You are on page 1of 15

( MCA PROGRAMME )

( Approved by AICTE, New Delhi & Affiliated to Bharathidasan University, Trichy )


(Recognized under sections 2( f ) & 12( B ) Status of UGC Act.1956)
PERAMBALUR - 621 212.

DEPARTMENT OF COMPUTER APPLICATIONS

PROJECT PROGRESS REPORT

( JANUARY-2023 to APRIL-2023 )

Name:

Register No:

Batch:

APRIL – 2023
SRINIVASAN COLLEGE OF ARTS AND SCIENCE- MCA PROGRAMME
( Approved by AICTE, New Delhi & Affiliated to Bharathidasan University, Trichy )
(Recognized under sections 2( f ) & 12( B ) Status of UGC Act.1956)
PERAMBALUR - 621212.

DEPARTMENT OF COMPUTER APPLICATIONS

MAJOR PROJECT DETAILS

JANUARY 2023 to APRIL 2023

1. NAME OF THE STUDENT :

2. REGISTER NO. :

3. ADDRESS :

4. MOBILE NO. & WHATSAPP NO. :

5. E-MAIL ID. :

6. PARENT MOBILE NO.

7. TITLE OF THE PROJECT :

8. INTERNAL (College) GUIDE


a. Name of the Internal Guide :
b. Phone No. :
c. E-mail ID. :

9. EXTERNAL (Company) GUIDE


a. Name of the External Guide :
b. Phone No. :
c. E-mail ID. :

10. NAME AND ADDRESS OF THE


INDUSTRY / COMPANY
THE PROJECT IS UNDERTAKEN :

Date: Student’s Signature

2
Internal Guide External Guide Project Co-Ordinator HOD

SRINIVASAN COLLEGE OF ARTS AND SCIENCE- MCA PROGRAMME


PERAMBALUR – 621 212.

DEPARTMENT OF COMPUTER APPLICATIONS

PROJECT REVIEW SCHEDULE – APRIL 2023

NAME OF THE
S.NO. DATE COMPLETION OF ACTIVITY MARKS
REVIEW
Front End, Back End,
ABSTRACT & TITLE 11.01.2023
1 Organization Address with 10
SUBMISSION (Wed)
Contact No. Submission
17.01.2023 Title Approval Through Online
2 TITLE APROVAL -
(Tues) forum
Presentation of Abstract, Existing
FIRST (ABSTRACT) 30.01.2023
3 system, Proposed system and 10
REVIEW (Mon)
algorithms used in your project
Submit soft copy of 1, 2 & 3
10.02.2023 Chapters with presentation and
4 SECOND REVIEW 10
(Fri) project confirmation letter from
the company
06.03.2023 Submit the soft copy of 4, 5 & 7
5 THIRD REVIEW 10
(Mon) Chapters with presentation
Submit the Project Report Soft
27.03.2023 Copy with all Chapters, Project
6 FOURTH REVIEW 20
(Mon) Completion Certificate,
Presentation

FINAL (MODEL) 10.04.2023 Model Review with Presentation


7 REVIEW
20
(Mon) & Rough Copy of Project Report

PROJECT REPORT 14.04.2023 Submit the Project Record, PPT


8 SUBMISSION (on date)
20
(Fri) Presentation & Document in CD
Guide Names & Allotment of Students:
No. of
S. No. Guide Name
Students
1 Prof. M. Rajakumar 8
2 Mrs. G. Archana 7
3 Ms. S. Lavanya 7
4 Mr. A. Mohamed Azharudheen 7
5 Dr. N. Elavarasan 7
6 Mr. N. Ananthakumar 6
7 Mr. P. Manivel 6
8 Dr. A. Banumathi 6
9 Ms. C. Arunthathi 5

3
Total 59

SRINIVASAN COLLEGE OF ARTS AND SCIENCE- MCA PROGRAMME


PERAMBALUR – 621 212.
DEPARTMENT OF COMPUTER APPLICATIONS
PROJECT REVIEW - STUDENT ATTENDANCE SHEET

NAME OF THE SCHEDULED ATTENDED GUIDE CO-ORD. HOD


S.NO.
REVIEW DATE DATE SIGN. SIGN. SIGN.

ABSTRACT & TITLE 11.01.2023


1
SUBMISSION (Wed)

17.01.2023
2 TITLE APROVAL
(Tues)

FIRST (ABSTRACT) 30.01.2023


3
REVIEW (Mon)

10.02.2023
4 SECOND REVIEW
(Fri)

06.03.2023
5 THIRD REVIEW
(Mon)

27.03.2023
6 FOURTH REVIEW
(Mon)

FINAL (MODEL) 10.04.2023


7
REVIEW (Mon)
PROJECT REPORT 14.04.2023
8
SUBMISSION (Fri)

PROJECT REPORT VERIFICATION (During Model Viva)

Sl. No. Description Status (Yes / No) Comment

Review Corrections
1 done in the next
Review

2 Followed Guidelines

3 Followed Schedule

Report Prepared as
4
per the Given Format

Project Verification Committee Members:1. 2.


(Name & Sign with Date)

4
EVALUTION OF PROJECT WORK:

Project work starts from: 11.01.2023 to 14.04.2023.

(1) Registration of project work. A Candidate is permitted to undergo for the project work if
and only if he/she produce the project confirmation from the reputed company else
he/she will not be permitted to do the project outside the college campus.
(2) Attendance is mandatory for all the reviews.
(3) Communication regarding project should be done through Online forum provided by the
department.
(4) Every Candidate shall work on project approved by the Project Coordinator and Head of
the Department.
(5) The duration of the project is for 4-Months.
(6) Students should submit 4-copies to the Head of the Department concerned on or before
the specified date.
 One copy to the University.
 One copy to the Department.
 One copy to the Guide.
 One copy to a student concerned.
(7) The Viva-Voce Examination & evaluation of Project Report shall be adjudicated by one
External Examiner assigned by the University and one internal examiner represented by
the Department / Guide.
(8) If the candidate fails to get a satisfactory report in the Viva-Voce examination, he/she
will not be eligible for the award of the degree, unless the candidate is asked to revise
and resubmit.

5
Dates of Reviews:
1. Abstract submission last date on:  11.01.2023

2. First (Abstract) Review on: 30.01.2023


Abstract should contain the following:
- Problem Description/Definition.
- Methodologies/Techniques to be used.
- Solution for the problem/Outcome of the Project.
- Abstract contain max. 200 words.

First (Abstract) Review should contain the following:


1. Presentation would be the duration of 15 minutes.
2. 10 Minutes for Power Point presentation.
3. 5 Min for Question/Answer session.
4. Audience: Head of the department, Guides, and I MCA students
5. Presentation evaluation committee (3 members) would evaluate for 10-marks.
PPT should include the following minimum content:
1. Title of the project.
2. Introduction to Project.
3. Aim or Problem statement.
4. Existing System.
5. Proposed System.
6. Software Requirements.
7. Hardware Requirements.

3. Second Review on: 10.02.2023


Second Review should contain the following:
1. Presentation would be the duration of 15 minutes. 
2. 10 Minutes for Power Point presentation.
3. 5 Min for Question/Answer session.
4. Audience: Head of the department, Guides, and I MCA students.
5. Presentation evaluation committee (3 members) would evaluate for 10
marks.
PPT should include the following minimum content:
1. Title of the project.
2. Introduction to Project (Aim or Problem statement) mention.

6
3. Modules.
4. System architecture.

4. Third Review on: 06.03.2023


Third Review should contain the following:
1. Presentation would be the duration of 15 minutes. 
2. 10 Minutes for Power Point presentation.
3. 5 Min for Question/Answer session.
4. Audience: Head of the department, Guides, and I MCA students.
5. Presentation evaluation committee (3 members) would evaluate for
10 marks.
PPT should include the following minimum content:
1. Title of the project.
2. Abstract.
3. Existing and Proposed System.
4. No. of modules and module description.
5. UML diagrams.

5. Fourth Review on: 27.03.2023

Fourth Review should contain the following:


1. Presentation would be the duration of 15 minutes.
2. 10 Minutes for Power Point presentation.
3. 5 Min for Question/Answer session.
4. Audience: Head of the department, Guides, and I MCA students.
5. Presentation evaluation committee (3 members) would evaluate for
20 marks.
PPT should include the following minimum content
1. Title of the project.
2. Abstract.
3. No. of modules and module description.
4. Test cases used.
5. Screenshots.
6. Conclusion.
7. References.

7
6. Final Review ( Model Review ) on: 10.04.2023

Final Review should contain the following:


1. Presentation would be the duration of 15 minutes. 
2. 10 Minutes for Power Point presentation.
3. 5 Min for Question/Answer session.
4. Audience: Head of the department, Guides, and I MCA students.
5. Presentation evaluation committee (3 members) would evaluate for 20 marks.

PPT should include the following minimum content:


1. Title of the project.
2. Abstract.
3. No. of modules and module description.
4. System architecture.
5. Database Diagram, Data Flow Diagram & UML Diagram.
6. Test cases used.
7. Screenshots.
8. Conclusion.
9. References.

7. Project Report Submission on 14.04.2023


1. Bounded Hardcopy: 4 Copies.
2. Full Document and Softcopy of Project .exe format in CD / DVD.

Note:

1. Students are instructed to meet their respective guide at least one day before the forth-coming review
for necessary corrections & updating information.
2. Any changes or information regarding the project and review will be intimated through the Online
mode (Class WhatsApp Group – only).
3. Students are instructed to join in the group (if not).
4. If any changes in their WhatsApp No. / E-Mail id, the same should be reported to the Department.
5. Students are instructed to provide the correct phone numbers (both student number and parent
number) with regard to placement.
6. All the Eligible Students must attend all the Placement Drives conducted in On Campus / Off
Campus, failing which he / she will not be allowed to continue their Project work.

8
Project Co-ordinator HOD

SRINIVASAN COLLEGE OF ARTS AND SCIENCE - MCA PROGRAMME,


PERAMBALUR - 621 212.
DEPARTMENT OF COMPUTER APPLICATIONS

FIRST (ABSTRACT) REVIEW - STATUS FORM

Register Number

Name

Title of the Project

Name & Address of


the Company

Date

Mobile Number

Status of the Project

Guide Name

Signature of the Guide

PROJECT CO-ORDINATOR HOD

9
SRINIVASAN COLLEGE OF ARTS AND SCIENCE - MCA PROGRAMME,
PERAMBALUR - 621 212.
DEPARTMENT OF COMPUTER APPLICATIONS

SECOND REVIEW - STATUS FORM

Register Number

Name

Title of the Project

Name & Address of


the Company

Date

Mobile Number

Status of the Project

Guide Name

Signature of the Guide

PROJECT CO-ORDINATOR HOD

10
SRINIVASAN COLLEGE OF ARTS AND SCIENCE - MCA PROGRAMME,
PERAMBALUR - 621 212.
DEPARTMENT OF COMPUTER APPLICATIONS

THIRD REVIEW – STATUS FORM

Register Number

Name

Title of the Project

Name & Address of


the Company

Date

Mobile Number

Status of the Project

Guide Name

Signature of the Guide

PROJECT CO-ORDINATOR HOD

11
SRINIVASAN COLLEGE OF ARTS AND SCIENCE - MCA PROGRAMME,
PERAMBALUR - 621 212.
DEPARTMENT OF COMPUTER APPLICATIONS

FOURTH REVIEW - STATUS FORM

Register Number

Name

Title of the Project

Name & Address of


the Company

Date

Mobile Number

Status of the Project

Guide Name

Signature of the Guide

PROJECT CO-ORDINATOR HOD

12
SRINIVASAN COLLEGE OF ARTS AND SCIENCE - MCA PROGRAMME,
PERAMBALUR - 621 212.
DEPARTMENT OF COMPUTER APPLICATIONS

FINAL (MODEL) REVIEW STATUS FORM

Register Number

Name

Title of the Project

Name & Address of


the Company

Date

Mobile Number

Status of the Project

Guide Name

Signature of the Guide

PROJECT CO-ORDINATOR HOD

13
EXTERNAL ATTENDANCE FORM

EXT. GUIDE SIGN. INT. GUIDE SIGN.


SL. No. DATE TIMING Remarks
(from Company) (from College)

14
PROJECT CO-ORDINATOR HOD

15

You might also like