MAKATI CENTRAL ESTATE ASSOCIATION INC. Estate Permit
2023-0807-1501R
1. Work Description/Purpose: Commencement Date:
Tuesday, August 08, 2023
PASSAGE AND STATIONING OF FIFTEEN (15) CONSTRUCTION VEHICLES Completion Date:
(TRANSIT MIXERS, PUMPCRETE & TRAILER / DELIVERY / CARGO / BOOM / DUMP TRUCKS) Friday, September 08, 2023
2. Project Title/Principal: Project Duration:
No Sundays & Holidays
ELURIA RESIDENCES PROJECT / BHAVYA PROPERTIES, INC. Work Hours:
8:00am to 8:00pm only
3. Project Address/ Location: No. of Work Force:
RADA & RODRIGUEZ STS., LEGAZPI VILLAGE

Please check one ( ) Owner ( ) Lessee (P) Representative


4. Name of Applicant Email: airsuan@gmail.com
SUAN SUNNY Tel. No.:
Last First M.I. CP No.: 0927-2299212
Address:

5. Name of Contractor: Email:


DATEM, INC. Tel. No.:
CP No.:
TO BE FILLED BY APPLICANT

Address:

6. Name of Contact Person Designation: Tel / Mobile No.: TIN of Payee:


AR. FERDINAND U. BLUE PM

7. Applicant's Declaration
(a). I hereby certify and acknowledge that I have read this application and affirm that the above statements, information and other attached
documentation are true, complete and correct to the best of my knowledge.
(b). I further confirm that the safety precautions, conditions and requirements herein stipulated will be observed. I agree to comply with all of the Estate
Management rules and regulations.
(c). In cases of violations by my agent, or myself, I hereby acknowledge the authority of Estate Management to revoke this permit, impose
penalties/sanctions and/or shut down work, without prejudice to legal remedies and claim for damages by Declarant/Association/Estate Management.

(d). I further authorize the representatives of Estate Management to enter the site at all times, for inspection purposes.
(e). In case there is a need to relocate and/or renovate the above mentioned project because of future Estate developments, I agree to
undertake all the responsibility and cost arising from the said relocation and/or renovation.
(f). Construction Guarantee Deposit/Bond (as applicable): I hereby acknowledge that any such fines or costs charged against the
deposit/bond shall be without prejudice to whatever works or actions that may be required of me by Estate Management to rectify or remedy the
violation, breach or infraction so committed at my sole cost and expense.
(g). I have the authority to sign on behalf of and therefore to bind, the corporation/partnership/principal.
(h). Subject to the applicable additional terms and conditions at the back page of this pemit.

Applicant's Signature over Printed name Title Date


8. Contractor's / Safety Officer's Declaration: I hereby affirm that I am aware of the job to be done and all the necessary precautions to be undertaken,
and I confirm that the minimum safety precautions specified above shall be observed and implemented prior to commencement and during the entire work
duration to protect the workers and the general public from the dangers and hazards of work. I checked and certify that all precautions and minimum safety
equipment highlighted are adequate to protect all workers and the general public. Additional precautions shall be imposed as the exigencies of the work may
require. I have the authority to sign on behalf of and therefore to bind, the corporation/partnership/principal.

Contractor's / Safety Officer's Signature over Printed name Title Date

MAINTENANCE Php: XXX


BOND Php: XXX
ASSESSMENT

CONSTRUCTION Php: XXX


ROAD SIGNS Php: XXX

PASS-THRU Php: 16,800.00 MARSHALS Php: XXX

OTHERS Php: XXX


EVENT Php: XXX
TOTAL Php: 16,800.00
Reviewed /
Approved by: Name Signature Date Remarks
Paid per OR#36281 dtd 8/07/2023. This supersedes permit no.
Finance MIMI C. QUIBAN 08/08/2023
FOR MANAGEMENT USE ONLY

2023-0807-1501.
Subject to the terms and conditions stated in MAPA
Technical FERDIE B. ANTONIO 08/08/2023
clearance
Estate
KARL REYNALD S. REYES 08/08/2023
Engineer
Operation
PHILIP MARCO P. DACANAY 08/08/2023
Manager
Approved by: RECEIVED BY
FOR AND ON BEHALF OF MACEA ESTATE MANAGEMENT Date: Time:
Name:

Company:

PAUL GETTY E. GRANADA Signature:


Authorized Signatory
PROCESSING OF PERMIT : 5 WORKING DAYS
Rev 01 Page 1 of 2
THIS APPLICATION FORM MUST BE SUBMITTED NOT LATER THAN/OR AT LEAST 5 DAYS BEFORE THE START OF WORK
Copy 1 - Applicant Copy 2 - Estate Management Office Copy 3 - Security
THIS PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING TERMS AND CONDITIONS:

b.) Affected traffic signs should be turned-over to MAPA prior to the


1. The work shall be done in the most expenditious manner so as to minimize
installation of road closure.
inconvenience to the public. In this regard, you shall coordinate with MaCEA at
c.) Cleaance from MAPA should be secured prior to the usage or installation
least four (4) hours prior to the actual implementation of the project.
of driveway access.
16.2 For repair/renovation/maintenance of a building affected sidewalk areas:
2. Work shall be done in such a manner as to avoid accidents. Adequate warning a.) The sidewalk should remain safe and freely passable to pedestrian at all
and informative signs (duly approved by MaCEA) for the safety of the general times.
public should be installed and placed such that obstruction is minimized. b.) Removal/disposal of debris shall be the responsibilty of the building
owner/contractor.
3. In the execution of your work, exteme care shall be exercised to prevent 16.3 For power, telecom and other utilities installations:
damage on the existing facilities and/or utilities and all other properties of
MaCEA. Measures should be taken so that concrete and its residue, and other a.) You shall secure Right-of-Way permit from the Ayala Property
construction debris, will not drain into the drainage system. Any damage caused Management Corporation (APMC) prior to the implementation of the
to such properties shall be repaired by you and at your own expense, in project.
accordance to our accepted standards. b.) Work is allowed during Mondays to Saturdays (except holidays) from
9:00 PM to 6:00 AM of the following day and 8:00 AM to 8:00 PM during
4. Upon completeion of your work, you shall leave the area affected by this Sundays and Holidays. c.) No
project free of all excess or waste materials and restore the same to its original service vehicle shall be parked at the work area. Manhole coves should be
neat condition. Excess materials shall be hauled within four (4) hours after the rigidly fastened upon work completion.
completion of the work. You shall notify MaCEA within twenty-four (24) hours 16.4 For road excavations:
after your completion of the project. a.) You shall secure Right-of-Way permit from the Ayala Property
5. Noise generating activities are not allowed from 8:00 PM to 8:00 AM on Management Corporation (APMC) prior to the implementation of the
Mondays to Saturdays and whole day on Sundays and Holidays project.
6. Displaced parking slots shall be coordinated and paid to the Makati Parking b.) Prior to undertaking the work, you shall remit to MaCEA the amount of
Authority (MAPA). (P______________) as payment for the cost of restoring affected areas
7. Personnel capable of handling vehicular traffic should be assigned on a full time (please refer to construction assestment at the front page)
basis to avoid creating traffic problem. c.) Prior to undertaking the work, you shall remit to MaCEA the amount of
(P______________) as deposit (without interest) for the cost of restoring
8. Sewage shall not be permitted to be discharged into the drainage system. other areas may be damaged during the course of the work. (please refer
to bond assestment at the front page)
9. All workers must properly wear their company uniform complete with personal
d.) Upon completetion of your work, excavated areas shall be backfilled at
protective equipment or PPE. Wearing of sanos/sleeveless shirts, slippers/sandals
every 0.20 meter layer with at least 95% compaction, Results of field
and other outfits that do not exhibit proper decency are not allowed outside the
density tests shall be submitted.
construction sites.
e.) As-built plan shall be submitted one (1) week after the completion of the
10. MaCEA's notation on the submitted drawing should be strictly complied with. project.
f.) All conditions on MaCEA's Guidelines for Road Excavations constitute an
11. You shall comply with all existing laws, government regulations and integral part of this permit and should be complied with accordingly.
requirements concerning this project
12. A copy of permit must be kept at the worksite at all times and it must be
presented to MaCEA representatives upon demand. 16.5 For stationing of construction vehicles, transit mixers, trucks or other type of
vehicle or equipment on roadway.
13. Subject to the inspection by MaCEA representative.
a.) The roadway shall be maintained safe/passable to all types of vehicles at
14. This permit may be cancelled or revoked anytime if any of the terms and all times. Total road closure is prohibited.
conditions listed herein are violated. b.) The vehicles and equipment should be confined within one lane of the
15. MaCEA is hereby relieved and released from any and all liabilities and roadway nearest the project site, and should be stationed one vehicle-at-a-
responsibilities from any clamis resulting from your undertaking. time only, in order not to disrupt the normal flow of traffic. No
16. Additional Terms and Conditions: vehicle/equipment may be parked to occupy more than one lane of the
16.1 For lot, sidewalk or road portion temporary enclosure: roadway. Power cables, where necessary, shall be in such a way that it is
safe and will not cause tripping/obstruction to the pedestrians.
a.) The enclosire should be made of good quality G.I. sheets or
c.) For delivery trucks, buses, vans: Engine must be turned off while
plywood, at least eight (8) feet high, structurally sound and
parked/waiting.
luminously painted for the safety and convenience of the general
public. No commercial sign shall be [painted on or attached to the
enclosure.

FORM EN/WP01 Page 2 of 2

AUTHORIZED PLATE NOS.:


RHS-887 NIC-3658 ACA-1169 DAF-3398
NBH-7283 NGF-6634 URI-371 DAF-4825
CBQ-2788 RND-738 URI-361 DAF-7681
CAA-7073 AFA-7479 NBF-4430 CHV-7556
NEQ-2610 NDJ5145 TQE-230 NAP-5254
NBC-4639 CBP-4689 ACA-1170 WOJ-179
RMX-1211 NQY-535 URI-332 NAJ-5999
AFA-8761 NAN-6480 NAW-9278 TCV-419
RLH-355 AIA-4568 NAN-6483 CAX-7056
AFA-7113 AIA-4500 UVQ-175 CAW-9329
NCJ-4798 NAW-9271 NAW-9275 UYQ-630
NID-1790 NAW-9274 AIA-6168 NID-8661
NGT-1211 NAN-6482 DAD-6523 NCC-3640
AAV-5350 NAW-9279 DAD-6520 NDO-2725
AAQ-9816 NBF-4431 DAD-6519 NDF-7266
WBQ-267 NAW-9272 DAF-2185 WWI-761
NBO-9110 NAN-6481 DAF-2187 NFC-7180
CBJ-4044 DAA-1092 DAF-2189 NAS-7951
NDM-5215 NBF-4420 DAF-2193 Y2Z-625

You might also like