.07.2023
Admin
Approval Total F.Aid Total F.Aid Total F.Aid F.Aid Rupee Total F.Aid Rupee Total As per PC-I Expected

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B New Schemes

Approved
32 1166 Quality Seed Production and Supply DDWP 25-05-2023 1202.722 0.000 0.000 0.000 0.000 0.000 1202.722 0.000 600.000 600.000 0.000 0.000 0.000 30.06.2024 30.06.2026 To establish ISTA seed accredited labs for adequate high quality
17-12-2021 seed supply to seed
to the Farming Community for
Ensuring Food Security in Pakistan industry and ultimately strengthening service delivery to farmers
36 Months
(Revised) for ensuring food security
and freedom from hunger (Quality Assurance).
To ensure quality production of early generation seed for import
substitution and promotion.

33* 1167 Establishment of Mineral Resource DDWP 949.730 0.000 0.000 0.000 0.000 0.000 949.730 0.000 300.000 300.000 0.000 0.000 0.000 30.06.2025 30.06.2025 • To establish the Mineral Processing and Extraction facilities to
Center in District Dukki Baluchistan for 24-05-2023 fulfill the industrial sector needs.
Product Design, Development and • To provide assistance to the local units to develop value added
24 Months
Value Addition to Enhance Export products.
• To develop the new techniques on the modern processing
equipment as per international requirements.

34* 1168 Establishment of Khuzdar Science & DDWP 900.000 0.000 0.000 0.000 0.000 0.000 900.000 0.000 200.000 200.000 0.000 0.000 0.000 30.06.2025 30.06.2025 • NBC is launching 1 x program for their contribution in growth of
24.05.2023 nationaleconomy, supporting in prosperity of region and prepare
Technology Block at NBC Quetta
youth for upcomingchallenges.
24 Months
• Introduce a culture of university – industry collaboration and
promotion oftechnology-based entrepreneurship, thereby
increasing employment opportunities for the talented youth.

35 1169 Research, Development and DDWP 1067.639 0.000 0.000 0.000 0.000 0.000 1067.639 0.000 400.000 400.000 0.000 0.000 0.000 30.06.2023 30.06.2026 • Establishing capability of research and development of APIs for
Technology Transfer of Selected Active 17-12-2021 selected high value pharmaceutical products.
Pharmaceutical Ingredients (APIs) for Reduce the risk of supply chain disruption and thus contribute
24 Months
Import Substitution (PCSIR) towards the national security aspect related to this important
sector.

36 1170 Establishment of Medical Cannabis DDWP 1946.014 0.000 0.000 0.000 0.000 0.000 1946.014 0.000 500.000 500.000 0.000 0.000 0.000 30.06.2024 30.06.2026 •Establish a capability
Establishment byof
of state introducing new
the art green technologies,
house such at
facilities each as
Greenhouses for Biotechnology 17-12-2021 PCSIR Labs Complexes Karachi, Lahore, Peshawar and Skardu to
Derived Bio-Products, National Hemp cultivate medicinal cannabis under controlled conditions for
36 Months
& Cannabis Analytical Laboratory and herbal and medicinal use.
National Industrial Hemp & Medicinal • Biotechnology based fermentation technology to produce
Cannabis Authority multiple cannabinoids (CBD, THC,
CBG, CBC etc.) under good manufacturing practices.

37 1171 Extension of Display Exhibits, DDWP 1866.640 0.000 0.000 0.000 0.000 0.000 1866.640 0.000 500.000 500.000 0.000 0.000 0.000 30.06.2024 30.06.2026 • To bring the Museum’s outlook to a world class level through
17-12-2021 addition of new attractive exhibits in the display galleries
Collection Repositories Improvement 36 Months
and Research Facilities • To upgrade the existing displays, collection repositories and
Enhancement at Pakistan Museum of research
Natural History, PMNH facilities
• To enhance and strengthen research facilities of PMNH

Total New Schemes 7932.745 0.000 0.000 0.000 0.000 0.000 7932.745 0.000 2500.000 2500.000 0.000 0.000 0.000

Total (Ongoing + Approved


33226.590 0.000 1698.308 0.000 7291.107 0.000 24615.304 0.000 8000.000 8000.000 0.000 0.000 0.000
New Schemes) within IBC

12-06-23
Page 5