Satuan Volume
PEKEERJAAN ARSITEKTUR
B PEKERJAAN KUSEN UPVC DAN RIALLING
Lantai -1
Pek. Pintu Besi + Pintu P1 Unit 39.00
Pek. Pasang Kusen UPVC + Pintu P2 Unit 9.00
Pek. Pasang Kusen UPVC + Jendela J1 Unit 34.00
Lantai -2
Pek. Pintu Besi + Pintu P1 Unit 47.00
Pek. Pasang Kusen UPVC + Pintu P2 Unit 9.00
Pek. Pasang Kusen UPVC + Jendela PJ1 Unit 2.00
Pek. Pemasangan Railing Tangga m1 13.10
Lantai -3
Pek. Pintu Besi UPVC + Pintu P1 Unit 1.00
Pek. Pemasangan Kusen UPVC + Pintu PD2 Unit 2.00
Pek. Pemasangan Kusen UPVC + Bouvenlight BV3 Unit 4.00
Pek. Pemasangan Railing Tangga m1 4.50
B PEKERJAAN ELEKTRONIKAL
A PEKERJAAN CCTV DAN PROYEKTOR
Lantai 1 (IP CAMERA WISENET)
IP Camera Bullet 2 MP Out Door True Day/Night Visiion Mo Unit 53.00
Instalasi CCTV titik 53.00
D PEKRERJAAN PENERANGAN
Lantai-Roof Top
Lampu Spot Light :ED 30 Watt IP 66 Unit 4.00
Lampu V-Shape LED 2x16 Watt Unit 8.00
Saklar Tunggal Cover Metalik With LED Unit 1.00
Saklar Ganda Cover Metalik With LED Unit 2.00
Stop Kontak 16 A Unit 3.00
Instalasi Penerangan titik 12.00
Instalasi Stop Kontak titik 3.00
PEKERJAAPLUMBING
Pipa Pembuangan Wastafel titik 2.00
Wastafel Unit 1.00
Sudah Dikerjakan Belum Dikerjakan
4.00
1.00
19.00
10.00
1.00
1.00
13.10
1.00
2.00
4.00
4.50
186.27
265.32
211.76
140.84
14.00
14.00
48.00
48.00
1.00
1.00
4.00
8.00
1.00
2.00
3.00
12.00
3.00
2.00
1.00